Attachment 5 Electrical Engineering



Similar documents
Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Document Comparison. AIA Documents A and A131CMc 2003

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

EXHIBIT "B" CRITERIA AND BILLING FOR EXTRA SERVICES

Document B101 TM. Standard Form of Agreement Between Owner and Architect

THIS AGREEMENT is made effective as of this day of in the year of.

CONTRACTOR GUIDELINES

OWNER-ARCHITECT AGREEMENT FOR DESIGN AND ADMINISTRATION SERVICES

1 OF 7. there will be few "surprises" as the work progresses.

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

How To Write A Contract In The European

Agreement between Owner and Architect

AGREEMENT FOR PROGRAM MANAGEMENT SERVICES WITH SINGLE GENERAL CONTRACTOR DELIVERY (Ocean View Elementary School Project)

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

MASTER AGREEMENT FOR PROJECT THE DEKALB COUNTY BOARD OF EDUCATION. Dated:

PRIME CONSULTANT SERVICES

1 RCNY CHAPTER 100

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

ASBESTOS/LEAD SURVEY AND CONSULTING AGREEMENT BY AND BETWEEN NEW YORK UNIVERSITY / NYU HOSPITALS CENTER - OWNER - AND - CONSULTANT PROJECT

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services

San Antonio Water System Standard Specifications for Construction ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

QSP INFORMATION AT A GLANCE

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

Construction Management Standards of Practice

SAMPLE. CONTRACT FOR PROFESSIONAL SERVICES: Lump Sum by Phase. Federal Identification (I.D.) Number

AIA Document A107 TM 2007

Robla School District

DESIGN & CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT, Made as of (Current Date), In the Year of (Current Year),

Fire Damage Repairs, 2510 Burton Street

203K CONTRACTOR DOC REQUIREMENTS

Document B101 TM. Standard Form of Agreement Between Owner and Architect

AGREEMENT FOR DESIGN/BUILD SERVICES WITH GUARANTEED MAXIMUM PRICE

GEORGETOWN PUBLIC SCHOOLS REQUEST FOR PROPOSALS. Perley Elementary School Roof Replacement Project DESIGN SERVICES

CITY OF LANCASTER RFP NO LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M.

ARCHITECTURAL SERVICES CONTRACT. THIS CONTRACT FOR ARCHITECTURAL SERVICES is made by and between the County of Nueces, hereinafter called County and

Center Unified School District

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

ACG Commissioning Guideline

STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES

Shawnee County ATTN: Bill Kroll 200 SE 7 th Street, Rm B-30 Topeka, KS Phone Bill.Kroll@snco.us

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR

BASE CONSTRUCTION INC

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

SANTA CRUZ COUNTY CRIMINAL DEFENSE CONFLICTS PROGRAM POLICIES AND PROCEDURES

7.4.1 Be required to make exhaustive or continuous on-site reviews;

Retaining Wall Replacement at the Currituck County Veterans Memorial Park

How To Write A Short Form Prime Prime Prime Contract Between A Contractor And Owner

Revised Work Scope Dated April 23 rd, 2015

Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT

COUNTY OF SARPY, NEBRASKA SPECIFICATIONS. VOIP Phones For the. Various County Departments

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

Layton Construction Co., Inc. Quality Management Manual

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

UTAH COUNTY REQUEST FOR PROPOSALS FOR A PROVIDER OF SUBSTANCE ABUSE CASE MANAGEMENT SERVICES FOR THE UTAH COUNTY JUSTICE COURT

This Exclusive Property Management Agreement is entered into by and between, ("Owner") and Executive Home Management, LLC.("Agent").

Section 100 Contractor Quality Control Program

How To Get A Job Done

.ME. Rules for Uniform Domain Name Dispute Resolution Policy (the "Rules") (As approved by domen on November 13, 2015)

MIGHTY MIKE PLUMBING, INC. PLUMBING GENERAL CONTRACTOR SERVICES PROPOSAL

The Consultant is a person or an entity engaged by the Client or the Architect to provide services supplementary to those provided by the Architect.

How To Build A House

CHAPTER 11 APPEALS AND DISPUTES

LOUISIANA CAPITAL IMPROVEMENT PROJECTS PROCEDURE MANUAL FOR DESIGN AND CONSTRUCTION

388 Blohm Ave. PO Box 388 Aromas CA (831) FAX (831) ADDENDUM NO. 1

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS M. D. ANDERSON CANCER CENTER SERVICE PROVIDER for A PROJECT OF LIMITED SIZE OR SCOPE

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri Manchester Road. Des Peres, Missouri 63131

AGREEMENT FOR FINANCIAL ADVISORY SERVICES RELATED TO TAX AND REVENUE ANTICIPATION NOTES (COUNTY KNN PUBLIC FINANCE)

AIA Document A141 TM Standard From of Agreement Between Owner and Design- Builder

IEC Electronics Terms and Conditions

BUYING AGENCY AGREEMENT

MASTER SERVICES AGREEMENT - DIGITAL ADVERTISING SERVICES

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES

JAMS Dispute Resolution Rules for Surety Bond Disputes

Compensation Methods for Architectural Services

Texas Department of Transportation

Belgrade School District No Invitation to Submit Bids For School Accounting, Payroll, and Human Resources Software

RIGHT OF ENTRY PERMIT (For providing Debris Removal on Private Property)

PROPOSAL COVER SHEET

Canterbury Park Pool Chamber Replacement

MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES

GUIDELINES FOR AUGUST 1995

Chapter I. 1. Purpose. 2. Your Representations. 3. Cancellations. 4. Mandatory Administrative Proceeding. dotversicherung-registry GmbH

AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between:

COMPLIANCE WITH LAWS, CODES, AND STANDARDS

Transcription:

A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or his/her designated representative and a review of an existing schematic layout of each project. 2. Review the progress and content of the drawings and cost estimate every two (2) weeks in meetings with the COUNTY, and prepare brief minutes thereof. CONSULTANT must monitor and keep COUNTY informed regarding the impact of design issues on the project budget. Upon the request of the COUNTY, CONSULTANT shall incorporate into the design such reasonable design and operations changes as the COUNTY deems appropriate as a result of the COUNTY s review processes and impact on the project budget or opinion of probable construction cost. If CONSULTANT disagrees with the COUNTY s request, such disagreement must be registered in writing and the COUNTY will attempt to reconcile such disagreement. If it is impossible to make reconciliation, the written disagreement will become part of the project s record. However, CONSULTANT shall then comply with the COUNTY s request. 3. Confirm existing building systems, including electrical, mechanical, plumbing, communications, telephones, and computers through visual observations, review of record documents, and discussions with the General Services Department Building Maintenance Superintendent, as applicable for a specific project. CONSULTANT shall not be responsible for unknown conditions that could not be reasonably identified through the methods described herein. (COUNTY's floor plans provided to CONSULTANT may not have all exact wall locations and functions shown on plans.) Field review of the improvement area and associated electrical room and panels is mandatory. 4. Design the project to conform with the requirements of the Office of Statewide Health Planning and Development (OSHPD), California State Fire Marshal (CSFM) and Board of Corrections (BOC) and/or other jurisdictional building officials, as applicable to a specific project, and the requirements of applicable building, seismic, and health codes applicable to all projects. 5. Prepare a detailed design development (preliminary) opinion of probable construction cost which shall identify the construction components, building systems, and requirements of the project. 6. The opinion of probable construction cost shall be projected to the midpoint of the probable construction period and include material and labor unit costs, overhead, profit, insurance, taxes, general requirements, supervision, and difficulty factors, and be submitted in the Construction Specifications Institute/Uniform Construction Index (CSI/UCI) format. 7. The opinion of probable construction cost shall identify escalation and design Page 1 of 8 Pages

contingency amounts, which must be approved by the COUNTY. B. Phase 2, Construction Documents: The CONSULTANT shall: 1. Prepare the final working drawings from the design development (preliminary design), as modified by the COUNTY, on 24" by 36" sheets and technical specifications on 8-1/2" by 11" pages setting forth in detail the work to be done, the materials, workmanship, finishes, and equipment required for the electrical and other components of construction necessary to provide the COUNTY a complete and functional project for its intended purpose within the requirements of this Agreement. The COUNTY will prepare the COUNTY's standard plan title sheet. 2. Keep COUNTY abreast of design's impact on the project budget. Upon the request of the COUNTY, CONSULTANT shall incorporate into the design such reasonable changes as the COUNTY deems appropriate as a result of the COUNTY'S review processes and impact on the project budget or opinion of probable construction cost. Assist COUNTY in developing base bid and additive bid item schedules. 3. Review, comment, and/or make recommendations on the form and content of the COUNTY's General Conditions, Special Conditions, and Bid Form as they apply towards this project. 4. In addition to the technical specifications, prepare special or supplemental conditions for the construction contract. The COUNTY will package the CONSULTANT's documents with the COUNTY's approved General Conditions, Notice to Contractors calling for bids, the Bid Form, and related documents to complete the construction contract and bid specifications. Specifications for asbestos abatement, if required for a specific project, shall be incorporated by the COUNTY into the bid package. 5. Submit to the COUNTY the projected and final construction opinion of probable construction cost in the CSI/UCI format for the base bid work and alternate bid items. The opinion of probable construction cost shall be projected to the midpoint of the scheduled construction period to be scheduled by the COUNTY. Differences between the design development (preliminary) and final opinion of probable construction cost shall be explained in writing. 6. Verify the reasonableness of the estimated construction period for construction contract bidding purposes as provided by the COUNTY Representative and identify long delivery times of materials and equipment which will control length of construction contract. 7. Include alternate bid items (preferably additive), not as separate design drawings but incorporated into the original construction drawings, to allow construction element Page 2 of 8 Pages

choices or cost options by the COUNTY. The basis of award may be on the base bid only, or the base bid plus additive alternates. Additive bid items may be necessary so that the COUNTY will be able to award a contract not exceeding available construction funds. 8. If required for the construction of a project, propose and submit a recommended testing and inspection list for materials identifying type, quantity, frequency, schedule, and cost estimate of tests to be performed by an independent testing firm during construction. 9. Submit progress originals and final originals of the plans, specifications, and opinion of probable construction cost to the COUNTY for reproduction by the COUNTY seven (7) days in advance of the final design presentation. 10. If required by approval agencies, such as OSHPD, CSFM and BOC, for the construction of each project, submit to the COUNTY in the appropriate agency forms, project background information and recommended testing and inspection list for materials to be used for each project identifying type, quantity, frequency, and schedule. Submit required numbers of sets of plans, specifications, and other documents required by approval agencies to the COUNTY. 11. Modify plans as required to obtain plan check approval. (The OSHPD building permit form shall be completed by the COUNTY, as assisted by the CONSULTANT.) 12. Deliver to the COUNTY, two (2) weeks prior to the advertising date (which will be determined by COUNTY), the final completed original drawings and specifications for COUNTY printing and distribution of bid sets to interested contractors. The original drawings and specifications index sheet shall be stamped and signed by the CONSULTANT and subconsultants' license numbers and renewal date and/or signed in accordance with the California Business and Professions Code. 13. Submit a list of general and specialty contractors who may be interested in bidding on this project. 14. Attend the pre-bid conference scheduled by the COUNTY. 15. Submit to the COUNTY for review and approval any addenda deemed necessary. Addenda, if any, shall be submitted no later than seven (7) working days prior to the scheduled bid opening. 16. Assist the COUNTY in evaluating the base bids and alternate bid items received. 17. Delete or otherwise change portions of the construction work at the request of the County if the lowest bid proposal for the construction contract exceeds the COUNTY approved opinion of probable construction cost (which will include the CONSULTANT's design contingency amount approved by the COUNTY) by 10% or more, and if the Page 3 of 8 Pages

COUNTY rejects all bids. The CONSULTANT shall revise the plans and specifications to comply with such modifications and shall assist the COUNTY in obtaining new proposals from contractors at no additional cost to the COUNTY. Modifications shall be completed on a time schedule commensurate with the scope of the change and as set forth by the COUNTY. C. Phase 3A, Construction Observation: The CONSULTANT shall: 1. Attend the preconstruction conference scheduled by the COUNTY. 2. Provide construction observation including but not limited to: a. Making recommendations to the COUNTY on all claims of the COUNTY or construction contractor (hereinafter called "CONTRACTOR") and all other matters relating to the execution and progress of work, including interpretation of the CONSULTANT's contract documents. b. Except for color boards, within seven (7) working days of COUNTY's request, reviewing and making recommendations for samples, schedules, shop drawings, and other submissions for general conformance with the design concept of the project and for general compliance with the plans and specifications and information given by the CONSULTANT's contract documents and as directed by the COUNTY representative. c. Within two (2) working days of COUNTY's request for information (RFI), responding to the COUNTY Construction Engineer or CONTRACTOR, through the COUNTY Construction Engineer with information and/or drawings needed from CONSULTANT in order to clarify the intent of the construction contract plans and specifications of the project. CONSULTANT shall review CONTRACTOR's cost proposals for all change orders associated with any additional work as may be necessary by the RFI clarification. d. Recommending and assisting in the preparation of necessary change orders, with supporting documentation, calculations and opinion of probable construction cost, for review and issuance of change orders by the COUNTY Construction Engineer to obtain appropriate agency acceptance and approval. Where the change order arises as a result of an error or omission of the CONSULTANT, the CONSULTANT shall not be compensated as an extra service for time spent or cost incurred in efforts connected with the correction thereof. Any changes to the construction contract shall be made only with written COUNTY approval. (1) Drawings and work necessary to delineate the COUNTY's changes in scope of the construction contract or to make modifications as directed by the Board of Supervisors shall be made as directed by the Construction Engineer and shall be compensated as an Extra Service. Page 4 of 8 Pages

(2) Where the change order arises as a result of an error or omission of the CONSULTANT, the CONSULTANT shall not be compensated as an Extra Service for time spent or cost incurred in efforts connected with the correction thereof. The costs of rework of installed work shall be assessed upon the CONSULTANT's contract payments. (3) Any changes to the construction contract shall be made only with written COUNTY approval. 3. Assisting COUNTY, at COUNTY's express, written authorization, with any claim resolution process involving CONTRACTOR and COUNTY as specified hereunder, including serving as a witness in connection with any public hearings or legal proceeding, including dispute resolutions required by law. The parties recognize that this clause is provided as a means of expediting resolution of claims among the CONTRACTOR, COUNTY, and CONSULTANT. However, it is understood the CONTRACTOR is not an intended third party beneficiary of this clause. Compensation for these services under this paragraph, number 3, shall be provided under the Extra Services provisions under Article V., Section B. and Article V., Section C. of this Agreement and shall be computed and invoiced at hourly rates, not to exceed CONSULTANT's normal and customary hourly rates for such services, to be negotiated with COUNTY at the time COUNTY authorizes these services, subject to the following: a. COUNTY may believe that CONSULTANT's work under this Agreement is connected with errors, or omissions, or problems related to a claim. As a result and upon notice of same by COUNTY, CONSULTANT's payment request for such extra services shall be held in suspense by COUNTY until final determination in accordance with Article IX, "Errors or Omissions Claims and Disputes" of this agreement, or by a court of law of the proportion that CONSULTANT's fault bears to the fault of all parties concerned. b. Such amounts in suspense, proportionate to the final determination that CONSULTANT's fault bears to the fault of all parties concerned, shall not be paid to CONSULTANT. However, the remainder of such amount held in suspense shall be paid to CONSULTANT when after a final determination in Accordance with Article IX, "Errors or Omissions Claims and Disputes" of this agreement, or by a court of law, is made, CONSULTANT submits a proper invoice to Department of Public Works and Planning, which shall have a maximum of five (5) working days to evaluate and approve the invoice before submitting it to the COUNTY Auditor-Controller/Treasurer-Tax Collector, who shall have an additional forty (40) calendar days from receipt of invoice to issue payment. Page 5 of 8 Pages

4. At intervals appropriate to the stage of construction, or as otherwise deemed necessary by CONSULTANT, visit the site of the project as necessary to become familiar generally with the progress and quality of the work and to determine that the work is proceeding in general accordance with the contract documents. CONSULTANT shall not be required to make exhaustive or continuous on-site inspections but shall give direction to the Construction Inspector as hereinafter more specifically provided. CONSULTANT shall not be responsible for the CONTRACTOR's failure to carry out the construction work in accordance with the contract documents, however, CONSULTANT shall immediately advise the COUNTY Representative of any known or observed deviation from the contract documents. 5. During the CONSULTANT's visits to the site, keep the COUNTY informed through written reports as to the progress of the work, endeavor to guard the COUNTY against defects and deficiencies of the work of contractors, and may recommend that the COUNTY reject work as failing to conform to the contract documents. 6. Conduct site visits which shall include but not be limited to on-site inspections to determine the dates of substantial completion and final completion and to recommend acceptance to the COUNTY, for the filing of the notice of completion and issuance of final certificate for payment. 7. Submit to COUNTY "verification" and "change order" forms required by OSHPD during construction. 8. Conduct a "project shakedown" and staff orientation for the completed project. 9. Review and forward two (2) copies of Operations and Maintenance Manuals to be furnished by the CONTRACTOR. 10. Inform the COUNTY of all written guarantees required of the CONTRACTOR by the CONSULTANT's technical specifications or special conditions. 11. Return to COUNTY all plans borrowed from COUNTY by CONSULTANT. 12. Require through the construction contract specifications that blueline "record drawings" be prepared by the CONTRACTOR and submitted to the COUNTY for acceptance by the construction inspector and CONSULTANT. However, upon completion of the project, CONSULTANT shall transfer the CONTRACTOR's "record drawing" changes onto the CONSULTANT's original drawings or.003" mylar (matte one or both sides) reproducibles of the original drawings. The complete "record drawing" set shall remain at all times the property of the COUNTY. Changes shall be identified by cloud markings and shall identify date of change and its source, such as from addenda, change order, or clarification. 13. If construction plans have been prepared with a CAD system, record drawings in the form of.dxf or.dwg files shall be furnished and delivered to Department of Public Works and Planning in addition to mylar reproducibles. Such.dxf or.dwg files shall be Page 6 of 8 Pages

furnished on 100MB Zip disks, 3.5" DS/HD disks, or compact disk (CD-ROM). 14. Participate fully, aligned with and not adverse to the interests of the COUNTY, upon request, in the early settlement discussions of construction claims resolution issues. In the event such participation is requested of CONSULTANT, CONSULTANT shall be paid for such services as provided under the Extra Services provisions under Article V., Section B. and Article V., Section C. of this Agreement for the time spent in such participation. All provisions of Article III., Section C., Paragraph 3. of this Agreement shall apply to CONSULTANT's participation in any early settlement discussions required by this Section. Participation in this process does not preclude the COUNTY's right to make an error and omissions claim against the CONSULTANT. 15. No final payment to the CONSULTANT will be issued until the services of this Phase has been performed and errors and omissions attributed to the CONSULTANT have been resolved. D. Phase 3B, Construction Inspection: 1. COUNTY may not have sufficient staff available at the time of construction to provide onsite construction inspection or construction testing required to ensure the CONTRACTOR's compliance with construction plans and specifications. At the sole option of COUNTY, and upon written authorization and direction as to scope of services, CONSULTANT may be required to perform construction inspection and construction testing services for the Capital Projects. It is understood that COUNTY may delete any or all of construction inspection and construction testing from CONSULTANT's services at any time prior to award of the construction contract and perform the construction inspection and testing with its own forces. 2. The CONSULTANT shall: a. Provide an Inspector Of Record (IOR) who will provide full time or part time inspection of the projects, as agreed in writing by the CONSULTANT and the COUNTY. The IOR shall be completely familiar with the project plans and specifications and knowledgeable and experienced in the type of construction involved. b. Provide all quality control testing required during construction. The testing shall be performed by a qualified, certified testing laboratory. 3. Based upon his/her observations of the progress of construction and the CONTRACTOR's application for payment, and the IOR's recommendation, determine on a monthly basis, the amount owing to the CONTRACTOR under the contract documents and shall recommend, through appropriate certificates, payments on such amounts. Such certificates shall constitute a representation to the COUNTY that the work has progressed to the point indicated and that to the best of the CONSULTANT's knowledge information and belief, the quality of the work is in accordance with the contract documents. Page 7 of 8 Pages

Page 8 of 8 Pages