CITY OF SELMA, TEXAS Inspection Checklist: Commercial

Similar documents
Mobile Home Pre-Inspection Checklist

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

C I T Y O F P E A R S A L L

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Vision Home Inspection

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Mark Cramer Inspection Services, Inc.

Residential Building Permits Information

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package

HomeSpec REPORT SUMMARY

Additions and Alterations

Pre-Drywall Inspection Report

Lighthouse Engineering, L.L.C.

RESIDENTIAL/COMMERCIAL

RESIDENTIAL SITE INSPECTIONS

PDmB, Inc. Definitions

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

Development Services Guidelines

How To Repair A Boat Landing Deck With A Boat Bed

Chapter 7 Plumbing Connections

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

Residential Foundations and Basements

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Building Code Inspections and Fees

State of Connecticut Department of Public Health RADON PROGRAM

Excerpts from the Canadian National Building Code (NBC)

Walls. Add Strength and Water Resistance When Repairing Your. Replace damaged framing members when walls are open

Patio Covers / Carports

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Page & Turnbull imagining change in historic environments through design, research, and technology

PLUMBING ROUGH IN INSPECTION

Uniform Construction Code (UCC) Building Permit Application Package

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

HEDDERMAN ENGINEERING, INC. Office , Fax

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

SECTION FACILITY STORM DRAINAGE PIPING

Superform Products Ltd.

Residential Inspection Guidelines

October 5, 2015 Dear Client,

Inspection Item COMMENTS

City of Fort Smith Building Permit Process Frequently Asked Questions

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Proposed Minimum Subterranean Termite Treatment Standards

The minimum reinforcement for the stem wall is the placement of:

Town House Center Highway North Huntingdon, PA 15642

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

Elevating Your House. Introduction CHAPTER 5

BUILDING PERMIT SPECIFICATIONS

Development Services Guidelines

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

Residential Plan Routing Information

March 14, Installation of Bay, Bow and Garden Windows

Sewage Compliance Form Instructions

2006 Codes. Please verify the following before calling for inspection

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

I NI NP R Inspected Items

Sample Drawing Package for One and Two Family Dwelling Applications

6 RETROFITTING POST & PIER HOUSES

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

INSTALLATION OF A BAY WINDOW

Building Construction and Development in Norristown: A User s Guide to the Land Development and Building Permit Process 1/25/11

Engineered Wood Foundations

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

ELIGIBLE REPAIR PROJECT PARAMETERS

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)

Rehab Inspection Report Page 1

Home Inspection Report

City of Hill Country Village Residential Construction/Development Packet

LS 2540 SEWER LATERALS AND INSPECTION TEES

City of Shelbyville Site Inspection Checklist

4 Installation Requirements

COMMONLY USED RESIDENTIAL BUILDING CODES

Bureau Veritas Contact Information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

EAST LYME HIGH SCHOOL

Single Family Residential Building Permit Questions & Answers

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Top 10+ Mistakes of DWV plumbing design

PROPERTY INSPECTION REPORT

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

MOBILE HOME SERVICE REQUIREMENTS GAS

Transcription:

Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides inspections of construction projects. These inspections act as an additional set of eyes to help assure that the construction is in compliance with the design, applicable codes, and city ordinances. The city does not take responsibility for the construction being in compliance with the design. The responsibility for correctness lies with the contractor. If construction is found to be non-compliant with the design at any time, even after inspection and/or occupancy, it is the responsibility of the builder to correct the construction deficiency. Construction documents often do not specify every detail of construction. This inspection checklist provides information to the builder about the city s expectations in specific inspections. Detailed inspection requirements are found at the end of this document. It contains information that should be transmitted down to the people doing the work. Please make sure that everyone needing this information is aware of the requirements. For scheduling inspections and for additional information that may not be found in this guideline, contact Traci White, Permits Administrator, at telephone number (210) 651-7827. The Permits and Inspections office is located at the Selma Municipal Offices, 9375 Corporate Drive, Selma, Texas 78154. This checklist will be updated as needed. The checklist that is in effect at the time your permit is pulled will be the applicable revision of the checklist. Changes to previous revisions will be in bold italic. Scheduling Guidelines The inspections department will make every effort to establish a relationship with contractors based on cooperation, with the understanding that cooperation must be mutual. Document SPID-4 Rev Y71004 Page 1 of 8

On our part, we ask for one day notice within a window ending at 12 pm on any day. In other words, an inspection called in before 12 pm will be scheduled for the next day. On your part, please do not call in inspections until the work is ready to be inspected or you are absolutely certain that it will be ready when the inspector arrives. This document will help you know what the city s requirements are, so there should be few questions about what ready is. If the inspector arrives to find a job-site not ready, no inspection will be done (we can not do partial inspections ), and a re-inspection fee will be assessed. The inspection may be re-scheduled no less than 48 hours later. Inspections that have legitimate failures can be rescheduled for 24 hours later. If the failed items have not been found to be corrected at the re-inspection, the second re-inspection may be scheduled no less than 48 hours later. Skipped Inspections It is very important that the builder keep his copy of each inspection report (see At the Job Site, below). Each inspection point must have a passing inspection report before further inspections will be done. Construction that continues past an inspection point without a passing inspection report can be a very serious problem. Various actions can be taken, including uncovering or making easily accessible those areas needing inspection or re-inspection, tearing out and redoing the work, a $500 penalty, and/or a notification to the client advising him of the negligence on the part of the builder. Re-inspection Fees The first re-inspection fee is $35, the second re-inspection fee is $50, and the third (and later) re-inspection fee is $75. Re-inspection fees can be paid at the Permits and Inspections office. Document SPID-4 Rev Y71004 Page 2 of 8

Before the Certificate of Occupancy Before the final inspection, the job file will be reviewed to make sure that there are no other areas that need attention, such as dumpster balances due, reinspection fees not paid, sewer or water fees due, or similar items needing closing, on this or any other project current or complete with the contractor. Failure to resolve these items will result in the city refusing any more permits or inspections to the builder until the items are closed. The plan container tube (see At the Job Site, below) must be returned to the city or replaced before a Certificate of Occupancy will be issued. At the Job Site Construction plans for inspections being done must be available at the job site. A plan container (a PVC tube, capped at each end) will be supplied by the city that can stay at the job site and be used to store the drawings. This tube will also be used for all document transmittals between the contractor and the city, including inspection reports, data sheets, manufacturer s instructions, etc. As applicable to the job and the inspection, the plans must include: Site plan Site Work, including utilities and storm water drainage Flatwork (all concrete work, including dumpster pads) Foundation Building construction (frame, plumbing, electrical, and mechanical) Energy compliance worksheet (MecCheck) Signage Inspections As applicable, the following inspections must be scheduled and passed: 1. Site a. Site plans must be available. c. Property pins must be visible and clearly marked. d. Batter boards must be erected and in the proper location. Document SPID-4 Rev Y71004 Page 3 of 8

e. Foundation site must be scarified (scraped clean of all organic material by removing either a minimum of the top 6 of preconstruction soil, or down to solid rock). 2. Utilities a. Utilities plans must be available. c. Every hose bib that is installed must have a vacuum breaker. d. Water main connections involving valves, changes in direction, or similar situations that must anchor against thrust must be equipped with both megalugs and thrust blocks. e. Open trench, pipe or conduit must be in trench on sand to proper depth, and sand available for cover. Alternately, in very good soil, sand may not be required, but yellow tape tell-tale shall be buried 12 above the utility 3. Building drain (sewer) rough c. Ten foot standpipe at high point must be filled no less than 1 hour before the inspection. Leave the standpipe in place and full (re-fill, if necessary) until after the foundation pre-pour inspection is passed. An air test at 5 psig is acceptable. d. Slopes must be correct. e. Pipe marking / identification must be up and visible. f. All drains must be exposed. g. Building drain must be sleeved with pipe 2 pipe sizes larger than drain, and held centered in that sleeve, where the drain penetrates the exterior beam. h. DO NOT connect the building drain to sewer main until the end of the construction. This connection must be inspected by the city before covering it up. 4. Plumbing and underground electrical rough c. Every hose bib installed must have a vacuum breaker. d. Pipe passing through interior concrete beams or a concrete slab or floor must be wrapped with a minimum of 32 mils of poly (6 wraps of 6 mil poly). Document SPID-4 Rev Y71004 Page 4 of 8

e. Pipe passing through the perimeter beam must be sleeved and held centered in a pipe sleeve two pipe diameters larger than the sleeved pipe. f. Potable water lines, electrical conduit, condensation lines, and T&P drains must be located per plans. g. Copper and PEX water lines must be sleeved with poly sleeves designed for that purpose. 5. Foundation pre-pour a. Inspections must be performed by the city s inspector and the engineer (or an authorized agent of the engineer). It is preferable that the engineer and the city s inspector perform the inspection at the same time. b. Foundation plans must be available. c. Address must be visible from street. d. Copy of engineer s inspection report must be provided to the city. e. Dimensions must be correct. Overall dimensions Square Beam depth Beam width f. Reinforcement must be correct. g. Sufficient chairing must be in place. h. Beams must be dry. i. Steel must be a minimum of 2 from dirt or poly. j. Moisture barrier must be 6 mil minimum (or per design) poly, taped at seams and reasonably free of holes. 6. Frame c. The rough opening of wood framed exterior doors shall be blocked and nailed as illustrated on the last page of this guide. d. Exterior sole plates 12 long and shorter may have only one anchor that is roughly centered. Sole plates 12 84 long must have two anchors, 3 6 from each end. Sole plates longer than 84 must have anchors no more than 6 feet apart. Splices (in-line or at corners) must have anchors within 6 of the splice. Document SPID-4 Rev Y71004 Page 5 of 8

e. Straps are an acceptable substitute for anchor bolts, but must be installed per manufacturer s instructions. Manufacturer s instructions must be available on the job site. f. All shavings, wood chips, sawdust, and debris must be cleaned from the sole plates and the area adjacent the sole plates. g. Roof sheathing must have either plywood clips or a physical gap between sheets unless tongue-and-groove sheathing is used. h. Brick ties must be in place at the time of frame inspection. i. Sheetrock and insulation may not be installed until this inspection is passed. 7. Electrical rough c. Nail plates must be installed where needed. 8. Plumbing top-out c. Every hose bib installed must have a vacuum breaker. d. All vent pipes must penetrate the roof and be to their full height. e. DWV pipes must be air tested to 5 psig or filled with water to highest point. f. Water pipes must be tested to 90 psig. g. Pipes must be insulated in appropriate areas. h. Gas lines must be tested at a minimum of 10 psig for 15 minutes. i. Gas lines must be separated from electrical lines by insulation that is additional to the non-metallic sheathing on the Romex. j. All gas shut-offs must be easily accessible. 9. Mechanical c. Ducts must be installed with size, UL listing, and R factor marking down and visible from below. Ducts not factory marked with the size shall be field marked at both the plenum and register ends. d. Duct joints must be completely sealed. e. Ducts must be supported such that there are no sags or bellies, but no more than 6 between slings in any case. 10. Insulation a. MecCheck must be available. Document SPID-4 Rev Y71004 Page 6 of 8

b. Plans must be available. c. Address must be visible from street. d. Insulation must be not compressed. Insulation must be cut around wires, plumbing, and electrical boxes. e. Poly-seal around doors, windows, and at corners. Stuffed insulation may not be substituted for poly-seal. f. Insulation must be up against interior surface that is being insulated. Garage ceiling insulation must be supported to be against a floor that may be above the garage. Plumbing wall insulation must be against the interior wall. g. Blown insulation data sheet must be in attic near the attic access door. h. Vertical penetrations must be poly-sealed. 11. Flatwork a. No construction design plans are required to be on site for driveways or sidewalks, because design guidelines are the same as those in San Antonio. However, site plans showing the location of driveways and sidewalks must be on site. b. Other flatwork, such as transformer pads and dumpster pads, must have construction plans on site. c. Reinforcement must be sufficiently chaired. d. Mesh reinforcement must be mat, not roll. e. New concrete poured next to existing concrete (such as a sidewalk adjacent to a slab) must be doweled 16 O.C. f. Expansion joints must be smooth-doweled and installed straight to allow relative movement. 12. Irrigation a. Irrigation plans must be on site b. Call for irrigation open trench inspection when system is completely ready to be covered up. c. Irrigation trenches must be a minimum of 12 deep. d. All pipes must be bedded in a minimum of 2 of clean material such as sand. e. There must be a minimum of 3 of sand bedding and cover if rocks are present. Document SPID-4 Rev Y71004 Page 7 of 8

f. Pipes crossing under driveways or sidewalks must be sleeved with pipe 2 pipe sizes larger than the irrigation pipe. g. Rain sensors must be installed. h. Backflow preventer (double check type) inspection report must be left in the BFP box or in the plan container. 13. Final a. All functional items of the building project will be checked, including electrical, plumbing, mechanical, and irrigation. b. Cosmetic items that are not complete, including landscaping, will be accepted only with written acceptance of incomplete work by the owner. In this case, a temporary Certificate of Occupancy may be issued at the discretion of the Permits & Inspections department. Document SPID-4 Rev Y71004 Page 8 of 8