How can we improve Aircraft Industry using Configuration Management?



Similar documents
What kind of tools are needed for Configuration Management in Aircraft Industry?

How is Configuration Management in Aircraft Industry implemented?

Sales Management Main Features

ANIMA: Non-Conventional Interfaces in Robot Control Through Electroencephalography and Electrooculography: Motor Module

Present & Future of A400M Services 23/05/2013

CHAPTER 7 Software Configuration Management

A. Before you read the text, answer the following question: What should a family do before starting to look for a new home?

How To Know If An Ipod Is Compatible With An Ipo Or Ipo (Sanyo)

Sympa, un gestor de listas de distribución para las universidades

5.2 A Software Process Improvement Solution for Small and Medium-Size Enterprises

PROCEDIMIENTOPARALAGENERACIÓNDEMODELOS3DPARAMÉTRICOSA PARTIRDEMALLASOBTENIDASPORRELEVAMIENTOCONLÁSERESCÁNER

Adaptación de MoProSoft para la producción de software en instituciones académicas

LA HOMOLOGACIÓN DE ESTUDIOS EN LA COMUNIDAD EUROPEA: PERSPECTIVAS DESDE EL PUNTO DE VISTA DEL TRABAJO SOCIAL

Verbos modales. In this class we look at modal verbs, which can be a tricky feature of English grammar.

El concepto 360+ nace de la propuesta de unir ambientes dentro de un mismo espacio, sin renunciar a sus diferentes necesidades.

Entrenamiento a Embajadores Ambassador training

Cambridge IGCSE.

VMware vsphere with Operations Management: Fast Track

Organizational agility through project portfolio management. Dr Catherine P Killen University of Technology, Sydney (UTS)

Resumen de Entrevista: Asociación de Agentes de Aduana del Puerto de Manzanillo

Technical Writing - A Guide to ERC and Programmes

SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK

PA (Process. Areas) Ex - KPAs

An Example of Using Key Performance Indicators for Software Development Process Efficiency Evaluation

IBM Rational Dónde estamos? Adónde vamos?

Varieties of Governance: Effective Public Service Delivery Workshop September, 2011 Paris, France. Cecilia Llambi...

New Server Installation. Revisión: 13/10/2014

BDL4681XU BDL4675XU. Video Wall Installation Guide

Electrician Application -- INSTRUCTIONS -- PLEASE READ CAREFULLY

BtoB MKT Trends. El Escenario Online. Luciana Sario. Gerente de Marketing IDC Latin America 2009 IDC W W W. I D C. C O M / G M S 1

Spanish Grammar II. Tierra Encantada Charter School. Contact Number: (505)

How To Teach A Security Manager

Susana Sanduvete-Chaves, Salvador Chacón-Moscoso, Milagrosa Sánchez- Martín y José Antonio Pérez-Gil ( )

Components Based Design and Development. Unit 2: Software Engineering Quick Overview

Plumbers and Irrigators INSTRUCTIONS -- PLEASE READ CAREFULLY

Phase planning today. Planificación por fases ahora. Phase planning today. Steve Knapp* 1, Roberto Charron*, Gregory Howell*

Pedro Arriagada S. Ph.D. Professor Business Economics Universidad del Desarrollo. Case Study. October 2010

INTELIGENCIA DE NEGOCIO CON SQL SERVER

Guidelines for Designing Web Maps - An Academic Experience

An approach to extend NDT in the development of Web Applications into Services based organizations

DIGITAL SIMULATION USED TO EVALUATE SELF-LEARNING APPLICATIONS AND ITS USERS José Maclovio Sautto Vallejo 1, Universidad Autóma de Guerrero

Software Engineering. What is a system?

Información Importante

Equity and Fixed Income

ICAO State Safety Programme (SSP) Introduction

Secure Architectures for a Three-Stage Polling Place Electronic Voting System

The Design and Improvement of a Software Project Management System Based on CMMI

Memorial Health Care System Catholic Health Initiatives Financial Assistance Application Form

Software Engineering Introduction & Background. Complaints. General Problems. Department of Computer Science Kent State University

Strategies to Reduce Defects in Floor and Wall Tiles; Application of Continuous Improvement Processes

Comments on Draft OECD/IOPS Good Practices on Pension Fund s Use of Alternative Investments and Derivatives

Revista Facultad de Ingeniería Universidad de Antioquia ISSN: Universidad de Antioquia Colombia

CUSTOMER ENGAGEMENT & COMMERCE PORQUE EL CAMINO & EL RESULTADO IMPORTAN

LINIO COLOMBIA. Starting-Up & Leading E-Commerce. Luca Ranaldi, CEO. Pedro Freire, VP Marketing and Business Development

A new MDA approach based on BPM and SOA to improve software development process

Skills Development Matrix

CONCEPTS OF INDUSTRIAL AUTOMATION. By: Juan Carlos Mena Adolfo Ortiz Rosas Juan Camilo Acosta

CONDITIONAL CLAUSES TIPOS PROP. CON IF / UNLESS. PROPOSICIÓN PRINCIPAL Will + verb ( = ll + verb) Modal (can, may, ) + Verb EJEMPLOS

Pipefitters, Refrigeration Techanicians, Sheet Metal and Fire Protection Sprinkler Fitter Application INSTRUCTIONS -- PLEASE READ CAREFULLY

How To Improve Environmental Education In The Galespaagos

Didactic training using a CNC lathe designed in a virtual environment

A Patient-Driven Model of Electronic Medical Record for Homeless Patients in Puerto Rico

2013 ASIS PUERTO RICO CHAPTER Inc. PRESENTS: 2013 SECURITY PROGRAM DESIGN 2-Day Program

Una vida asombrosa (An Amazing Life)

How To Manage A Distributed Application

Ingeniería de Software & Ciclos de Vida. Luis Carlos Díaz Miguel Torres Julián Rodriguez

What is the Common Problem that Makes most Biological Databases Hard to Work With, if not Useless to most Biologists?

Software Project Models

Product Lifecycle Management in the Food and Beverage Industry. An Oracle White Paper Updated February 2008

VaughanTown. Newsletter 5:...Last Words. Last Words and Recommendations Last Reminder Meeting point map.

Ask your child what he or she is learning to say in Spanish at school. Encourage your child to act as if he or she is your teacher.

Dave Rojas. Summary. Experience. Software Engineer - Web Developer & Web Designer davejrojas@gmail.com

Spanish GCSE Student Guide

1.- NAME OF THE SUBJECT 2.- KEY OF MATTER. None 3.- PREREQUISITES. None 4.- SERIALIZATION. Particular compulsory 5.- TRAINING AREA.

Lifecycle Models: Waterfall / Spiral / EVO

DIPLOMADO DE JAVA - OCA

Software Maintenance Capability Maturity Model (SM-CMM): Process Performance Measurement

Curriculum Reform in Computing in Spain

Software Configuration Management Plan

Project AGUA Survey Results

Bucle for_in. Sintaxis: Bucles for_in con listas. def assessment(grade_list): """ Computes the average of a list of grades

New words to remember

Versión precedente* Lista productos disponibles** Disponible desde el June 1, 2013

AP SPANISH LANGUAGE 2013 PRESENTATIONAL WRITING SCORING GUIDELINES

Service Catalog Management: A CA Service Management Process Map

System Software Product Line

Govern IT! Possible ways for R+D+i on Computer and Management Sciences, together

Ensuring Reliability in Lean New Product Development. John J. Paschkewitz, P.E., CRE

OPTIMISING PROCESSES OF IT ORGANISATION THROUGH SOFTWARE PRODUCTS CONFIGURATION MANAGEMENT

The Role of CM in Agile Development of Safety-Critical Software

El modelo estratégico de los canales de. contacto con el cliente dentro de los objetivos. de calidad y rentabilidad

MKS Integrity & CMMI. July, 2007

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

GREPECAS Project G3. Implementation of the Quality Management System in AIM units. (Presented by the Secretariat) SUMMARY

Copyright TeachMe.com 4ea67 1

THE DEVELOPMENT OF SOCIAL WORK EDUCATION IN SPAIN. Dr. Francisco Gómez Gómez Dr. Félix Herrador Buendía Universidad Complutense de Madrid

Requirements to obtain a Mexico Charter Blanket Permit FOR CARGO, AIR AMBULANCE OR PASSENGER

The word Kaizen is a Japanese term

Adapting the Spencer model for diffuse solar radiation in Badajoz (Spain)

How To Write A Report On A Drug Company

Transcription:

Seventh LACCEI Latin American and Caribbean Conference for Engineering and Technology (LACCEI 2009) Energy and Technology for the Americas: Education, Innovation, Technology and Practice June 2-5, 2009, San Cristóbal, Venezuela. How can we improve Aircraft Industry using Configuration Management? Félix Calvo Narváez Universidad Politécnica de Madrid, Madrid, España, felix.calvo@upm.es Carlos Rodríguez Monroy Universidad Politécnica de Madrid, Madrid, España, crmonroy@etsii.upm.es RESUMEN Apenas existe literatura sobre el empleo de Gestión de Configuración (CM) en la Industria Aeronáutica. Sin embargo, puede resultar muy útil en el momento actual, en que la complejidad para hacer aviones es creciente y la aplicación de CM resulta muy apropiada. Las piezas de la aeronave se fabrican en países distintos, incluso se montan las mismas piezas en países y factorías distintas. Los diseños en materiales distintos y cada vez más ligeros, no hacen sino incrementar la complejidad, y además se le une que los clientes solicitan versiones muy diferentes del mismo modelo, que son cambiantes con el transcurso de los años. El objetivo principal del trabajo es indicar las áreas de mejora futura en los procesos actuales donde CM puede ser útil, así como mostrar las posibles tendencias a la vista de los desarrollos que va marcando la industria aeronáutica. Por otro lado, también hay que hablar de los riesgos que conlleva. CM es una disciplina que nace de la necesidad de asegurar el control en los complejos procesos de relaciones. El estudio recomienda trabajar en paralelo en el tiempo ahorrado es una cuestión importante. Varias organizaciones de iniciar el trabajo con información avanzada (o varias propuestas, si son necesarias), con más solidez. Palabras claves: Gestión de la Configuración, Industria Aeronáutica, Mejoras ABSTRACT There is little literature on the use of Configuration Management (CM) in the Aviation Industry. However, it can be very useful today, where complexity to manufacture aircraft is increasing, and application of CM is very suitable. The pieces of the aircraft are manufactured in different countries, even the same parts are assembled in different countries and factories. Designs in different materials and increasingly lightweight, but do not increase the complexity, and it connects to customers seeking very different versions of the same model, which are changing over the years. The main objective of the work is to indicate areas of future improvement in the current CM which can be useful, and show possible trends in the light of developments which will mark the Aircraft Industry. We must also talk about the risks involved. CM is a discipline that arises from the need to ensure control in the complex process of relationships. The study recommends work in parallel when the time saved is an important question. Several organizations start the work with advanced information (or several proposals, if they were necessary), with more robustness. Keywords: Configuration Management, Aircraft Industry, Improvements WE1-1

1. INTRODUCTION Here appears some risk founds, improvements proposed, etc. related with the Configuration Management: The engineering manoeuvres very quickly in the technical aspects, but the aircrafts development times are very long, six or seven years, in some cases more than 10 years. Because of this when the aircraft starts to operate, it has old technology, developed six or seven years before. This situation makes the programs development times will be the most important advantage or disadvantage with their competitors. Moreover to deliver on time is very important to minimize economical impact: o No aircraft operation times must be covered by the enterprise. o The company loses the customer confidence. Less aircraft ordered. To reduce the time to develop the modifications will contribute to reach these objectives. This point tries to improve the modifications development, where the CM is involved, from change request (CR) appears till the modification (MOD) approval. We are trying to solve these pitfalls. 2. CONFIGURATION MANAGEMENT PROCESSES The procedures to be followed by any actor in any process must be classified inside three types: Rigid: the procedure (or steep) is rigid when its fulfilment is obligatory to assure the product integrity. In the example of the change process, a rigid procedure could be the assistance of at least one person from design organization to comment the technical solution. Semi-rigid: the procedures with recommended but not obligatory fulfilment. These do not affect to the product integrity, but they are recommended to do the process more efficient. This is the theory, finally the main actors will know if this action really improves the process or not. Following with the change process, an example could be the quality control assistance to the committees, it is not necessary, because of its work is independent, but it is very recommendable to make easier the future modifications attestation. Flexible: procedure with little relevance, its realization or not will be decided by the actor thinking in each case if the contribution improve the general process. Taking one more time the example of the change process: the cost controller assistance to the committees. He can know better than anyone if its assistance to the committees is in each case, more or less convenient. Obviously, this decision does not require a company directive. With this treatment two advantages could be obtained: To speed up the process. When the processes are not so relevant, the actors could save some work, and with this, the process could save time and in consequence the program could save money. To make the processes more flexible, providing the actors the decision to realize or not some works being based on their own experience. This proposal could be applied to all the processes, not only the change process. 3. MATURITY GATES MODEL The maturities gates models are intended to enable an effective management of huge projects by defining points of decision and target dates. The maturity gates model divides the A/C Program life into four main phases: WE1-2

MG3 MG4.1 MG4.2 MG5 MG6 MG7 MG9 MG11 MG13 Feasibility Concept Integration Tests Flight tests 24 months Definition 24 months Production FAL Ramp up Requirement Change Process Change Note Process MOD Process Freeze of Top Level Performance Freeze of Top Level Requirement Figure 1: New milestone model MG0 to MG3 This phase involves from the establishment of product or the A/C idea until the basic concept definition. During this phase the market situation and its needs are studied in order to identify an A/C concept capable of fulfilling specific market needs. MG3-Entry into concept Start of concept phase of development based on adequate level of evidence regarding market needs capture (top level requirement to be drafted with formal market validation), aircraft family concept feasibility (technical and industrial) and a draft business case. Includes assessment of suppliers (and first selections) and technology readiness. MG4.1-Ready for authorization to offer Implies ability to freeze the level of performances (top level), economics and of the customization policy, which will be marketed after ATO. The uncertainty level of the main parameters contributing to "performance" needs to be consistent with the selected margin (traditionally 4% on specific range and 2.5% on weight). It involves as well to have taken a set of strategic assessments and decisions regarding the choice of concept (e.g. installation architecture), the supplier s involvement, and the technological readiness. MG4.2-Ready for industrial launch & entry into definition It implies to have frozen all top level requirements and fully selected the baseline configuration. Definition work is started based on preliminary loads with a given uncertainty level and overall systems architecture. MG5-End of concept It implies to have secured the route to achievement of all Top Level requirements. This feasibility demonstration should be at that stage sustained by the results of demonstrators and prototypes. MG6-Start of production Start of production of the sections included manufacturing of the long lead items. WE1-3

MG7-Freeze of definition End of the definition phase. MG9-Entry into final assembly line Sections arrive with little/no levels of outstanding work. MG11-First flight Implies to have demonstrated not only that the 1 st prototype can safely fly but also that it has achieved a close level of maturity compared to the first aircraft to be delivered (close to service readiness). MG13-Entry into service It implies to have demonstrated the maturity level of the first aircraft definition. Seven configuration management processes have been defined. 4. CHANGE MANAGEMENT PROCESS FOR NEW PROJECTS The objective is to ensure a common understanding of the change management process across the enterprise. The process shall: Provide at the earliest opportunity visibility of an impending change situation. Be transparent in terms of identifying the actors (participants) and their tasks in the process. Provide clear indication as to the mechanism to initiate, manage and implement change. Provide agreed points where the visualization of progress shall be identified. Provide an input to design/project reviews. Capture/implement the output from design/project reviews. Ensure full traceability. Maximize the benefits of the concurrent way of working. Ensure that change management and communication of data is consistent within a geographically dispersed project team environment. 4.1 PROCESS FLOW The global change process within the product lifecycle is divided in five sub processes: Initiation phase Evaluation phase Investigation phase Decision phase Implementation phase In figure 2 is shown the overview about the whole change process. WE1-4

Idea/Request dropped Idea/ Request Initiate Change Idea/Request dropped Idea/Request acce pte d Evaluate Change Rejected pr opos ed solutions Investigati on launched Investigate Change Proposal rejected Mature proposed solution Decide Change Appr oval for imple mentation Implement Change Implementation confirmation & closure Component Level Aircraft Level Initialization Comp CCC Component Evaluation Prog CCC Investigation CCB Implementation Closure Figure 2: Process flow for future programs 4.2 PROCESS PHASES Initiate change The input, which initiates the change process, shall be received from an authorized organization. Evaluate change The repercussions resulting from the Idea/request including initial proposed solution(s) shall be collected and evaluated. Investigate change The subject of the idea/request shall be fully investigated and proposed solutions shall be evolved. Decide change A final decision on the acceptance or rejection of the proposed solution(s) shall be taken by the appropriate empowered body and communicated to the involved disciplines. Implement change Involved disciplines shall update impacted/affected data (e.g. documents, models). On task completion the appropriate configuration authority shall be informed and the change process shall be closed. 4.3 GLOBAL PROCESS PARTICIPANTS The following roles for participants shall be identified: The initiator identifies a need for a change/evolution and initiates a change process. WE1-5

The task owner is responsible and accountable for monitoring and coordinating of all necessary activities to satisfy an idea/request within the whole change process. He/She shall also have the responsibility to prepare decision steps and appropriate reviews. Technical/operational specialists are experts who are affected by an idea/request and set at an appropriate level of business to perform dispatched task activities. Technical/operational specialists are accountable to: - investigate change requests and evolve solutions, - realize solution by updating of impacted data (e.g. documentation, models). Decision authorities, have the responsibility and accountability for decision making on behalf of the project/program for a specific change. Shall be empowered to take the following decisions: - To accept or reject an idea/request, - To launch or reject a change investigation, - To decide which solution shall be implemented to satisfy an idea/request. 4.4 DECISION/REPORTING POINTS WITHIN THE CHANGE PROCESS Each process step within the change process is triggered by a decision and appropriately reported. 1. Acceptance/rejection of request, between: initiation phase & evaluation phase 2. Agreement/refusal to launch investigation, between: evaluation phase & investigation phase 3. Agreement/refusal that mature proposed solutions are ready for final reviewing and decision, between: investigation phase & decision phase 4. Approval/rejection for implementation, between: decision phase & implementation phase 5. Approval/refusal for change process closure. After implementation: final report stage to identify implementation is complete 5. CHANGE PROCESS IMPROVEMENTS Attending to different criteria, there are several ways of work in the change process: By the urgency criteria. The work required can be classify as: o Normal: Do not have especial urgency. They are not critical to deliver on time. They represent more than 90% of modifications, in Spain. o Urgent: Require develop as soon as possible. They could generate problems to deliver on time. They represent less than 10% of modifications, in Spain. By the process criteria. The work process can be classified as: o Work in sequential process. For example: WE1-6

works CR CCC Initial TR S CRS tim e Figure 3: Process with sequential works example o Work in parallel process. This is only used in exceptional cases, with urgent modifications. In example: works CR Initial TRS CRS PRS CCC CCB update TRS Tools des. Time with parallel works time Figure 4: Example of process with parallel works 5.1 COMPARISON BETWEEN THE DIFFERENT WAYS OF WORK In the study made is observed that the most important thing to reduce the global lead time of a modification development is the urgency level. The normal process followed is by sequential works: o It is more robust. It works with solid solutions. o The following actors use information more detailed. When the modification is urgent it could be processed: o In sequential process. o In parallel process. When the modification is very urgent it will be processed in parallel, with advanced information. o Advantage: global reduction of lead times. o This could carry some risks like: To work with non-definitive solutions. If the modification finally is rejected, a lot of resources will have been spent unnecessary. Money and time will be lost. So, our study recommends: o To work in parallel when the time saved is an important question: WE1-7

In urgent serial solutions. In retrofitted solutions. Always important for the planning and to reduces the concessions. o To work in sequential process: In the no urgent serial solutions, with a lot of time to implementation, i.e. mod for low weigh reductions. The improvements for the company should be: o To reduce cost of modifications. o To reduce the implementation times. 5.2 PROPOSAL The study recommends: o To work in parallel when the time saved is an important question: In urgent serial solutions. In retrofitted solutions. Always important for the planning and to reduces the concessions. o To work in sequential process: In the no urgent serial solutions, with a lot of time to implementation, i.e. mode for low weigh reductions. To make the parallel work with several solutions stronger, the proposal make is remake the change request. This will make with recommendations and several technical solutions in the new change request (C.R.2) sent from configuration control to the involved people, in this case design, costing and manufacturing. To work at least these 3 departments at the same time: Chang. Req. C.R. Conf. Cont C.R. Design Tech. Solut. TRS D.S. Costing Cost prev. CRS D.S. Embodiment prevision PRS D.S. C.C.C. Decision About: D.S. Figure 5: Actual process WE1-8

Chang. Req. C.R.A Conf. Cont + Designer = C.R.B C.R.B Costing Cost prev. CRS D.S. Design Tech. Solut. TRS D.S. C.C.C. Decision About: D.S. Embodiment prevision PRS D.S. Figure 6: Proposed process The time used to remake the C.R.2 with more information is always minor than the time saved in the next steps. This C.R.2 will be realized between the configuration controller and designer of this part. This permit to several organizations to start the work with advanced information (or several proposals, if they were necessary), with more robustness. The committee should always have the capacity to order: o Work in parallel o Several solutions evaluation o Work with advanced information, determining it. 5.3 EXPECTED RESULTS The improvements for the company are: o To reduce cost of modifications. o To reduce the implementation times. 6. CHANGE PROCESS DURING CONCEPT PHASE FOR FUTURE PROGRAMS The objective of this the change management process is to research and to carry out a modification implementation within a framework (scenario), which is defined in the scenario management sub-process, in order to get an optimal solution for an A/C configuration that can be perfectly definable and feasible for the activities to perform in the definition management sub-process. So the, this sub-process could be defined as a connection between the framework creation and the process that will define it in detail. In this way, it describes, analyzes the impact of a change and implements it to become this framework into something completely defined. WE1-9

CN Initialization Rejected Check before CCC CN Approved Rejected Component CCC CN Evaluation Rejected CN Investigation Program CCC CN Approved Rejected CN Implementation CCB CN Approved CN Closure Figure 7: Change process during concept phase for future programs 7. ORGANIZATION INTEGRATION In the companies with a lot of disciplines evolved and related, could appear some problems with these organizations relationship. These problems can be more important to the CM work, making this work more difficult. All of this, it is because of: The autonomy: People in each organization treat to make its task as independent as possible to the other organizations. In other words, some times the workers owns the wrong idea that their work: Start with the one order input, they make a work based on this input, and the work finish with a deliverable, forgetting other processes other processes related with them and important for the efficacy and efficiency on the CM processes. The stagnation or change resistance: some proposals of change (necessaries or improvements) can have the opposition of some people that develop this work. This could be because of: o People have done the same task from several years ago, and now they present resistance to learn another form of task. o This new proposal increases the work of this person. It has more resistance, without thinking on the enterprise development. An example of this could be the implementation of new management tools. This situation makes the processes more rigid and makes the enterprise more vulnerable to the environment changes, obstacles for possible improvements and impacts on development times. These position are very prejudicial for any enterprise, but especially for the companies with high investigation and technological contain like in our case, the aeronautical companies. The solution is evident, but not easy: To make aware: it is very important to think always work for the company global improvement. To inform: this is the complementary to this first point. This consists to inform all the evolved organizations on the reasons of the changes. At this point CM organization has the responsibility to inform why the management changes are necessary. In example when a change in the product structure is proposed (new structure treatment, new tools, etc.) it is necessary to explain why is this. WE1-10

To collaborate: requires improving the global enterprise task. At this point CM organization must provide support to all the organizations related with it. The product evolution on its own structure since it is defined from design is transferred to manufacturing engineering. In this way, there are several interfaces and relationships between the structure layers of design and manufacturing. 8. COMMITTEES DURATION Before the committees treated all modifications not closed, this could make these committees duration was two or three days, the repercussion was that the assistance to this committees was low. Because of this, we should try that the committees only treat the urgent and more important modifications, so they take place in only one day, and the involved people assist to their respective hours. 9. PRODUCTION NUMBERING PROBLEM Another problem found with the configuration is the different aircraft numbering in the manufacturing organization. The main problem is that the sequence aircraft manoeuvres at the same time that the production planning, and with this the connexion matrix too. This could generate a lot of problems to assure the configuration, and more if the assembly to be delivered has only one connexion matrix for one work package but this work package is divided in several parts to be delivered to different factories. There are certain pressures to change this. This is difficult, but the most important thing that manufacturing engineering is trying to do, is that all the inputs and outputs of this organization are with MSN numbering. 10. CONCLUSIONS The organizational structure of a classic aircraft manufacturer in addition to the usual managers: engineering, production, project office, maintenance, quality, etc. had a department of aid for these executives and which was devoted to documentation and its control. In the course of the years, this department has been converted, because of the need for more effective management of documentation and the greater complexity of systems and equipment required for aircrafts development and production. This joined outsourcing of certain parts, as well as globalization, has led inexorably to the creation of configuration management department, undertaking difficulties of this new situation, working on simplifying processes, and optimizing resources to try reduce the time per unit associated with this increased complexity, thus resulting in lower unit costs. Integrated organization lets to make aware, inform and collaborate easily. Recent failures in development processes, in the major aircraft manufacturers, have led to significant delays in deliveries to customers. At present, using CM correctly would have been avoided. The study recommends work in parallel when the time saved is an important question. Several organizations start the work with advanced information (or several proposals, if they were necessary), with more robustness. REFERENCIAS Appleton, B.; Sayco, M. (2003). SCM Branching Strategies. IEEE Computer Soc. Los Alamitos, CA, USA. Berczuk, S.P.; Appleton, B.; Brown, K. (2003). Software Configuration Management Patterns. Addison-Wesley Professional, Pearson Education. NJ, USA. Blanchard, B.S. (2008). System Engineering Management, Fourth Edition. Wiley Series in Systems Engineering and Management. John Wiley & Sons, Inc. NJ, USA. WE1-11

Dam, S.H. (2007). DoD Architecture Framework: A Guide to Applying System Engineering to Develop Integrated, Executable Architectures. SPEC Training. Virginia, USA. Duvall, P.; Matyas, S; Glover, A. (2007). Continuous Integration: Improving Software Quality and Reducing Risk. Addison-Wesley Signature Series, Pearson Education. NJ, USA. Forsberg, K.; Mooz, H.; Cotterman, H. (2005). Visualizing Project Management, Third Edition. John Wiley & Sons, Inc. NJ, USA. Hass, A..M..J. (2003). Configuration Management. Principles and Practice. Cockburn-Highsmith Series Editors. Pearson Education. NJ, USA. McGraw, G.; Chess, B. (2008). A Software Security Framework: Working Towards a Realistic Maturity Model. Inform IT Network. Pearson Education, Informit. Indiana, USA. St. Charles, D. P. (1990). Simultaneous Engineering. Integrating Manufacturing and Design, 1 st edition, pp. 160-164. Society of Manufacturing Engineers. Dearborn, Michigan, USA. Autorización y Renuncia Los autores authorizan a LACCEI para publicar el escrito en los procedimientos de la conferencia. LACCEI o los editors no son responsables ni por el contenido ni por las implicaciones de lo que esta expresado en el escrito Authorization and Disclaimer Authors authorize LACCEI to publish the paper in the conference proceedings. Neither LACCEI nor the editors are responsible either for the content or for the implications of what is expressed in the paper. WE1-12