Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program



Similar documents
CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Architectural Processing and Inspections for Home Mortgage Insurance

Outlet stabilization structure

Drainage Analysis for the McKownville Area

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

Homeowner s Guide to Drainage

Town of Beaumont. Lot Grading Guidelines

Lansdowne Stormwater UPDATE

Home Drainage & Causes of Basement Flooding. Water

CITY UTILITIES DESIGN STANDARDS MANUAL

WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN

Action plans for hotspot locations - Ash Study

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

First in Service First in Safety

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Appendix B. Property Owner Questionnaire

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Table 4.9 Storm Drain Inlet Protetion Applicable for

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Boardman Township Check-List: Drainage and Flooding Issues on Private Property

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

5.14 Floodplains and Drainage/Hydrology

URBAN DRAINAGE CRITERIA

Swannanoa River Flood Risk Management Study

Small Dam Hazard Assessment Inventory

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

BASEMENT FLOODING. Prevention Guide for. Homeowners

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Property Care White Papers. Site Drainage: Monitor and Maintain

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

How To Get A Flood Risk Reduction Rebate

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

Chapter 4. Flood Control

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

City of Green Bay Department of Public Works Engineering Department

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

City of Shelbyville Site Inspection Checklist

Review of Footing Drain Disconnection Projects

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Prattsville Berm Removal Project. 1.0 Project Location


DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

CHAPTER 3 STORM DRAINAGE SYSTEMS

SECTION INLETS INLET LOCATIONS

STORM DRAINS CHAPTER 7

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

SANITARY SEWER BACKUP. Causes & Prevention

The City of Ottawa Flood Hazards

Project Manager. Geoff Masotti, P.Eng. T Ext. 254 T

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

PREVENTING WET OR FLO ODED BASEMENTS

City of West Linn Public Works Design Standards Table of Contents

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

CLIFTY CREEK PLANT MADISON, INDIANA

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Low Impact Development Checklist

Essex County Council Flood Investigation Report

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Downspout to storm sewer. Leaky laterals

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

BRIDGES ARE relatively expensive but often are

2011 HYDRAULICS MANUAL

Mitigating Basement Backups

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Protect Your Home From Flooding. A guide for Lethbridge Residents

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Basements and Deep Building Construction Policy 2014

LISGAR DISTRICT BASEMENT WATER INFILTRATION INVESTIGATION SUMMARY REPORT. Submitted to: City of Mississauga Mississauga, Ontario

Transcription:

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012

Introduction The U.S. Army Corps of Engineers (Corps), in accordance with the Project Management Plan (PMP) for the Tookany Creek Flood Damage Reduction Feasibility Study, is developing existing conditions models of the hydrologic and hydraulic characteristics of the Tookany Creek Watershed. As part of that effort, the Corps and Cheltenham Township deployed an assessment team to field inspect nine neighborhood areas over a three day period and gather critical information to calibrate the models. Additionally, the team gathered preliminary data to support the development of opportunities for flood mitigation. The following report summarizes the field notes captured during those inspections. The sections below do not necessarily present a complete representation of the area, but rather supplement the data available through citizen surveys, photographic journals and many other studies completed within this watershed. The assessment teams included the following personnel: U.S. Army Corps of Engineers Erik Rourke Project Manager Micah Kirkpatrick Economist Michael Bartles (27 th and 29 th only) Hydraulic Engineer Robert Moore (28 th and 29 th only) Hydraulic Engineer Glen Stevens (27 th and 29 th only) Hydraulic Engineer Doug Leatherman Civil Engineer Cheltenham Township Pat Duffy (27 th only) Township Engineer Mike Flemming (28 th only) Public Works Director Joe O Neill (29 th only) Fire Marshal Table 1: Assessment Team Personnel. The team adhered to the following schedule prepared by organizes from Floodside. September 27, 2012 Brookdale Avenue Brookside Road Harrison Avenue September 28, 2012 Rock Lane/Widner Road Bickley Road Cliff Terrace September 29, 2012 High School Road Shoemaker Road Mill Road Table 2: Schedule of site visits. 1

September 27, 2012 (Thursday) 0930 Brookdale Avenue: Approximately 34 homes are located along Brookdale Avenue. A small berm maintained by the Pennsylvania Department of Environmental Protection (PADEP) runs along Tookany Creek. The berm ties into high ground at the Rices Mill Road Bridge where the Township operates a pump station for internal drainage. The pump station receives power from the main electrical grid and is supplemented with diesel generators in the event of a power failure. Immediately downstream of the bridge is the George Perley Bird Sanctuary. According to the residents interviewed, flooding occurs in this area predominantly because of interior drainage issues associated with runoff flowing down Keswick Avenue. Although water has reached the top of the berm, residents reported the berm has not overtopped except near the pump station at Rices Mill Road Bridge. Most of the damage reported includes damage to vehicles and contents associated with basement flooding. The PADEP is evaluating a flood control project in this area that includes raising the berm and the construction of several basins. 1100 Brookside Road: An unnamed tributary enters a culvert just upstream of the intersection of Shoemaker and Brookside Roads. The stream remains underground until discharging into the Tookany Creek approximately 250 feet upstream of Church Road. Approximately nine homes experience flooding in this area. According to residents, the flooding predominantly occurs because of ground water infiltration. During heavy rainfall events, water will accumulate behind the homes in the location of the original stream channel. Testimonial data indicates the water begins to back up behind a wall adjacent to Tookany Creek until a ponding area forms. Evidence, indicated by signs of erosion, suggests sheet flow may occur down Brookside Road (from Figure 1: View looking upstream along Tookany Creek at Rice Mill Road. Pump Station is shown on the right. Figure 2: Culvert at upstream limit of underground portion of the unnamed tributary before flowing behind the homes on Brookside Road. Church Road) and flow between two homes and potentially contributing to the ponding area. Water enters the homes through basement drains and/or cracks in the foundation walls. Some of the homes had small parapet walls surrounding basement windows that indicate the homes may have experienced basement flooding from overland flow. 1330 Harrison Avenue: Behind the homes located along the 200 Block of Harrison Avenue within the Glenside/Edge Hill drainage portion of Tookany Creek, two stream branches converge 2

at 90 degree angles and enter a subsurface culvert. Upstream along the eastern branch are several small parks. Upstream along the western branch is the recently constructed Glenside Elementary School. The Glenside Elementary School supposedly contains an underground stormwater management system. According to testimony from local residents, the majority of flooding occurs from drainage unable to reach the creek. Near the middle of the 200 Block of Harrison, a storm drain carries flow from the streets to the creek. The elevation difference between the inlet and outlet is small with the outlet only 18 inches above the creek bottom. This small change in elevation results in water being unable to drain from the streets. Similar issues occur near the intersection of Springhouse Lane and Oak Road. The majority of damage in both areas is contained to vehicular damage and basement flooding. Prior to reaching the confluence behind the homes, the eastern branch flows under the Harrison Ave Bridge. Testimony suggested this bridge has not been overtopped, however stormwater does flow parallel to the bridge contributing to the issues near the middle of the 200 block. Further upstream from this location, the stream runs adjacent to several parks. Figure 3: One of the parks upstream of the Harrison Avenue site. September 28, 2012 (Friday) 0930 Rock Lane/Widener: Flooding along Rock Lane occurs predominately upstream of Widener Road and downstream of Serpentine Lane. At some point in the 1960 s, Cheltenham Township acquired several homes between these two points and adjacent to Rock Creek. Majority of the flooding is contained to basement and vehicular damage along Rock Lane. Although, following the 2011 Tropical systems, one structure along Widener Road sustained significant structural damage. At this location, Rock Creek enters a culvert before traveling an unknown distance and discharging into Tookany Creek. Rock Creek empties into Tookany Creek just downstream of the Church Road crossing adjacent to SEPTA s railroad tracks. Next to this location is Wall Park. Cheltenham Township s temporary pumps for the sanitary bypass system are also located at this location. Upstream from this location along Tookany Creek, SEPTA replaced a bridge crossing increasing the hydraulic 3

efficiency under the bridge. Resident testimony suggests flooding has increased since SEPTA completed this project. Figure 4: Area of previous acquisition project by Cheltenham Township in 1960s along Rock Creek. The inspection team also visited a property located along Heather Road. At this location, stormwater runs down a steep incline causing property damage adjacent to the driveway. 1100 Bickley Road: Eight homes along Bickley Road experience similar circumstances to the residents along Harrison Ave. Approximately 70 feet after Tookany Creek flows under Bickley Road, it enters a culvert and travels approximately 125 feet before daylighting. Within these 125 feet, the creek makes an approximate 90 degree turn. Resident testimony indicates water backs up behind South Keswick Ave. flooding the back yards while stormwater ponds in front of the houses. One inlet along the 200 block of Bickley Road drains the runoff from this area. Residents indicated water as deep as 10 feet behind the homes. Damage in this area consists of basement flooding and vehicular damage. One structure reported receiving structural damage to a front porch footer, however the claim was denied by Flood Insurance. On the opposite side of Bickley Road, one resident described runoff from businesses along Easton Road draining into her property. At the back end of her property, a drain carries the water back to Tookany Creek upstream of the Bickley Road crossing. Residents also provided information concerning a drainage system utilized by Bishop McDevitt High School to keep their athletic fields in playable condition. The school drains the fields into a swale that runs towards the Glenside Free Library and eventually toward the back of the properties along Bickley Road. 4

Figure 5: Single storm inlet along Bickley Road 1300 Cliff Terrace: Upstream of All Hallows Church, at the intersection of Greenwood Ave. and Bent Road, a tributary to Tookany Creek enters a culvert to traverse under the church before becoming an open channel again for approximately 215 feet before entering another culvert just upstream of Maple Ave. The tributary remains in the culvert for approximately 930 feet before entering Tookany Creek. During the site visit, the team noted that the inflow rates observed at the upstream portion were higher than the observed rates discharging into Tookany Creek. Along the alignment of the culvert, numerous inlets experience significant debris blockages during an event. The culvert alignment follows the natural drainage within the area represented by steep slopes on each side of the channel centerline. Flooding in this area is predominately limited to vehicular damage, basement flooding and damage to exterior structures (garages/sheds). One resident documented significant damage from a walkout basement. The flooding occurs when surface water reaches the natural drainage channel during high intensity storms, following the terrain contours and flows towards Tookany Creek. The Jenkintown SEPTA parking lot along Greenwood Avenue and Glenside Avenue also suffers from damage during flooding events. The stream banks in this area consist of stone walls with a natural channel bottom. The parking lot extends to the edge of the stream allowing cars to park in high hazard areas. Upstream of Greenwood Avenue, Tookany Creek flows adjacent to Wyncote Park. SEPTA buildings and a local restaurant across from Wyncote Park have experienced damage. 5

Figure 6: Inlet along Maple Ave. The inlets represent the natural low point in this area. The field inspection also included an area along North Avenue, upstream of the Jenkintown SEPTA station along Tookany Creek where industrial/commercial buildings received significant damage following the Tropical events of 2011. These properties are located upstream of where Tookany Creek makes a right angle, flows under the railroad tracks and makes an opposite right angle before continuing downstream. September 29, 2012 (Saturday) 0930 High School Road: At the High School Road location, four structures are potentially subject to flooding with two of those structures significantly more susceptible than the others. The homes are located just downstream of the High School Road bridge. Upstream of this bridge is the Ogontz Field. Flooding in this area begins from backwater associated with the downstream Mill Road Bridge crossing as well as overtopping of the High School Road Bridge. Flooding also occurs from ponding within Ogontz Field as it drains through low points along High School Road between the houses. Residents interviewed indicated that the water behind the homes is relatively still during flood periods, almost like a swimming pool. Figure 7: High water mark from the 2011 Events behind High School Road. 1030 Shoemaker Road: Along Shoemaker Road, approximately nine homes experience basement flooding to various degrees from Tookany Creek. Flooding also affects the municipal maintenance building, storage area and parking lot on the opposite side of the creek. In June 2008, in an attempt to alleviate some of the flooding issues, the Pennsylvania Department of 6

Environmental Protection (PADEP), Cheltenham Township and the Pennsylvania Fish and Boat Commission removed an old mill dam near these homes through a Delaware River Estuary Grant. The residents indicate they have not noticed a reduction in flood magnitude due to the dam removal, but have noticed an increase in deposition along the channel since the removal of the dam. According to the residents, the frequency of the events has increased over the last 10 years. Along this reach of stream, the right bank (facing downstream) consists of a stone wall. The left bank is only partially contained by a similar wall. However, the top of the left bank wall is lower than the right bank. The walls were constructed in the late 1960s following recommendations in a report prepared by a joint venture of George B. Mebus, Inc. Engineers, Glenside, Pennsylvania and Metcalf and Eddy Engineers, Boston Massachusetts. The front of the properties along Shoemaker Road are elevated and slope downward near the backside of the structures exposing walk-out basements. The ground remains flat from the back of the homes until it reaches the creek. Immediately adjacent to the creek and behind the homes is an access road used by the residents to access garages and off-street parking. 1130 Mill Road: The Mill Road crossing over Tookany Creek causes backwater to affect upstream areas (High School Road). As this backwater increases in elevation, the water eventually overtops the banks near the bridge, causing flood damage to nearby residences and one business. Mill Road slopes down and away from the bridge forcing overflow towards the residences along Mill Road. Backwater effects from the downstream Harrison Ave crossing were not noted. Prior to the Township s installation of the temporary sanitary sewer bypass system, this area experienced significant problems with sewer backups. Figure 8: A resident points out a high water mark from the 2011 events. Figure 9: Wall adjacent to Tookany Creek overtopped in 2011. 7