FONAG The Fund for the Protection of Water, Ecuador



Similar documents
Water Fund FONAG - Ecuador

WATER FOR LIFE BEST PRACTICES AWARD

A concept to equitably share water resources within and amongst rural communities

Application of Invest`s Sedimentation Retention model for restoration benefits forecast at Cantareira Water Supply System

Central American Strategy for Rural Area-based Development ECADERT. Executive Summary

Building Drought Resilience through Land and Water Management

Regional Exchange on IWRM experiences in the Mekong River Basin

HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back!

How To Be Sustainable With Tourism

TERMINAL EVALUATION TERMS OF REFERENCE

Integrated Solid Waste Management Programme, Loja Ecuador

Education, Training and Public Awareness through the Least Developed Countries Fund. Rawleston Moore Global Environment Facility June 2012

Governing the Water Energy Food Nexus: Opportunities for Basin Organisations Eric Hoa (UNEP)

Situation Analysis. j:\cc69\nmm\website docs\situation analysis\situation analysis approach and method.doc

Organic farming : key advantages to be encouraged

STRATEGIC PRIORITIES

HYDROPOWER PROGRAM SUSTAINABLE HYDROPOWER PLANNING IN MYANMAR

URBACT III Programme Manual

CONSULTING REQUIREMENTS

FINAL EVALUATION VIE/029. Technical Assistance towards Programme Support, Developing Business with the Rural Poor in Cao Bang

Case Study: The History of the San Juan Headwaters Forest Health Partnership

LIFE ORIENTATION DOCUMENT

Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems

The current institutional and legal context for biodiversity conservation and management is characterised by the following features:

National Report to the Fifth Session of the United Nations Forum on Forests TURKEY

PILOT PROJECT «DONG NAI» Technical support for the implementation of Integrated Resources Management in Vietnam

Annex 1: Conceptual Framework of the Swiss-Polish Cooperation Programme

How To Manage Protected Areas

NGO Self-assessment through a SWOT exercise

DRY LAND, LIVELIHOODS AND GENDER PROGRAM

Research to improve the use and conservation of agricultural biodiversity for smallholder farmers

Terms of Reference for Rangeland Management Plan Preparation

Aquatic Ecosystems Restoration

Regional cooperation in the IGAD sub-region: of transboundary water resources

Outcome Mapping Planning, Monitoring and Evaluation

Projects that promote the conservation and/or sustainable use of endemic species. 3

TERMS OF REFERENCE N 025/2015

Payments for Ecosystem Services: towards improved biodiversity conservation and water security in South Africa, a semi-arid, developing country

Ecosystem-based Adaptation

A Framework for Financing Water Resources Management In Brief

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

Problem Tree Analysis

TORONTO CALL TO ACTION Towards a decade of Human Resources in Health for the Americas

Ramsar COP8 DOC. 20 Information paper English only

INTEGRATED NATIONAL ADAPTATION PILOT República de Colombia INAP

Role of Civil Society Organisations in REDD Projects

AGRICULTURAL USE OF PESTICIDES ON SANTA CRUZ

Tracking Tool for SFM/REDD- Plus Projects. Guidance Note v0.2

GLOBAL ALLIANCE FOR CLIMATE-SMART AGRICULTURE (GACSA)

Water resources. The main problems of pollution that need to be addressed in the country are the following:

Effective Environmental Impact Assessment: Good practices, Methods and Processes

TERMS OF REFERENCE. ASSIGNMENT INFORMATION Position Title:

Module 6: Financial Resource Mobilization for NBSAPs

Water Conservation: A Guide to Promoting Public Awareness

How to cite this document GNPS, GCREG, CDF, and GC Galapagos Report Puerto Ayora, Galapagos, Ecuador.

AN INNOVATIVE APPROACH TO CARBON OFFSETTING AND SUSTAINABLE DEVELOPMENT.

FACTS ABOUT EVERY RIVER HAS ITS PEOPLE PROJECT

Plan for the Establishment of ASEM Water Resources Research and Development Center

Organic farming. A guide on support opportunities for organic producers in Europe. Agriculture and Rural Development

The World Bank Group s Common Property Resource Management Network

Inter-municipal cooperation in watershed conservation through the establishment of a regional water fund FORAGUA in Southern Ecuador

Ecological Restoration of an altered area at the Majuy

Global Environment Facility GEF OPERATIONAL PROGRAM #13 ON CONSERVATION AND SUSTAINABLE USE OF BIOLOGICAL DIVERSITY IMPORTANT TO AGRICULTURE

Call for Expressions of Interest: Contributing to the BIOPAMA Regional Observatory for Biodiversity and Protected Areas in West and Central Africa

River restoration and Natural Water Retention Measures. but questions and obstacles remain regarding their implementation

UEBT. Biodiversity Barometer

Principles for Responsible Investment in Farmland

VIENNA RESOLUTION 4 CONSERVING AND ENHANCING FOREST BIOLOGICAL DIVERSITY IN EUROPE

Save the Children. Protecting Children in Zambia from Violence, Abuse, Neglect and Exploitation

Ministerial Declaration of The Hague on Water Security in the 21st Century

Mainstreaming Cross-Cutting Outcomes: Gender Equality, Environmental Sustainability, Cultural Respect and Understanding. A Toolkit

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions

Inputs provided by: 1. General description of mandates and objective(s) of your organization / associated network with institutional structure

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS

Tool for assessing the capacity of regional organisations undertaking hygiene promotion training for emergencies

Technical Consultant

Food Security and Water in Central America in the context of Climate Change: Maureen Ballestero Chair GWP Costa Rica

Intended Nationally Determined Contribution (INDC) of the Federal Democratic Republic of Ethiopia

48th Session of the International Conference of Education (ICE)

Title: President/CEO. Location: Washington, DC. Reports to: Board of Directors. Position Summary:

UGANDA. Climate Change Case Studies

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

TARAPOTO PROCESS ON THE AMAZON FOREST S SUSTAINABILITY CRITERIA AND INDICATORS

Safe Water Quality for All Uses: Promoting science-based policy responses to water quality challenges

Country and Regional Reports on GEOSS-related Activities. Ms. Taniya Koswatta Coordinator, APN Secretariat

Towards sustainable and strategic management of water resources

REFLECTION ON MANAGEMENT OF WATER RESOURCES. Guido Heijdra MSc MCM CMC Associate Professor Water and Environmental Management

IRRIGATION PROJECTS IMPLEMENTED BY FAO IN LEBANON

Green Infrastructure Case Study Template

Transcription:

FONAG The Fund for the Protection of Water, Ecuador Thomas Chiramba, Silas Mogoi and Isabel Martinez (UNEP), Tim Jones (DJEnvironmental) Type of tool: investments and fiscal measures for biodiversity protection Issue: watersheds Location: Ecuador, LAC Introduction The Fund for the Protection of Water (Fondo para la protección del Agua FONAG) is a private trust fund established in 2000 for a period of 80 years and regulated under Ecuador s stock market law. In essence, the Fund is an example of payment for the environmental services provided by ecosystems (commonly referred to as Payment for Ecosystem Services or PES). Challenge and objectives FONAG works to ensure the provision of a sufficient quantity of water of good quality by supporting actions directed at protecting water resources, based on the principles of long-term natural sustainability. FONAG focuses on the Upper Guayallabamba river basin, the Antisana river basin, the Oyacachi river basin and the Papallacta river basin which are crucial for maintaining the water supply to the Metropolitan District of Quito and its surrounding area. FONAG s area of operation covers some 5,025 km 2 and held 1.96 million inhabitants at the time of the 2001 census. Oyacachi and Papallacta river basins In order to avoid the degradation of these river basins, FONAG is supporting actions directed making the activities of local communities more sustainable but also more productive. Antisana River Basin Activities in the Antisana River basin are directed towards protecting the quality of water entering the Mica Quito Sur reservoir, part of the system that provides potable water to the city of Quito. The main problem in this basin is related to poor livestock management practices in surrounding properties, which cause water pollution, soil erosion and adversely impact nature conservation in the Antisana Ecological Reserve. Preparatory studies at an estimated cost of USD 22,000 are currently underway, with equal contributions by FONAG and TNC, and additional counterpart funding from the implementing institution. The approach: how did PES help overcome barriers to dealing with the challenge? Establishing a fund Page 1 of 9

A pilot project was set up in 1998, payments to FONAG began in January 2000 and financing of watershed protection projects was initiated in January 2002. The trust provides a stable, long-term financial mechanism, using revenues (interest and investments) derived from its equity to co-finance activities aimed at maintaining the hydrographic basins that supply the water needs of Quito Metropolitan District and its surrounding area of influence. Establishing a clear mission, and vision FONAG s Mission was established as: FONAG rehabilitates, cares for and protects water basins that supply water to the Metropolitan District of Quito and surrounding areas. Vision: to be the mobilising agent that involves all actors in exercising their citizenship responsibly on behalf of nature, especially water resources. A consensus and dialogue participatory approach To lead processes and consensus through dialogue, proper decision-making, strengthening research and the appropriate use of technology to achieve integrated management of water resources in which active, responsible participation based on solidarity leads to sustainable water management. FONAG implements programmes and projects that meet the institutional challenges of building a new water culture (where the active and responsible participation of all stakeholders and actors creates a more just, shared and sustainable use of water resources with improved health and development outcomes) and achieving integrated water resource management. Communities particularly targeted by FONAG programmes and projects include: Communities in the Cayambe-Coca Ecological Reserve (Oyacachi river basin) Communities in the Antisana Ecological Reserve (Papallacta river basin and La Mica Lagoon) Communities in the Cotopaxi National Park (Pita sub-basin of the Upper Guayallabamba) Communities in the Los Ilinizas Ecological Reserve (San Pedro sub-basin of the Guayallabamba) The activities implemented by FONAG are the result of various consensus-based processes carried out among the participating institutions. Collaborate with institutions Through the Ecuadorian Centre for Agricultural Services (CESA), FONAG is seeking to conserve water resources, improve animal husbandry and agricultural practices, strengthen local resource management and provide access to financial services. All these components Page 2 of 9

will be developed during an initial implementation phase lasting fifteen months, at an estimated cost of USD 78,000, with part-funding provided by FONAG and co-financing from The Nature Conservancy and CESA. Among other practical actions, work is being done to genetically improve livestock herds living around the Oyacachi basins, through a campaign to vaccinate, identify and execute a programme to provide these herds with vitamins and rid them of parasites. Implementing specific programmes and projects These programmes and projects are carried out in FONAG s geographical area of operation (see below) with the participation of various community actors, local authorities, governmental bodies, non-governmental organisations, and educational institutions. FONAG implements its programmes directly, conceiving them as a way of building processes that are capable of changing people s attitudes toward nature and encouraging responsible water management. The programmes have a minimum time scale of 20 years and cover all six key areas of FONAG s activities: Water Management Site surveillance and monitoring Restoration of vegetation cover Environmental education Training in Integrated Water Resource Management (IWRM) Communication The Water Management Programme has two parts: technical and social. The first aims to develop water management tools, while the second seeks to achieve better governance and administration of water resources. The technical work is being implemented by IUCN and the social component is led by the Fundación Futuro Latinoamerica with the support of the Tinker Foundation. The projects are interventions undertaken by supporting institutions, communities, educational organisations and local governments. They are short-term, with a maximum duration of two years. There are currently 20 such projects covering all of the sub-basins within FONAG s area of operation. Of the institutional budget, 20% is assigned to these projects. Page 3 of 9

Financing and financial approach The capital assets of the FONAG are composed of contributions from local businesses, private and international institutions. Concerned with the conservation of water resources and committed to finding solutions for the problems resulting from inadequate management of these resources, the Metropolitan Water and Sewerage Company of Quito (EMAAP-Q) and the international environmental NGO The Nature Conservancy (TNC) entered into a contract establishing the Fund in January 2000. The Electric Power Company of Quito (EEQ) joined in May 2001; the private brewery company Cervecería Andina S.A. (now Cervecería Nacional S.A.) participated with effect from March 2003; Swiss Development Cooperation (SDC/COSUDE) from January 2005; and The Tesalia Springs Co. from April 2007. Of FONAG s investments, 80% are allocated to developing and strengthening these programmes. Specific projects are an integral part of FONAG s six programmes, which are led by likeminded institutions with co-financing provided by FONAG. FONAG s financial development is illustrated in Figures 1 to 3 below. FONAG s success is based in large part on: A philosophy of modest but steady growth Limiting its financial support for programmes/projects to the revenue (interest and income on investments) derived from its equity capital Attraction of increasingly significant counterpart funding By 2009 FONAG was making financial contributions of almost one million USD per year and leveraging counterpart funding to fund programmes and projects with total expenditure of nearly four times this amount. Evaluation: economic, social and environmental benefits FONAG is contributing to securing present and future water supplies for Quito. Through the fund, more than 65,000 ha of watersheds are now under improved management. Upstream farmers receive support for watershed protection programmes, as opposed to cash payments. More than 1800 people are estimated to have received increased economic benefits associated with watershed management and conservation. Scaling up and lessons learnt from implementation Page 4 of 9

FONAG has served to inspire the development of similar schemes elsewhere in Latin America and beyond. Lessons learnt Governments, NGOs (including international NGOs), development assistance agencies, the corporate sector and local communities can work effectively together on PES schemes if the benefits for all stakeholders are clear. Relatively modest expenditure can leverage much bigger overall investment through counterpart contributions. Restricting use of the fund to yields from interest and investments NOT capital means that the fund grew slowly but sustainably. Strong capacity building and communications/ awareness-raising components have been vital to FONAG s success. A stable, long-term financial mechanism provides the security, stability and sustainability needed for partners to feel confidence in participating in FONAG and enables FONAG to operate. Reference http://www.fonag.org.ec/portal/ downloaded 1 September 2011 Page 5 of 9

Figure 1: FONAG equity yield 2000-2009 (USD) Year Total equity Revenue equity (interest investments) from Reserve fund Total available Yield (%) & 2000 164.046 5.990 Not yet established 5990 3.65 2001 443.502 20.306 Not yet established 20306 4.58 2002 837.111 56.059 3.433 59492 7.11 2003 1.450.053 82.605 84.594 167199 11.53 2004 2.112.553 133.774 377.716 511490 24.21 2005 2.693.452 281.980 251.784 533764 19.82 2006 3.588.514 540.456 599.220 1139676 31.76 2007 4.193.784 467.123 96.434 563557 13.44 Page 6 of 9

2008 5.162.206 1.014.447 26.480 1040927 20.16 2009 6.437.743 1.140.345 1140345 17.71 *A reserve was established in 2002 so that FONAG could be in a position to cover unforeseen but legitimate cost increases for projects already underway. Figure 2: Programmes and Projects funded (USD) comparison of 2000, 2005 and 2009 Programmes & Projects 2000 2005 2009* TOTAL FONAG contribution TOTAL FONAG contribution TOTAL FONAG contribution FONAG Programmes: Water management 98,931 28,931 576,677 58,977 Site surveillance and monitoring 78,809 23,809 324,564 95,719 Restoration of vegetation cover 351,952 109,952 774,149 248,649 Page 7 of 9

Environmental education 35,757 20,757 311,257 79,016 Training in IWRM 350,000 50,276 32,776 Communication 25,832 5,832 83,290 55,370 Programme support 36,091 16,091 1,082,266 49,728 FONAG Programmes subtotal 977,372 205,372 3,202,479 620,235 Community Projects 113,108 69,108 369,186 152,394 Operational management 690 690 136,560 76,560 119,026 52,318 FONAG administrative costs 5,078 5,078 51,770 51,770 97,350 83,350 Overall total 5,768 5,768 1,278,810 402,810 3,788,041 908,297 Page 8 of 9

Figure 3: Steady growth in FONAG s investment in programmes and projects and the more rapid growth in counterpart funding leveraged (vertical axis, USD), comparing the situation in 2000, 2005 and 2009 (horizontal axis). Page 9 of 9