Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment



Similar documents
Application for Approval of Overseas Inspection Agency for Pressure Vessels

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

GUYANA No. of 2011 REGULATIONS. Made Under. CREDIT REPORTING ACT (Cap. 84:01)

HOW TO APPLY FOR REGISTRATION AS A SAFETY OFFICER Under the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

NABL NATIONAL ACCREDITATION

IMPLEMENTATION DATE: 1 st OCTOBER 2015

Quality Management System

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

BRUNEI DARUSSALAM GOVERNMENT SCHOLARSHIPS FOR FOREIGN STUDENTS TENABLE IN BRUNEI DARUSSALAM

Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT

1 RCNY CHAPTER 100

RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing

23. The quality management system

IMPLEMENTATION DATE 1 st OCTOBER 2015

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

SCOPE OF APPLICATION AND DEFINITIONS

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

STEEL fabrication quality SySTEmS guideline

Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories

How To Get A Small Business License In Australia

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

Associate Engineer. Regulations for the title of Associate Engineer

IMQ RULES. Contents. IMQ Rules - Product certification

Example of a food company quality

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

GUIDELINES FOR INVESTMENT ADVISERS AND INVESTMENT REPRESENTATIVES UNDER THE SECURITIES INDUSTRY ACT 1983

Mutual Recognition Arrangements (MRA) Scheme. Designating Local Testing Laboratories and Certification Bodies for Conformity Assessment

CHINA PIONEER PHARMA HOLDINGS LIMITED

Enhancing Safe Use of Cranes A Great Workforce A Great Workplace

APPLICATION FOR AUTHORISATION AS REINSURER

QSS 0: Products and Services without Bespoke Contracts.

Standard conditions of purchase

EA-6/02 M: EA Guidelines on the Use of EN and ISO/IEC for Certification to EN ISO Publication Reference PURPOSE

Application for Registration as Asset Manager

Approval of test houses Application form guidance notes

Rules for the certification of event sustainability management system

QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES

ISO 14001:2004 Environmental Management System Manual

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Rules for the certification of asset management systems

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC , Explosive Atmospheres - Edition 1.

House Purchase Loan. Application Form. Housing and Social Support, Kerry County Council, County Buildings, Rathass, Tralee

Owner-User Pressure Equipment Integrity Management Requirements

1. The authorised signatories of *all our accounts/the following account(s) maintained with The Hongkong and Shanghai Banking Corporation

APPLICATION TO TRANSFER FROM THE SUPERVISED DIVISION

APPLICATION PROCEDURES AND REQUIREMENTS FOR SPECIALIST ASSESSMENT

LAW. ON ELECTRONIC SIGNATURE (Official Gazette of the Republic of Montenegro 55/03 and 31/05)

Memorandum of Understanding

ACCREDITATION SCHEME JEWELLERY BUSINESSES

1.1 The following words and expressions have the following meanings, unless they are inconsistent with the context:

FREEDOM OF INFORMATION (SCOTLAND) ACT 2002 CODE OF PRACTICE ON RECORDS MANAGEMENT

TRADE UNIONS ACT (CHAPTER 333, SECTION 55) TRADE UNIONS REGULATIONS

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)

IMPORTANT INFORMATION FOR APPLICATION FOR CONVERSION OF A FOREIGN PROFESSIONAL PILOT LICENCE

on Electronic Signature and change to some other laws (Electronic Signature Act) The Parliament has hereby agreed on this Act of the Czech Republic:

Scheme of Operations Relating to Enrolment in the Agents List, Managers List or Brokers List and the Application for Enrolment

EVERCHINA INT L HOLDINGS COMPANY LIMITED (the Company ) Audit Committee

Drinking Water Quality Management Plan Review and Audit Guideline

APPLICATION FOR RENEWAL OF LICENCE TO USE OR OPERATE AN ELECTRICAL INSTALLATION (Please read Explanatory Notes before completing the Forms)

ACCReDITATION COuNCIL OF TRINIDAD AND TOBAGO ACT

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

E Lighting Group Holdings Limited 壹 照 明 集 團 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) Stock Code : 8222

Health and safety policy

RESTRICTED. Professional Accreditation Handbook For Computer Science Programmes

Office for Nuclear Regulation

Revised Scheme of Service for Occupational Health and Safety Personnel

PLANT VARIETIES PROTECTION ACT (CHAPTER 232A, SECTION 54) PLANT VARIETIES PROTECTION RULES

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

International Laboratory Accreditation Cooperation. Laboratory Accreditation or ISO 9001 Certification? global trust. Testing Calibration Inspection

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities

BERMUDA TRUSTS (REGULATION OF TRUST BUSINESS) EXEMPTION ORDER 2002 BR 38 / 2002

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

PART A. .3 to ensure the early and efficient collection and exchange of security-related information;

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

LORD CHANCELLOR S CODE OF PRACTICE ON THE MANAGEMENT OF RECORDS UNDER

TERMS OF REFERENCE OF AUDIT COMMITTEE

Guide to Requirements for Consent to Assess for Schools

House Purchase Loan Application Form

Electronic Documents Law

Supplier Quality Manual

THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No: 23/2014/TT-NHNN Hanoi, 19 August 2014 CIRCULAR

House Purchase Loan. Application Form

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

Voluntary Certification Scheme for Traditional Health Practitioner

Surgi Manufacturing Quality Manual

INSURANCE PRUDENTIAL RULES In terms of Section 50 of the NBFIRA Act Section 43 on Licensing

INSTALLATION ELECTRICIAN / MAINTENANCE ELECTRICIAN APPRENTICESHIP ASSESSMENT PLAN

Guideline on good pharmacovigilance practices (GVP)

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

Audit Committee Terms of Reference

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

REGULATIONS GOVERNING THE SYSTEM OF RECOGNITION AND CREDIT TRANSFER FOR OFFICIAL UNIVERSITY POSTGRADUATE STUDIES

SC-A-063 (Ver 10-09/15) Page 3 of 6

PUBLIC SECTOR PANELS OF CONSULTANTS (PSPC)

INSURANCE INTERMEDIARIES (GENERAL BUSINESS) REGULATIONS 1999

Transcription:

Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Tel: 64385122 www.mom.gov.sg mom_oshd@mom.gov.sg Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment This form may take you 20 minutes to complete. You will need the following information to fill in the form: Narrative description and company s commitment to the services, including history of company, company s goal and policy, type of services, staff skills and training programme and countries where services can be rendered Personnel data sheet of all partners, directors and key inspection personnel ISO certificate for quality management supervision or quality assurance manual Relevant approval certificates, testimonials or letters from government authorities Sample copies of test reports, inspection reports and certificates and other technical reports published by company

Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Application Application for Approved as (Overseas/Local) an Appro Third Party Inspection Agency for (Lifting Equipment) APPLICATION FORM Name of Company: Type of organisation Please tick Address of Head Office: Partnership Private Company Public Listed Company Government Owned Company Government Department Others (Please state) Date of Application: Telephone Number: Facsimile Number: Internet Address: Scope of Work applying for: Design Review and Prototype Testing Remnant Life Survey Name: Particulars of Person making application Designation: Declaration I hereby declare that the information supplied in this application (including all the attachments) are true and correct to my best knowledge and belief, and the testimonials, certificates, letters of authorization and documents as given by the persons whose names appear on them and submitted with this application are true and genuine. Date Signature Page 1 of 23

Signature/Date For Official Use Approved/Not Approved Partners, Directors and key inspection personnel. (Completed Personal Data Sheets for each of those listed below are to be appended to this list.) Name and Designation Education (Degree/Diploma) Working Languages Number of years with Organisation Year of birth and Age last birthday Page 2 of 23

Projects and Services provided over the past 3 years. Project/Equipment Inspected Date when inspection was carried out Codes Used Country where inspection was made Client Page 3 of 23

Personal Data Sheet I PERSONAL PARTICULARS Name: (Underline Surname) Date of Birth: Date joined organization: Current Appointment: Please affix a recent passport sized photograph here. II EDUCATION & TRAINING Basic Date Training Received Specialist Date Training Received III SURVEY EXPERIENCE Assignments (Previous and present employment, relevant to lifting equipment surveys) Date Description Code Familiarity with design codes (State the design codes title and the degree of familiarity in their use.) VI LANGUAGE PROFICIENCY Page 4 of 23

Written Spoken V PUBLICATIONS Date Title of Publication VI DECLARATION I hereby declare that the information given is true to the best of my knowledge and belief, and that any testimonials, documents and appendices that are submitted with this personal data sheet are true and genuine, given and signed by the persons whose name appear on them. Date: Signature: VII MARKINGS AND STAMPS USED BY APPROVED INSPECTOR Note : Please use separate sheet if spaces provided above is insufficient. Page 5 of 23

Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Application for Application Approved as (Overseas/Local) an Third Party Inspection Agency for Lifting Equipment Table of Content 1. Guidelines for the application as an Approved (Overseas / Local) Third Party Inspection Agency for Lifting Equipment 2. Guide to the preparation of Quality Assurance Manual 3. Approval criteria for Inspector 4. Application form 5. Extension Criteria for the Service Life of Mobile Crane 6. Criteria for Type Approval Page 6 of 23

Guidelines for the Application as an Approved (Overseas / Local) Third Party Inspection Agency for Lifting Equipment GENERAL 1. Two programmes have been instituted by the Occupational Safety and Health Division to enhance the safe integrity of lifting equipment. The programmes are the Type Approval of Lifting Equipment and the Limit of the Service Life of Mobile Cranes. 2. This two programmes require the appointment of Third Party Inspection Agencies to carry out: a. Design review and prototype testing of the lifting equipment for the type approval scheme; and b. Remaining service life assessment for the extension of the service life of mobile cranes beyond the stipulated period. 3. A Third Party Inspection Agency must be independent to the owner of the equipment under review or inspection. TYPE APPROVAL OF LIFTING EQUIPMENT 4. The objective of a design review is to ensure that the lifting equipment is designed to an acceptable code or standard. 5. The following codes and standards may be used: ISO EN SS BSI DIN FEM ANSI ASME 6. At the end of this review, the Third Party Inspection Agency shall issue a Certificate of Compliance (Design Review) for the model of the equipment surveyed testifying that the design meets the relevant codes and standards. 7. The objective of prototype testing is to confirm that the equipment conforms to the design specifications and that it can perform as designed in a safe manner when used. 8. The prototype shall be tested: a. By an accredited testing laboratory or organisation, accredited to a national accreditation authority in the country where the lifting equipment is manufactured (the accreditation authority shall have a Page 7 of 23

mutual recognition agreement with the Singapore Accreditation Council); b. In a suitable testing environment at the manufacturer works or a laboratory set up to test the lifting equipment. 9. At the end of the testing, the Third Party Inspection Agency shall issue a Certificate of Compliance (Prototype Testing) testifying that the prototype meets the code requirements and the test result meets the design parameters. 10. If the Agency carries out both the review and testing, he may issue a combine Certificate of Compliance (Design Review & Prototype Testing) for the purpose of obtaining the Type Approval. EXTENSION OF THE SERVICE LIFE OF MOBILE CRANES 11. The objective is to carry out a thorough assessment on a mobile crane for the purpose of extending its service life beyond the maximum stipulated service life for that class of cranes. 12. The scope of work includes: a. Assessment of the Case Proposal; and the Inspection and Maintenance-Scheme prepared by the owner of the crane; and b. Recommendation of an estimated remaining service life for the crane. (refer to "Extension Criteria for the service Life of mobile cranes for more details) 13. At the end of the assessment, the Third Party Inspection Agency shall furnish a report to the Commissioner for Workplace Safety and Health submitted through the owner of the crane indicating the Case Proposal s compliance with the relevant codes and guidelines, and recommend the remaining service life. The report would then be used as supporting document by the owner to apply to the Ministry for the extension of the service life of the mobile crane. CRITERIA FOR THE APPOINTMENT AS A THIRD PARTY INSPECTION AGENCY FOR LIFTING EQUIPMENT 14. The criteria for the appointment as an Approved Third Party Inspection Agency for Lifting Equipment are as follows: a) The organisation shall have at least 2 qualified inspectors under its direct employment. (see "Approval criteria for inspector") Page 8 of 23

b) The organisation shall have instituted a quality management system such as the ISO 9000 certification scheme or equivalent to ensure the quality of the assessment being carried out. c) Overseas applicants shall be accredited to the national accreditation bodies as an Inspection Agency for the relevant scope of work. APPLICATIONS 15. Organization with the relevant competent personnel and experiences may apply to the Division as an approved Third Party Inspection Agency for lifting equipment. 16. The organization should make the application from the Office where the Company s policy is formulated, and where the operations are directed. 17. The organization shall ensure that the office must be staffed with sufficient number of competent inspectors and other supporting staff to carrying out the assessment. 18. The person making the application should be a person: a. holding executive power in the Head Office, b. charged with the responsibility of maintaining the Quality Assurance Manual, c. who can act as liaison person between the company and the Commissioner for Workplace Safety and Health, d. well versed with all facets of the organization s operation, and e. with knowledge and experience in relevant work and activity. FEES PAYABLE 19. The fee for the approval of an organisation as an approved third party inspection agency is S$180.00. DOCUMENTS TO BE SUBMITTED 20. The following documents must be submitted in the application: a. Completed application form; b. A narrative description of the Company s commitment to the services covering the following aspect: i. History of the company since its formation; ii. Company goal and policy; iii. Types of services (please indicate the Codes and legislation used in the country); iv. Countries in which services can be rendered; and Page 9 of 23

v. Staff skill and training programs. c. Personal Data Sheets of all partners, directors and key inspection personnel; d. A copy of the ISO certificate testifying to the quality management system of the organization. If the organization is not ISO certified, a set of the Company s Quality Assurance Manual is to be submitted (refer to "Guide to the preparation of quality assurance manual"). The Commissioner for Workplace Safety and Health may in future required the approved organization to be ISO certified; e. Copies of the approval certificates, testimonials or letters from government authorities. f. Sample copies of: i. Test reports; ii. Inspection reports and certificates; iii. Any technical reports or magazines published by your company or inspectors; 21. The documents submitted should be in English. Where this is not possible, an official translation from the appropriate foreign mission should accompany the document. 22. The Commissioner of Workplace Safety and Health will authorized the organization in writing, if he is satisfied based on the submission that the applicant is competent to carry out the relevant scope of work. 23. The Commissioner of Workplace Safety and Health would accept the certificates, reports that have been duly endorsed by the approved Third Party Inspection Agency for the purpose of the type approval of lifting equipment or for the extension of the service life of mobile cranes. GENERAL NOTE ON THE COMPLETION OF THE APPLICATION FORM 24. All sections of the form are to be completed. 25. All relevant documents are to be submitted with this application. These should include document which are not specifically requested for but which are, in your opinion, helpful to us in assessing your Company s capability. 26. If the number of forms supplied is not sufficient, please make the necessary number of copies, and then complete them for submission. 27. If the space provided in the application form is not sufficient, please attach separate sheets for submission. Page 10 of 23

28. All documents submitted by the applicant will become the property of the Commissioner for Workplace Safety and Health. They will not be returned to the applicant in whatever form. 29. Any information provided by the applicant will be kept in strict confidence. They will not be released to any party without the written approval of the applicant. 30. Authorization, if granted, will be for the specific country applied for and the period stated in the letter of Authorization. 31. Failure to provide any or insufficient information required by the Commissioner for Workplace Safety and Health will be a cause for rejection. 32. As it takes time for the Division to process each application, the applicant is advise to make allowance for the processing of his application. Generally the processing times required for approval is 2-4 weeks. The above stated processing time is applicable if the application is complete (i.e. all required supporting documents and information are supplied) at the time of submission. Page 11 of 23

Guide to the Preparation of Quality Assurance Manual 1. The inspection agency should assure the quality in all phases of inspection, even before work commences, through the Quality Assurance Manual. The Commissioner for Workplace Safety and Health views the Quality Assurance Manual from the inspection agency as a very important piece of document and reflects the commitment of the Authority to quality. 2. The inspection agency, through its management should define the agency's Corporate Policy and Objectives to quality in the Quality Assurance Manual. This commitment to quality should be signed by the chief executive in the organisation (which in most cases should be the President or Chairman of the Board of Directors). 3. The Manual should also describe the Quality System within the organisation: Definition Quality System (BS 4778, or ISO9000) "The organisation structure, responsibilities, activities, resources and events that together provide organised procedures and methods of implementation to ensure the capability of the organisation to meet quality requirements". This Quality System should satisfy the Corporate Objective defined by its chief executive. 4. The representative submitting the application for approval should be designated the Quality Assurance Representative as well. The Quality Assurance Representative should Page 12 of 23

Liaise with the Commissioner with regard to problems or queries on the Quality Assurance Manual. Undertake internal audit independent of management on the organisation's Quality Assurance Manual. Ensure that only authorised amendments can be included in the Quality Assurance Manual. Ensure that the Quality system is properly documented into a Quality Programme in the Quality Assurance Manual. 5. The inspection agency should prepare a Quality Assurance Manual, keeping in mind the points raised in the foregoing paragraphs, and submit to the Commissioner for Workplace Safety and Health at the time of submission for approval as an Third Party Inspection Agency. The Appendix to this guide gives a suggested layout of a Quality Assurance Manual. The minimum information to be included in each section of the manual is as suggested in the Appendix; the inspection agency may wish to include additional information, if necessary. Page 13 of 23

APPENDIX Suggested Make-up of the Quality Assurance Manual 1 Facing Page : (i) (ii) (iii) Company name and address Telephone telex, cables, and fax numbers Type of services 2 Statement of Authority (Corporate Policy and Objective) : (i) (ii) (iii) Authority and responsibility of persons accountable for enforcing QA Systems, their freedom to initiate, recommend and provide solutions to QA problems. Statement of support of management. Dated and signed by president or chairman. 3 Glossary of terms : (i) (ii) 4 Organisation Charts : (i) (ii) (iii) (iv) (v) (vi) 5 QA Responsibilities : (i) (ii) (iii) 6 Design Reviews : (i) (ii) (iii) For abbreviated titles of personnel and control documents. Not mandatory. Contain job titles of key management personnel. By job titles controlling engineering purchase, QA etc, showing accesses to top management. Additional departmental charts if necessary Branch office organisation charts Dated, with revision identification Job titles used in charts should be consistent with manual Preparation, revision, distribution and implementation of QA manual and controls of the QA manual. Responsibility for performance of the staff. Other responsibilities assigned by management under the Quality Assurance System such as calibration of measuring and test equipment, receiving inspections, resolution of non-conformances, reporting etc Responsibility for review of design. Control of job order etc. Distribution and disposal of design and reports Page 14 of 23

7 Examination and Inspection Program 8 Correction of Nonconformities 9 Calibration of Inspection Equipment : (i) (ii) (iii) (iv) : (i) (ii) (iii) : (i) (ii) (iii) Describe operations from receipt of request for inspection through to final issue of report. Description of documents used to control the above functions, including a description of issuer and how they are used Who is responsible for preparation and correctness and completion of the reports? Is distribution and retention of reports provided for? Define non-conformities. Responsibilities for resolution. Documentation. Who is responsible? Method of record keeping Frequency 10 Records retention : (i) (ii) 11 Sample Forms : (i) (ii) Distribution of reports Explain Company procedure regarding records generation and retention. Control forms, identified by number or letter and their use explained in the manual. They may be included with the relevant section in the manual or as an appendix. Forms shown should be marked: Sample or Exhibit. Internal written procedure. 12 Internal Audits : Management audit system 13 Training : (i) (ii) (iii) (iv) Personnel to have appropriate experience. Regular training/upgrading programme or training. Demonstrate Competence. Records of personal training/experience/certification. Page 15 of 23

Third Party Inspection Agency for Lifting Equipment Approval Criteria for Inspectors Description Approval Criteria 1 Age Above 21 years old and below 65 years old at last birthday. 2 Academic Qualifications Basic degree in an engineering discipline from a university or college recognized by the Singapore Professional Engineers Board. 3 Professional Qualifications Relevant qualifications in welding technology, welding inspection, lifting equipment inspection, nondestructive testing and other related technologies. Inspectors with knowledge on the design and manufacturing of mobile cranes would be advantaged. 4 Experience Inspectors with a basic degree in engineering must have at least 5 years relevant experience in welding technology and inspection, lifting equipment inspections, non-destructive testing and other related technologies. 5 Familiarity with Standards and Codes Familiar with codes and standards related to lifting equipment and steel structures. Page 16 of 23

Extension Criteria for the Service Life of Mobile Cranes 1. INTRODUCTION 1.1. With effect from 1 st Jun 2002, the maximum service life of crawler, truck or wheel mounted mobile cranes (of a similar construction to that shown in the attached Appendix from SS CP 37) shall not exceed that as shown in Table A below. Table A Design Safe Working Load (Maximum Capacity) Maximum allowable years of service from the year of manufacture 50 tons and below 20 Above 50 tons but not more than 100 tons 25 100 tons and above 30 1.2. The maximum service life of such a crane may be extended subject to the prior approval of the Commissioner for Workplace Safety and Health. 1.3. If the Commissioner is satisfied that the crane is safe for use during the period of extension, he may, subject to conditions, extend the service life of the crane to a period specified in the extension approval document. 2. EXTENSION CRITERIA FOR THE SERVICE LIFE OF A MOBILE CRANE 2.1. The owner of a mobile crane who wishes to extend the service life of his crane may apply for the extension by submitting to the Commissioner a Proposal for Extension of Service Life of a Crane. This proposal shall comprise: (a) A Case Proposal; (b) An Inspection and Testing Report; (c) A Final Assessment and Recommendation Report. 2.2. The owner of the mobile crane shall prepare the Case Proposal. The owner shall engage an Approved Third Party Inspection Agency for lifting equipment to carry out the inspection, arranged for testing, conduct an assessment, recommends the estimated remaining service life and proposed an inspection / maintenance scheme. 2.3. The elements of the Assessment Procedures are outlined as follows: Page 17 of 23

Elements of the Assessment Procedures for Extension of Service Life of a Crane I) Case proposal: Part 1 of the Case Proposal is a written record of the crane detailing the following: (a) Usage patterns (e.g. number of operating cycles per hour at certain loading condition); (b) Records of any past accidents, failures, defects that could affect the structural integrity of the crane, and replacement carried out; (c) Records of maintenance carried out; (d) Possible modes of failure. Part 2 of the Case Proposal consist of a proposed scheme to evaluate the remaining service life of the crane and shall include the following: (e) The methodology and assessment employed including testing and inspection to be carried out to address the potential fatigue stresses experienced by the crane; and (f) The acceptance criteria adopted. The criteria shall be based on an acceptable code and standard such as British Standards 7910: "Guide on the methods of assessing the acceptability of flaws in fusion welded structures" and any other codes / standards acceptable to the Commissioner for Workplace Safety and Health. To be performed by Owner (can be assisted by the Third Party Inspection Agency) II) Inspection of the mobile crane: The inspection of the mobile crane shall be carried out in a suitable testing environment and shall include but not limited to the following: (a) A thorough visual inspection shall be carried out on the mobile crane. Critical load bearing parts such as the boom section and areas that are not accessible during the annual inspection shall be dismantled so as to facilitate inspection. (b) Welding at critical load bearing parts (e.g. hinges) shall be inspected and any defects shall be recorded. (c) Direct a testing agency to conduct the necessary testing such as NDT or mechanical testing. Third Party Inspection Agency Page 18 of 23

III) Elements of the Assessment Procedures for Extension of Service Life of a Crane Non-Destructive Testing and Mechanical Testing: To be performed by The following load bearing parts shall be tested using an appropriate testing method to ascertain its mechanical integrity: (a) Main Jib/Boom (b) Fly Jib and / or other attachments; and (c) Slew rings (d) Hook Blocks (e) Wire ropes, etc SAC- SINGLAS accredited testing laboratory The Third Party Inspection Agency may specify other parts of the cranes to be tested if he has reason to believe that there are possible defects, which can only be detected by NDT. IV) Inspection and Testing Report At the end of the inspection and testing, a report shall be prepared and shall include the following details: (a) General condition of crane based on the visual inspection; (b) Location where visible defect/s was/were found; (c) Method/s of Non-Destructive Testing used; (d) Description of the types of flaws detected (with photographs attached) (e) Recommend any corrective actions to be carried out on the crane. Third Party Inspection Agency V) Assessment The Third Party Inspection Agency shall thereafter review the results of the inspection and testing based on the proposed methodology and assessment carried out on the mobile crane and carry out, if his professional experience and judgement think it necessary, a stress analysis on critical locations of the crane. Third Party Inspection Agency Page 19 of 23

VI) Elements of the Assessment Procedures for Extension of Service Life of a Crane Recommendations To be performed by The Third Party Inspection Agency shall then recommend an estimated remaining service life for the crane based on his professional experience, and the possible failure mode and mechanism stipulated in the Case Proposal. The Third Party Inspection Agency shall also propose an inspection / maintenance scheme for the crane for the extended service life, so that any defects or deterioration in the crane can be detected and actions can be taken to remedy any unsafe situation before the mechanical integrity of the crane is affected. Third Party Inspection Agency VII) Final Report At the end of the assessment, the Third Party Inspection Agency shall furnish a report to the Commissioner, submitted through the owner of the crane. The report shall detailed the results of his Assessment and Recommendations as outlined above and shall be duly endorsed by the Third Party Inspection Agency. Third Party Inspection Agency This final report would be used as supporting document by the owner to apply to the Commissioner for the extension of the service life of the mobile crane. 3. IMPORTANT NOTES 3.1. The Third Party Inspection Agency and the testing agency appointed under Section III Non-Destructive Testing and Mechanical Testing shall be independent of each other. 3.2. The crane shall meet the requirements as stipulated in the Workplace Safety And Health Act and its subsidiary legislations. It shall also comply with the requirements of the Singapore Standard Code of Practice 37: Safe Use of Mobile Cranes: 2000. 3.3. The extended service life of the mobile crane if granted will be for a period not exceeding 3 years. Owner of cranes who wish to extend further the service life of his crane is required to carry out another assessment. Page 20 of 23

Criteria for the Type Approval for Lifting Equipment 1. INTRODUCTION With effect from 1 st April 2004, all tower cranes used in Singapore shall be type approved for use. 2. CRITERIA FOR TYPE APPROVAL In order for lifting equipment to be type approved by the department, the application must satisfy the Department in the following aspect: a. Design Codes and Standards i. The lifting equipment shall be designed according to international codes and standards acceptable to the Commissioner for Workplace Safety and Health. The following codes and standards are currently acceptable for use: ISO BSI FEM ANSI DIN SS ASME EN ii. Other National Codes may be used subject to the prior approval of the Commissioner for Workplace Safety and Health. b. Verification of Design and Fabrication i. The verification involves a design review and a prototype testing by an approved party as outlined below. Purpose of verification Design Review To verify that the design conforms to the relevant design codes and standards Prototype Testing To verify that the equipment had been fabricated in accordance to the design specification and can perform its function as designed in a safe manner when used. (Note 2) Party to conduct the verification in overseas Approved Overseas Third Party Inspection Agency Page 21 of 23

Party to conduct the verification locally Approved Local Third Party Inspection Agency Professional Engineer of the relevant discipline (Note Approved Person 1) Certification of equipment required Note 1: Certificate of Compliance (Design Review) Certificate of Compliance (Prototype Testing) a. This applies in the case where type approval is sought for a lifting equipment that is already in use in Singapore, but there is no documentation to establish the origin of the lifting equipment. b. The owner of the lifting equipment shall engaged a Singapore registered Professional Engineer (P.E.) (of the relevant engineering discipline) to carry out a design review. The P.E. shall use the latest and applicable version of the Singapore Standards in his design. c. Where the applicable Singapore Standards is not available, any of the following national codes may be used: ISO BSI FEM ANSI DIN ASME EN d. Other National codes may be used subjected to the prior approval of the Commissioner for Workplace Safety and Health. Note 2: a. The prototype or a model of the lifting equipment shall be tested in a suitable testing environment at the premises of the manufacturer works or a laboratory set up to test the lifting equipment. c. Quality Assurance by the Manufacturer i. The manufacturer of the equipment must satisfy the department that the equipment that they produced consistently meets the specifications of the crane that was type approved for used in Singapore. ii. The manufacturer must put in place a documented Quality Assurance System that is reviewed or audited periodically. A copy of the quality assurance manual shall be submitted to the department for review. d. Compliance to Legal Requirements i. Every lifting equipment shall also meet all the legal and procedural requirements, such as: Installation of various safety devices, e.g. limit switches; Efficient braking or locking mechanism; Assess to operator's cabin; Page 22 of 23

Crane logbook detailing the identification/markings of parts/components and the records of inspections, maintenance, replacement, and etc. Page 23 of 23