Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview



Similar documents
OE PROJECT CHARTER TEMPLATE

LGS Project Management Methodology

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University.

Cisco Change Management: Best Practices White Paper

How To Write A Project Management Plan

MNLARS Project Audit Checklist

Program Lifecycle Methodology Version 1.7

Organization. Project Name. Project Overview Plan Version # Date

Project Governance Plan Next Generation Project Oregon Military Department, Office of Emergency Management, Program (The OEM 9-1-1)

Project Management Plan for

Information & Technology. Change Management Policy

Managed Hosted IP Telephony Services shared services for Government One Network. One Planet. Infinite Possibilities.

Department of Administration Portfolio Management System 1.3 June 30, 2010

Role and Skill Descriptions. For An ITIL Implementation Project

Ten Steps to a Successful Business Phone System Implementation. By Clare Kaufman

Cisco Data Center Optimization Services

Cisco Video Surveillance Services

Project Management for econnectivity

Development, Acquisition, Implementation, and Maintenance of Application Systems

Best Practices for deploying unified communications together with SIP trunking connectivity

Framework. 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP

PROPOSAL XXX INFRASTRUCTURE MIGRATION PROJECT (RFP 20XX.XX.XX)

PHASE 3: PLANNING PHASE

Project Knowledge Areas

N-Wave Networking Services Service Catalog

IT General Controls Domain COBIT Domain Control Objective Control Activity Test Plan Test of Controls Results

PHASE 3: PLANNING PHASE

Maturity Model. March Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Cisco Data Center Optimization Services

Cisco Network Optimization Service

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

Crosswalk Between Current and New PMP Task Classifications

Minnesota Health Insurance Exchange (MNHIX)

Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:

PROJECT MANAGEMENT FRAMEWORK

Information Technology Project Oversight Framework

EXECUTIVE SUMMARY...5

PHASE 8: IMPLEMENTATION PHASE

Information & Technology Management Branch Ministry of Education. Change Management Policy

IT Project Management Methodology. Project Execution Support Guide. Version 0.3

Cisco Unified Communications Remote Management Services

VoteCal Statewide Voter Registration System Project. Master Project Management Plan. Version 1.2

Project Charter and Scope Statement

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

Cisco Services for IPTV

Empowering the Enterprise Through Unified Communications & Managed Services Solutions

PHASE 1: INITIATION PHASE

Networking Systems (10102)

Prepared for: Prepared by:

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management

Cisco Unified Contact Center Planning and Design Service

TRANSITION PLAN TEMPLATE

Process Improvement Plan

Community Anchor Institution Service Level Agreement

Ellucian Implementation Methodology. Summary of Project Management and Solution Delivery Phases

ComplianceSP TM on SharePoint. Complete Document & Process Management for Life Sciences on SharePoint 2010 & 2013

CDC UNIFIED PROCESS JOB AID

GMS NETWORK BASIC PRODUCT SPECIFICATION 1. INTRODUCTION 2. SERVICE DEFINITION. 2.1 Service Overview. GMS Network Basic

Treasury Board of Canada Secretariat (TBS) IT Project Manager s Handbook. Version 1.1

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

U.S. Department of Education Federal Student Aid

Internal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit

ACESS A Comprehensive Enterprise Social Services System

PETER CUTLER SCOTT PAGE. November 15, 2011

Oversight of Information Technology Projects. Information Technology Audit

Project Team Roles Adapted for PAAMCO

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

Implementation Guide. Simplify, Save, Scale VoIP: The Next Generation Phone Service. A single source for quality voice and data services.

The purpose of this course is to provide practical assistance for defining and managing project scope.

GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION

Support and Service Management Service Description

STATEMENT THOMAS P. MICHELLI CHIEF INFORMATION OFFICER U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT DEPARTMENT OF HOMELAND SECURITY REGARDING A HEARING ON

ATTACHMENT 3 TO AIU3 HOSTED VOIP SERVICE REQUEST FOR PROPOSAL (December 10, 2010)

That the Board of Regents approve ASU upgrading its current Avaya Definity PBX System.

PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding

Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997

DIRECTIVE NUMBER: v2.0. SUBJECT: Correctional Integration Systems Change Management Plan

Information Technology Services Project Management Office Operations Guide

Why are PMO s are Needed on Large Projects?

Business Continuity protection for SIP trunking service

Sample Quality Management Plan

N e t w o r k E n g i n e e r Position Description

PUB (MPI) 1-62 Reference: Gartner Scorecard

BridgeConnex Statement of Work Managed Network Services (MNS) & Network Monitoring Services (NMS)

Ancero IP Toll Free Service Guide

Project Management Guidelines

Project Implementation Process (PIP)

Skatteudvalget (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis

TEMPLATE. U.S. Department of Energy. Project Name. Feasibility Study Report. September 2002 U. S. DEPARTMENT OF ENERGY

SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND

Why Choose the Oracle Taleo Recruiting Cloud?

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

APPENDIX 8 TO SCHEDULE 3.3

Information Technology Governance Overview and Charter

California Dept. of Technology AT&T CALNET 3. Service Level Agreements (SLA) MPLS, VPN and Converged VoIP

Security. Security consulting and Integration: Definition and Deliverables. Introduction

PROJECT MANAGEMENT PLAN Florida A&M University Financials Version 9.0 Upgrade and Redeployment

IP Telephony Management

IT Project: System Implementation Project Template Description

How To Write An Slcm Project Plan

Transcription:

Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview 1/1

Table of Contents 1. Introduction...3 2. Executive Summary...4 3. Program Definition...5 3.1. Program Scope... 5 3.2. Program Deliverables... 5 3.3. Assumptions... 6 3.4. Definition of Success... 6 4. Roles and Responsibilities...7 4.1. Program Team Roles and Responsibilities... 7 5. Program Management Processes...10 5.1. Project Scope and Plan Documents... 10 5.2. Program Tracking... 10 5.3. Communications... 10 5.4. Change Requests... 11 5.5. Outstanding Items... 11 5.6. Deliverables Validation... 12 5.7. Risk Management... 12 2/2

1. Introduction The purpose of this document is to define the scope of the work that is required to satisfy the requirements of the Program. The intent is to ensure that all parties and stakeholders involved have a common understanding of the objectives, roles and responsibilities. As well, this document: ¾Identifies the processes that will be used during this program by the program office; ¾Describes the program and the way it will be managed; ¾Lists the program deliverables; and ¾Provides details of the scope of the work to be performed. 3/3

2. Executive Summary The Program scope covers a new Voice over IP (VoIP) Network Solution Design, Testing, Integration, Implementation and Network Management. The program outcomes are intended to provide a platform for the convergence of the existing client data and voice networks and assure a managed migration from conventional time division multiplex (TDM) technology to VoIP telephony technology. Through this initiative, the Contractor, partnering with the Solution Vendor, will demonstrate a leadership role in the industry to deliver both data and voice services operating on one client IP Backbone infrastructure. The Contractor has proven its ability to provide dependable network solutions and with positive results. The objective of this Program solution is to provide networking services that are secure, redundant, scaleable, and enhanced by professional management at the Local and Wide Area Networks level. As such, what is being proposed is a comprehensive end-to-end network solution. Benefits to the Client include: reduced network costs, simplified network architecture and administration, overall improved efficiencies throughout the network, and reclamation of resources to re-focus on core competencies. The Contractor Program Team works closely with the Solution Vendor Program Team to fulfill and exceed customer expectations, aiming to deliver the VoIP solution in time and on the budget. A number of joint team meetings were held and aimed at defining, evaluating and specifying technical solution, service fulfilment and major program deliverables. The Contractor key resources are being assigned to work on the solution and service assurance at greater technical detail and building the network. 4/4

3. Program Definition 3.1. Program Scope The program scope covers the program management services, technology and operational support for the upgrade of the existing Client voice network systems and services to the current version of the Solution Vendor s Voice over IP product line, including four major projects / groups of activities: Technical Solution Design; Core Infrastructure Provisioning, including: o provisioning core and non-core elements facilitating network access, transport and IP distribution; o additional upgrades to existing network to all its locations; o provisioning of transport for the IP edge distribution devices with enough bandwidth to carry all data and VoIP traffic; o building main transport rings. Service Fulfilment, including: o data and IP network design; o development and execution of the overall solution testing; o installation of the network switch systems; o ordering, engineering and installation of the customer equipment; o data solution and service design, site migrations, and service activation. Network Management, including resource provisioning, training, tools, and processes: o alarming of systems and core infrastructure, for notification of all failures; o capacity and core network upgrades testing; o installation of a network management platform to manage the network infrastructure; o customer technical and end-user, contractor technical and support services training; o operational handoff & ongoing support mechanism. 3.2. Program Deliverables The Program deliverables reflect the major program activities within the Scope of Work to be delivered by the Program team. The following major activities were identified reflecting major in-scope projects within the Program: Program and In-scope Projects Management Technical Solution Design Core Infrastructure Provisioning, including network planning and engineering Service Fulfilment, including data network design, end-to-end testing, site installations and migrations Network Management, Transition and Operational Handoff Program Schedule Program Charter Program & Project Status Reports Test Plan Technical Solution Design Document Network Management Plan Network Sites VoIP Migrations 5/5

Service assurance and training for support staff and the end-users Through the Program life cycle a number of additional related activities and tasks will be emerging and included into the Scope of Work, such as: Non-standard elements to the proposed solution identified Ensure that tested and documented standards are in place for all custom parts of the solution Additional core builds required to ensure the network meets the capacity requirements Capital budget development and tracking for implementation Complete a detailed design of the WAN and LAN configuration templates to support the service fulfillment of Client requirements Identify gaps within the technology or processes required to meet the deliverables Ensure there are processes and procedures in place to test and turn-up the service Staffing and training, ensuring that the appropriate resources are available Deal with changes to the implementation plan and escalate accordingly Advise the stakeholders issues and potential risk to the successful completion of the program 3.3. Assumptions Contractor will manage the overall implementation schedule Any change to the program baselines will be managed based on the formal Project Management processes, including stakeholder sign-off Voice over IP will be treated as an upgrade to the existing solution Client information required to place orders and complete detailed designs will be accurate and provided in a timely manner The Steering Committee is capable of supplying the team with the resources to ensure success Contractor has the in-house expertise to perform the work The Program management team and its primes are dedicated to this initiative and will not be pulled onto other projects which may impact this one. 3.4. Definition of Success The Program and relevant VoIP network transition is considered successful when the requirements listed below have been successfully met while applying Contractor s best practices, executing on processes and methodologies and adhering to the Client s and Contractor s policies and procedures. Provide updated and accurate documentation as a result of the transition; No unscheduled outages due to the project activities; Comply with the client security policies and regulations; All changes approved through Change Management processes; Successful proof of concept and pilot location conversions with no impact to production; and Successful transition of all network locations. 6/6

4. Roles and Responsibilities 4.1. Program Team Roles and Responsibilities Each program team member is assigned specific roles and responsibilities. The table below identifies these roles, individuals assigned and their associated responsibilities for this program. Role Team Member Responsibilities Steering Committee Program Sponsor Program Manager 9Serve as a decision making body to ensure that any decisions made respect the objectives of the program; 9Approve and sign off on the Program Charter; 9Remove directional, fiscal and resource roadblocks to enable the program s successful execution; 9Hold regular program review meetings with the Program Manager to monitor the progress of the program; 9Commit to providing resources for this program from their respective areas by signing deliverables forms in partnership with their primes; 9Ensures overall program success, achieving business objectives, expected benefits, high internal and external customer confidence; 9Provides effective program communication and issue resolution with executive level stakeholders; 9Provides day-to-day guidance to the Program Manager on behalf of the Steering Committee; 9Approves requests for changes that affect the overall program budget, scope, timeline, etc. as required. 9Manages the program in the assigned areas of responsibility; 9Manages multiple concurrent projects within the program, ensuring the program success and objectives and delivery on time and budget; 9Brings a unified approach to managing program and concurrent projects within the program, following Project Management Methodology to optimize use of the corporate, client and third party resources; 9Ensure that program is properly defined, budgeted, approved, planned, documented, resource allocated, scheduled, supervised and completed; 9Takes part in selecting and assigning the Project Managers and Primes, guides and mentors them, acting as the escalation point as required; 9Develop initial program timelines Project Managers and Primes; 9Guides the Project Managers and their primes in the development of the project plans, approves the project plans developed by project managers in conjunction with the primes; 9Combines all individual project plans into a master project; 9Defines and manages reporting and communication within 7/7

Role Team Member Responsibilities the program, including setting up regular status meetings with Steering Committee, program management team and project managers as required; 9Works with the Project Managers and their primes to ensure they have the resources, budget and tools they need to be successful in their projects; 9Manages cross-project interdependencies between the projects and project teams; In-Scope Project Managers In-Scope Project Primes and SME s 9Manage projects within the assigned areas of program, ensuring the projects success and delivery on time and budget; 9Ensure that projects are properly defined, budgeted, approved, planned, documented, resource allocated, scheduled, supervised and completed; 9Work with the Program Manager and the primes in the development of the Project Management plans and scope documents, for the assigned projects in the program; 9Takes part in selecting and assigning the Project Primes and Team Members, guides and mentors them, acting as the escalation point as required; 9Work with the primes to ensure they have the resources, budget and tools they need to be successful in their subprojects; 9Manage the project lifecycles of the combined projects, including project initiation, analysis, planning, design, construction, implementation, integration and closure. 9Work with the Program Manager and the team to define success for their sub-projects; 9Produce regular status reports to the Program Manager and attend the project management team meetings; 9Develop change notices with the primes and work with the Program Manager for resolution; 9Develop outstanding items forms and notify Program Manager when the outstanding item begins to jeopardize the time line; 9Develop deliverables forms with the primes and associated Steering Committee member and acquire signoff at both the committed and acceptance levels; 9Manage all project team meetings, capture minutes from meetings and track action items; 9Keeper of the deliverables for their teams; 9Record keeper for and communicator of teams decisions and directions. 9Work with the Project Manager in the development of project plans and scope documents; 9Perform duties as outlined in scope document and the project management plans; 9Respond in a timely fashion to the Project Managers request for information; 9Provide updates to Project Managers on status of work; 9Identify risks and work with Project Managers to mitigate them; 8/8

Role Team Member Responsibilities 9Relay needs to project mangers in a timely manner; 9Review and commit to deliverables by signing deliverables forms in partnership with their Steering Committee partner; and 9Review and accept, in partnership with other primes, the project deliverables related to their projects. 9/9

5. Program Management Processes 5.1. Project Scope and Plan Documents Project Management Plans (PMPs) will be developed for each group of related activities, tasks and projects within this program. Each Project Manager appointed to manage these projects shall develop the PMPs in conjunction with the primes. The PMP s will follow the structure of the Program Charter. Project Scoping and Status Reporting documents will be developed by the Program Manager and shall be filled in for each project by the project managers / primes, together with the project SME s and team members. See appendixes for the templates of the documents. 5.2. Program Tracking Contractor assigns Program and Project Managers to manage the delivery of the major Program activities and groups of tasks defined as the Program projects. Project Managers mandate consists of two general project management tasks: a) Activity tracking on a regular and timely basis; and b) Reporting necessary information to the Program Manager and the Steering Committee. This information should contain the following: Progress reports on work being done (project status reports) Deliverables-in-progress status, in relation to the implementation plan Issues which have arisen Deliverables out for approval 5.3. Communications The Project Managers will provide the following routine status reports to the Program Manager: Formal weekly Project Status Reports, which prepared in the format defined and include: Status overview; Actions completed in the past period, and those planned for the coming period; Deliverables status; and Status of outstanding Problems/Issues, Decision Requests and Change Control items. Daily and weekly reporting via e-mail or phone conversations, as appropriate, to raise any new items or deviations from current plan, including: Scope change; Target dates impacted; Technical issues; Timeline estimates; and Review or approval issues. 10/10

Team meetings will be held on a regularly schedule basis. For the purposes of this project, the meetings will be held weekly until the program is up and running and then they may be moved to biweekly at the Program Manager s discretion. The Program Manager will provide the Steering Committee and Program Sponsor(s) with a synopsis of the program to date, in a regular status reports. This reports will be discussed at the regular status meetings. 5.4. Change Requests Any proposed changes to the program baseline plan which could affect the scope, schedule or assumptions, must be reviewed by all affected parties, so that a properly informed decision can be reached on whether to approve or reject the change. Change requests may be proposed by the Steering Committee or by Primes, and will be processed using the following change control procedure and the appropriate change request form: a) The Project Manager will provide a brief description of the change request. The Project Manager will log the request and work with the Program Manager to jointly assess whether the change should be considered for implementation. b) Each will assess the potential benefits and costs (schedule, risk, expense) of implementing the change for the Project and for the overall Program, consulting with other members of their teams as appropriate. c) The Project Manager will provide a recommendation to the Program Manager on whether the change should be accepted within a reasonable time of the request being received. d) Based on this (and other) input, the Program Manager will decide whether to proceed with the change, and the original requestor will be informed of the decision. The Program Manager will have five (5) working days from receipt of change request form to approve or reject the change. After the five (5) working days, if no response has been received, the change request is considered rejected. 5.5. Outstanding Items Outstanding items include any items, which if not resolved, could have an adverse effect on the project. The following information is supplied for each outstanding item: ¾Description of item; ¾Deadline for resolving the item and the impact if not resolved in time; ¾Risk mitigation; and ¾Description of action needed to resolve item. For each outstanding item, the Project Manager who developed the item, will discuss with the Program Manager the implications of the item and how it will affect the sub-project it is related to. The item is logged, with the necessary risk mitigation information and included in the weekly status reports provided to the Program Manager. 11/11

5.6. Deliverables Validation The proper Deliverables review and approval form must accompany any and all deliverables. The Program Manager and Program Sponsor has five (5) working days from receipt of deliverables form to approve or reject the deliverables. After the five (5) working days, if no response has been received from the project sponsor, the deliverable is considered approved. 5.7. Risk Management The following high-level risks have been identified for the overall program: ¾The Program Contract reflects current high-level client expectations for the technical network solution, services, and assurance ¾Specific solution depends on the accuracy of the current network and other client specific information ¾Client - specific technical solution requirements need further refinement ¾Technical solution is based on the latest technology platform from the Solution Vendor that needs to be validated ¾A number of actions and issues are outstanding, including some details of the proposed solution implementation ¾Current proposed solution is based on a number of assumptions that have to be further verified ¾Organizational uncertainties such as restructuring or changing priorities ¾Budgetary constraints ¾Insufficient time to complete all tasks. The expectation of the program team is that the Program Management and Steering Committee, in conjunction with the program team, will facilitate the mitigation of these risks. This risk list is by no means complete and should not be taken as such. New risks will arise as the program unfolds and the scope documents and project management plans are developed. Any risks the team believes cannot be overcome in a timely manner will be brought to the Steering Committee s attention for discussion and resolution. 12/12