Riprap Design for High Velocity Flows

Similar documents
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Emergency Spillways (Sediment basins)

Design of Riprap Revetment HEC 11 Metric Version

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow

CITY UTILITIES DESIGN STANDARDS MANUAL

Appendix 4-C. Open Channel Theory

Riprap-lined Swale (RS)

Topic 8: Open Channel Flow

Outlet stabilization structure

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Welded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road,

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

How To Check For Scour At A Bridge

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

CHAPTER 5 OPEN CHANNEL HYDROLOGY

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

BRIDGES ARE relatively expensive but often are

Scour and Scour Protection

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

City of Shelbyville Site Inspection Checklist

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA

2O-1 Channel Types and Structures

CHAPTER 3 STORM DRAINAGE SYSTEMS

Open channel flow Basic principle

Open Channel Flow in Aquaculture

Section 2100-Trenching and Tunneling

Chapter 7 Ditches and Channels

M6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)

Part 7 GEOTEXTILE FILTER FABRICS

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

CHAPTER 2 HYDRAULICS OF SEWERS

Experiment (13): Flow channel

6.0 Results of Risk Analyses

Lecture 6. Jump as energy dissipation Control of jump.

DRAINAGE CRITERIA MANUAL (V. 2) CULVERTS CONTENTS

Chapter 9. Steady Flow in Open channels

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Evaluation of Open Channel Flow Equations. Introduction :

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B?

Watershed Works Manual

NJ Interception Drainage

Broad Crested Weirs. I. Introduction

Basic Principles of Channel Design

Design Charts for Open-Channel Flow HDS 3 August 1961

Table 4.9 Storm Drain Inlet Protetion Applicable for

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)

Objectives and Purpose...Page 1 Open Bottom Arch - Flow Model...Page 1 The Pros and Cons of Metal Arch Culverts...Page 2 Positive Features of Arch

USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE

SECTION 5 - STORM DRAINS

Managing Our Water Retention Systems

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

DESIGN GUIDELINES FOR EARTH RETENTION

Basic Hydrology. Time of Concentration Methodology

SECTION EARTH MOVING

METHOD OF TEST FOR DETERMINATION OF PERMEABILITY OF GRANULAR SOILS

CHAPTER 860 OPEN CHANNELS

Module 7 (Lecture 24 to 28) RETAINING WALLS

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Lecture 17 Design of Earthen Canals. I. General

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

2011 HYDRAULICS MANUAL

3. Design Procedures. Design Procedures. Introduction

WEATHERING, EROSION, and DEPOSITION REVIEW

A Stream Restoration Case Study in the California Central Coast

geotextile filter design, application, and product selection guide

STORM DRAINS CHAPTER 7

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

CHAPTER 11 ENERGY DISSIPATORS

CHAPTER 7 DRAINAGE OF PAVEMENTS

Safe & Sound Bridge Terminology

Block and Gravel Inlet Protection (BIP)

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

OPEN-CHANNEL FLOW. Free surface. P atm

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

SECTION 5. Sediment Control Measures

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

Jackson Gulch Outlet Canal Rehabilitation Project

Pima RDstiChannel DesiggSubmittal

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Stormwater/Wetland Pond Construction Inspection Checklist

UNDER DRAINAGE AND FILTER DESIGN

Hydraulic Jumps and Non-uniform Open Channel Flow, Course #507. Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC

SANITARY SEWER SPECIFICATIONS

CONFIRMING WET WEATHER TREATMENT FACILITY HYDRAULIC DESIGN WITH PHYSICAL MODEL STUDY

Crossing creeks Stream crossings on farms

CHAPTER 4 STORM DRAINAGE SYSTEMS

Division 2 Section Section 02795

PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL

PERFORMANCE OF FLOOD-TESTED SOIL-CEMENT PROTECTED LEVEES. Kenneth D. Hansen, P.E. 1 Dennis L. Richards, P.E. 2 Mark E. Krebs, P.E.

Sand and Silt Removal from Salmonid Streams

Transcription:

Montana Association of Dam and Canal Systems Riprap Design for High Velocity Flows Thursday, October 7, 2010 Presented by: Douglas Chandler, PhD, PE Paul Sanford, MSCE, PE

Applicability Dam spillways Plunge pools/stilling basins Channelized river and stream reaches Steepened river and stream reaches Canal drops Fish blocks or fish passage channels

Course Outline Hydraulic Principles for Riprap Design Erosion Mechanisms & Failure Modes for Bank Riprap Erosion Mechanisms & Failure Modes for Bed Riprap Determining Appropriate Rock Size Filter Layer Concepts Specifying Riprap Gradations & Thickness Other Design Considerations Basic Specifications for Riprap Application of Different Methods Examples Questions and Answers

Hydraulic Principles for Riprap Design Design Criteria provide benchmarks by specifying quantifiable limits of performance Infrastructure Protection Channel Geometry Vertical Stability Lateral Stability

Hydrology Design Discharge Hydraulic Principles for Riprap Design Dams minimum 0.2% Annual Chance Flood (500-year) Highway structures 10% to 2% Annual Chance Flood typical Stream restoration 1% Annual Chance Flood typical

Considerations Hydraulic Principles for Riprap Design Stable Channel capable of resisting the scouring forces of flow Capacity Freeboard

Hydraulics (continued) Manning s n Hydraulic Principles for Riprap Design Handbook Method calibrated photographs and other subjective methods Analytical Methods physically-based hydraulic roughness equations Empirical based on observation, experience, or experiment

Hydraulic Principles for Riprap Design Hydraulics (continued) Tractive Force When water flows in a channel, a force is developed that acts in the direction of flow on the channel bed. This force, which is simply the pull of water on the wetted area, is known as the tractive force (Chow, 1959) T = γys = 62.4 pcf x Depth in feet x Slope of Water Surface From Chow, 1959

Erosion Mechanisms & Failure Modes for Bank Riprap Particle Erosion Translational Slide Modified Slump Slump

Erosion Mechanisms & Failure Modes for Bank Riprap Particle Erosion Tractive force of flowing water exceed bank material s ability to resist movement Initiated by abrasion, impingement of flowing water, eddy action, local flow acceleration, freeze/thaw action, ice, toe erosion Causes: Stone size not large enough Individual stones removed by impact or abrasion Side slope of the bank too steep

Erosion Mechanisms & Failure Modes for Bank Riprap Translational Slide Downslope movement of a mass of stones with fault line on a horizontal plane Initiated when channel bed scours and undermines toe of riprap blanket Causes: Bank side slopes too steep Presence of excess hydrostatic pressure Loss of foundation support at the toe of the riprap blanket caused by erosion of the lower part of the riprap blanket

Erosion Mechanisms & Failure Modes for Bank Riprap Modified Slump Mass movement of material along an internal slip surface within the riprap blanket Causes: Bank side slopes too steep Material critical to the support of upslope riprap is dislodged by settlement of the submerged riprap, impact, abrasion, particle erosion, or some other cause.

Slump Erosion Mechanisms & Failure Modes for Bank Riprap Rotational-gravitational movement of material along a surface or rupture that has a concave upward curve Cause-related to shear failure of the underlying base material that supports the riprap Causes: Non-homogeneous base material with layers of impermeable material that act as a fault line when subject to excess pore pressure Side slope too steep and gravitational forces exceed the inertia forces of the riprap and base material along a friction plane

Erosion Mechanisms & Failure Modes for Bed Riprap Grade Control Structures Bank erosion cutting around ends Bed scour Channel Bed Riprap Plucking of riprap that is too small Erosion of downstream end Slumping due to inadequate filter

Determining Appropriate Rock Size Calculate Tractive Force Determine Permissible Tractive Force maximum unit tractive force that will not cause serious erosion of the material forming the channel bed on a level surface If tractive force is greater than permissible tractive force, erosion occurs use bigger rock Erosion Resistance Depends on: stone shape, size, weight, and durability; riprap gradation and layer thickness; channel alignment, crosssection, gradient, and velocity distribution (USACE, 1994)

Methods Determining Appropriate Rock Size Charts and Tables Programs & Spreadsheets E.g. Riprap Design System Washington Spillway Spreadsheets

Filter Layer Concepts A filter is a transitional layer of gravel, small stone, or fabric placed between the underlying soil and the structure. (HEC-11) The purpose of a filter Prevents the migration of fine soil particles through voids Distributes the weight of the armor units, causing more uniform settlement Permits relief of hydrostatic pressures within the soils For areas above water line, prevents surface water from causing erosion beneath the riprap

Filter Layer Concepts When should a filter be used? Whenever the riprap is placed on fine grained material subject to significant subsurface drainage Proper design is critical to bank riprap stability If filter openings are too large, excessive flow piping through the filter can cause erosion and failure of bank material below filter. If filter openings are too small, the build-up of hydrostatic pressures behind the filter can cause a slip plane to form along the filter, causing a translational slide failure

Gradation of filter layer Filtration Criteria Filter Layer Concepts D 15filter /D 85soil should be less than 5 to assure adequate filtration/retention Permeability Criteria D 15filter /D 15soil should be above 5 to assure adequate permeability/drainage Uniformity Criteria D 15filter /D 15soil should be less than 40 to assure adequate uniformity D 50filter /D 50soil should be less than 25 to assure adequate uniformity* *additional retention/uniformity criteria for drainage filters by USBR & COE

Application of Different Methods Summary of Filter Design D 15coarse /D 85fine < 5 < D 15coarse /D 15fine < 40

Filter Layer Concepts Other Filter Design Parameters Filters should be clean less than 5 to 10% fines Ideally, gradation curves for riprap and filters should be parallel Thickness of Filter Layer Single layer 6 to 15 inches Multiple layers 4 to 8 inches (each individual layer) Multiply by 1.5 for underwater placement Personal Opinion Rather than multiple layers to transition between coarse riprap and fine grained bank can often justify thicker layer (say 24 ) of well-graded pit run sandy gravel with cobbles some natural armoring of the outer layer occurs as fines wash away from uppermost layer under the riprap

Geotextile Filters Cheaper Filter Layer Concepts Acceptable for smaller riprap, especially with significant thickness of riprap layer Sometimes used as one part of a two part filter this is fairly efficient Vulnerable to tearing with large riprap don t drop rock Not uniform support for protected soil on steep slopes especially with large riprap (sometimes there is soil movement under the geotextile) Difficult to impossible to place under water, especially if in current

Specifying Riprap Gradations & Thicknesses Specifying rock weight is alternative to gradation Three-point gradations are common D 100, D 50, D 15 W 100, W 50, W 15

Specifying Riprap Gradations & Thicknesses

Specifying Riprap Gradations & Thicknesses USACE Gradations USACE Gradations shown for rock with a unit weight equal to 155 pcf Gradations shown below were developed for riprap placement in the dry, for low turbulence zones

Specifying Riprap Gradations & Thicknesses FHWA Gradations Assumes a specific gravity of 2.65 Based on AASHTO guidelines

Specifying Riprap Gradations & Thicknesses Thickness Guidelines and Constraints Normal range is 1.0 to 2.0 Thickness greater than 1.0 may allow a reduction in stone size due to increased layer thickness HEC-11 Guidance All stones should be contained reasonably well within the riprap layer thickness Should not be less than D 100 stone or less than 1.5 times D 50 stone Should not be less than 12 inches for practical placement Should increase thickness by 50% for underwater placement Should increase thickness by 6-12 inches where riprap will be subject to floating debris, ice, waves, wind, or bedforms

Other Design Considerations Material Quality Rock riprap preferred Broken concrete and other rubble must control material quality and gradation Shape neither the width or thickness of a stone should be less than 1/3 the length Consider rock density denser is better Angular rock is better than rounded Edge Treatment Toe extend below scour depth Flanks Smooth hydraulic profile at edges is important Bank Slope 2H:1V maximum

Placement Other Design Considerations Hand and machine placing Expensive Allows for steeper side slopes Dumping segregation and breakage can occur Longitudinal Extent Dependent on site conditions HEC-11 provides some guidance

Design Height Consider Other Design Considerations Wave action for impinging flow Design discharge and water level Superelevation in bends Hydraulic jumps Freeboard desired Ice Damage Crushing, impact loading, shearing forces Potentially increase stability factor if location has historic ice problems

Examples Basic Specifications for Riprap Montana Department of Transportation Standard Specifications for Road and Bridge Construction, 2006 Edition. Federal Highway Administration Hydraulic Engineering Circular No. 11 Design of Riprap Revetment, March 1989.

Basic Specifications for Riprap MDT Riprap Material Specifications Furnish stone that is hard, durable, and angular in shape, resistant to weathering and water action, free from overburden, spoil, shale, structural defects, and organic material. Each stone must have its greatest dimension not greater than three times its least dimension. Do not use rounded stone or boulders from a streambed source as riprap. Do not use shale or stone with shale seams.

Basic Specifications for Riprap HEC-11 Riprap Material Specifications Stone shall be hard, durable, angular in shape; resistant to weathering and water action; free from overburden, spoil, shale, and organic material. Neither breadth nor thickness of a stone shall be less than one-third of its length. Minimum unit weight shall be 155 lb/ft 3 LA Abrasion Test: no more than 40% loss

Application of Different Methods USACE Method For flow in manmade or natural channels having low turbulence and slopes less than 2% (spillways generally won t qualify) Bed or Bank

Application of Different Methods ASCE Method Uses Isbash equation with a modification to account for channel bank slope. Bed or Bank

Application of Different Methods USBR Method Developed for estimating riprap size downstream of a stilling basin Procedure developed using eleven prototype installations with velocity varying from 1 fps to 18 fps.

Application of Different Methods USGS Method Equation resulted from field data taken from WA, OR, CA, NV, and AZ. Survey related hydraulic conditions to performance of riprap protection. Surveys included 39 events of which 22 resulted in no riprap change. Of the 17 remaining events, 14 failures were caused by particle erosion.

Application of Different Methods Isbash Method Developed for the construction of dams by depositing rock into running water. Turbulence level (low or high) is factored into equation.

Application of Different Methods Cal B & SP Method CA Dept. of Transportation developed this method to protect highway embankments. Riprap embankments consist of one or more layers of rock. Accounts for different types of flow (impinging or parallel) by modifying the average channel velocity

Application of Different Methods HEC-11 Method Developed for use in rivers or streams with non-uniform flow conditions and discharges normally greater than 50 cfs. Bed or Bank

Application of Different Methods

Smith Lake Dam Examples Smith Lake Dam Located north of Whitefish Lake in Flathead County, Montana Problem Input Washington Spillway Calculations Riprap Design System

Examples Smith Lake Dam Problem Input Dam height = 11 feet No low-level outlet Trapezoidal principal spillway channel Length = 200 feet Design flow = 500 year = 143 cfs Crest channel slope = 0.020 ft/ft bottom width = 15 ft Drop channel slope = 0.100 ft/ft bottom width = 10 ft

Application of Different Methods

Examples Smith Lake Dam Smith Lake Dam (cont.) Comparison of RDS to WA spreadsheets (Bank)

Examples Teton Creek Teton Creek Stream Restoration Located in Teton County, Idaho

Examples Teton Creek Teton Creek (continued) Problem Input Q = 2050 cfs n = 0.053 Slope = 0.010 ft/ft Channel & inset floodplain Ch. btm width = 40 feet Inset FP side slope = 2:1 Riprap Design System Comparison with project gradation Bank protection at inset floodplain margin

Examples Teton Creek Teton Creek (cont.) Riprap Design System 160 pcf vs. 140 pcf riprap (USACE Method results shown)

Examples Teton Creek Teton Creek (cont.) Riprap Design System Thickness Comparison (for results shown, γ = 140 pcf)

Examples Teton Creek Teton Creek (cont.) Riprap Design System Thickness Comparison (for results shown, γ = 140 pcf)

Examples Clearwater Clearwater River Fish Barrier Removal Located in Missoula County, Montana

Examples Clearwater

Examples - Clearwater Plan View of Numbered Rocks Profile

Clearwater (cont.) Problem Input Examples - Clearwater Total Q100 = 2250 cfs Q for channel = 1716 cfs Q for spillway = 534 cfs (spillway crest set 2.5 feet above channel spill) N = 0.09 Riffle slope = 0.03 ft/ft Riprap Design System Comparison with project gradation

Clearwater (cont.) Fish Passage Channel Examples - Clearwater Design Flow approx. 20 cfs Challenges Preventing subsurface flow Stability design flow vs. fish passage design low flow Tolerance for rock placement (>42 inch rock)