Summary of Marine Work in the last years

Similar documents
REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

MLD: Domestic Maritime Transport Project

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: Notice required:

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: Notice required:

Failing Coastal Wood Infrastructure on the Great Lakes

Republic of Turkey - Ministry of Economy,

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish

HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan

WATERWAYS in Finland

PORT OF SAN FRANCISCO STRATEGIC PLAN. To increase the volume of cargo shipping. To efficiently manage and improve all Port property.

REPUBLIC OF CROATIA MINISTRY OF TOURISM

U.S. Coast Guard. America s Maritime Guardian

SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership

MARINE LIABILITY PRODUCTS

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

GHANA PORTS AND HARBOURS AUTHORITY PORT OF TEMA PROJECTS:

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING

Hurricane Hotwash. Presented by: David W. Mock, P.E. Director S.E. Region, Ports and Maritime Group CH2M HILL. AAPA Cruise Committee

Port of Rotterdam International

OWPST & Titan 200 & UK Offshore

About the Port. Created as an act of state legislation Five member cities. Coronado. San Diego. Coronado. National City.

Maritime High School Course Outline

Fishing Support Service Employment

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

RESEARCH Massachusetts Recreational Boater Survey. Project Summary

CODES OF CONDUCT FOR VESSELS AND CRAFT USING THE CATTEWATER

RYA Guide to the River Medina

A Brief Study Of The Development Of Falmouth Within The Context Of The Cruise Ship Pier

LRTP Ref. Detailed Project Description. FDOT funding in prior yearfm Source. Cruise Terminal B & C for new service 20,000 11,000

Ownership and Management of Port Administration

London Array. Operations and Maintenance

Passenger Terminal Amsterdam

APARTMENT IRA DEC - PORTO ROTONDO

Mersin, TURKEY. Port extension project

Piers, Wharves & Docks

(e) Harbor By-law - Article IX of the General By-laws.

Evaluating the Condition of Seawalls/Bulkheads

DREDGING IN FIGURES 2011

PROJECT MANAGEMENT SERVICES

Where you find us and what we do

Port of Farsund. The exotic choice. Your first and foremost port in Norway

Crowley 60 Years in Alaska. February 2014

RESUME for Christopher G. Creed, P.E.

ESTIMATES OF EXPENDITURE ON DEVELOPMENT ACCOUNT 2012/2013

Marine industry careers

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

Capacity building for Maritime Domain Awareness in East Africa

GREENLAND COMMAND. Rear Admiral Henrik Kudsk

Marine Safety and Pollution Prevention Laws and Enforcement Authorities

Navy Inactive Ships Program

NORWAY. Website. Contact points Flag State. EEA Country. Port State. Coastal State

Assessment of environmental vulnerability of Maputo bay using Remote Sensing data and GIS

Part 0 - Classification and Surveys Classification and Surveys I

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

POSITION DESCRIPTION 1 PURPOSE OF POSITION

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

HV Submarine Cable Systems Design, Testing and Installation

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

How To Navigate The Ocean In The Pacific Coastline

ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015

MARINE PRODUCTS DIRECTORY

Partnering with the Community and Finding Volunteers

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Boatmaster s Licenses

ORDINANCE NO.:

The Faust Corporation has always held safety, quality and environmental impact as its first concern in the designing and construction of projects.

Offshore Wind Operations. Fife, at the heart of renewable energy development in Scotland

Impact of Larger Vessel Size on Port Infrastructure Costs

THE PORTS ACT Regulations made by the Mauritius Ports Authority under Section 65 of the Ports Act 1998

Makah Tribe January 28, 2010

Creating a Seamless Model of the Littoral and Near Shore Environments

Appendix Table 1. NAICS based Definition of Coast Industries: List of Industry Sectors Considered to Be Coast Industries

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

SINGAPORE. A PREMIER GLOBAL HUB PORT THE WORLD S BUSIEST PORT

Volunteer Programs. Promoting Public Understanding, Support & Stewardship of the Channel Islands Marine Protected Areas

The Boating Infrastructure Grant Program BIG. Additional guidance for developing a competitive BIG Tier II proposal.

Allianz Global Corporate & Specialty Hull, Protection & Indemnity and Marine Liability Insurance

to the General Terms and Conditions ( AGB ) Applicable to Civil-Law Agreements on the General Use of the Port of Hamburg

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012

Practical Information for Participants

ISLAND TOURISM AND YACHTING IN GREECE

Offshore Structures. Offshore Drilling Equipment

Benefits of Navigational Port Studies

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida

NYC Small Business Services Waterfront Permits Unit

F BATHYMETRIC SURVEYS MAGDALEN ISLANDS AMENDMENT 002

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z

National Transportation Safety Board

Statistical Summary Marine Occurrences 2013

CONTENTS TRAFFIC ACCIDENTS AND SAFETY POLICIES INTRODUCTION BOOK 1 TRAFFIC ACCIDENTS

Project Management. Project Co-ordination. Disclaimer. Geoff Withycombe Executive Officer Sydney Coastal Councils Group

Permitting of Development and Infrastructure Projects in Abu Dhabi

How To Answer A Cargo Handling Questionnaire

CAIRNS SHIPPING DEVELOPMENT PROJECT

Marine Guide for Ship Masters Contents

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

Fot. Kacper Kowalski/aeromedia.pl

MAJOR CHANGES IN GLOBAL SHIPPING, MEETING THE DEMAND, IMPLICATIONS FOR PORT OPERATORS. Bernard MAZUEL, Délégué Général UNION DES PORTS DE FRANCE

U l t i m a t e e f f i c i e n c y D re D ging

Transcription:

64 Elgeish Road Sporting Summary of Marine Work in the last years 2006 Ministry of Interior Affairs Police Beach Club Rushdy Breakwaters, shore protection, recreation areas and new quay wall for docking of small yachts EGP 150,000,000 2004 Sumid Petroleum Company El Sukhna Red Sea 2009 Sumid Petroleum Company Sidi Krir port 2008 Sumid Petroleum Company Sidi Krir port 2006 Private beach, Sumid Petroleum Company km. 90 west of North Coast 2009 Port Authority 2007 French Harbor Port New quay wall (double row sheet pile) for berthing of new tug boats and supply boats Complete protection works including new breakwater Upgrading and repairing of existing Structures Complete investigation for new harbor to accommodate 50000 to 100000 dwt vessels, 10m draft (Breakwaters, Quays, Wharfs, Breakwaters, Protection) Protection works (breakwaters and shore stabilization) Rehabilitation and upgrading of the Quays No. 87/3 and 87/4 Modified layout EGP 15,000,000 EGP 10,000,000 EGP 30,000,000 EGP 4,000,000

64 Elgeish Road Sporting 2008 Gemsa Petroleum Company Red Sea Modified layout of existing Jetty EGP 4,000,000 2009 Crude Oil Pipeline Aml Petroleum Company Gabl. El Zait Red Sea 2008 Developing Department Ministry of Housing Rhomel beach Marsa Matrouh 2010 ian Naval Forces Abou Kir Harbor 2012 Ministry of Interior Affairs Police Beach Club Rushdy 2009 Ministry of Tourism Port of 2008 Fardous Beach (Bianki), Aggami Inspection and upgrading (16km length 50m depth) Upgrading of the existing Trestle up grading and Rehabilitation of Jetty No. 6 (350m length) New construction works East of the existing east breakwater (construction of new breakwater for the reclamation of 7500m 2 land) new Jetty for cruise vessels at the Eastern port Complete studies (survey, soil investigation, waves, tides, currents, sediment transport, erosion) for the marine protection works (Breakwaters) Inspection Inspection EGP 10,000,000 EGP 5,000,000

64 Elgeish Road Sporting 2007 Arab Contractors Company Repairing and upgrading of the diaphragm wall cells No. 42, Inspection Container terminal Damitta Port Damitta 43, 44 Quay No. 4 2009 Arab Contractors Company 2009 2009 El Raouafad Shipping Company African Consulting Office Damitta Port Damitta 2007 African Consulting Office Port 2008 Port Authority 2007 Engineering Syndicate Club Saba Basha 2010 Arab Contractors Company Rashid Transformation and modification of the General Cargo Terminals No. 5 and 6 Transformation of general cargo terminals No. 71 80 to a container terminal Stability study to analyze the causes of failure (destruction) of quay No. 41 in harbor during the dredging Complete design for the rehabilitation of quay Protection works (breakwaters and shore processes) Stability analysis for the protection work (9 groins, each 450m long, 5000m beach face) Inspection EGP 8,000,000

64 Elgeish Road Sporting 2009 Construction Company (Tallhat Mostafa) Reviewing, re planning and redesign San Stefano Marina EGP 20,000,000 2010 ian Company for Natural Gas Edko 2008 Ministry of Defense Protection works for the defense fence Rehabilitation and upgrading of artificial Beach Sidi Krir village EGP 1,000,000 2007 Ministry of Tourism 2010 Marsa Alam Company Ministry of Tourism Marsa Alam 2009 Port Authority 2009 Port Authority Complete studies (site investigations, topographic and hydrographic surveys, complete soil investigation, under water Inspection) for the protection, repairing and strengthening works for the foundation of the trestle and the bridge of El Fanar (beacon) Bridge in El Montazah Palace and designing of Hamatta Marina, Red Sea (300 km from Hurghada) Complete Investigation for all berthing structures and terminals at Port (Concrete Cape, Bollards, Apron levels, finishing surfaces, Ducts, etc.) Upgrading and repair of all quays in and El Dekhila Harbors Supply and installation study of the fender systems for and El Dekhila Harbors EGP 8,000,000

64 Elgeish Road Sporting 2009 Port Authority, designing and providing all tender Documents for the new Negma light House Port 2009 Port Authority 2010 ian Company For ship Repairing 2008 ian Naval Forces Damietta Harbor Damietta 2009 ian Naval Forces 2008 ian Armed Forces North Saini 2008 ian Naval Forces Abou Kir Harbor 2007 ian Naval Forces Port Said, designing and providing all tender Documents for the new marking buoys (32) for marking the entrance channel of Port, designing and providing all tender documents for the rehabilitation and upgrade of quay walls Complete investigation, planning, designing and providing all tender documents for the sheet piles quay wall for a new wharfs at Damietta Port for the ian Naval Forces (150m length, 8.0m depth), designing for the rehabilitation and upgrading of quay No. 9, Ras El Tean, for the ian Naval Force, designing and providing all tender documents for the construction of a new Jetty (piles and sheet piles construction) at Rafah region New Jetty at Abou Kir base for the ian Naval Forces (pile construction) Marine Protection Works (Breakwaters) for the protection of the Jetty at El Als region EGP 4,000,000 EGP 20,000,000 EGP 25,000,000 EGP 8,000,000

64 Elgeish Road Sporting 2009 Coast Guard Forces Suez, designing and providing all tender Documents for the construction of slip way for the special units force of the armed forces 2008 Ministry of Transportation Port Said Port Authority Port Said 2009 Port Authority 2010 Ongoing Shipyard Company 2012 Sodium Carbonate Company (SOLVAY) 2012 Yacht Club 2012 Amer Group Elsokhna Preparation of the technical and legal documents for the arbitration case of East Port Said Port Providing complete solution for the deepening in front of all existing quay walls in Port Upgrading all facilities of shipyard including: New berths Dry docks Workshops Wharfs Slip ways Stores Gas stations etc. in association with CSTC and NDRI China of offshore pipeline Upgrading and repair of existing platform and sea walls and design of international yacht marina at porto sokhna project including: Piled platform shore protection beach reclamation supporting facilities Study Legal Arbitration Documents Redesign Review EGP 60,000,000 EGP 1,800,000,000 EGP 1,500,000 EGP 60,000,000

64 Elgeish Road Sporting 2012 Amer Group Elsokhna and design of Cancun Platform EGP 1,500,000 2007 Yemen Naval Forces Alhodaida 2006 Yemen Coast Guard Adan 2009 Yemen Engineering Corps Alhodaida 2005 Ministry of Fisheries Midi 2006 Yemen Naval Forces Alkhokha 2010 Alwadei Group Alsaleef Al Katheeb Harbor quay walls and break waters Upgrading of Coast Guart Platforms and design on light vessels floating marina and warehouses 100t vessel crane slip way, land reclamation and supporting structures at Algabbana Breakwaters, shore protection, recreation areas and new quay wall for docking of fishing ships Breakwaters, shore protection, recreation areas and new quay wall Upgrading and repair of sheet pile quay walls USD 85,000,000 USD 8,000,000 USD 15,000,000 USD 45,000,000 USD 25,000,000 USD 4,000,000

64 Elgeish Road Sporting 2010 Yemen Port Authority Alhodaida Upgrading and repair of sheet pile quay walls USD 2,000,000 2011 Ministry of Fisheries Alkhawba 2006 Yemen Coast Guard Adan Breakwaters, shore protection, recreation areas, new quay wall and supporting structures for docking of fishing ships (in association with the World Bank) Upgrading of Naval Forces Platform and Slipway USD 9,500,000 USD 6,500,000