145 Park Place, Point Richmond, CA Fax INSTALLATION GUIDE

Similar documents
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

BENTLEY ELEMENTS COLLECTION LVT

Wecryl Waterproofing System under surfacing supplied by others

Concrete Repair. Applications and Procedures

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

SEAMS SEAMING USING SEAM TAPE

SC2000 CEMENT BONDING PROCEDURES

REPAIR MANUAL MATERIALS

GENERAL RUBBER LINING PRINCIPLES

COATING & WRAPPING OF UNDERGROUND PIPING

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Epoxy Crack Injection (the basics)

Carpet Tile Installation Guidelines

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Minor Cracks in Horizontal Surfaces

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Resurfacing Concrete. Page 1 of 5

Your guide to home maintenance. Flat Roofs

Herringbone Pattern Flooring

SECTION POLISHED CONCRETE FINISHING

CA-48 TECHNICAL SPECIFICATION

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

BLACK JACK ALL WEATHER ROOF COATING

Solvent Cementing Instructions For Plastic Pipe & Fittings

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Division 9. SignaFlor Pad and Pour Flooring System

PR11 Plastic Repair, Adhesive

Shower Walls and Tub Surrounds

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING OF WET ROOMS

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Aspect Metal Peel & Stick Tile Installation Guide

GigaCrete Specification PlasterMax

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

SECTION STORM DRAINAGE SYSTEM

CRACK and JOINT REPAIRS on INDUSTRIAL CONCRETE FLOORS, PAVEMENTS and SECONDARY CONTAINMENT AREAS

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

Kemlite Transportation Products

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

Document Library TS Data Sheet

Specification for Pipe Coating Repairs Offshore

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

STERI-SOFT HIGH FOOT TRAFFIC, ULTRAVIOLET RESISTANT, URETHANE RESILIENT FLOORING SYSTEM, 1/8 GREEN BUILDING FEATURES TYPICAL APPLICATIONS

Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

LAYING BLOCK AND BRICK

Epoxy Floor Coating Problem Solving Guide

How to Install Hardwood Flooring Over a Sub Floor

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Section SEWER PIPE INSTALLATION AND TESTING

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

Tecnoepo Flooring System 185

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

T R A N S F E R A B L E F U L LY

Site sampling and testing of concrete

Wetroom Panel (Concealed Fix)

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

BLADE REPAIR INSTRUCTION BOOKLET

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

SECTION Formatted Specification for the ULTRAFLOR DIAMATIC Topical Polished Concrete System DRAFT

How to Build a Printed Circuit Board. Advanced Circuits Inc 2004

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

A. Work on this project shall consist of, but is not limited to, the following:

Rudder Repair and refinish

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

Basement Window Installation Guide Hopper and Sliding

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

SECTION POLISHED CONCRETE FINISHING. InovaCrete Polished Concrete Floor Finish (GUIDE SPEC)

COLLISION REPAIR TECHNOLOGY CONTEST DESCRIPTION

Joining and Bonding Procedures For Resin Based FRP Equipment

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Active and Passive Sash Replacement

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

Sikaflex Sealant Installation. Sika Corporation

SWEPCO HEAVY DUTY POLYMASTER ROOF SYSTEM 201

12 POLYURETHANE ADHESIVE (PU 105)

RAPTOR TRUCK BED LINER - BLACK

ITEM THERMOPLASTIC MEMBRANE ROOFING

R44 SERVICE BULLETIN SB-89 (supersedes R44 Safety Alert dated 23 February 2015)

High-performance, 2-part epoxy anchoring adhesive

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002

SECTION RESURFACING CAST IN PLACE CONCRETE

Mold Preventing I nterior System

Product Information. Tel: x2426 or x2443 Fax:

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Transcription:

145 Park Place, Point Richmond, CA 94801 510.233.8654 Fax 510.233.8673 www.edgefrp.com info@edgefrp.com INSTALLATION GUIDE CONTENTS 1. Pre-installation 2. Surface preparation 3. Saturator setup 4. Application of FRP primer 5. Application of filler / adhesive 6. Manual application of FRP reinforcement 7. Application of pre-saturated FRP reinforcement 8. Application of anchors 9. Field quality control 10. Repair of damaged or defective areas 11. Appendix A. Equipment list 1. PRE- INSTALLATION 1.01. Assemble all tools, equipment, required documents and copy of specifications and project drawings. 1.02. Clear work area providing adequate work space and protect all surfaces not receiving repairs with plastic sheeting. 1.03. Fabric for small installations not requiring use of saturator may be pre-cut and stored flat or on a roll of no less than 8-inch radius (200mm) 1.04. MSDS s, Safety and emergency instructions to be posted at all times. 1

1.05. Protective clothing and equipment to be worn for duration of job. 1.06. Refer to section 3.02 of manufacturers specifications for environmental conditions. 2. SURFACE PREPARATION 2.01. CONCRETE 1. Unsound areas of the concrete substrate (such as broken pieces, delaminated areas, etc.) must be removed to reveal sound material. 2. If corrosion of the existing steel reinforcement exists, the steel and concrete must be repaired before installation of the FRP. Any deteriorated concrete or corroding reinforcing steel must be repaired per ICRI Guideline #03730. DO NOT COVER CORRODING REINFORCING STEEL WITH FRP. 3. Voids in the concrete substrate greater than 0.50 in (500 mm) in depth must be filled with an appropriate repair mortar. The repair material shall be selected per ICRI Guideline #03733 and the project requirements. If required, the bond strength of the repair material to the existing concrete may be verified with pull testing per ASTM D 4541. Minimum direct pull-off strength required is 200 psi (1.4 MPa). 4. Cracks in the concrete substrate greater than 0.010 in (0.25 mm) wide must be injected with epoxy or similar material approved by the Engineer of Record. 5. Prior to initiating surface preparation procedures, the Contractor shall first prepare a representative sample area. The sample area shall be prepared in accordance with the requirements of this Specification, and shall be used as a reference standard depicting a satisfactorily prepared substrate. 6. Uneven concrete surface irregularities (offsets) must be ground and smoothed to less than 0.04 in (1 mm). 7. When fiber reinforcement is run around outside corners or edges, these corners must be rounded to a radius of no less than 0.5 in (15 mm). Application of fiber reinforcement around inside corners shall be avoided. No detailing is required if fiber is run parallel to corners. 8. When bond of the FRP to the concrete substrate is required for structural performance, the surface of the concrete substrate must be profiled using abrasive blasting and/or disc grinding to a minimum ICRI CSP 3 (refer to ICRI Guideline #03732). Surface materials (laitance, surface lubricants, broken mortar pieces, paint coatings, staining, etc.) must be removed by abrasive blasting and/or disc grinding. Dust generated from surface grinding must be removed using a clean air blower or other suitable means. If the dust has been removed by means of water washing, the surface must be thoroughly dried. 9. When structural performance relies only on the bond of the FRP to itself at lap splices, the substrate must be cleaned of any dust, debris, or laitance. 2.02. MASONRY 1. Surface materials (laitance, surface lubricants, broken mortar pieces, paint coatings, staining, etc.) must be removed by abrasive blasting and/or disc grinding. Dust generated from surface grinding must be removed using a clean air blower or other suitable means. If the dust has been removed by means of water washing, the surface must be thoroughly dried. 2

2. Care must be taken to avoid excessive removal of mortar during abrasive blasting. 3. Uneven surface irregularities (offsets) must be ground and smoothed to less than 0.04 in (1 mm). 4. When fiber reinforcement is run around outside corners or edges, these corners must be rounded to a radius of no less than 0.5 in (15 mm). Application of fiber reinforcement around inside corners shall be avoided. No detailing is required if fiber is run parallel to corners. 2.03. PLASTER 1. Although not recommended, FRP shall be applied to plaster ONLY when specified by the designer, and only in contact critical applications, never in bond critical applications. 2. Surface materials (laitance, surface lubricants, broken plaster pieces, paint coatings, staining, etc.) must be removed by abrasive blasting and/or disc grinding. Dust generated from surface grinding must be removed using a clean air blower or other suitable means. If the dust has been removed by means of water washing, the surface must be thoroughly dried. 3. Voids, missing plaster etc shall be patched with an appropriate patching compound. 4. Uneven surface irregularities (offsets) must be ground and smoothed to less than 0.04 in (1 mm). 5. When fiber reinforcement is run around outside corners or edges, these corners must be rounded to a radius of no less than 0.5 in (15 mm). Application of fiber reinforcement around inside corners shall be avoided. No detailing is required if fiber is run parallel to corners. 3. SATURATOR SETUP 3.01 Saturator must be placed on a level surface with a minimum 4 (1.2M) working area all around. 3.02 Gap in upper rollers to be set to 0.02 (0.5mm) for carbon and 0.04 (1mm) for glass. 3.03 Saturator resin bath and all rollers shall be cleaned with an appropriate solvent at least once during each work day and at the end of each work day. Clean up shall be initiated at first sign of resin gel in resin bath and must be completed before cure. 3.04 Carbon fabric shall be routed under hold down bar in resin bath and come UP through upper rollers and be taken up on a PVC roll until the required length is reached. 3.05 Glass fabric shall be routed under hold down bar in resin bath and come DOWN through upper rollers and be taken up on a PVC roll until the required length is reached. 3

3.06 Cut and saturated fabric on PVC rolls shall be stored in a clean area free from dust and direct sunlight until applied to the surface (max 15 min). 4. APPLICATION OF FRP PRIMER 4.01. All surfaces must be clean, dry and free of all dust and debris. 4.02. Prepare epoxy primer in accordance with manufacturers instructions. Mix only the quantity of primer that can be used within its batch life. Batch life will be reduced in higher temperatures and when mixed in higher volumes. Adjust batch size accordingly. Do not use any epoxy, which has exceeded its batch life. 4.03. To avoid allowing primer to cure prior to FRP application, apply primer only to surfaces, which will be laminated within 3 hours. 4.04. Constituent parts must be accurately metered and thoroughly mixed for between 2 and 3 minutes. For large batches (over 1 gallon) use a mechanical mixer. 4.05. Apply primer to repair surfaces with a medium nap roller or non-shedding brush. Apply 2 nd coat, if needed, to areas, which have thoroughly absorbed the 1 st coat. 4.06. Using a brush, stipple primer into any voids, bug holes etc. 4.07 When priming masonry, particular attention must be paid to priming the mortar. 5. APPLICATION OF FILLER / ADHESIVE (Where needed) 5.01. All surfaces must be primed. Primer, which has cured for over 24hrs, must be abraded with a light sand sweep, sandpaper or abrasive pad. 5.02. Prepare epoxy filler/paste in accordance with manufacturers instructions. Mix only the quantity of filler that can be used within its batch life. Batch life will be reduced in higher temperatures and when mixed in higher volumes. Adjust batch size accordingly. Do not use any epoxy, which has exceeded its batch life. 5.03. To avoid allowing filler to cure prior to FRP application, apply primer only to surfaces, which will be laminated within 1 hour. 5.04. Constituent parts must be accurately metered and thoroughly mixed for between 2 and 3 minutes. For large batches (over 1 gallon) use a mechanical mixer. 5.05. Apply filler to surface voids using a steel or stiff plastic spreader. Ensure all voids and offsets are thoroughly filled and excess filler is removed. 5.06 Only the mortar lines need be filled on masonry, except for large offsets. 6. MANUAL APPLICATION OF FRP REINFORCEMENT 6.01. All surfaces must be primed and, where needed, filled. Primer & filler, which has cured for over 24hrs, must be abraded with a light sand sweep, sandpaper or abrasive pad unless still tacky to the touch. 4

6.02. Prepare epoxy saturating resin in accordance with manufacturers instructions. Mix only the quantity of epoxy that can be used within its batch life. Batch life will be reduced in higher temperatures and when mixed in higher volumes. Adjust batch size accordingly. Do not use any epoxy, which has exceeded its batch life. 6.03. Fabric should be pre cut to required lengths and widths and clearly labeled. 6.04. Using a roller, apply a coat of mixed resin to a suitable worktable, which has been protected with plastic sheeting. Lay pre cut fabric onto resin coat and press down with a soft plastic spreader. Apply more resin to the fabric and spread evenly until fabric is fully covered and saturated thoroughly with resin. Allow to sit for 1 minute, applying more resin if needed. Squeegee off excess resin if necessary and roll fabric onto a PVC plastic tube with approx 4 diameter. 6.05. Apply saturated fabric to repair surface. Orient fibers as detailed in project drawings and within specified tolerances. Fibers shall be laid taut and without wrinkles. Using soft plastic spreaders and (suitably protected) hands, smooth out wet fabric ensuring full contact with the surface and to remove trapped air. Fibers must be straight and aligned correctly. Apply additional saturating resin, if needed, during the smoothing out to assist in handling. 6.06. To join ends of fabric; overlaps in the longitudinal direction must be a minimum of 6. Additional saturating resin can be used to insure complete bonding between layers and lack of voids. No overlap is needed between adjacent bands of fabric. Overlaps must be staggered for multiple layers. 6.07. For applying additional layers, follow items 3 through 6. 6.08. Check applied laminates after 30-45 minutes and again prior to gel stage to ensure that no voids or delaminations are present. 6.09. The installed composite must be protected from rain, direct sunlight, dust, sand etc for 24 hrs. 7. APPLICATION OF PRE-SATURATED FRP REINFORCEMENT 7.01. All surfaces must be primed and, where needed, filled. Primer & filler, which has cured for over 24hrs, must be abraded with a light sand sweep, sandpaper or abrasive pad unless still tacky to the touch. 7.02. Roll saturated fabric onto repair surface using PVC roller. Orient fibers as detailed in project drawings and within specified tolerances. Fibers shall be laid taut and without wrinkles. Using soft plastic spreaders and (suitably protected) hands, smooth out wet fabric ensuring full contact with the surface and to remove trapped air. Fibers must be straight and aligned correctly. Apply additional saturating resin, if needed, during the smoothing out to assist in handling. 7.03. To join ends of fabric, overlaps in the longitudinal direction must be a minimum of 6. Additional saturating resin can be used to insure complete bonding between layers and lack of voids. No overlap is needed between adjacent bands of fabric. Overlaps must be staggered for multiple layers. 7.04. For applying additional layers, follow items 3 through 6. 7.05. Check applied laminates after 30-45 minutes and again prior to gel stage to ensure that no voids or delaminations are present. 5

7.06. The installed composite must be protected from rain, direct sunlight, dust, sand etc for 24 hrs. 8. INSTALLATION OF ANCHORS (if required) 8.01 Clearly mark all areas to be anchored. Anchors should be installed between FRP layers. 8.02 Drill a 15 mm hole 1 cm deeper than cured section of anchor. 8.03 Clean hole of all dust and prime with pre mixed epoxy primer. 8.04 Using a syringe filled with adhesive paste, fill _ of hole with adhesive. 8.05 On a clean, plastic covered table, saturate anchor ensuring dry fibers are thoroughly saturated. 8.06 Insert cured end of anchor fully into hole & remove excess adhesive. 8.07 For anchoring a sheet to a flat surface, evenly flare out saturated fibers around 360 ensuring fibers lay flat against surface. For anchoring a wall to footings or to an overhead slab, evenly flare out saturated fibers to 90, ensuring fibers lay flat against surface. 8.08 Apply next layer of FRP in accordance with section 6 or 7 above. 9. FIELD QUALITY CONTROL 9.01. Supervision 1. A trained field supervisor shall observe all aspects of onsite preparation and material application including surface preparation, resin component mixing, application of primer, application of resin and fiber sheet, curing of composite, and the application of protective coatings. 2. Newly installed FRP composite shall materials shall be visually inspect to insure complete saturation, full contact between layers and to substrate, proper fiber orientation, and lack of wrinkles, bubbles, and voids. 9.02. Inspection for Voids/Delaminations 1. After allowing at least 24 hours for initial resin cure to occur, perform a visual and acoustic tap test inspection of the layered surface. 2. Large delaminations shall be marked for repair. Small delaminations less than 2 in 2 (1300 mm 2 ) in size and which are not localized do not require corrective action. 3. Large delaminations should be repaired by either injection with resin or, by removing delaminated area and patching with new fabric, allowing a 6 overlap all around the repair. This is at the discretion of the inspector. 6

10. REPAIR OF DAMAGED OR DEFECTIVE AREAS 10.01. Repair of all the defective work after the minimum cure time for the FRP laminates shall comply with material and procedural requirements defined in manufacturers specification or as provided by the manufacturer according to the type of defect, the type of application, and the materials used. 10.02. Repair all defects in a manner that will restore the system to the designed level of quality. Removal of defective sections shall be replaced and properly spliced with non-damaged areas. Splice locations shall be prepared for bond by abrading cured surfaces. Voids shall be prevented. 10.03 The Owner s representative shall approve repair procedures for conditions that are not specifically addressed in this specification. All repairs and touch up shall be made to the satisfaction of the Owner s representative and Engineer of Record. 7

APPENDIX A. EQUIPMENT LIST 1. One saturator per 7 person crew 2. 4 diameter pvc tubes for saturated fabric 3. MSDS and all required documents 4. Surface preparation tools 5. Plastic sheeting 6. Work tables 7. Weight scale 8. Mixing pots and buckets 9. Brushes, rollers and roller trays 10. Trowels, plastic and metal 11. Scissors & utility knives 12. Solvent and cleaning cloths 13. Garbage containers and bags 14. Disposable gloves (latex and rubber) 15. Disposable outer suits 16. Safety glasses 17. Safety equipment as per installer s policy 18. Disposable and NIOSH respirators 19. First aid kit 20. Non toxic hand cleaner (citrus based) 21. Marking pens 22. Note pads & production forms 23. Glass (or suitable) sheets for witness panels 24. Grinders and grinding discs 25. Electric drills 26. Mixing sticks and mixing fixture for drill 27. Power source or portable generator 28. All needed electrical cords 29. Hand tools 30. Temperature and humidity meter 31. Tape measures 32. Ladders and scaffolding as needed 33. Storage container 34. Syringes for repairs & anchors 35. FiberBond fabrics as specified 36. Fiberbond laminating resin (A & B) 37. Fiberbond Primer (A & B) 38. Fiberbond Adhesive paste (A & B) 39. Fiberbond pultruded sections (if required) 40. Fiberbond Anchors (if required) 8