UDAIPUR The Smart City Draft Smart City Proposal Udaipur Municipal Corporation
Contents Outcome of Citizen Consultation in Round 1 (top 5 priorities for City) Key inferences from Top priority Framing of draft City Vision Insights from Citizen Consultation in Round 2 Projects identified Area based Development Retrofitting Greenfield Pan City Development Solid Waste Management Public Transport (Intelligent Transport System)
Citizens top 5 priorities 12 parameters were prioritized on 1 5 scale under Round 1 citizen s consultation 64,486 feedbacks received 44% voted Tourism as city s top priority
Key Inferences Wall City area Development Water Supply & Sewerage SWM Traffic and Transportation Hills & Lakes Development What does Tourism infer? (Sports, Eco, Biodiversity, Medical) Safety & Security Street Vendors Professional Training, Education & Health Walkability and Clean Mobility Public Convenience
Principles of framing City Vision Ideas Camp organized by MoUD at Delhi on Oct 6-7, 2015 Key principles stipulated for formulating Vision statement: Unique to city s challenges Unique to city s opportunities Short & Focused City Vision Branding
Vision Statement Eternal Udaipur: World's favourite Lakeside Heritage City
Round 2 Consultations Online Consultation Physical Consultation Councilor s meeting Citizens consultation Smart City Website MyGov activities Facebook Tasks Discussion Polls
Round 2 Consultations Insights (MyGov) Area based Development Proposals Hence, Walled City area has been proposed for retrofitting under area based development proposal
Round 2 Consultations Insights (MyGov) Pan City Proposals Hence, 1. Solid Waste Management 2. Transportation and Parking are proposed under PAN city proposals
1. Area based Retrofitting Walled City Ward Map (17 wards) Nagar Nigam City Palace Gulab Bagh Railway Station
1. Area based Retrofitting Walled City Sectors Power Supply Water Supply and Sanitation Smart Proposals Underground of cabling with new conductors Smart metering Replacement of old lines SCADA (real-time system monitoring) 24x7 supply Sewerage System Network enhancement for walled city e-sensors for Man-holes for real time monitoring Roads Parking Solid Waste Management Street Lighting SCADA (real-time system monitoring) Resurfacing to promote walkability (street furniture) Smart Parking (availability of space) Hybrid battery operated vehicles Pelican Signaling Door to door collection and scientific disposal GPS to track waste collection vehicles Sensor in waste bins to send bin-fill alerts Mobile App/ SMS facility for public to send alerts garbage littering Waste to Energy (and fuel) Plant Hybrid LED lights (wall mounted) 11
1. Area based Retrofitting Walled City Sectors Heritage/ tourist amenities Safety and Security IT connectivity Lakes School Infrastructure Smart Proposals Conservation of heritage by development regulations of façade development Organised signage s Bi-lingual Mobile App for visitors (including GPS locations) IT based ticketing and feedback system Bio-toilets Installation of the CCTVs (Video crime monitoring) Automatic reporting of trouble spots Wi-fi facility Real-time water quality monitoring system Suggest remedial measures Smart Class-room with comprehensive Multi-media applications 12
Over Head Wires Clutter of Street Lights Poles Non-uniform Façades On-street Parking Open Drains (foul-smell) Present Layout
Proposed Layout Illustrative
Non-uniform Façades Over Head Wires Clutter of Street Lights Poles Poor road surface Present Layout Non-pedestrian friendly surface
Proposed Layout - Illustrative
Present Layout
Proposed Layout - Illustrative
1. Area based Retrofitting Walled City Real-time Lake Water Quality Monitoring Provide constant data on what is polluting the Lake water @Pichola and Fateh Sagar The real-time data can be used for immediate corrective actions and remedies
1. Area based Retrofitting Walled City Smart Parking Management 1. Area within Gulab Bagh It will assist in restricting traffic from moving inside the walled city area. IPT Stands could be located in the same place offering Park & ride for walled city commuter. The same space could be utilized for parking by walled city residents at night, to maintain decorum of space in night hours. It could be equipped with ITS & real time information system giving information about bus, IPT also Multi Level Parking Lots for residents only
2. Area based Greenfield Education Hub @South Ex. Salient features Atleast 10% of the required energy from solar power Policy and incentive for education and knowledge based units Startups Institutes, etc. Walk to work (pedestrian friendly, cycle tracks, etc.) Transit oriented development (TOD) 80% green buildings Parks at 5min walking distance Rain water harvesting Underground utilities Command center (CCTVs, etc.) Zero discharge (garbage, waste water, etc.)
2. Area based Greenfield Education Hub @South Ex. Conceptual landuse Conceptual Layout Landuse Plan
3. Pan City Smart Solid Waste Management The Smart Cities Mission is emphasizing: Zero Garbage Discharge Total SWM and convergence with SBM Aspects Project population Total Waste generation Assumptions 2015 2035 5 lakh (including floating share) ~8 lakh (including floating share) 200 TPD 500 TPD C&D waste 50 TPD 100 TPD Slaughter waste 10 TPD 20 TPD Biomedical waste 1 TPD 3 TPD e-waste ~1.5 TPD - Industrial 30 TPD - TPD: Tonnes per day
3. Pan City Smart Solid Waste Management Bin-Free City model Door-step collection (at household and commercial sectors) Segregation at source Separate collection and transportation Bins of appropriate size only at F&V markets or high rise residential/ commercial/ institutional buildings Such bins to be placed inside concerned premises (not on road-side) Such bins to have sensors to give bin-fill alerts to trucks with GPS Mini-Transfer Stations Common for a group of wards Designed to reducing land requirement Portable compactors for high density areas Transfer to processing facility after compaction
3. Pan City Smart Solid Waste Management Compost-cum-RDF plant 90 to 250 TPD capacity Compost to be sold to open market RDF to be sold to nearby Cement plants Biogas plant 20 TPD for slaughter and food waste C&D waste processing facility 50 TPD capacity to be increased to 100 TPD after 10 years Sanitary Land Fill Site Residues ~50 TPD (increased to 150 TPD) Construction in modular to assess capacity enhancement requirement GPS is already installed in 12 garbage collecting vehicles by Udaipur Municipal Corporation
4. Pan City Smart Mobility Solution Smart facilities for pedestrians and cyclists Smart traffic management center Smart traffic signals Smart enhancement of city bus system Smart Urban road safety management Smart parking management Low carbon Intermediate public transport Smart Management of Urban Freight
4. Pan City Smart Mobility Solution Smart facilities for pedestrians and cyclists 1 Construction and Maintenance of Footpath 143 Kms 2 Grade Separated Pedestrian Facilities/Pelican Signaling 19 3 Development of Cycle Tracks Road resurfacing 100000 Sq.m Road markings 100 Sq, m 4 Introduction Public Bike sharing Scheme Bicycles 88 Infrastructure 8 Towing vans 2 5 Tourism Promoting Transport Infrastructure (Heritage Walk) 3.2 kms Smart city bus system & low carbon IPT 1 Modernization of Existing IPT 1803 2 Introduction of City Bus Services 41 3 Augmentation of City Bus Services 360 4 Ancillary Infrastructure IPT/Bus Q Shelters 372 Bus Depot/Terminal (18 OD Terminals and 22 4 Bus Depot/Terminal) Intelligent Transport Systems ITS on IPT 1803 ITS on Bus 41 ITS of Augmented fleet of Buses 360 ITS on IPT/Bus Q Shelters 112
4. Pan City Smart Mobility Solution Smart Urban road safety management & Smart traffic signals 1 Intersection Improvement (C) 19 2 Street Markings 204 Kms 3 Street Lighting 712 kms 4 Traffic Signal 19 5 Surveillance CCTV & Speed Gun at Intersections 19 6 Traffic Information & Management Center 1 7 Public Transport Control Center 1 Smart parking management 1 Construction of MLCP (Town Hall, Old City, Kalakheda near Fateh Sagar) with real 3 time VMS 2 Smart Metering and parking lines for On-street parking 20kms 3 Provision of parking space requirement in building bylaws Smart Management of Urban Freight 1 Construction of freight terminal 4 2 Restriction of freight vehicle movement (10 PM to 6 AM ) 3 Small LCV local distribution (12 noon to 4 PM)
Thank You Visit us at: http://udaipursmartcity.in/