DAM FAILURES and CONSTRUCTION INSPECTION

Similar documents
RECENT FAILURES OF LARGE CORRUGATED METAL PIPE SPILLWAYS

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section 2100-Trenching and Tunneling

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Stormwater/Wetland Pond Construction Inspection Checklist

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Beacon Hill Sewer District Standard Specifications

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SECTION STORM DRAIN SYSTEM

SECTION 7- STORM SEWER

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

LS 2540 SEWER LATERALS AND INSPECTION TEES

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

Wastewater Capital Projects Management Standard Construction Specification

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Moving Small Mountains Vesuvius Dam Rehab

Ultra-Rib PVC Storm Sewer Pipe 8" - 30"

Specifications for Residential Property Owners Connection to New Public Sewer

900 SEWERAGE WORK ITEM PIPE SEWERS COMPLETE IN PLACE

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Appendix B.1. NRCS-MD Code No. 378 Pond Standards/Specifications

STORMWATER MANAGEMENT CHECKLIST

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SECTION STORM DRAINAGE SYSTEM

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012

DIVISION 4300 STORM DRAINAGE

Section SEWER PIPE INSTALLATION AND TESTING

Guide to working on Public Sewers

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Emergency Spillways (Sediment basins)

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Minimum Design Criteria for the permitting of Gravity Sewers

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

SECTION STORM DRAINAGE TABLE OF CONTENTS

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Section 402. STORM SEWERS

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

SECTION 9. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer.

Sewer Line Rehabilitation

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

SECTION GRAVITY SANITARY SEWERS

Royal Seal Gasketed Sewer Pipe

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

C. Section TESTING LABORATORY SERVICE.

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

SECTION UNDERGROUND ELECTRIC SERVICE

SECTION EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS

The Evolution of Watertight Storm Drainage Systems John M. Kurdziel, P.E. (Member)

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

City of Shelbyville Site Inspection Checklist

CHAPTER 6 - SANITARY SEWER

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

HDPE PRODUCTS QUALITY, PERFORMANCE AND ECONOMY COMBINED

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

City of West Linn Public Works Standard Construction Specifications. Table of Contents

Part 9 SUBDRAIN DESIGN AND LAYOUT

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SECTION POLYVINYL CHLORIDE (PVC) PIPE

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

FY08 SEWER POINT REPAIRS BID TABULATION

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

Emergency repair of Bridge B421

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

Jay R. Smith Mfg. Co.

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

SECTION 600 INCIDENTAL CONSTRUCTION

SECTION NONREINFORCED CONCRETE SEWER PIPE

GEOTECHNICAL DESIGN MANUAL

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

Transcription:

DAM FAILURES and CONSTRUCTION INSPECTION by Hal Van Aller Maryland Dam Safety

Embankment Dam Schematic

Medford Quarry Wash Pond CMP failure

Velvet Hills sinkhole

Sinkhole in crest of new MD dam

WCC (Joe Kula) Testpit along pond CMP spillway

AACounty CMP with void

Loveton Dam Failure (1989) Breach

Anti-seep collars do not prevent seepage failures!

Loveton 78 CMP viewed from downstream 78 inch CMP viewed from downstream

Failed PVC pipe with anti-seep collar

Annap Mall collapsed CMP d.s. of Riser

Annap Mall u.s. view

What caused these failures? Design Construction Inspection All of the above??

Spillways are Confined Space

Ray Martin cave

Typical Problems schematic

Compaction in Haunches

Pipe Installation in Dam Flowable Fill Dam Embankment Pipe in vertical trench Filter Diaphragm

Excavation through dam Side slopes must be 2(H):1(V) or flatter 15 ft

FILTER DIAPHRAGM

Centennial Park dam chimney drain construction

Filter Diaphragm flooding with water for compaction

Merkle Filter Diaphragm with vibrator

CONSTRUCTION Experienced contractor desired must realize that ponds are different from roads and utilities must work with design engineer compaction along spillway is critical-- don t construct embankment and then cut trench spillway joints must be watertight

Alternative Designs Avoid large diameter CMP User weir or drop box structure If pipes unavoidable, use: Concrete pressure pipe (min. ASTM C-361) Complete concrete cradle or flowable fill Watertight joints Filter diaphragm Avoid combining pond with road embankment

CHUTE SPILLWAYS SCHEMATIC

Concrete flumes on embankment have problems too

CMP spillway on steep slope through dam embankment

Tasker s Chance concrete weir

Crooksville, OHIO- COMPLETED WEIR

Parker Pond new sheet pile spillway

Do's and Don ts for Pond Design and Construction Don t use anti-seep collars to stop leakage Do use filter diaphragms Don t allow spillway installation in trench Do require watertight joints Do inspect each pipe joint as it is put together so it can be redone if necessary Do consider alternative spillway design that eliminates pipe through dam or foundation

Inspection More than just testing Compaction! Inspector should:! work for the design engineer, not the contractor! understand design assumptions and effects of unanticipated conditions! not allow deviation from design without design engineer s approval! observe and document: pipe mfg marks, joint type, gasket material and size, and installation procedure

Foundation Proof rolling Inspection by Geotechnical Engineer

Compaction Use STANDARD Proctor (ASTM D-698 or AASHTO T-99) Do Not use MODIFIED Proctor (ASTM D-1557 or AASHTO T-180) Nuclear gage readings need to be corrected to match lab moisture & density

Utility Conduits (water, sewer, gas) Pipes through the dam must meet spillway requirements No granular backfill for pipes parallel to the dam axis

Pre-cast riser structures

Movement Anchor Plates

Leaky Joints

Concrete Pipe Installation Pipe supports Clean and Lubricate joints Lubricate Gasket Tension Gasket Full concrete cradle, not just bedding If not o-ring gaskets then owner and engineer must approve

Prepare foundation and supports

Mudmat is a good idea

Clean joints

Lubricate joints

Lubricate o-ring

Tension o-ring with round-shaft screwdriver

Mis-aligned o-ring...

...causes broken bell

Gaskets for Concrete Pipe Traditional O-ring joint Deep joint allows for substantial extensibility Symmetric design accommodates internal or external pressure

Newer Profile Gaskets Press-Seal Gasket Company states these advantages over o-rings: Stepped joint is cheaper to manufacture than groove for confined o-ring gasket Easier to install, less force needed to home joint Less bell breakage

Gaskets for Concrete Pipe New style Profile Joint Smaller joint separation allowance Designed for internal pressure

Gaskets for Concrete Pipe New style Profile Joint

Formed concrete cradle

Cradle poured against soil

Poor installation

Take Pictures!

Dam on Soft Foundation

Spillway pipe at end of construction

Same pipe after excessive foundation settlement