Application Guide for Jotun Architectural Powder Coatings using the Heat Transfer (Sublimation) Process

Similar documents
Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

How to Build a Printed Circuit Board. Advanced Circuits Inc 2004

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

SCREEN PRINTING INSTRUCTIONS

Specifications for Programs: 737, 747, 757, 767, 777, 787

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

A. Work on this project shall consist of, but is not limited to, the following:

SECTION GUARDA SECURITY WINDOW SCREENS

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Pre-treatment of Aluminium Surfaces Architect Information Surface Finishes. Status

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)

SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.

Colonnade Security Pipe

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

How compact discs are made

You have just purchased the most portable and economical spray chrome system in the world!

KALPANA INDUSTRIES LTD. TECHNICAL DATA SHEET

the runnerless types of molds are explained post molding operations are described the basic methods of applied decoration methods are examined

Tractor Painting Tips

Crystal Clear Sealant

How To Test A Base Axe

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

Rooflight INSTALLATION INSTRUCTIONS

Assembly of LPCC Packages AN-0001

3 Scotch-Seal TM. Tamper Proof Sealant Technical Data Issue No. 5

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

FlyMe Environmental impact assessment MHI/ Page 1(6) 2 Description and assessment of the Production process

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

HARD SURFACE PAPERS INSTRUCTION GUIDE

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Good Boards = Results

1.1.2 Polypropylene The polypropylene must be a white opaque film, 1 2 mil thick. Biaxial orientation is preferred.

TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

CHAPTER 5. OVERVIEW OF THE MANUFACTURING PROCESS

Flocking of textiles. Flocked shirt 13. flocking drying cleaning. adhesive. application. creation

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

RAPTOR TRUCK BED LINER - BLACK

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

CLEAR-DIVISIONS CENTERFOLD

Pilkington Reflite Handling and Processing Guidelines Solar Control

3M Thermally Conductive Adhesive Transfer Tapes

City of San Diego, CWP Guidelines

RTV159. RTV157 and RTV159 High Strength Silicone Adhesive Sealants

SurTec 650 Tri-Chrome Passivation of Aluminum

CONTENTS. 1 cooling technology white paper

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

White rust on galvanized and galvanized pre-painted steel. Technical Information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

The Anatomy of a Label

RTV162. Electronic Grade Silicone Adhesive Sealant

FLEXIBLE CIRCUITS MANUFACTURING

3M Thermal Bonding Film AF42

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

K2 STONE NATURAL VENEER

CI/SfB. Ro8 (K3) September Pilkington Activ Neutral. Additional Handling and Processing Guidelines

Minor Cracks in Horizontal Surfaces

ULTRA 865HD HIGH PERFORMANCE MULTI PURPOSE GREASE

3 Laser Toner Printable Polyester Label Material 7840TL

How to Install Hardwood Flooring Over a Sub Floor

COATING & WRAPPING OF UNDERGROUND PIPING

IS800 Series. Technical Data Sheet IS802, IS803, IS808, IS Description. Key Features and Benefits. Typical Physical Properties

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Crevice Corrosion on Stainless Steel Propeller Shafts

3 Scotch-Weld TM. Structural Adhesive Films AF 6 AF 10 AF 13. Technical Data July, 2001

Building Owners Guide to a Duro-Last System!

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Profiles for floors of same height Cerfix Projoint

CLEAR-DIVISIONS VARIOFOLD

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

pro-part Ficha técnica Recommended use Materials Substrates

GUIDELINES FOR HANDLING FABRICATION INSTALLATION AND CLEANING

STRAIN GAGE INSTALLATION HOLE DRILLING

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

Scotch-Weld. Low-Odor Acrylic Adhesives DP810 DP810 NS. Technical Data June, 2004

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Sapa: SECTION ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS

Asbestos

WATERPROOFING OF WET ROOMS

RECOATING AND RENEWING SPF ROOFING SYSTEMS

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

Spandrel Glass Types and Recommendations

Division 9. SignaFlor Pad and Pour Flooring System

Technical Data Sheet February 2014

BENTLEY ELEMENTS COLLECTION LVT

Window Installation Instructions

CHAPTER 3 MOISTURE TESTING

Mold Preventing I nterior System

Care and Maintenance for Wood Flooring

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

Temperature C Cure time to reach hours LSS > 1MPa minutes

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Technical Data May, 2015

Solvent Cementing Instructions For Plastic Pipe & Fittings

Transcription:

Heat Transfer (Sublimation) Process Application Guide for Jotun Architectural Powder Coatings using the Heat Transfer (Sublimation) Process Date of Last Revision: April 2016 Page 1 of 8

Contents 1.0 Introduction 3 2.0 General overview.. 3 3.0 Surface preparation and pre-treatment. 3 4.0 Drying.... 4 5.0 Base coat application 5 6.0 Curing of the base coat.. 5 7.0 Storage of base coated components.. 5 8.0 Jigging and application of the heat transfer film.. 6 9.0 Sublimation... 6 10.0 Handling... 7 11.0 Final inspection and quality control.. 7 12.0 Packing. 7 Date of Last Revision: April 2016 Page 3 of 8

1.0 Introduction This document provides guidelines for the factory application of Jotun Façade for the wood finish effect using sublimation process. Jotun Façade powder coatings are used for the aesthetic and corrosion protection of architectural aluminum and claddings. 2.0 General overview Jotun Façade Powder Coatings are exterior durable powder coatings designed as a base coat for sublimation or heat transfer decoration technique to meet the stringent requirements of the construction industry. It provides longevity to the projects and building components by ensuring gloss retention, colour stability and corrosion protection. The critical steps that must be controlled are: 1) Surface preparation and pre-treatment 2) Drying 3) Base Coat Application 4) Curing of the Base Coat 5) Storage of Base Coated Components 6) Jigging and Application of the Heat Transfer Film 7) Curing 8) Final inspection and quality control 3.0 Surface preparation and pre-treatment Proper attention should be given to the cleaning and preparation of the aluminum components. The aluminum or aluminum alloy must be suitable for the pre-treatment and the coating process. It should allow the coating to perform according to technical properties specified in the Product Data Sheets for Jotun Facade, as well as other properties specified for these systems. The substrate must be bare clean, free from corrosion, and not exposed beforehand to any anodic or organic coating. There must be no sharp edges. The edges radii must allow the coating to completely cover the whole object s surface to ensure adequate film thickness and prevent holidays. 3.1 Handling 3.1.1 Components or objects must be carefully handled. Avoid contamination with dust, oil, fat, finger marks, etc. 3.1.2 Care should be taken to secure a proper treatment of the total area. Date of Last Revision: April 2016 Page 3 of 8

3.2 Pre-treatment 3.2.1 It is recommended that the following pre-treatment is performed. Moreover, always follow the chemical supplier s recommendation. a) Degreasing / etching alkaline or acidic. Etching degree must be 1 g/m 2. And 2 g/m 2 if the coated component is exposed to sea climate area. b) Rinse c) Acid wash d) Rinse e) Chromating f) Rinse g) Rinse, using demineralized water (the last running water from the object should be tested at 20 C. The readings should be taken from the open sections and readings should be below 30 µsiemens/cm). 3.2.2 The coating thickness of the chromate conversion layer should be: Yellow chromate = 0.6 1.2 g/m 2 Green chromate = 0.6 1.5 g/m 2 The color of the pre-treatment will have an influence on the final appearance of the coating. A final quality check with the stakeholders to verify that the final appearance is as per standard is advisable. 3.2.3 Chrome-free pre-treatment Suitable chrome-free pre-treatments are also recommended. Due to the variety of chrome-free pre-treatments available today, only the approved systems from Qualicoat and GSB should be used. Detailed advice should be sought from the pre-treatment supplier. 4.0 Drying Pre-treated aluminum components should be dried in an oven. Maximum object temperatures in the drying oven must not exceed 100 C. Perform the process according to the chemical supplier s written instructions. Date of Last Revision: April 2016 Page 4 of 8

5.0 Base Coat Application Pre-treated aluminum components should never be handled with bare hands. Pre-treated aluminum components are to be transferred to the coating process immediately in a clean and dry state, to avoid deterioration of the pre-treatment integrity. Pre-treated components should be powder coated within 12 hours. Otherwise, pre-treated components should be properly stored in a cool, dry place and should be covered with a clean plastic sheet. A single coat application should be undertaken in one operation, to a film thickness of 80 100 microns for exposed areas. Wider film thickness variation can lead to pronounced color difference in the final color of the coated profiles. The coating thickness should not exceed 100 microns if the coated aluminum component is to be treated mechanically after coating (i.e. sawing, milling, drilling, etc.). 6.0 Curing of the Base Coat Powder coated aluminum components should be cured in a curing oven, using the curing schedule as per product data sheets of Jotun Façade. The temperature of the object to be coated must be recorded once a week. The temperature is best obtained by measuring it at the thickest wall of the object, while the oven is fully loaded. The air temperature in the curing zone must not deviate from the adjusted nominal temperature by more than ± 5 C. It is important to a fully cured base coat to ensure an easy removal of the film after the sublimation process. Refer to the relevant technical datasheet of the base coat. 7.0 Storage of Base Coated Components Base coated aluminum components should never be handled with bare hands. Base coated components should be unloaded and transferred to a clean rack or other similar container. Components should be allowed to cool down prior to the application of the film. Base coated components should never be dropped or collide with any hard surface to prevent damage to the base coating. Base coated components should be decorated with a suitable film within 12 hours. Otherwise, base coated components should be properly stored in a cool, dry place and should be covered with a clean plastic sheet. To avoid deterioration of the base coat components, maximum storage of base coated components should be < 72 hours. Date of Last Revision: April 2016 Page 5 of 8

8.0 Jigging and Application of the Sublimation Film Proper maintenance of equipment (including cleaning) is a must to have reproducible results. The presence of impurity on the profile surface (dust, grains, aluminum chips) prior and during sublimation process leads to permanent faults on the quality of wood finish. Before the application of the sublimation film, masking tapes are installed on the both ends of each coated aluminum component. Depending on the geometry and size of the coated aluminum component, the size of the film is pre-determined. The proper size of the bag is calculated as the addition of the total external perimeter of the profile plus 200mm. Once the sublimation film is selected, the base coated aluminum components are assembled on a conveyor for the sealing of the sublimation film. The bag can be sealed using either an automatic bagging-machine (ultrasonic welding) or manually by using a tape. 8.1 Batch Type Sublimation Process Film sealed base coated aluminum components are assembled one by one on a trolley with vacuum accessories. Film ends at the edges of the base coated aluminum components are inserted on sealing tubes and locked in. Once the steel rectangular table is filled, the sublimation film on the base coated aluminum components is then vacuum sealed. In order to get a good film contact to the coated aluminum, it is recommended to have an applied vacuum of 200KPa or 29 psi. The Trolley with accessories is transferred to the sublimation oven for the process of ink transfer into the powder coating. 8.2 Continuous Type Sublimation Process Film sealed base coated aluminum components are assembled one by one onto a conveyor. One by one, the film ends at the edges of the base coated aluminum components are inserted on sealing tubes and locked in. The sublimation film on the base coated aluminum components are then air vacuumed. In order to get a good film contact to the coated aluminum, it is recommended to have an applied vacuum of 200KPa or 29 psi throughout the sublimation process. One by one, these vacuum sealed coated aluminum components in the conveyor are transferred to the sublimation oven for ink transfer. 9.0 Sublimation The vacuum sealed powder coated aluminum components must be cured as specified by the film supplier. In order to get a proper ink penetration, the metal temperature on the profile must not be below 190 C and not exceed 200 C) (see the relevant Product Data Sheet). Final color of the wood finish can vary if the curing temperature (as recommended by film supplier) is not achieved. The temperature of the object to be Date of Last Revision: April 2016 Page 6 of 8

coated must be recorded once a week. The metal temperature is best obtained by measuring it at the thickest wall of the object using a surface temperature probe. The air temperature in the sublimation zone must not deviate from the adjusted nominal temperature by more than ± 5 C. 10. Handling Once the coated aluminum components are out of the curing oven and cooled down, compressed air is blown into the bag of the sublimation film for easier removal. Coated aluminum components should be cooled to below 40 C before manual handling. Precaution should be taken to avoid damages on the finished coating during stacking, packaging, storing and transportation. 11. Final inspection and quality control Thorough inspection and coordination with the other application steps are essential for a quality coating. Inspection should be considered as part of the process control operation and not just a decision point for approving or rejecting coatings. If each processing step is done correctly, a high quality coating is assured. Regular quality control tests to be carried out after base coat curing include film thickness, visual assessment of the color and visual appearance of the coating. The surface of the coating must be continuous and damage-free. The base color of the coating must be even. Regular quality control tests to be carried out after the curing process include film thickness, visual assessment of the color, gloss, adhesion and other mechanical properties, and visual appearance of the coating. Cure test can be carried out using the MEK (Methyl Ethyl Ketone) test. 12. Packing Special care must be taken when loading and unloading the coated components and objects. Reasonable care should be exercised during handling. To prevent any damage during transportation, each coated object or component should be packed individually and isolated from other objects or components by a Kraft paper, plastic sheet, foam pad or any other equivalent that serves the purpose. Regular adhesive tapes should never come into direct contact with the coating. Should protective tape be required, then only a specially designed tape for the protection of coated aluminum shall be used. No residue of any nature should be left on the finished product. If coated aluminum components are wrapped with any plastic sheet, these coated aluminum components should not be subjected to high heat or high humidity or direct sunlight. Note: The information on this Application Guide is given to the best of the manufacturer s knowledge, based on laboratory testing and practical experience. Jotun Powder Coatings reserves the right, without notice, to alter or change the content of this Application Guide. Jotun Powder Coatings. Revised April 2016 THIS APPLICATION GUIDE SUPERSEDES ALL PREVIOUSLY ISSUED VERSIONS Date of Last Revision: April 2016 Page 8 of 8