Growing the Energy Hub

Similar documents
A Virtual Power Plant to balance wind energy - A Canadian Smart Grid Project. Number of customers

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2010 Monitoring Report

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2012 Monitoring Report

The New Brunswick. Energy Blueprint. Progress Report Department of Energy and Mines October 2012

TABLE OF CONTENTS Integrated Resource Plan

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

Canada A Global Leader in Renewable Energy Enhancing Collaboration on Renewable Energy Technologies

Introducti ti t on o El Electricit ity and Gas R egulation Regulation i n in C anada Canada Who does what

Closing the Gap Between Wholesale and Retail

Electricity Supply. Monthly Energy Output by Fuel Type (MWh)

Electricity Rates Forecasting:

Natural Gas and Electricity Coordination Experiences and Challenges

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

RESPONSE TO PUB ORDER 117/06. PUB Order 117/06 Directive 6

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)

POLICY ACTIONS INVESTING IN INNOVATION

New Brunswick Electricity Business Rules

Nuclear Power s Role in Enhancing Energy Security in a Dangerous World Al Shpyth, B.A., M.E.S. Director, Government Relations Cameco Corporation

Mitchell Rothman. Mitchell Rothman. Current Position Mitchell Rothman is a Managing Consultant in Navigant Consulting s Toronto office.

Scotian WindFields the Evolution of Community Power in Nova Scotia

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Smarter Energy: optimizing and integrating renewable energy resources

Overview of the IESO-Administered Markets. IESO Training. Updated: January, Public

Prince Edward Island. Energy Strategy Consultations

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY

Ontario Wholesale Electricity Market Price Forecast. Ontario Energy Board

Transmission Planning in the ERCOT Interconnection

RE-POWERING MARKETS Market design and regulation during the transition to low-carbon power systems

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions

Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan

The UK Electricity Market Reform and the Capacity Market

Nova Scotia s Energy (Efficiency) Resource

Good afternoon, and thanks to the Energy Dialogue for your kind invitation to speak today.

New York s Transmission Challenges and Opportunities: An Overview

Energy Projections Price and Policy Considerations. Dr. Randy Hudson Oak Ridge National Laboratory

CRS Report Summaries WORKING DRAFT

Danish Energy Model RE Policy Tools MAIN Asian Dialog, Bali January Mr. Henrik Breum Special Advisor

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

NV Energy ISO Energy Imbalance Market Economic Assessment

SaskPower CCS Global Consortium Bringing Boundary Dam to the World. Mike Monea, President Carbon Capture and Storage Initiatives

Renewable Energy and the Role of Energy Storage

Re: Docket No. RM , Comments on Proposed Rule on Integration of Variable Energy Resources

Roadmap to a Sustainable Energy Future for the Northern Forest Region

CANADIAN STRATEGY. July 2015

High Penetration of Distributed Solar PV Generation

KAYA IDENTITY ANALYSIS OF DECARBONIZATION OF THE NY ECONOMY REQUIRED FOR CLIMATE ACTION PLAN GOAL OF 40% REDUCTION BY 2030

International Workshop on Renewable Energy Policies in Developing Countries, November 22-23, 2010 Washington, DC

May 30, Expert Panel on Tax Room Government Street Victoria, BC V8W 9V8 Dear Expert Panel on Tax,

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

WORLD ENERGY INVESTMENT OUTLOOK 2014 FACTSHEET OVERVIEW

Industries Association. ERCOT Successes and Challenges

Wind Energy in Egypt

The Utility of the Future

ANALYSIS OF THE ADMINISTRATION S PROPOSED TAX INCENTIVES FOR ENERGY EFFICIENCY AND THE ENVIRONMENT

Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards

Levelized Cost of New Electricity Generating Technologies

How To Plan For A New Power Plant In Manitoba

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Green Industries, Department of Trade and Industry

Solar Power in China. By Zhou Fengqing

VISION FOR SMART ENERGY IN DENMARK Research, Development and Demonstration

Energy Procurement & Sustainability Services Strategy at every stage of your energy and sustainability life cycle

PROVINCIAL OUTLOOK UPDATE February 6, 2015

Energy Productivity & Pricing

Cleaner Air with Electricity Infrastructure Renewal

R&D in Vattenfall Johan Söderbom

Overview of California Renewable Energy and Grid Infrastructure Policies, National and Global Trends

Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

Electricity Demand Forecast: Do We Need the Power?

Energy Megatrends 2020

Energy Situation in Egypt

New Brunswick - Creating Opportunities in Clean Energy

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...

ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012

Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM

Electricity Pricing. An Introduction to Canadian Electricity Rates

Overview of Long Island Electric Service Territory

Fact Sheet on China s energy sector and Danish solutions

REC QUESTIONS & ANSWERS

Renewable Choice Energy

MINNESOTA CLEAN ENERGY ECONOMY PROFILE. How Industry Sectors are Advancing Economic Growth

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

The Burning Question. What would it take to. leave fuel worth trillions in the ground and is 12,000 10,000 8,000. 6,000 humanity up to it?

Statement for the Record

Adapting to a changing climate and energy future

CRITICAL THINKING AT THE CRITICAL TIME. Cheap Fossil. on Renewable

Net Metering Summary Within Northeast Utilities

Governance. What s a Governance?

Office of Climate Change, Energy Efficiency and Emissions Trading. Business Plan

Energy Offices Meeting

100% Renewable Energy in Hawaii: It s No Longer A Matter of When

Alternative Power Purchase Agreements

THE CURRENT BALANCE. The Role of Cost, Reliability, and Environmental Impact in the Massachusetts Electricity Market

Electricity Prices Panel

Energy BUSINESS PLAN ACCOUNTABILITY STATEMENT THE MINISTRY LINK TO GOVERNMENT OF ALBERTA STRATEGIC DIRECTION

Transcription:

Growing the Energy Hub New Brunswick System Operator Its Mission and Vision Sylvain Gignac, President & CEO New Brunswick System Operator 1

Presentation Outline The Energy Hub A Definition Regional Challenges & Opportunities The NBSO Its Role Planning for the Hub Strategic Initiatives to Support the Hub 2

The Energy Hub A Definition 3

Definition The Government of New Brunswick is interested in developing the province as an energy resource hub, through the development of renewable and non-carbon emitting resources, such as wind, hydro and nuclear for domestic load and export to surrounding markets. 4

Interconnections in the Maritimes 800 1200 Québec 100 New Brunswick 222 500 350 PEI Maine 30 300 New Hampshire 1000 Nova Scotia 5

Installed Capacity in the Maritimes PEI, 188 NM, 158 NS, 2340 NB, 4175 6

7 The Energy Hub Regional Challenges & Opportunities

Political & Economical Increased Regional Demand: The New England Governors and Eastern Canadian Premiers (NEG/ECP) have resolved to enhance the region s energy independence, increase development of renewables, and reduce the volatility of electricity prices. ISONE New England Long Term Transmission Plan & Possible Market Coordination with New Brunswick: For the New England region, the potential benefits include access to possibly significant amounts of potentially lowercost energy, and non-carbon emitting and renewable resources to help the region meet both RPS and RGGI requirement. 8

Political & Economical State RPS Policies in ISO New England 9

Political & Economical Financial Crisis: Stock-valuations for utilities plummeted; The slowing economy ate into some of the demand for electricity; and, In the short term, power companies, the third largest borrowers after the government and the financial-services industry, can no longer rely on mountains of cheap credit. 10

Political & Economical Nex WilderHill Energy Index 11

Political & Economical Oil Prices: At $50 USD or less per barrel, the economical incentive to add renewable capacity may have lost its financial appeal. However, on the long run, in the US, the consumption of fuels is tending to be made more expensive while renewable sources of energy and nuclear will continue to enjoy government promotion partly to secure supplies. Increased interest in North South transmission capacity. 12

Political & Economical 2800 MW Hydro 1500 MW Wind Lower Churchill Transmission Options 13

Political & Economical Energy Policy for America: Security of Supply Economic Efficiency Sustainability Environmental Protection 14

Political & Economical US President Elect - New Energy Policy for America: Help create five million new jobs by strategically investing 150 billion over the next ten years to serve as a catalyst for private efforts to build a clean energy future. Put 1 million Plug-In Hybrid cars - cars that can get up to 150 miles per gallon - on the road by 2015, cars that the US will work to make sure are built here in America. Ensure 10 percent of their electricity comes from renewable sources by 2012, and 25 percent by 2025. Implement an economy-wide cap-and-trade program to reduce greenhouse gas emissions 80 percent by 2050. 15

Political & Economical President Obama's first weekly address: "To accelerate the creation of a clean energy economy, we will double our capacity to generate alternative sources of energy like wind, solar, and biofuels over the next three years. We'll begin to build a new electricity grid that lay down more than 3,000 miles of transmission lines to convey this new energy from coast to coast. We'll save taxpayers $2 billion a year by making 75% of federal buildings more energy efficient, and save the average working family $350 on their energy bills by weatherizing 2.5 million homes. 16

Political & Economical Transmission & System Operations Study in Nova Scotia: The NS DOE is moving forward with a major transmission and system operator study which will help facilitate renewable opportunities beyond 2013 by plotting a flexible path forward for renewable policy development. This includes: 1. A review of options for NS transmission system to maintain reliability. 2. A review of options to expand the transmission system to accommodate renewable energy supplies in NS to meet NS targets and also import/export of renewables. 3. A review of options for system operations - Existing NSPSO - Independent NS system operator - Integration of NSPSO with NBSO -New regional SO for at least NS, NB and PEI ( NS RFP Dec. 2/08) 17

Current Supply Mix In New England Maritimes 18

Net Potential Generation in NB Lepreau II Lepreau III Natural Gas Other co geneneration Hydro Biomass Wind Newfoundland injection 1100 MW 1100 MW 500 MW 500 MW 400 MW 100 MW 3,000 MW 800 MW 19

Wind Generation for the Maritimes Area Area Present Within 2 Years Within 5 or 6 Years NB 96 300 600 NM 42 350 850 NS 60 300 550 PEI 72 150 500 Total 270 MW 1100 MW 2500 MW Kent Hills Wind Farm: Workers are ready to bolt the rotor or blade assembly to the nacelle, which sits atop of the tower 20

System Impact Studies for Wind SIS Queue for NB Over 3000 MW NS 2000 MW PEI 1400 MW 21

Wind Capacity in NB Exploitable Potential 42,000 MW (as per NB wind atlas) Economically Feasible (NB) 3,000-4,000 MW Economically Feasible (Maritimes) 5,500-7,500 MW 22

Wind Integration Cost Study 23

Large Wind Integration Requirements Large Geographic & Electric Size: Larger footprint of traditional generation is needed in order to reduce load volatility and the cost of balancing load with aggregate generation. Five-to-Fifteen-Minute Dispatch: In terms of load following, costs are higher in areas that have only hourly energy markets or hourly-adjustable contracts. 24

Large Wind Integration Requirements Hourly Scheduled between Markets to be reviewed: Fixed hourly schedules; Dispatch signals sent on hourly basis; and, Within-hour variation in output is handled by Automatic Generation Control Unit or Load Following with significant opportunity costs. 25

Opportunities for the Hub: Increasing environmental requirements; Major investment on grid infrastructures throughout the US; A regional willingness to buttress coordination; and, Unstable and potential rising fossil fuel prices. The marginal cost of producing alternative fuels, such as oil sands, is probably around $70/b. Set against this, the Basket price fell below $60/b on October 24, and below $50/b on November 21, before continuing down to $42/b. There is a clear mismatch along the time-horizon, with many longer-term investment needs not being supported by shorter-term price movements. 26 Increasingly, delays, cutbacks and cancellations of projects are being announced throughout the industry, together with other responsive measures, as crude prices drop from one investment-breakeven level to the next and the realization dawns that this is no overnight phenomenon. Moreover, this trend has been reinforced by the present severe restrictions on credit and the gloomy world economic outlook.

Challenges for the Hub: Market access to neighboring areas: Stronger transmission ties with our neighbors; and, Better dispatch integration with our neighbours to integrate large amounts of wind resources into the bulk power system reliably. 27

28 Challenges for the Hub: Sharing the Costs of Transmission: Transmission Pool Funding: as an example, in New England, transmission assets have to meet the test as Market Efficiency Transmission Upgrade to be paid regionally: The need to address specific reliability needs; and, They should not be limited to economic or environmental benefits. Participant funding may have to be agreed by the beneficiaries of the projects: merchant transmission line versus private line.

Certainty in our resources and the region s need for these New Brunswick has the potential to add generation and transmission capacity to answer the growing needs of our neighbours. The NBSO needs to develop and cultivate a robust energy partnership with developers and regional policy makers. 29

30 The NBSO Its Role

31 An Independent System Operator Established in October, 2004. Performs Independent System Operator functions. Non-profit organization independent of all other electricity market participants. Governed by an independent board. Regulated by the EUB; and, Operations of the NBSO funded through Schedule 1 (Scheduling, System Control and Dispatch Service) of Transmission Tariff.

Core Activities Maintain the adequacy and reliability of the integrated electricity system Procure and provide ancillary services Enter operating and interconnection agreements Participate with standards authorities (NPCC, NERC, etc) Undertake and coordinate power system planning and development responsibilities For present and future needs For adequacy and reliability For efficient operation of a competitive market Facilitate the operation of a competitive market Design and administer Open Access Transmission Tariff Implement Market Rules 32

North American Reliability Corporation The North American Electric Reliability Corporation (NERC): its mission states that it is to "ensure that the bulk power system in North America is reliable. Northeast Power Coordinating Council (NPCC) is one of nine regional electric reliability councils under NERC authority. In terms of load served, NPCC covers 20% of the Eastern interconnection's total load demand, and 70% of Canada's entire demand. The NBSO, which is an ISO, coordinates, controls and monitors the operation of the electrical power system. 33

North American Electric Reliability Council SPC - Member of the NPCC 34 -One of 18 Reliability Coordinators

Blackout of 2003 35

36 The NBSO Planning for the Hub

Comprehensive Power System Planning Substantial investment needed in transmission. To the extent that power projects are stalled by the planning process, this would impede progress; Planning is consistently one of the top concerns for inward investors. A 2006 report by Ernst & Young on the relative attractiveness of countries for investment found that the countries position will fall because of concerns about planning issues; CPSP will integrate local, provincial and regional benefits, as well as economic, environmental and social objectives; and, Cost, delay and uncertainty that may be created by the energy planning system and the impact on our energy policy goals compel us to put planning at the forefront. 37

Policy NB/NS/Adjacent markets -Federal Gov t -Utilities -NERC/NPCC -Regulators Integrated System Load -Generators -Transmission -Etc Resource Availability Wind -Tidal -Natural gas -Etc Technology Availability Infrastructure -Controls -Etc Environment Siting -Emissions -Etc NBSO Scenario Analysis Scenarios NBSO Strategic Planning Process Various Stakeholders Comprehensive System Plan(s) Analysis SO Analysis Policy Decisions Investment Decisions NBSO Decisions 38

39 The NBSO Strategic Initiatives to Support the Hub

Strategic Objectives Transmission Access; Coordination Between Markets; and, Renewable Capacity. 40

Transmission Access Strategies Access to Transmission Capacity - Access rights need to be redefined in the context of the Energy Hub so that all generators may access transmission for export purposes. Expansion Projects within New Brunswick that may be necessary to integrate remote renewable resources to the power grid with the aim of serving domestic load and exports; Interconnection Projects that may be needed in order to export more power into New England; Allocation of Transmission Costs - In order to make more efficient use of existing and new capacity there needs to be better arrangements for sharing transmission capacity costs; and, Transmission Upgrades in Adjacent Markets. 41

Transmission Access Initiatives To seek Expressions of Interest & RFP to solve emerging constraints within the Province and for exports: In December 2008, the NBSO released its Discussion Paper on Potential Generation and Transmission Developments. To participate in Joint Coordinated System Plan; To review and redesign the NB Tariff; and, To increase our involvement in ISO-New England, FERC, and state committee activities, regulatory proceedings relative to transmission planning (technical, economic & policy). 42

Coordination Between Markets Initiatives To explore more advanced market coordination and potential integration with ISO-NE, including: Alternative 1: Increase the frequency and the flexibility of scheduling transactions; Alternative 2: Actively coordinate dispatch; or Alternative 3: Conduct a single dispatch within a unified market across New England and New Brunswick/Maritimes. To investigate the possibility of developing a NORDPOOL arrangement for a region consisting of NB, NS, PEI, New England and Québec. (e.g. access to regional resources for regulation and load following - balancing) 43

Coordination Between Markets - Initiatives To propose regional approach to intra-hour scheduling & dispatch between markets; To implement with ISO-NE the half-hour scheduling: Pilot; and, Automation. To work with HQTE and NSPI on intra-hour schedule changes; 44

Renewable Capacity Initiatives: Tariff and market rules revisions specific to variable nondispatchable generation (e.g. wind power forecasting, settlement, dispatch); To develop capacity in wind forecasting; To promote the recognition of New Brunswick s renewable capacity within the adjacent market s generation mix. 45

The NBSO, through our leadership role, is recognized as a key contributor to the development of generation, transmission and export energy for the attainment of social, environmental and economic benefits for the region. 46