Boiler efficiecny improvement at Holboca CET Iasi II

Similar documents
How To Calculate Fuel Type I

Assessment Report for CDM proposed standardized baseline (Version 01.0)

Draft Large-scale Consolidated Methodology ACM00XX: Construction of a new natural gas power plant

Draft consolidated baseline and monitoring methodology ACM00XX

Bundling small-scale energy efficiency projects

Revision to the approved baseline methodology AM0011

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011

National Inventory System

Emission monitoring, reporting, and verification (MRV) for U.S. cap and trade programs. Jeremy Schreifels US EPA

The Greenhouse Gas Protocol

Approved baseline and monitoring methodology AM0056

Improving the quality of certification, measurement, verification and validation of conformity assessment results Dr Elsabe Steyn

Communicating Your Commitment: Your Guide to Clean Energy Messaging

An introduction to the Sustainable Biomass Partnership

Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity;

TIMISOARA COMBINED HEAT AND POWER REHABILITATION FOR CET SUD LOCATION

GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM. Version 04. Revision history of the document

for Energy Efficiency Parminder Sandhu, P. Eng

National Greenhouse Gas Inventory System in Finland

Improvement of Lithuania s National System for GHG inventory preparation

Portfolio Manager and Green Power Tracking

Addendum. Part Two: Action taken by the Conference of the Parties serving as the meeting of the Parties to the Kyoto Protocol at its first session

Greenhouse Gas Reporting Criteria

The importance of energy balances to estimate greenhouse gas emissions

A Summary of the Kyoto Protocol and the Marrakesh Accords By James G. Derouin Fredric D. Bellamy David R. Nelson Mark E. Freeze 1

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

Feasibility Study Proposal & Report Guide. Industrial Optimization Program

2. Environmental indicators

ALLIED PRINTING SERVICES, INC. CORPORATE SUSTAINABILITY AND ENVIRONMENTAL MANAGEMENT PROGRAM REPORT

Crediting the displacement of non-renewable biomass under the CDM

Greenhouse Gas Emissions Data Request Form. Resolved Example (Suppliers Case).

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

GHG data management issues in an Oil Company. Maria Mantini, Corporate HSE Leonardo Gelpi, Corporate M2M Oil & Gas Session New Delhi, 4 th March 2010

IMPLEMENTING ISO 14001:

VER+ A robust Standard for Verified Emission Reductions (Criteria Catalogue)

Energy consumption. Environmental indicators

Solar-Diesel hybrid system to stabilize solar power generation

How To Track Rsw Certified Material

5.5 QUALITY ASSURANCE AND QUALITY CONTROL

QUALITY ASSURANCE (QA)/ QUALITY CONTROL (QC) AND VERIFICATION NEELAM SINGH WORLD RESOURCES INSTITUTE

QUALITY ASSURANCE (QA) / QUALITY CONTROL (QC) AND VERIFICATION

Institutional Arrangements For Inventory System in Korea

Technical Support Document for the Soda Ash Manufacturing Sector: Proposed Rule for Mandatory Reporting of Greenhouse Gases

New Jersey Farm Bureau

Introduction to our Business in Valmet. Marita Niemelä VP, Strategy Pulp & Energy 20 August 2014

In 2013, the Spanish economy emits million tonnes of greenhouse effect gases, 7.8% less than in 2012

Standard Clean development mechanism project standard

Inventory of LCPs in Turkey LCP Database introductory presentation

Calculating CO2 Emissions from Mobile Sources

Methodological tool Tool for the demonstration and assessment of additionality

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators

Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity;

Getting Started Guide The Massachusetts Department of Environmental Protection Massachusetts Greenhouse Gas Registry

EURELECTRIC responses to the invitation in Draft decision -/CMP.5 to make submissions to the UNFCCC secretariat on:

COAL INDUSTRY ADVISORY BOARD

Environmental protection and products

CSX Public Safety, Health, and Environmental Management System

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

CHAPTER V TOE COMBUSTION EFFICIENCY OF DIFFERENT BOILER SYSTEMS* EXPERIMENTAL OESUX.TS Chapter Preview

ClimatE leaders GrEENHOUsE Gas inventory PrOtOCOl COrE module GUidaNCE

Spillemyndigheden s change management programme. Version of 1 July 2012

Recover Heat from Boiler Blowdown Water

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

Good Practice Form

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

How to Earn the LEED Green Power Credit

Annex 1 Tool for the demonstration and assessment of additionality

Musgrave Energy & Natural Resources Management Policy. Working together to deliver sustainability

QA/QC OF INVENTORY SYSTEMS

Developing the Project Design Document

ANALYSIS OF THE ADMINISTRATION S PROPOSED TAX INCENTIVES FOR ENERGY EFFICIENCY AND THE ENVIRONMENT

INDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive

Carbon Footprint Analysis 2011 H2

Advance unedited version

How To Get A Carbon Credit

GHG-emissions of Russian long distance gas transport pipelines and options for mitigation

SSE s criteria used for GHG emissions reporting

of bioenergy and actions

CGD REPORTS.

FINDING YOUR CHEAPEST WAY TO A LOW CARBON FUTURE. The Danish Levelized Cost of Energy Calculator

Wigton Wind Farm Project Project Design Document

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments

Annex 8 GUIDELINES FOR COMPLETING THE PROJECT DESIGN DOCUMENT FORM. (Version 01.0) CONTENTS

Publishable Summary for the project Safety and quality assurance along the pellets supply chain SafePellets

KYOTO PROTOCOL TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE

September 9, Mr. John Eichberger Executive Director Fuels Institute 1600 Duke Street, Suite 700 Alexandria, Virginia 22314

CDP7 and OneReport Comparison

Greenhouse Gas. Emission Inventory Report:: 2013 GREENHOUSE GAS EMISSIONS INVENTORY REPORT. Prepared by : Metin Tokgöz. Controlled by : Uğur Çomoğlu

Hackney Biomass Boiler Information Request Form

Nordea Asset Management. Our Approach on Climate Change

From Carbon Subsidy to Carbon Tax: India s Green Actions 1

THE INDC OF THE EUROPEAN UNION AND ITS 28 MEMBER STATES

Financing New Coal-Fired Power Plants

Environmental Management Plan

Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production systems

SIMAIN - Energy Optimization. A holistic approach to cut energy costs sustainably. April Siemens AG All Rights Reserved.

Fact Sheet. Sustainable Textile Production (STeP)

Air quality and biomass installations. A briefing for local authorities

Category 3: Fuel- and Energy-Related Activities Not Included in Scope 1 or Scope 2

How Does Coal Price Affect Heat Rates?

Transcription:

Boiler efficiecny improvement at Holboca CET Iasi II Monitoring Plan Guidelines and Procedures Version 3 2008-09-24-23.03.2010-2:15

1. Monitoring Requirements 1.1. Objective of the Monitoring Plan The objective of the Monitoring Plan (MP) is to provide a practical framework for the collection and management of performance data in order to monitor and verify the GHG emission reduction generated by the Joint Implementation project, Boiler efficiency improvement at Holboca CET Iasi II. The project is based on the injection of the liquid chemical named Therma Chem FS 12 into the combustion process of the existing boiler installations in order to increase the thermal efficiency of the boilers and thereby reduce greenhouse gas emissions. Moreover the project encompasses the erection of a new ash handling system for continuous ash removal at the power plant. The MP shall after its validation act as an integrated part of the contractual agreement for CO 2 trading between the Romanian government and the Danish government. This MP provides for a monitoring methodology for monitoring and estimating GHG emission reduction referring to the baseline approach used. The monitoring methodology comprises the calculation of annual CO2 emission reductions associated with the reduced fuel consumption at the CET. The methodology shall be used for the entire monitoring period, which is 7 years. 1.2. Requirements for the Monitoring activities 1. Monitoring of the GHG emission reductions generated by the project activity shall be performed by data collection based on the SCADA system and respective measurement devices installed at the CET facility in Holboca. 2. Records shall be kept electronically and on paper, until 2014. 3. Monitoring reports including the actual GHG emission reductions shall be issued on annual basis in the entire crediting period of 7 years. 4. Persons trained in the monitoring shall carry out monitoring of the GHG emission reductions associated with the project activity. 5. Based on the monitoring results, the GHG emission reductions shall be calculated and submitted for verification as: - AAUs for the period until the end of 2007 - ERUs for the period between 2008-2012 6. A Quality Assurance (QA) system shall be implemented to secure accurate and transparent monitoring of GHG emission reductions. 7. The governing language for monitoring records and reports is English. 8. The outcome of the MP shall make it possible for a Independent Entity to accredit the AAUs and ERUs generated by the project according to requirements of the Joint Implementation Supervisory Board. 9. The monitoring shall follow the guidelines as established by the projects determined Project Design Document and requirements of the Joint Implementation Supervisory Board. 10. A draft version of the annual monitoring report shall be submitted to the Romanian government and Danish government or their representatives before issuing the final version. For a time period of seven (7) years the Romanian Government, the Danish Government and the verifier shall annually received the reports presented below. Receiver of annual reports Draft version monitoring report Final version monitoring report Romanian Government Two (2) copies Two (2) copies Danish Government Two (2) copies Two (2) copies Verifier Two (2) copies Table 1: Monitoring report Page 2 of 10

11. The monitoring plan may be adjusted during the crediting period, to be in /in compliance with Romanian legislation when and if such legislation will change. 1.3. Frequency of Monitoring and Verification Procedures The table below illustrates the time schedule for monitoring- and verification. Time period and frequency Monitoring Verification MP time period Oct. 2006 Dec. 2012 May 2007 Feb. 2013 First period of monitoring Oct. 2006 Apr. 2007 May 2007 Last period of monitoring Oct. Dec. 2012 Feb. 2013 Table 2: Time Period for monitoring- and verification 1.4. Baseline Reference 1.4.1. Key elements of the baseline The baseline methodology is based on the following stepwise approach: Step I: Step II: Step III: Selection of the time duration with the most applicable emission factors per produced ton of steam for the baseline and project Calculation of the total baseline and project emissions by multiplying the corresponding emission factors per produced ton of steam with the total annual steam production The difference between total baseline and total project emissions represent the total emission reductions The following values are used for developing the baseline: - Coal consumption [t/day] - Fuel oil consumption [t/day] - Steam production [t/day] - Net calorific value of coal used [kcal/kg] - Net calorific value of fuel oil used [kcal/kg] - Crediting period of 7 years [2006-2012] 2. Verification and basic assumptions The MP provides a practical approach and describes the methodology of how to quantify the project performance in terms of the GHG emission reductions. The monitoring of the GHG emission reductions shall be based on transparent data management and calculation methods. 2.1. CO 2 emission reductions 2.1.1. Basic assumptions The MP is based on the basic assumption that the direct CO 2 emission reductions generated by the project activity are equal to the business-as-usual scenario and that this scenario will prevail in the monitoring period. 2.1.2. Methodology The steps presented below describe the methodology used for calculating the CO 2 emission reductions generated by the project activity: Step I: The specific type of fossil fuel, the calorific value of the coal (kcal/kg) and fuel oil (kcal/kg) used shall be described. The utility shall conduct on-site analysis Page 3 of 10

or contact the relevant supplier of coal and fuel oil to obtain precise and reliable data. Step II: The CO 2 emission factor for coal (kg CO 2 /GJ) and fuel oil (kg CO 2 /GJ) shall be estimated in with the Revised 1996 IPCC Guidelines for National Greenhouse Gas Inventories: Reference Manual. Step III: Estimate the fuel consumption based on the applicable respective procedure on a daily basis based on the recorded hourly average value. Step IV: Estimate the heat production on a daily basis based on the recorded hourly average value from the SCADA system. 2.2. Environmental and social impacts 2.2.1. Basic assumptions The MP and the corresponding baseline approach is based on the assumption that the introduction of Therma Chem FS 12 into the combustion process, will lead to a reduced fuel consumption at the CET and thereby reduce greenhouse gas emissions. Another basic assumption is that the project will lead to a decrease of local dust and particle pollution from coal transportation and combustion, improving the health condition for inhabitants of the city and its surroundings. Local stakeholders can at any time submit comments to the project s environmental- or social impact and important comments and its solution will be included in the annual monitoring report. 2.2.2. Methodology Any environmental and social impacts caused by the project will be recorded by local EPAs and described in EPA inspection reports and forms, following the guidelines presented in paragraph 3.1.2 and 3.1.4. 2.3. Operation- and monitoring obligation This paragraph describes requirements for the collection of key performance parameters necessary to achieve verifiable emission reduction data. This will call for certain operational obligations and data collection obligations to be fulfilled by the CET. The CET shall take all reasonable actions to optimise the operation of the project activity. 1. The CET shall ensure the delivery of coal and fuel oil to the CET in order to guarantee its operation. 2. The CET shall as a minimum fulfil the obligations concerning monitoring- and data management which are described in this document, this shall act as an integrated element in -to-day management system for the CET facility. 3. The CET shall notify the Romanian Government and the Danish Government if the power plant is stopped, or if combustion of fuel and heat production have dropped significantly. 4. The CET shall notify the Romanian Government and the Danish Government if implementation of new directives or legislation will affect the operation and the corresponding GHG emission reduction generated by the project Boiler efficiency improvement at Holboca CET Iasi II. 3. Management of the Monitoring Plan The table below outlines the data to be collected in order to monitor emissions from the project and how these data will be archived (The table was taken from the Monitoring Plan of the PDD D.1.1.) Page 4 of 10

ID number (Please use numbers to ease crossreferencing to D.2.) fp a,b1 fp a,b2 fp b,b1 fp b,b2 qp B1 qp B2 CV a CV b variable of coal consume d in boiler 1 of coal consume d in boiler 2 of fuel oil consume d in boiler 1 of fuel oil consume d in boiler 2 of steam produced in boiler 1 of steam produced in boiler 2 Calorific value of coal Calorific value of fuel oil Source of data unit Measured (m), calculated (c), estimated (e) Recording frequency Proportion of data to be monitored How will the data be archived? (electronic/ paper) - kcal/kg m per day 100% electronic - kcal/kg m per day 100% electronic Comment Based on onsite analysis and billing records Based on onsite analysis and billing records The Management of the MP shall ensure the registration of performance data for verification of the GHG emissions, which verification shall be executed by an Independent Entity as certified by the Joint Implementation Supervisory Board. 3.1. Responsibilities The management and operation of the CET facility is as mentioned earlier the responsibility of the company operating the CET plant, S.C. CET Iasi S.A.. The CET shall ensure environmental credibility through systematic and accurate performance of monitoring during the entire crediting lifetime of the MP. Page 5 of 10

The CET is responsible for implementation of the management system according to the guidelines in this MP. The management system shall be based on the guidelines as mentioned in this monitoring plan and standard recording forms. 3.1.1. and records handling handling shall be conducted in a transparent way to secure high quality data recording and data filing. The forms included in the MP shall be used as a protocol for data handling, which as a minimum comprise written recording of all monitoring data and electronic recording and backup. In addition, all reports (monitoring reports, QA reports, verification reports etc.) shall be kept in both written and electronic form (with backup). and information obtained from third parties shall be in writing and confirmed with the stamps and signatures necessary. Uncertainty related to data handling shall be recorded by the CET and the verifier shall be notified about this, and if necessary monitoring shall be modified according to agreement with the verifier. recorded in the first three (3) months of the first year of the monitoring period shall be forwarded to the contracted verifier immediately after this threemonth period has passed for identification of possible mistakes or irregularities. 3.1.2. Quality Assurance System The quality assurance system shall secure that monitoring and requirements are followed. The QA system will not be according to any ISO 9000 or similar standards. The QA system comprises inspection of the monitoring procedure by an independent third party. It is recommended that the local EPAs will be responsible for this third party activity, but no formal agreement has been made so far. The EPAs are operating as branch offices under the Ministry of Waters and Environment in Bucharest. The QA-system at the CET will in general focus on the presented below and the QA system shall be in force during the entire crediting and monitoring period. QA Procedure Time for inspection Inspection 1.0 Calibration of SCADA system CET 2.0 Identification of calorific value of fossil fuels used 2.1 Description of heat value and if possible chemical composition. - coal Daily CET - fuel oil 2.2 Suppliers (name, official company registration number, address phone and fax number). 3.0 Reading of fuel consumption Hourly CET 4.0 Reading of steam production meter Hourly CET 5.0 Calculation of CO2 and equivalent CO2 emission One (1) time 5.1 Calculate the quantity of CO2 emissions using the forms in per year. the annexes. Local EPA 6.0 Environmental and social impact 6.1 Environment impacts (degree of improvements, air quality, sustainability of impact, etc.) 6.2 Social impact (comfort level in buildings, number of jobs created, new business areas) QA Procedure One (1) time per year. Time for inspection 7,0 Training of staff members 7.1 Monitoring Before commissioning of the project and hereafter one (1) time per year. CET and local EPA Inspection CET Page 6 of 10

The QA system can be changed according to request from the Verifier and the Romanian or Danish Governments. 3.1.3. Training of operational staff Training of operational staff members shall be conducted before commissioning of the project. Training shall be replicated when the boiler installations are entering into operation to secure full understanding of the monitoring and to secure the highest possible reliability of the monitoring results. It is the responsibility of the utilities to ensure that the operational staff members receive the necessary training enabling them to fulfil the requirements as specified in the MP. The training described in this MP may be changed according to request from the verifier, the Romanian Government or the Danish Government. Training Procedures (Guidelines) Training Procedures Time for training and responsibility 1.0 Review of MP (before commissioning of the project) 1.1 Objectives of MP Requirements of MP Monitoring methods to be used handling and elaboration of annual emission reduction report QA system The role of local EPA and Verifier 2.0 Characteristics of fossil fuels used Timing: 2.1 Characteristics of existing fossil fuels used Timing: Before the JI project is commissioned. Responsibility: The CET and technology supplier will be responsible for training Before the JI project is commissioned. Responsibility: The CET will be responsible for training 3.0 Monitoring CO 2 emission reduction Timing 3.1 of fuel combusted Before the JI project is 3.3 Filling in forms and calculating CO 2 emission reduction commissioned. Responsibility: The CET will be responsible for training 3.1.4. Instruction of EPAs As part of the QA system the local EPA will frequently visit Holboca CET Iasi II to carry out inspection of the monitoring described in this MP. The local EPA is a public authority under the Romanian Ministry of Waters and Environment responsible for environmental issues related to the local society (county level) like inspection of the wood processing industry, forestry, air quality and wastewater quality. In this context the EPA shall act as a third party to secure that monitoring are respected as detailed in the MP. Also the EPA as branch offices for the Ministry are in direct contact with Romanian DNA in this project when speaking about emission reduction trading. S.C. CET Iasi S.A. (operator of Holboca CET Iasi II) and other project participants (fx. Romanian Ministry of Waters and Environment) will instruct the EPA in the to be conducted by them. The EPA will conduct inspections two (2) times every year during the crediting period, and in this way secure that the monitoring at Holboca CET Iasi II are being correctly implemented based on the monitoring forms and the guidelines. Inspection guideline items for an EPA inspection report are listed below. Page 7 of 10

EPA Inspection Report (guidelines) Paragraph (issues) 1.0 Basic Information 1.1 Name of Inspection Report Name of EPA elaborating the inspection report Contact name/address/phone/fax Name of JI project owner Contact name/address/phone/fax Time of inspection Language 2.0 Fuel Consumption 2.1 Quantities of fuels used Net calorific value of fuels used Record keeping of data Calibration of measuring equipment 3.0 Steam Production 3.1 Quantities of steam produced Record keeping of data Calibration of measuring equipment Romanian/English 4.0 Calculation of CO2 Emission Reductions 4.1 Steam specific emissions CO2 emissions Record keeping of data 4.2 Emission reductions 5.0 Training 6.0 Environmental and Social Impacts 5.1 Negative impacts 5.2 Positive impacts 7.0 Observations and comments 3.1.5. Monitoring Report The CET shall every year during the entire crediting period elaborate the monitoring reports mentioned in paragraph 1.2 (Table 1) with the content following the guidelines presented below. The number of monitoring reports per year can be changed according to request of the verifier, the Romanian Government or the Danish Government. Contents of annual monitoring reports (guidelines) Paragraph (issues) Language 1.0 Basic information English 1.1 Name of monitoring report English Name of owner of the JI project Contact name/address/phone/fax Name of company elaborating the monitoring report Contact name/address/phone/fax Time period for monitoring Name of verifier Contact name/address/phone/fax 2.0 Description of Project Performance English 2.1 Overall description of performance of boiler facilities and operation during the respective period of monitoring. English 2.2 Description of performance of the JI project English 2.3 Description of fuels consumption and energy content English Page 8 of 10

2.4 Description of steam production English 2.5 Description of CO2 emissions English 2.6 Description of CO2 emission reductions English 3.0 Monitoring Procedures English 3.1 Description of monitoring methods and equipment English 3.2 Description of adjustments of monitoring methods and equipment English 3.2 Description of training and calibrations English 3.3 Description of errors English 3.4 Filled in forms (in Annexes) English 4.0 Changes in Monitoring Procedures English 4.1 Description of changes in operation of the JI project activity English 4.2 Description of changes in the supply of fuels. English 4.3 Description of changes conducted according to agreement with verifier, Romanian Government and/or Danish Government. English 3.1.6. Instruction of operational staff The CET is responsible for necessary instruction of the operational staff members enabling them to carry out monitoring according to this MP. The instruction shall be performed before the beginning of each heating season to secure highest possible quality of monitoring activities. The utilities shall conduct an instruction meeting minimum one (1) month before the beginning of each heating season and before the first monitoring period starts. 3.1.7. Confirmation Confirmation of the management and monitoring for carrying out a satisfactory MP must be approved through the determination of an Independent Entity before the project can start generating AAUs and ERUs, respectively. In addition, monitoring may not officially begin until all the required management and monitoring are in-place. This shall be confirmed by the Project Manager endorsed by the Iasi TPP General Manager stating that aqll conditions have been fulfilled or upon mutual agreement between the CET, Romanian Government, and Danish Government. Summary - Management of the monitoring plan The summary aims to highlight the key elements and responsibilities of the management of the MP. Obligations CET Verifier MP Review of the MP and comments. Review of MP and comments. Review management of monitoring plan. Review of management system. Preparation of monitoring. Training of staff members performing monitoring. Updating of MP if necessary. Preparation for data collection, data handling and data storing. Collection Review of methods and system for data collection system including updating of these if necessary. Review of methods and system for data collection including comments. Page 9 of 10

Handling Appointment of person (s) responsible Review of data handling for data handling. systems. storing Establishment of data storing system for Review of data storing system written- and digital data. including backup systems. Establishment of backup system for data storing. Monitoring Timetable for monitoring activities. Review and provide comments on timetables, monitoring sheets etc. Reporting Establish framework for reporting which Review of framework for fulfil requirements of MP. reporting. Instruction Responsible for instruction of staff members to perform the different monitoring. provide comments on performance of the training. Page 10 of 10