Michigan City Sanitary District Sanitary Sewer and/or Sanitary Lift Station Construction Permit Application Form Instructions

Similar documents
DeSoto County is not a water service provider and does not operate any

El Paso Water Utilities Public Service Board. Application for Renewal Industrial Wastewater Discharge Permit

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO , Construction Permit No. CP , Callaway County

Sanitary Sewer Overflow Report Form

How To Install An Overhead Sewer

City of Largo Environmental Services Department Environmental Control Program th Avenue North Clearwater, FL Phone: (727)

Inland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director

Retail Marijuana Establishment License Application

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Submit a copy of your license issued by the Department of Social and Health Services.

Nursing Student Loan Forgiveness Program Renewal Packet

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

COMP PLAN SUBMITTAL CHECKLIST

SANITARY SEWER MASTER PLAN

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Tim Schneller, P.E. GBA Engineers and Architects

RE: Service of Notice of Violation / Cease and Desist Order, Number: DO

DRAFT Public Outreach Document for What s an SSMP?

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Procedures for the Acceptance of Wastewater from Asbestos Abatement Projects

SANITARY SEWER SYSTEM ASSESSMENT

Pest Management Area # of ##

Christopher Lamm, Engineering Services Manager. Second Amendment to Sanitary Sewer Agreement

CDPS ANNUAL REPORT FOR DISCHARGES FROM THE APPLICATION OF PESTICIDES COG860000

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Time of Sale Inspections

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

STATE OF COLOMDO For Agency Use Only

According to L. R. S. 48:385, any discharge to a state highway ditch, cross ditch, or right-of-way shall require approval from: AND

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

Electronic Signature and Fee Payment Confirmation

Transient Sellers Program: Employee Application Required Fee: $31. (includes criminal records check fee)

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

PROPERTY LINE ADJUSTMENT APPLICATION

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

INTRODUCTION AND BACKGROUND

RLI ENVIRONMENTAL INSURANCE Environmental Solutions for a Greener World

Sanitary Sewer Master Plan

APPLICATION FOR INDIVIDUAL WATER & WASTEWATER FACILTIES

APPLICATION FOR RESIDENTIAL OR HEALTH CARE LICENSE

INDUSTRIAL WASTEWATER PERMIT APPLICATION (SHORT FORM DENTAL OFFICE OR CLINIC)

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program

ASSOCIATED LICENSEE LOAN MODIFICATION CONSULTANT, FORECLOSURE CONSULTANT AND COVERED SERVICE PROVIDER APPLICATION FOR RENEWAL OF LICENSE AND CHECKLIST

Check Off (Below) Information That Is Submitted With Permit

FELONY WAIVER APPLICATION

Contractor Signature: Title:

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

NEW YORK CITY FIRE DEPARTMENT

Design of Sewage Pumping Stations by John Zoeller, PE, CEO/President

PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

2.1 Development of Risk-Based Asset Management Framework

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

DATE STAMP RECEIVED BY OFFICE OF PLANNING

WASTEWATER DISCHARGE PERMIT APPLICATION FOR DRY CLEANING SERVICES. City: State: Zip: City: State: Zip:

INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT

INSURANCE APPLICATION FORM

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

APPLICATION FOR TAX ABATEMENT BRAZOSPORT COLLEGE

CITY OF THE VILLAGE OF DOUGLAS ALLEGAN COUNTY, MICHIGAN ORDINANCE NO

DEPARTMENT OF ENVIRONMENTAL QUALITY

LAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES

Testimony. Shaun LaLonde Agency Hearing Staff Eduardo Hernandez Applicant Witness

Sanitary Sewer Overflow Annual Report

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD CENTRAL VALLEY REGION MONITORING AND REPORTING PROGRAM NO. R NPDES NO.

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

How to Build a Wastewater Pump Station in Florida?

86 Main Road, Tiverton, RI Phone Fax

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

Innovative I/I Analysis Leads to Sustainably Program

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Attached is a form to amend the certificate of limited partnership of a Florida limited partnership or limited liability limited partnership.

(2) The Compliance Determination Requirements in Section D of this permit; (3) The Compliance Monitoring Requirements in Section D of this permit;

APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT

SECTION 5: SANITARY SEWER SYSTEM DESIGN

pennsylvania Mr. Shawn Garvin Regional Administrator U. S. Environmental Protection Agency Region III 1650 Arch Street Philadelphia, PA

LAKEHAVEN UTILITY DISTRICT. Developer Extension Agreement Application

SECTION EIGHT BONDING REQUIREMENTS

BACKGROUND DISCUSSION

Request for Proposals - Architect of Record

State of Georgia Department of Natural Resources Environmental Protection Division Watershed Protection Branch

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

Nursing Student Loan Forgiveness Program Application Package

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification

MAINTENANCE AND PERFORMANCE BONDS

Policy and Procedures for the Evaluation of Downstream Impoundments

AN UPDATE ON LOUISVILLE MSD s BASEMENT BACKFLOW PREVENTION PROGRAM 10 YEARS AND 6,700 INSTALLATIONS LATER

Texas Commission on Environmental Quality Page 1 Chapter Design Criteria for Domestic Wastewater Systems

REQUEST FOR PROPOSAL

Plumbing Contractor or Restricted Plumbing Contractor

Transcription:

Michigan City Sanitary District Sanitary Sewer and/or Sanitary Lift Station Construction Permit Application Form Instructions Dear Applicant: To complete your construction application, you must submit all of the necessary items. If your application materials are incomplete, you will be sent a deficiency notice, and your application will be retained for ninety (90) days. If the requested/required information is not received within the ninety (90) day period your application will be denied due to incompleteness. You can also obtain a copy of this application package at: http://www.emichigancity.com/cityhall/departments/sanitary/index.htm. Please complete the following steps: Complete all information on Page 1 of the Construction Permit Application Form; Sign and Date the Application on Page 1; Complete all the information on the Project Design Summary on Page 2, and certify it with a professional engineer's stamp (or land surveyor's stamp for gravity sewer projects), signature, and date (include additional information as an attachment to the application, as necessary); Complete the Capacity Certification/Allocation Letter on Page 3 (leave signature box and date signed box blank as this page will be signed by the City Engineer upon approval); Complete the Certification of the Register Professional Engineer or Land Survey Letter on Page 4; Indentify the location of the Project on the Michigan City Area Map on Page 5, by inserting the words The Proposed Project Location, and by using an arrow and other identification such as bracketing or circling the proposed location, or attach a different map of the Project location if necessary; and Include any other information requested by the Michigan City Sanitary District or necessary to describe the project. Include Permit Fee Schedule and the Base Fee in the form of a check made payable to the Michigan City Sanitary District. The Base Fee is $250. Additional payments may be requested by the MCSD at a rate of $100 per hour for all time in excess of two (2) hours spent in the review and issuance of the Permit. Submit three (3) sets of plans and specifications, including profiles and bedding details. Every page must be stamped and signed by a professional engineer. You must submit three (3) complete copies of the entire Construction Permit Application, including three (3) copies of the Plans and Specifications and all attachments to: General Manager Michigan City Sanitary District 1100 E. Eighth Street Michigan City, IN 46360-2567 Telephone: (219) 874-7799 Please be advised that if your project will disturb one (1) or more acres of land area, coverage under 327 IAC 15-5 (Rule 5) is required. If your project will disturb one (1) or more acres of land area you must also complete the Michigan City Sanitary District, Storm Water Associated with Construction Permit Application Form, and include three (3) copies of this application with your Construction Permit Application Form. Additionally, upon approval by the Michigan City Sanitary District, you will need to submit a Notice of Intent (NOI) Letter (Application) to the Indiana Department of Environmental Management as required by 327 IAC 15-13 and 327 IAC 15-5.

MICHIGAN CITY SANITARY DISTRICT APPLICATION FOR CONSTRUCTION PERMIT SANITARY SEWER AND/OR SANITARY LIFT STATION PURSUANT TO 327 IAC 3 MCSD FORM (CPA-10-2012) INSTRUCTIONS: 1. This form must be filled out completely. 2. Additional pages (attachments following this form) are part of this application form and must be filled out completely. 3. Submission of plans and specifications are part of the application. 4. If you have any questions regarding this application, call the Michigan City Sanitary District at (219) 874-7799. Mail or Hand Deliver Completed Application to: General Manager Michigan City Sanitary District 1100 E. Eight Street Michigan City, IN 46360 Name: Company Name: Address: APPLICANT APPLICANT S ENGINEER OR LAND SURVEYOR Name: Company Name: Address: Telephone number: Telephone number: NAME AND LOCATION OF PROPOSED FACILTY Name: Location (Referenced the location by identifying at least two existing streets and briefly describe location): ATTACHMENT CHECKLIST A. Sanitary Sewer Design Summary Form: Yes B. Capacity Certification/Allocation Letter: Yes C. Certification of PE or LS Letter: Yes D. Project Location Map: Yes E. Plans and Specifications: Yes City: F. Permit Fee Schedule & Base Permit Fee: Yes N/A County: G. Additional Information Required by the MCSD: Yes N/A FUNDING SOURCES AND PERMIT APPLICATION FOR CONSTRUCTION, EXPANSION, OR MODIFICATION OF (Check all that apply) A. Is this project being funded (in part or entirely) by any local grants or matching funds: Yes No B. Is this project being funded (in part or entirely) by State Revolving Loan Funds (SRF): Yes No A. Does the project include Sanitary Sewer(s): Yes No B. Does the project include Sanitary Sewage Lift Station(s): Yes No C. Is this new construction: Yes No D. Is this construction for rehabilitation and/or replacement of an existing Sewer(s) or Lift Station(s): Yes No CERTIFICATION AND SIGNATURE Application is hereby made for a Permit to authorize the activities described herein. I certify that I am familiar with the information contained in this application and to the best of my knowledge and belief such information is true, complete and accurate. Printed name of person signing: Title: Signature of Applicant Date application signed (month, day, year): 1

DESIGN SUMMARY - SANITARY SEWER AND/OR LIFT STATION Narrative Description/Summary of the Proposed Project Design Flow Number of units 1 bedroom apartments 200 gpd/unit gpd 2 bedroom apartments 300 gpd/unit gpd Single family homes 310 gpd/unit gpd Commercial lots gpd gpd gpd Total average flow gpd Peaking factor Peak flow gpd Sewer 8-inch (sewer type) 10-inch Total length of sewer The new sewer will be connected to an existing -inch diameter sanitary sewer at (referenced to two existing streets) (P.E. or L.S. stamp, signature and date) Lift Station Type (wet/dry, submersible, wet-well mounted, etc.) Number of pumps Capacity of pumps gpm TDH RPM HP Back-up power source Yes No Average wet-well detention time Audio/visual alarm with self-contained power supply or telemetry system Force Main feet of -inch (type) Force main discharge elevation Wastewater treatment will be provided by Wastewater Treatment Inspection/Maintenance Inspection during construction will be provided by Maintenance after completion will be provided by 2

CAPACITY CERTIFICATION/ALLOCATION LETTER (This form must be filled-out in its entirety) Name of applicant: Name of owner: Name of project: CERTIFICATION I, Charles G. Peller, Jr., representing the City of Michigan City, Indiana, in my capacity (Name of individual) (Name of city or town) as City Engineer have the authority to act on behalf of the City of Michigan City, Indiana (Title) (Name of city or town) certify that I have reviewed and understand the requirements of 327 IAC 3 and that the sanitary collection system proposed, with the submission of this application, plans and specifications, meets all requirements of 327 IAC 3. I certify that the daily flow generated in the area that will be collected by the project system will not cause overflowing or bypassing in the collection system other than NPDES authorized discharge points and that there is sufficient capacity in the receiving water pollution treatment/control facility to treat the additional daily flow and remain in compliance with applicable NPDES permit effluent limitations. I certify that the proposed average flow will not result in hydraulic or organic overload. I certify that the proposed collection system does not include new combined sewers or a combined sewer extension to existing combined sewers. I certify that the ability for this collection system to comply with 327 IAC 3 is not contingent on water pollution/control facility construction that has not been completed and put into operation. I certify that the project meets all local rules or laws, regulations and ordinances. The information submitted is true, accurate, and complete, to the best of my knowledge and belief. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. Gallons per day (Total Average Flow for Project): Wastewater Treatment Plant (Name of WWTP): J.B. Gifford WWTP, Michigan City, IN. Sewers (Owners of sewers): Signature: Date Signed (month, day, year): (Please refer to IC 13-30-10 for penalties of submission of false information). 3

CERTIFICATION OF REGISTERED PROFESSIONAL ENGINEER OR LAND SURVEYOR LETTER (This form must be filled-out in its entirety) Name of applicant: Name of owner: Name of project: CERTIFICATION I,, representing the project applicant, in my capacity as a registered (Name of individual) (Name of city or town) professional, certify the (Engineer or Land Surveyor) (Indiana registration number) following under penalty of law: The design of this project has been performed under my direction or supervision to assure conformance with 327 IAC 3 and the plans and specifications require the construction of said project to be performed in conformance with 327 IAC 3-6. The peak daily flow rates, in accordance with 327 IAC 3-6-11 generated from within the specific area that will be collected by the proposed collection system that is the subject of the application, plans, and specifications (when functioning as designed and properly installed), will not cause overflowing or bypassing in the same specific area serviced by the proposed collection system other than from NPDES authorized discharge points. The proposed collection system does not include new combined sewers (serving new areas) or a combined sewer extension to existing combined sewers. The sewer at the point of connection is physically in existence and operational. Based upon information provided by the owner of the Wastewater System, the ability for this collection system to comply with 327 IAC 3 is not contingent on downstream water pollution/control facility construction that has not been completed and put into operation. The design of the proposed project meets applicable local rules or laws, regulations and ordinances. The information submitted is true, accurate, and complete, to the best of my knowledge and belief. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. Gallons per day (Total Average Flow for Project): Wastewater treatment plant (Name of WWTP): Sewers (Owners of sewers): Signature: Date Signed (month, day, year): (Please refer to IC 13-30-10 for penalties of submission of false information). 4

Map of Michigan City to Identify Project Location (Add Additional More Detailed Maps as Necessary) 5

Fee Schedule Michigan City Sanitary District Sanitary Sewer and/or Sanitary Lift Station Construction Permit Base Fee: $250 Is Base Fee Enclosed Yes No Remainder of Form to be completed by MCSD Personnel Base Fee Received by MCSD? Yes No Date: Are Additional Fees Necessary? Yes No Additional Time Spent in Review in excess of 2 Hour Maximum as per Resolution 1304-12. Additional Time spent hours Additional Amount due to MCSD: Amount: Additional Amount received by MCSD: Yes No Date: Please remit this form with your Permit Application and upon request if additional Fees are necessary. Note - Michigan City Sanitary District Resolution 1304-12, effective September 12, 2012, states the following: NOW, THEREFORE, BE IT RESOLVED by the Board of Commissioners of the Michigan City Sanitary District that the following fees shall be charged and collected prior to the issuance of a sanitary sewer construction permit by the MCSD: A minimum charge of $250 per application plus an additional $100 per hour, billed in 1/4 hour increments, for any time spent on the review, issuance, and construction monitoring in excess of 2 hours. 6

ADDITIONAL INFORMATION Attach Additional Information as Requested and/or as Necessary to Describe, Explain, and/or Clarify the Information Contained in this Construction Permit Application. 7