Section 10. Contain-It Secondary Containment Piping System. Effective Jan. 1, 2013. See www.gfpiping.com for updated info.



Similar documents
Easy and Reliable Secondary Containment Piping System Split Pipe and Fittings Solid Pipe

Hose Clamps & Fittings

Hose and Tube Fittings Series 1-3

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES

P900 SERIES PORTABLE HYDROSTATIC TESTER

British Standard Pipe BSP

ABS DWV FITTINGS ABS-0215 FEBRUARY 2015 SUPERCEDES ABS-1214 ASTM D2661

Schedule 40 & Schedule 80 Rigid PVC Piping Systems Scroll Down for Dimensions, Components, Hangars & Supports, Fabrication Techniques

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Product Knowledge Guide. (Updated May 2015) BR-PK Charlotte Pipe and Foundry Company.

INSTALLATION INSTRUCTIONS BL-8704

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

INSTALLATION INSTRUCTIONS MK-8704

INSTALLATION INSTRUCTIONS. SharkBite. Connection System. The SharkBite System



DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

Watts Pure Water Systems

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

SYSTEM PLUMBING KIT INSTALLATION, OPERATION & SERVICE MANUAL. PENTAIR POOL PRODUCTS CORPORATE OFFICE Sanford, NC (919)

Elavo White Ceramic Round Vessel Bathroom Sink

Many Products...One Source

Thread and End Connection

Instructions. Complete RPS 2900 Pump Kit for RoadLazer RoadPak Line Striping System 3A1304A ENG. Pressure Relief Procedure.

Tubing and Accessories

Working with Copper Tubing

Sewage Compliance Form Instructions

FITTINGS A series Aluminium (light weight) compression fittings Ø mm tube size, BSPP and BSPT thread

MACHINE DRAWING QUESTION BANK. 2. What are the parts not usually sectioned? (Nov 04)

Fittings, Tubing & Nipples

In-Track Repair of Concrete Ties. Deland Humpherys, Director Track Mtce

AZEK Rail Install Guide

Complete Systems & Parts Automatic Oiler & Grease Bank

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling

Technical Data. Installation

RadianceRail Installation Guide

Installation, Maintenance, & Repair Series 4000B/LF4000B

Check Valves & Actuated Valves

TracRac G2. Overhead Rack Installation Instructions. TracRac Inc. 994 Jefferson St. FallRiver MA IN-42000_B

SYSTEM PLUMBING KIT INSTALLATION, OPERATION & SERVICE MANUAL. PENTAIR POOL PRODUCTS CORPORATE OFFICE Sanford, NC (919)

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

Tubing, Fittings and Air Handling System Components

Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping

To qualify for discount rate, request and payment must be received 21 days prior to show/ event opening. Payment in U.S. currency only.

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS

Transport & Automotive CATALOGUE. March Customer Service Phone: Fax: sales@tubefit.com.au.

SIZING AND CAPACITIES OF GAS PIPING

Parts Manual. TWIN 2 & 3 Parts & Accessories F210846R01. Your efficiency is our Challenge!

Operator s Manual. Pressure Injection Cell Model PC8500. Congratulations! Contents

8D.1 BALL ANGLE METER VALVES - 3/4" & 1" P B E B B B-24267

Installation Instructions HighRock 4x4 TM

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

SIMPLAIR PIPING TOOL

Proportional pressure regulators VPPE

Defining Quality. Building Comfort. Heating and Cooling Coils

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

Installation Instructions AQ-5100, AQ-5200 & AQ-5300 Under Counter Water Filter Single Stage (5100), Two Stage (5200) and Three Stage (5300) systems

ECM-D70T / ECM-D70T1.5

Installation Instructions

1. Geo Vertical 2. Geo Horizontal

Temperature Adaptor. Vacuum Tree

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

CONGRATULATIONS! HERE S YOUR H2OUTLINE SPRINKLER DESIGN

NEW CONNECTION INDUSTRIAL PRODUCTS NC.10V NC.20V NC.30V. NC. SD.10 NC. SD.20 NC. F.Clamp

with installation dynafact boost GAUGE this manual is for use with systems

Portable digital microprocessor thermometers with interchangeable probes

BY MCI SOLUTIONS SECONDARY CONTAINMENT ADAPTOR

Scotch-Weld PUR Easy 250 Adhesive Applicator

Copper and Copper Alloy Tube, Pipe and Fittings

NITROUS TRANSFER PUMP INSTRUCTIONS

Self Purging Liquid Trap (SPLT ) User s Manual

TopSky DLG Installation Manual

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

9,'(2 #6(3$5$725 8VHU V#0DQXDO

Crystal Clear Sealant

Powers Controls TH 192 HC Heating/Cooling Room Thermostat

HotLok Pass Through Blanking Panel

MASTER. Installation and Operation Manual. Water Conditioning Corp. MCA Time Clock Series Residential Softeners. February 2011 Version

*PATENT PENDING. NS1100 / NS2200 Installation Manual & Owner s Guide

INSTALLATION MANUAL. Glass Vessel Sink. I toll free: I Kraus USA Inc.

Based on SG GSA Fire & Security Products Contract GS-07F-0396M, Mod PO-0099 January 30, 2013

AKRON EDUCTORS TROUBLESHOOTING GUIDE OPERATION & THEORY OF EDUCTORS GENERAL OPERATING AND MAINTENANCE INSTRUCTIONS

Ve-Lock manufactures Needle Valves from Solid bar stock Materials & all parts details are as below:

Installation and Maintenance Instructions

The Plastic Injection Moulders. Furniture Fittings & Tube Inserts

Multiport Spill Containment with Defender Spill Containers

Valve systems Base plates, according to standard ISO Brochure

Installation Instructions Hustler 6-BTV Trap Vertical

V - JET. Counteflow System. V-JET Counterflow System Installation and Operation Manual

Powers Controls TH 192 S Single Temperature Room Thermostat

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CHCSCS

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

MTI10 Insertion and MTL10 In-line Thermal Mass Flowmeter and Temperature Transmitter

SECTION D LINEAR FLUORESCENT LAMPHOLDERS LINEAR FLUORESCENT LAMPHOLDERS

American SAE J531 Taper Thread Pipe Plugs and Drain Plugs

StackFlowMaster FPD580 TORBAR probe Stack gas metering systems. Measurement made easy. Introduction. For more information

W I T H I N J O I ST S I N STA L L AT I ON

Installation and Operation Manual

Transcription:

Section 10 ontain-it Secondary ontainment Piping System

Glossary S = ontain-it Socket SPG = Spigot End (same dimension as pipe outside diameter) MPT = Male Pipe Thread FPT = Female Pipe Thread Product ine Description 39 Fittings 41 Pipe 42 Accessories The technical information given in this publication implies no warranty of any kind and is subject to change without notice. Please consult our Terms and onditions of Sale. Not for Use with ompressed Air or Gases DO NOT TEST with Air or Air over ater GF Piping DOES NOT REOMMEND the use of thermoplastic piping products for systems to transport or store compressed air or gases, or the testing of thermoplastic piping systems with compressed air or gases in above or below ground locations. The use of GF Piping products in compressed air or gas systems automatically voids the warranty for such products, and their use against our recommendation is entirely the responsibility and liability of the installer. GF Piping will not accept responsibility for damage or impairment from its products, or other consequential or incidental damages caused by misapplication, incorrect assembly, and/or exposure to harmful substances or conditions. The only exception to this recommendation is when testing the ontain-it Secondary System or the Fuseal Squared Double ontainment Piping System s containment joints.

Page ontain-it Pipe 10.4 ontain-it Fittings 10.5 ontain-it Terminations 10.9 ontain-it entralizers 10.11 ontain-it Accessories 10.12 10.3

ontain-it Pipe Split Pipe lengths [ft] Part No. USD/ft ift [ft] Minimum Order [ft] Minimum 4 10 37015040 * 20.32 360 60 4.215 3.525 6 10 37015060 * 42.46 120 20 6.275 5.375 Solid Pipe lengths [ft] Part No. USD/ft ift [ft] Minimum Order [ft] Minimum 4 20 37026040 * 11.52 520 20 4.215 3.882 6 20 37026060 * 24.26 340 20 6.275 5.782 10.4

ontain-it Fittings ontainment oupling - Standard, Split (S x S) G 4 4629-040 80.08 5 2.00 0.38 4.38 5.81 4.69 3.88 6 4629-060 120.12 5 2.75 0.38 5.81 8.19 6.88 5.97 ontainment oupling - Extended, Split (S x S) Maximum Gap: 5.50" 4 4629-040E 88.58 5 5.00 10.00 5.81 4.69 3.88 6 4629-060E 127.40 5 5.75 11.50 8.19 6.88 5.97 ontainment oupling - Reducing, Split (S x S) 1 2 6 x 4 4629-532 160.16 5 2.00 2.75 5.81 8.19 6.88 5.97 10.5

ontainment 90 Ell, Split (SxS) G 4 4606-040 104.34 5 2.00 2.44 5.81 4.69 3.88 6 4606-060 160.16 5 2.75 3.38 8.19 6.88 5.97 ontainment 45 Ell, Split (S x S) G 4 4617-040 104.34 5 2.00 1.00 5.81 4.69 3.88 6 4617-060 160.16 5 2.75 1.75 8.19 6.88 5.97 ontainment Tee, Split (S x S x S) G H 4 4601-040 121.34 5 2.00 2.38 7.19 8.63 5.81 4.69 3.88 6 4601-060 175.94 5 2.75 3.44 10.25 12.44 8.19 6.88 5.97 10.6

ontainment 45 ye, Split (S x S x S) G GJ N I. D. 4 4683-040 160.16 5 2.00 0.75 5.88 11.00 7.13 5.81 4.69 3.88 6 4683-060 230.54 5 2.75 1.81 7.75 15.19 9.75 8.19 6.88 5.97 ontainment ap, One Piece (S) 4 4647-040 65.52 5 1.75 1.94 4.50 6 4647-060 95.86 5 2.75 3.19 6.75 ontainment Female Adapter, One Piece (S x FPT) 4 4635-040 80.08 5 1.75 3.18 5.00 6 4635-060 121.34 5 3.00 5.00 6.75 10.7

Plug, One Piece (MPT) 4 4650-040 65.52 5 6 4650-060 95.86 5 Adapter Sleeve, One Piece (IPS Spg x S) 4 x 4 4687-040 65.52 10 6 x 6 4687-060 95.86 10 ontainment PPFR Floor Drain, One Piece (IPS Spg x MPT) For use with Fuseal primary piping only. Must use 4635-060 for ontain-it transition. Part No. USD 3 x 6 46104-530 * 825.06 4 x 6 46104-532 * 825.06 10.8

ontain-it Terminations Termination Fitting - Rigid PV, Split (S to IPS) Part No. USD 4 x 1 2 4628-415 * 134.68 2.00 4.44 5.81 4.69 3.88 4 x 3 4 4628-416 * 134.68 2.00 4.44 5.81 4.69 3.88 4 x 1 4628-417 * 134.68 2.00 4.44 5.81 4.69 3.88 4 x 1 1 4 4628-418 * 134.68 2.00 4.44 5.81 4.69 3.88 4 x 1 1 2 4628-419 134.68 2.00 4.44 5.81 4.69 3.88 4 x 2 4628-420 134.68 2.00 4.44 5.81 4.69 3.88 6 x 2 1 2 4628-529 * 194.14 2.75 5.81 8.19 6.88 5.97 6 x 3 4628-530 194.14 2.75 5.81 8.19 6.88 5.97 6 x 4 4628-532 194.14 2.75 5.81 8.19 6.88 5.97 Test Termination Fitting - Rigid PV, Split (S to IPS) Part No. USD 4 x 2 4628-420T 140.74 2.00 4.44 5.81 4.69 3.88 6 x 4 4628-532T 200.20 2.75 5.81 8.19 6.88 5.97 Termination Fitting - Flexible Alcryn, One Piece ontain-it to IPS/Metric [mm] Part No. USD 4 x 1 2 20 4628-415A 80.08 4 x 3 4 25 4628-416A 80.08 4 x 1 32 4628-417A 80.08 4 x 1 1 4 40 4628-418A 80.08 4 x 1 1 2 50 4628-419A 80.08 4 x 2 63 4628-420A 80.08 6 x 2 1 2 75 4628-529A 236.60 6 x 3 90 4628-530A 236.60 6 x 4 110 4628-532A 236.60 10.9

Test Termination Fitting - Flexible Alcryn, One Piece ontain-it to IPS/Metric [mm] Part No. USD 4 x 1 2 20 4628-415AT 86.14 4 x 3 4 25 4628-416AT 86.14 4 x 1 32 4628-417AT 86.14 4 x 1 1 4 40 4628-418AT 86.14 4 x 1 1 2 50 4628-419AT 86.14 4 x 2 63 4628-420AT 86.14 6 x 2 1 2 75 4628-529AT 242.66 6 x 3 90 4628-530AT 242.66 6 x 4 110 4628-532AT 242.66 Termination Fitting - Flexible Alcryn, One Piece ontain-it to opper Tube Part No. USD 4 x 1 2 4628-415A 80.08 4 x 3 4 4628-416A 80.08 4 x 1 4628-417A 80.08 4 x 1 1 4 4628-418A 80.08 4 x 1 1 2 4628-419A 80.08 4 x 2 4628-420A 80.08 6 x 2 4628-528A 212.94 6 x 2 1 2 4628-529A 236.60 6 x 3 4628-530A 236.60 6 x 4 4628-532A 236.60 Test Termination Fitting - Flexible Alcryn, One Piece ontain-it to opper Tube Part No. USD 4 & 1 2 4628-415AT 86.14 4 & 3 4 4628-416AT 86.14 4 & 1 4628-417AT 86.14 4 & 1 1 4 4628-418AT 86.14 4 & 1 1 2 4628-419AT 86.14 4 & 2 4628-420AT 86.14 6 & 2 4628-528AT 218.40 6 & 2 1 2 4628-529AT 242.66 6 & 3 4628-530AT 242.66 6 & 4 4628-532AT 242.66 10.10

ontain-it entralizers entralizer (ontain-it x IPS) d 4 x 1 2 4686-415 * 41.26 25 4 x 3 4 4686-416 * 41.26 25 4 x 1 4686-417 * 18.20 25 4 x 1 1 4 4686-418 * 41.26 25 4 x 1 1 2 4686-419 * 18.20 25 4 x 2 4686-420 * 18.20 25 6 x 2 1 2 4686-529 * 55.82 25 6 x 3 4686-530 * 24.26 25 6 x 4 4686-532 * 24.26 25 6 x 1 2 Twin 4686-811 * 134.68 5 6 x 3 4 Twin 4686-813 * 134.68 5 6 x 1 Twin 4686-815 * 134.68 5 entralizer (ontain-it x opper Tube ) 4 x 1 2 4686-415 * 41.26 10 4 x 3 4 4686-416 * 41.26 10 4 x 1 4686-417 * 41.26 10 4 x 1 1 4 4686-418 * 41.26 10 4 x 1 1 2 4686-419 * 41.26 10 4 x 2 4686-420 * 41.26 10 6 x 2 4686-528 * 53.67 10 6 x 2 1 2 4686-529 * 55.82 10 6 x 3 4686-530 * 55.82 10 6 x 4 4686-532 * 55.82 10 entralizer (ontain-it x Metric) d 4 x 20 4686-712 * 41.26 25 4 x 25 4686-713 * 41.26 25 4 x 32 4686-714 * 41.26 25 4 x 40 4686-715 * 41.26 25 4 x 50 4686-716 * 41.26 25 4 x 63 4686-717 * 41.26 25 6 x 75 4686-719 * 55.82 25 6 x 90 4686-720 * 55.82 25 6 x 110 4686-721 * 55.82 25 6 x 20 Twin 4686-812 * 134.68 5 6 x 25 Twin 4686-814 * 134.68 5 6 x 32 Twin 4686-816 * 134.68 5 10.11

ontain-it Accessories Fitting lip 4 & 6 4693-101 * 0.55 25 Pipe lamp Part No. USD 4 & 6 4693-102 * 491.40 Drill Bits Part No. USD 4 4693-104 * 60.66 6 4693-106 * 121.21 Test Gauge Part No. USD 4 & 6 4693-150 * 62.40 Manual Injection Gun - System II d Part No. USD 4 & 6 4694-200 * 552.06 Pneumatic Injection Gun - System II d Part No. USD 4 & 6 4694-201 * 1516.66 Adhesive artridge - System II imited Shelf ife of 18 Months d 4 & 6 4694-302 * 72.80 12 10.12

Mixing Tips - System II Description Straight 4694-303 * 6.98 10 Bent 4694-307 * 18.80 10 Flexible 4694-306 * 32.76 10 10.13

Adhesive Requirements ontain-it artridge Fittings/Pipe # of Sockets/Tube 1 cartridge 4 fittings 14 1 cartridge 6 fittings 10 1 cartridge 4 pipe 20 ft. length, both sides 1 cartridge 6 pipe 10 ft. length, both sides Adhesive artridge Requirements alculation This table is designed to assist in the accurate determination of the number of adhesive cartridges required for a specific project. Fittings Quantity of 4 Tees and yes Quantity of 4 Fittings (other than tees and wyes) x 3 = x 2 = /14 = Quantity of 6 Tees and yes x 3 = Quantity of 6 Fittings (other than tees and wyes) x 2 = /10 = (+) Split Pipe Feet 4 Split Pipe/20 (1 cartridge will fill 20 ft., both sides) = (+) Feet 6 Split Pipe/10 (1 cartridge will fill 10 ft., both sides) = (+) TOTA ARTRIDGES 10.14