ENCORE / BRAVO SHOWER AND TUB DOOR INSTALLATION INSTRUCTIONS

Similar documents
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

ENIGMA-X SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

INFINITY-Z SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

VISION SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

SLIMLINE SHOWER BASE

Destiny Shower Enclosure Installation Instructions

Important Information

NIAGARA Shower Cabin Installation Instructions

Stainless Steel Sink Work Center With Portable Sink, Colander and Cutting Board

Bathroom Installation Guide

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Acrylic Walls Installation Instructions

Chelsea Loft Bed WARNING:

Models A spe n, Econoline C o l o n i al. and Savoy. Installation Instructions. Contractors Wardrobe

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

How To Install Your Frameless Shower Enclosure

COASTLINE QUADRANT ENCLOSURE. Installation / Maintenance Instructions Rev

DIY CABINET REFACING INSTALLATION GUIDE

KITCHEN INSTALLATION GUIDE

Extra Tall Wide Span Gate

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

IMPORTANT INFORMATION

Beautifully Traditional

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09042K1

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual.

Premier & Deluxe 3-Season Room Sliding Glass Door

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

ACE. PIVOT AND BI-FOLD DOOR Installation and User Guide. These instructions must be left with the user W2-D

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Folding Bath Screen Instruction Manual

Curved Quadrant Instruction Manual

Installation Instructions Avalanche XUV Cap IMPORTANT! IMPORTANT!

pottery barn kids MADELINE BUNK BED

WARNING: Important: Keep these instructions for future reference. Gate Instructions (1) Assembly and Installation Instructions

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Heavy Glass Frameless Shower Door With Return Panel

Basic Spring Motor Roller Shades

care & cleaning guide

OWNER S MANUAL Table Tennis Table Patent Pending

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

Beadboard Wall Bookcase

GENERAL CARE PLUMBING & VALVE INFORMATION TUB & SHOWER DOOR INFORMATION FOR QUESTIONS CALL OUR SERVICE DEPARTMENT

Installation Instructions

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

& CLEANING GUIDE MAINTAIN BEAUTY & PERFORMANCE

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Wetroom Panel (Concealed Fix)

LACAVA. Table of Contents. Owner s Manual. Wall-mounted & Vessel Sinks PS#:

Speed-Mat Rectangle Cutter

AZEK Rail Install Guide

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Select Radiators Installation Guide

CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions

RadianceRail Installation Guide

BUNK BED. Model No.: DA3797E - Espresso DA3797P- Pine. UPC CODE: (Espresso) (Pine) NOTE: Lot number: Date of purchase:

IN00378 (rev A) Corner Entry

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

MGB Chrome Bumper Conversion

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

Information Technology Solutions

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

ROTARY TUMBLER INSTRUCTIONS AND PARTS LIST

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

Installation Instructions S

Operating and Installation Instructions

Unpacking, Installation, and Customization

DE Frame with C Series Sidelight

DREAMLINE EXCLUSIVE LIMITED WARRANTY

Best Barns USA Assembly Book

6mm Two Door Offset Quadrant

Active and Passive Sash Replacement

CULINAIRE COLLECTION STAINLESS STEEL KITCHEN SINKS

GENUINE PARTS INSTALLATION INSTRUCTIONS

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

Window Installation Instructions

ATS Overhead Table Shelf System INSTRUCTION MANUAL

Installation Instructions

Technical data sheet PVC Bi-fold doors

Basement Window Installation Guide Hopper and Sliding

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Integral Kit Instructions

Owner s Guide and Installation Manual PELLA EXPRESS INSTALL STORM DOOR MODELS

Samuel Shorty Bunk Bed

CK548000TX. Amherst Cocktail Table Trunk. Assembly Instructions PO#: Page 1

M128 SERVICE MANUAL- M128 MODEL #S-11 MANUAL CAN OPENER

ROTARY TUMBLER INSTRUCTIONS AND PARTS LIST

Installation Guide. Bath and Wall Surrounds SERIES B

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

DETACHABLE WINDSHIELD AND DOCKING HARDWARE KIT

Owner's Manual & Assembly Instructions

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

Assembly and Usage Instructions

Transcription:

ENCORE / BRAVO SHOWER AND TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model s web page on DreamLine.com MODEL #s SHDR-1660580-## SHDR-1648760-## SHDR-1654760-## SHDR-1660760-## ##=finish 01- Chrome 04- Brushed Nickel 06- Oil Rubbed Bronze For more information i about DreamLine Shower Doors & Tub Doors please visit i DreamLine.com

This model is treated with DreamLine s exclusive ClearMax TM Glass technology. This is a specially formulated coating that prevents the build up of soap and water spots. Install the surface with the ClearMax TM label towards the inside of the shower. Please note that depending on the model, the glass may be coated on either one or both surfaces. For best results, squeegee the glass after each use and dry with a soft cloth. 2

1 2 Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the Detailed Diagram of Shower Door Components. If the unit has been damaged, has a finishing defect, or has missing parts, please contact our customer support department within 3 business days of the delivery date. Please note that DreamLine will not replace any damaged products or missing parts free of charge after 3 business days or if the product has been installed. Feel free to contact DreamLine TM if you have any questions, and please provide an order number, job name or other proof of purchase to help us identify your original order. 2. Please note that you should consult your local building codes with questions on installation compliance standards. Building and plumbing codes may vary by location, and DreamLine is not responsible for code compliance standards for your project and will not accept any returns. 3. If this unit is going to be installed in a new construction, please install all of the required plumbing and drainage before installing the shower. Use a competent and licensed (if required by local code) plumber for all plumbing installation. 4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and will be able to support the total weight of the unit. Also make sure the walls are at right angles. Irregular installation surface level, radius corners or improper angle of side walls will result in serious problems for your installation. Please, note that some adjustments and drilling might be necessary during the installation process. 5. Please protect all primary surfaces of the product during installation. Never set your glass down directly onto a tile floor. Leave corner protectors in place until necessary to remove them. Always use a piece of wood or cardboard to protect the bottom edge and corners of the glass prior to and during installation. 6. This unit must be installed upon a finished threshold and against finished walls. 7. This model can accommodate up to 3/8 per wall profile for out-of-plumb conditions. Verify that the walls are plumb before proceeding with the installation. 8. This model requires that you drill into the threshold for proper installation. 9. This model requires a minimum 2-1/4 of flat threshold space for installation. 10. This model requires two people for installation. 11. Professional installation recommended. NOTE: This manual will describe the shower door installation. Please follow the same sequence of installation steps for the tub door installation. 3

Tools Level Tape Measure Pencil Phillips Screwdriver Drill bit (Ø=5/16") Drill bit (Ø=1/8") Silicone Metal File Power Drill Hammer Miter saw or Hacksaw NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed diagram and packing list in your manual as a reference. Before discarding the carton, check for small hardware bags that may have fallen to the bottom of the box. If any parts are damaged or missing, please contact DreamLineTM for replacement. The shipping boxes may contain extra parts not used in your model configuration. NOTE: Retain these installation instructions for future reference. 4

Detailed Diagram of shower door components The glass surface with the ClearMax label must be installed to face inside of the shower Parts List # ITEM Qty # ITEM Qty 1 Wall Profile 2pcs 9 Ø8 Plastic Wall Anchor 6pcs 2 Upper Guide Rail 1pc 10 Countersunk Head Screw ST4.2 40 4pcs 3 Door Glass 2pcs 11 Truss Head Self-Tapping Screw 4.2x10 4pcs 4 Wall Profile Bumpers 4pcs 12 Truss Head Self-Tapping Screw 4.2x16 2pcs 5 Guide Block 1pc 13 Truss Head Self-Tapping Screw 4.2x30 2pcs 6 Roller Assembly 4pcs 14 Allen Wrench 3mm 1pc 7 Upper Guide Rail Connector 2pcs 15 Bottom Guide Rail 1pc 8 Towel Bar 2pcs # Box 1 Glass Box (GL) 2 Aluminum Acc Box (AC) 3 Spare Acc parts bag Boxes Box Contents by part# 3 1. 2. 4. 5. 6. 7. 8. 9. 10. 11. 12.13 12. 13 one each; 9. 10. 11 three each. 5

Installation steps 1. Measure the finished opening width at the bottom and at the top (at the model height: 58 for tub or 76 for shower). Use these dimensions as W in step #2. Also check the threshold for level and the walls for plumb. See Fig 1 for details Fig 1 6

2. Using a miter saw or hacksaw, cut the Upper Guide Rail (#02) 1/16 shorter than the top dimension W from step #1. (W - 1/16 = finished cut length L) ( see Fig 2a) The Bottom Guide Rail (#15) needs to be cut equally from both ends to keep the center guide holes centered. (The Bottom Guide Rail (#15) has been precut for the model size. See Table A). Using a miter saw or hack saw, cut the Bottom Guide Rail (#15) 3/4 shorter than the bottom dimension W from step #1. (W - 3/4 = finished cut length L) (see Fig 2b) See Fig 2a & 2b for details L Upper Guide Rail (#02) W (finished opening) - 1/16 = L (finished cut length) W-1/16 (1.5mm) Note: The Bottom guide rail (#15) needs to be shorter than the Upper guide rail (#02) because it fits between the wall profiles, while the upper guide rail fits wall-to-wall. Fig 2a Table A Model Size Precut Bo om Rail Length 60 x 76 59-3/8 (1508mm) 48 x 76 47-3/8 (1203mm) 54 x 76 53-3/8 (1356mm) 60 x 58 59-3/8 (1508mm) EQ Bottom Guide Rail (#15) W (finished opening) - 3/4 = L (finished cut length) FOR EXAMPLE: If the finished opening W = 59, then 59-3/4 = 58-1/4 finished cut length L will be 58-1/4. (The Bottom rail length for the 60 model = 59-3/8-58-1/4 = 1-1/8 1-1/8 divided by 2 = 9/16 Cut 9/16 off from each end to a finished cut length of 58-1/4 ). Note that this is only an example and the actual cut-off amount will vary based on the actual finished opening dimension. L W-3/4 (18mm) EQ W= finished opening width 3/8 (9mm) center bottom guide 3/8 (9mm) Finished cut length L Fig 2b 7

3. Place the Bottom Guide Rail (#15) onto the threshold in the desired position. Use a tape measure to align it evenly with the front edge of the threshold and mark its position on the threshold. TIP: Use the left and right Wall profiles (#01) to center the Bottom Guide Rail (#15) on the threshold to maintain the proper spacing from the walls. See Fig 3 for details Fig 3 8

4. Attach the Upper guide rail connectors (#07) to the top of both Wall Profiles (#01) using the ST4.2 x 30 Truss head screws(#13). (Fig 4a) Position one Wall Profile (#01) against the wall onto the Bottom Guide Rail (#15). Check for plumb with a level and mark the position. Mark both holes in the Upper Guide Rail Connector (#07) for drilling. (Fig 4b). Remove the wall profile and drill Ø 5/16 holes and insert the Wall anchors (#09). See Fig 4a and 4b for details TIP: Add a few drops of dish soap to the screws to make installation easier. Fig 4a 1 2 3 Ø5/16 (8mm) Fig 4b 9

5. Apply silicone to the back of the Wall Profile (#01) and place it back into position on the wall. Attach the Upper Guide Rail Connector (#07) using two each of the ST4.2 x 40 Countersunk Flathead Screws (#10). Attach two of the Wall Profile Bumpers (#04) using the ST4.2 x 10 screws (#11) and cover the holes with the decorative caps. See Fig 5 for details 1 2 Fig 5 10

6. Position the Bottom guide rail (#15) on the threshold and mark the threshold through the center guide holes for drilling. Remove the Bottom guide rail (#15) and drill into the thresohold: Drill Ø1/8 holes for installation into an acrylic threshold Drill Ø5/16 holes and use anchors for installation into a tile threshold. Apply silicone to the bottom surface of the Bottom guide rail (#15) and place it back into position on the threshold. Attach the Guide block (#05) and Bottom guide rail (#15) to the threshold using two of the ST4.2 x16 screws (#12). Cover the screw holes with the decorative caps. See Fig 6 for details 1 2 Ø1/8 or Ø5/16 3 4 5 Fig 6 11

7. Position the remaining Wall Profile (#01) against the wall onto the Bottom Guide Rail (#15). Check for plumb with a level and mark the position. Mark the holes in the Upper Guide rail connector (#07) for drilling. (Fig 7.1) Remove the wall profile and drill Ø 5/16 holes and insert the Wall Anchors (#09). See Fig 7 for details 1 2 3 Ø5/16 (8mm) Fig 7 12

8. Apply silicone to the back of the Wall Profile (#01) and place it back into position on the wall. Attach the Upper Guide rail connector (#07) to the wall using two each of the ST4.2 x 40 Countersunk flathead screws (#10). Attach two of the Wall Profile bumpers (#04) using the ST4.2 x 10 screws (#11) and cover the holes with the decorative caps. See Fig 8 for details 1 2 Fig 8 9. Install the Upper Guide Rail (#02) onto the installed Wall profiles (#01) making sure that it sits firmly onto the Wall profile connectors (#07). See Fig 9 for details Fig 9 13

Note: Do not attach the Towel bars (#08) to the Door glass (#03) until instructed. Do not attempt to lift the glass with the towel bars as doing so may cause damage to the glass and/or serious personal injury. Use an assistant or a professional grade glass suction cup to handle the glass. 10. Install the Roller Assemblies (#06) onto the tops of both doors. Be sure to position the rollers facing in the correct direction for each door - both wheels facing out for the outside door glass, and both wheels facing in for the inside door glass. Bring both lites of Door glass (#03) into the shower area for hanging. Using padding to protect the glass and shower area. See Fig 10 for details Inside door glass Outside of shower Inside door glass Outside door glass Outside door glass Outside of shower Inside door glass Outside of shower Outside of shower Outside door glass Fig 10 11. Have an assistant carefully lift one end of the Upper Guide Rail (#02) about one inch - just to the top of the Upper Guide Rail Connector (#07). See Figs 11 and 12 for details lift Upper guide rail approx 1 Fig 11 Fig 12 14

12. Using an assistant to support the Upper Guide Rail (#02), lift and insert the outer door glass up into the Upper Guide Rail (#02) so the Roller Assemblies (#06) fit into the groove inside the rail. Carefully lower the Upper Guide Rail (#02) so the door glass slides into the proper slot in the Guide block (#05). See Fig 13 for details Outside door glass door glass Outside outside of shower Outside door Fig 13 13. Next, install the inner door glass in the same manner. Move the installed door to the opposite end, lift the Upper Guide Rail (#02), and install the inner door glass into the Upper Guide Rail (#02) and into the Guide block (#05). See Fig 14 for details Inside outside of shower Outside door glass door glass Inside door Fig 14 15

14. To compensate for minor out-of-plumb conditions (up to 3/8 ): After both doors are installed, use the Allen Wrench (#14) to make minor adjustments with the Roller Assemblies (#06) as necessary. Remove the cover plate, then loosen the mounting bolt on the roller. Rotate the adjustment bolt on the bottom of the wheel assembly to tilt the door glass to the desired position. Re-tighten the mounting bolt and replace the cover plate. See Fig 15 for details 3 outside of shower Cover plate / Mounting bolt Loosen / tighten Adjustment Bolt mounting bolt Fig 15 cover plate adjustment bolt Use the adjustment bolt on the roller assemblies to adjust the door glass 15. Install both the inside and outside Towel bars (#08) using all provided gaskets as shown. Cover the bolt with the decorative cap. See Fig 16 for details Fig 16 16

16. Apply good quality mildew-resistant silicone to the entire interior perimeter where the wall profile meets the wall and along the threshold. Allow 24 hours for the silicone to fully cure before using the shower. See Fig 17 for details 24 Hours Fig 17 17

Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic back walls: wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use with a soft cloth. Rinse and wipe off the glass using either a soft cloth or a squeegee to prevent soap buildup and water spots (Hard water can etch the surface of the glass over time if left to dry). To prevent scratching the surface: never use abrasive cleaners or cleaning products that contain scouring agents. Never use bristle brushes or abrasive sponges that may scratch the surface. HARDWARE: To ensure a long lasting finish: wipe off the metal parts after each use with a soft cloth. Do not use abrasive cleaners or cleaning products containing ammonia, bleach or acid. If accidentally used, rinse the surface as soon as possible to prevent damage to the finish (peeling or corrosion). After cleaning the polished finishes, rinse thoroughly and wipe dry with soft cloth. Clean stainless steel surfaces at least once a week. When applying stainless steel cleaner or polish to stainless steel hardware, work with (not across) the grain. Never use an abrasive sponge or cloth, steel wool or wired brush as these may permanently scratch the surfaces. NOTE: To maximize the life of your door, it is important to regularly inspect the glass and other hardware for misalignment, proper attachment, and/or damage. Contact DreamLine with any questions or concerns. 18

TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine Shower Doors and Enclosures please visit DreamLine.com