TRENCH BEDDING & BACKFILL

Similar documents
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Division 2 Section Section 02795

SECTION EARTH MOVING

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

PERMEABLE INTERLOCKING CONCRETE PAVEMENT

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

C. Section TESTING LABORATORY SERVICE.

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Specification Guidelines: Allan Block Modular Retaining Wall Systems

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION PERVIOUS INTERLOCKING CERAMIC PAVERS

4-02 Gravel Base Ballast and Crushed Surfacing

Replace with: Section REQUEST FOR TENDER RFT 15 ( ) PARKING LOT 2 RESURFACING ADDENDUM # 2. - Page 1 of 2 -

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

DESCRIPTION OF WORK:

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

Soils and Aggregates Division

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

Developer s/consultants Field Services Guidelines

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

SECTION 4Aggegate Subbase

Permeable Pavement Construction Guide

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section EXCAVATION AND BACKFILL FOR UTILITIES

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

APPENDIX B. I. Background Information

Building Your Interlocking Concrete Pavement to Last a Lifetime

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

Section 2100-Trenching and Tunneling

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

CONSTRUCTION PERMIT REQUIREMENTS

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SUPPORT OF EXCAVATION

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

SECTION EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM

1. ASTM C Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

Unit Price Averages Reports

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

SECTION PAVEMENT DESIGN

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR

SECTION SHEETING, SHORING AND BRACING

SECTION GRAVITY SANITARY SEWERS

STANDARD SPECIFICATIONS

SECTION SITE PREPARATION

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

550 PIPE CULVERTS, SEWERS AND DRAINS

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION STORM DRAIN SYSTEM

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Soils, Foundations & Moisture Control

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION SIGNAL WIRE AND CABLE

SEWER DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS

SPECIAL SPECIFICATION 5757 Power Duct System

No allowance will be made for classification of different types of material encountered.

SECTION 334 (Pages ) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE

SECTION ABANDONMENT OF SEWER MAINS

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

Construction Specifications for Keyhole Pavement Coring and Reinstatement

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

Effect of grain size, gradation and relative density on shear strength and dynamic cone penetration index of Mahi, Sabarmati and Vatrak Sand

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Final 1 st Edition January 2006 A GUIDELINE FOR THE DESIGN AND CONSTRUCTION OF ASPHALT PARKING LOTS IN COLORADO

Transcription:

1.0 SCOPE This specification provides the requirements and standards for bedding of pipes and conduits, and for trench backfill materials and construction procedures, including testing and inspection. 2.0 INDEX 1.0 SCOPE 2.0 INDEX 3.0 GENERAL 4.0 MATERIALS 5.0 CONSTRUCTION 6.0 FIELD SAMPLING AND TESTING 3.0 GENERAL 3.1 Standard Test Methods: The following standard test methods of the American Society for Testing and Materials (ASTM) form a part of this specification and are referred to herein by alphanumeric designation. ASTM ATION C136 D423 D424 D1556 D1557 D2419 D2844 D2922 TITLE Sieve Analysis of Fine and Coarse Aggregates Liquid Limit of Soils Plastic Limit and Plasticity Index of Soils Density and Unit Weight of Soil in Place by the Sand-Cone Method Moisture-Density Relations of Soils Using 10-lb. (4.5-kg.) Rammer and 18-in. (457-mm.) Drop Sand Equivalent Value of Soils and Fine Aggregate Resistant R-Value and Expansion Pressure of Compacted Soils Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) 3.2 Substitute Test Method: Where local practice prescribes revised test methods for the ASTM tests listed above, those tests may be substituted for the ASTM designated test method listed upon prior approval from SPPCo. 12 37

3.3 Material Sources: 3.3.1 New Sources - The contractor or customer, at his own expense, shall have any bedding and backfill materials from sources previously undeveloped, or unfamiliar to SPPCo., tested and certified by an approved, independent materials testing laboratory, per these specifications. 3.3.2 Existing Sources - Bedding and backfill materials from sources previously developed and familiar to SPPCo. may be accepted without testing and certification upon written request by the contractor or customer. SPPCo. reserves the right to determine the acceptability of all materials proposed for use. 4.0 MATERIALS 4.1 Electric Conduit Sand Bedding: Material shall be free of ice, clay, organic matter or other objectionable material, and shall conform to the following standards: 4.1.1 Gradation per ASTM C136: SIEVE SIZE PERCENT BY WEIGHT PASSING SIEVE 3/8" 100 #4 90-100 #50 10-40 #100 3-20 #200 0-15 4.1.2 Alternate Electric Conduit Bedding: Upon prior approval from SPPCo., native material may be utilized as bedding for electric conduit. Approval granted per this section in no way relieves the contractor or customer from meeting the requirements of the remaining sections of this specification. For SPPCo. electric contract jobs, native material conforming to this section must be bid as an alternate material. The native material shall be free of rocks, ice, organic matter or other objectionable material, and shall conform to the following standards: Electric Primary/Secondary Conduit - 100% by weight shall pass 3/8" sieve. Electric Service Conduit - Native material shall be free of rocks/clods larger than 4" across their greatest dimension. 13 37

4.2 Gas Pipe Sand Bedding: Material shall be free of ice, clay, organic matter or other objectionable material, and shall conform to the following standards: 4.2.1 Gradation per ASTM C136: PERCENT BY WEIGHT SIEVE SIZE PASSING SIEVE. 3/8 " 100 # 4 90-100 # 50 10-40 #100 3-20 #200 0-15 4.2.2 Sand Equivalent per ASTM D2419: 25minimum. 4.2.3 Plasticity Index per ASTM D4318: Non Plastic. 4.2.4 Moisture - Density per ASTM D1557: Max. +2% of optimum, Min. -5% of optimum. 4.2.5 Any gas pipe sand bedding material retained on a #4 sieve shall not contain more tham 30% angular material as described in ASTM D2488. Gas pipe sand bedding material which contains subangular, subrounded or rounded material, and conforms to Sections 4.2.1 and 4.2.2 is acceptable. CRITERIA FOR DESCRIBING ANGULARITY: Angular - Particles have sharp edges and relatively plane sides with unpolished surfaces. Examples include particles which resemble arrowheads. Subangular - Particles are similar to angular description but have rounded edges. ANGULAR SUBANGULAR SUBROUNDED ROUNDED 14 37

Subrounded - Particles have nearly plane sides but have well-rounded corners and edges. Rounded - Particles have smoothly curved sides and no edges. 4.3 Crushed Gravel Backfill: Crushed gravel backfill shall be a crusher-run, mineral aggregate free of ice, clay, organic matter, or other objectionable material, and shall conform to the following standards: 4.3.1 Gradation per ASTM C136: PERCENT BY WEIGHT SIEVE SIZE PASSING SIEVE _ 1" 100% 3/4" 90-100% # 4 35-65% #16 15-40% #200 2-10% 4.3.2 Liquid Limit per ASTM D423: 35maximum 4.3.3 Plasticity Index per ASTM D424: Maximum Allowable Plasticity Index (PI) shall be determined by the formula: PI = 15 - (S x 100) where S is the percent by weight passing the # 200 sieve. 4.3.4 Resistance R-Value per ASTM D2844: 70minimum 4.4 Native Backfill: Native backfill shall be excavated native granular material free of ice, clay, debris, organic matter, and rocks larger than 4" across their greatest dimension. 4.5 Substitute Material: Substitute bedding and backfill materials may only be used if prior written approval from SPPCo. is received. In requesting the use of a substitute material, the contractor or customer must submit adequate evidence that the material has been successfully used in similar applications for other utilities or local governmental agencies. 15 37

5.0 CONSTRUCTION 5.1 Trench Configuration: Trench configurations shall conform to SPPCo. s Trench Excavation Standards (Drawing #TE0001). 5.2 Material Installation/Repair: Conduits, pipes, and all apparatus shall be handled, installed, and joined in accordance with SPPCo. s construction standards, and the manufacturer s specifications or recommendations. The contractor or customer, at his own expense, shall repair or replace any conduits, pipes or appurtenances damaged during bedding and backfill operations. 5.3 Sand Bedding: Sand bedding material, conforming to sections 4.1 and 4.2, shall be placed in 12" maximum loose lifts and compacted to 90% maximum density per ASTM D1557. 5.4 Backfill: 5.4.1 Public Rights-of-Way - Trenches in established streets, highways, or private paved areas subject to vehicular traffic shall be backfilled with crushed gravel, conforming to section 4.3, and shall be placed in 12" maximum loose lifts and compacted per ASTM D1557. The top two lifts shall be compacted to 95% maximum density and shall extend a minimum of 12" below finish grade. The area above the sand bedding and below 12" from finish grade shall be compacted to 90% maximum density. Developers or the engineer of record are responsible for required compaction tests. 5.4.2 Private Property - trenches in private property and areas not subject to vehicular or pedestrian traffic may be backfilled with native material, conforming to section 4.4 and shall be placed in 12" maximum loose lifts and compacted to 80% maximum density per ASTM D1557. 5.4.3 Utility Easements - Trenches in utility easements which shall be overlain with vaults, transformers, or similar equipment shall be backfilled in accordance with Section 5.4.1. 5.5 Compaction: All compaction shall be by hand-operated, plate-type, vibratory, or other suitable hand- 16 37

tampers in areas not accessible to larger rollers or compactors. Extreme care shall be taken to avoid damage to conduits, pipes, and any appurtenances. Water densification by inundation or jetting shall not be permitted without prior written approval from SPPCo. 5.6 Trench Dewatering: Where groundwater is encountered, the contractor or customer shall dewater the trench sufficiently to meet the bedding and backfill requirements of sections 5.3 and 5.4. Dewatering shall continue until backfill has progressed to a minimum of two feet above the groundwater level. SPPCo.'s inspector(s) may require drain rock (3/4" minus) in addition to the bedding depending on condition of trench bed. 5.7 Finish Operations: 5.7.1 Fine Grading - After backfilling, all trenches except those in existing paved areas shall be graded flush with adjacent finish or subgrade elevations. 5.7.2 Temporary Patching - Unless otherwise specified, all pavement cuts shall be temporarily patched with asphaltic concrete to a minimum depth of 2", with the finish grade 1/2" above the grade of the existing asphalt. 5.7.3 Disposition of Excess Materials - Surplus excavated soils, asphalt pavement, concrete and other debris shall be promptly removed from the jobsite and properly disposed of. 6.0 FIELD SAMPLING AND TESTING 6.1 Materials Testing: The contractor or customer, at his own expense, shall retain the services of an approved, independent materials testing laboratory to perform the following tests: 6.1.1 Moisture-Density Relations - The sand bedding, crushed gravel, and native backfill materials shall be tested for moisture density relations per ASTM D1557, Method D. Test locations will be randomly selected by SPPCo. 6.1.2 Density Tests - The sand bedding, crushed gravel, and native backfill materials shall be tested for density per ASTM D1556 or D2922. Test locations will be randomly selected by SPPCo. The following frequencies shall apply: Sand Bedding - Tests shall be made at a minimum of one test per lift per 800 lineal feet of trench. 17 37

Crushed Gravel Backfill - Tests shall be made at a minimum of one test per lift per 500 lineal feet of trench. 6.1.3 Tests will be reported by specific location: Ex. T-pad 1: sand bedding test @ 3' from finish grade. 6.2 Retesting: If any test conducted per sections 6.1.1 and 6.1.2 fails, the area shall be recompacted and two additional tests shall be performed. Test locations will be randomly selected by SPPCo. at installer cost. 6.3 Reporting: The results of all tests shall be submitted to SPPCo. within 24 hours after the completion of the test. 6.4 Exceptions: At remote locations or for small installations, as determined by SPPCO., the sampling and testing procedures in section 6.0 may be waived by SPPCo.. Such waiver in no way relieves the contractor or customer from meeting the requirements of the remaining sections of this specification. 18 37