Technical Report Completed for Orvana s El Valle-Boinás/Carlés Project in Northern Spain, Including Reserve and Cash Flow

Similar documents
For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Detour Gold Provides New Life of Mine Plan for Detour Lake

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

AVINO SILVER & GOLD MINES LTD.

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

Corporate Presentation October 2015

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

(NYSE-MKT:XRA, TSX:XRC,

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

FORWARD-LOOKING STATEMENTS

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Savannah North Scoping Study Looking into the future 3 February 2016

FIJI GOLD LION ONE METALS

Copper and Gold at Our Core

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

INVESTOR PRESENTATION January 2014

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

How To Know If Goldcorp Is A Successful Company

CANADA S INTERMEDIATE GOLD PRODUCER

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

TSX-V: CDA WKN: A0M6U5

AGNICO-EAGLE MINES LIMITED

FORWARD LOOKING STATEMENTS

CNSX: TV

Copper and Gold at Our Core

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

Aurvista Gold Plans Significant Exploration Program at Douay

China Gold International Resources Corp. Ltd.

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

Forward Looking Statements

For personal use only. MRV Metals Launch February 2016

Trip to Pulacayo. Pulacayo - Paca

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

Sabina Gold & Silver Corp.

inv ested i n o u r f u t u r e Corporate Presentation

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Trevali reports record Santander Mine production for Q and increases 2015 guidance

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

January Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

Q CONFERENCE CALL. Q Earnings Call. Thursday, August 13, :00 am EST.

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Denver Gold Show September 24, 2013

FOR IMMEDIATE RELEASE

INVESTOR PRESENTATION. January, 2016

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Corporate Presentation January New Leader in Precious Metals

MEDIA RELEASE OCEANAGOLD PROVIDES UPDATE ON DIDIPIO PROJECT AND CORPORATE RE-FINANCING INITIATIVES

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Candelaria and Ojos del Salado Chile

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Corporate Presentation November 2015 TSX: ORA

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

ABACUS MINING & EXPLORATION CORP. Management Discussion & Analysis FORM F1. For the Period Ending. September 30, (Amended and Restated)

Focusing on Near Term Production and Exploration in Quebec

AQUILA RESOURCES. Focused on the Great Lakes Region. Investor Presentation June 2016 TSX: AQA INVESTOR PRESENTATION TSX: AQA

Nevada Focused, Discovery Driven. TSX V. RPM OTCQX: RPMGF

Positioned for Production: Exploring for Growth

Economic Highlights (In US$ unless otherwise indicated)

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

NEWS RELEASE. Supplemental information:

FORWARD LOOKING STATEMENT

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

The Gold Industry Leader. Goldman Sachs Basic Materials Conference New York June 2 4, 2010

Resources Rising Stars

KATANGA MINING ANNOUNCES 2013 YEAR END RESULTS AND COMMITMENT OF GLENCORE TO EXTEND AND INCREASE LOAN FACILITIES

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

ACQUISITION OF TWO QUALITY MINES IN NEVADA

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

Almonty Industries Inc. to Acquire Woulfe Mining Corp. and become the Leading International Tungsten Company

NOVEMBER January 2013

Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements March 31, 2013.

The last great Canadian gold mining camp controlled by a junior mining company.

First Quarter 2015 Investor Conference Call May 7, 2015

2015 Third Quarter Results Webcast October 29, 2015

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmental Reclamation & Trading

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Endeavour Management Presentation

EQUITY RAISING ANNOUNCEMENT

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

Transcription:

43-101 Technical Report Completed for Orvana s El Valle-Boinás/Carlés Project in Northern Spain, Including Reserve and Cash Flow 7-year mine production schedule with annualized production over 100,000 ounces gold and 3,900 tonnes copper The base-case, pre-tax cash flow analysis using Orvana s long-term metal prices results in an IRR of 48% and a NPV (5%)of $91.1M.* Using 30 April 2010 (date of Technical Report) metal prices and exchange rate, the IRR is 158% and the NPV (5%) is $362.9 M Significant upside potential identified in the report has prompted Orvana to initiate a 20,000 metre drilling program Development advances towards the A107, San Martin, and Black Skarn North ore zones, and mill refurbishing continues according to plan with production start-up early 2011 *All figures in US$ Toronto, Ontario, July 14, 2010 Orvana Minerals Corp. (TSX:ORV) announced today the completion of a 43-101 compliant reserve statement and cash-flow model for the El Valle-Boinás/Carlés ( EVBC ) gold project in northern Spain, dated April 30, 2010. The 7-year mine production schedule generates approximately 100,000 ounces of gold per year and yields an IRR of 48%, an NPV (5%) of $91.1M, and a payback of 2.16 years (capital cost divided by average annual cash flow from operations), using metal prices of $800 per ounce gold, $12.50 per ounce silver, and $2.00 per pound copper. The Technical Report was submitted by mining engineers Adam Wheeler, Robert Dowdell, and Alan Noble, all Independent Qualified Persons for purposes of National Instrument ( NI ) 43-101. This mine plan clearly demonstrates the project s robust economics, said Roland Horst, Orvana s Chief Executive Officer. Based on the reserve estimation reported in the NI 43-101, a 7-year operation has been scheduled.

- 2 - With the significant exploration potential, the mine life could be extended for years to come. In fact, we plan to immediately commence a 20,000 metre underground drill program. The EVBC deposit is comprised of both mesothermal skarn and epithermal veins. The mine plan contemplates working the skarn and epithermal veins by cut-and-fill and long-hole stoping methods. Throughput is planned at approximately 1,900 tpd. BASE-CASE OPERATIONAL PARAMETERS: Throughput (transition & sulphide): Avg. Annual Production: 1,900 tpd (for 7 years) 105,000 ounces Au (recovered) 3,900 tonnes Cu (recovered) 160,000 ounces Ag (recovered) Gold recovery (LOM): 94% Copper recovery (LOM): 78% Silver recovery (LOM): 70% KEY FINANCIAL INPUT PARAMETERS (ALL VALUES IN US DOLLARS): Pre-production capital: $59,590,071 (of which $11.2 million spent to April 30) Working Capital: $ 2,649,704 Sustaining capital: $21,576,375 Ongoing Mine Development: $26,766,854 Mine operating cost: Cut-and-fill (skarn) $ 47.92/t ore Long-hole stoping $ 37.48/t ore Cut-and-fill (oxide) $ 80.70/t ore Sublevel stoping $ 36.05/t ore Processing cost: $ 21.43/t ore G&A: $ 5.03/t ore Copper price (LOM): $ 2.00/lb.

- 3 - Gold price (LOM): $800.00/ounce Silver price (LOM): $ 12.50/ounce Exchange Rate: Euro = $1.35 Production is subject to a 2.5% net smelter return royalty held by Anglo Pacific Ltd. The following reserve was calculated from the measured and indicated part of the resource and dated 30 th April 2010. RESERVES Tonnes Gold Copper Silver Category Kt g/t % g/t Proven 1,311 4.09 0.90 10.9 Probable 3,352 5.68 0.68 10.9 Proven + Probable 4,663 5.23 0.74 10.9 Based on the long-term metal prices above, the project shows an IRR of 48%, a NPV (5%) of $91.1M, and a payback of 2.16 years with an average pre-tax cash cost of $461/ounce. Using 30 April 2010 (date of the 43-101 Technical Report) metal prices and exchange rate, the IRR is158% and the NPV (5%) is $362.9M. Pre-production activities are progressing with development advancing towards the A107, San Martin, and Black Skarn North ore zones. In addition, mill refurbishing continues according to plan to meet the early 2011 start-up goal. The financial summary for the reserve evaluation of results presented herein was completed by or under the supervision of Robert Dowdell, Adam Wheeler, and Alan Noble, Independent Qualified Persons for the purposes of NI 43-101. The summary report will be available on the Company s website, www.orvana.com, and filed on SEDAR this week.

- 4 - About Orvana Orvana Minerals is a gold producer with a strong balance sheet and is transforming itself into a multi-mine gold and copper producer. Orvana owns and operates the Don Mario Mine in Bolivia, whose mine life is planned to be extended another 9 years, and is developing two other promising assets: the advanced-stage El Valle-Boinás/Carlés gold-copper project in northern Spain and the Copperwood copper project in Michigan. Additional information is available at Orvana s website (www.orvana.com). Forward Looking Disclaimer Certain statements in this press release constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws ( forward-looking statements ). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, potentials, future events or performance (often, but not always, using words or phrases such as believes, expects plans, estimates or intends or stating that certain actions, events or results may, could, would, might, will or are projected to be taken or achieved) are not statements of historical fact, but are forward-looking statements. Forward-looking statements relate to, among other things, all aspects of the reactivation of production at the EI Valle-Boinas/Carles Mine and its potential operation and production. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Orvana as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates and assumptions of Orvana on which statements in this news release are based may prove to be incorrect, and they include, but are not limited to, the various assumptions set forth herein and in the Company s most recently filed Annual Information Form, as well as permitting and development at the EI Valle-Boinas/Carles Mine being consistent with the Company s current expectations and there being no significant disruptions affecting the Company s activities at the mine. A variety of inherent risks, uncertainties and factors, many of which are beyond the Company s control, affect the operations, performance and results of the Company and its business, and could cause actual results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements in this press release. Some of these risks, uncertainties and factors include the Company s ability to obtain and maintain all necessary regulatory approvals and licenses; challenges to the Company s interest in its property and mineral rights; and other risks generally associated with mine development, including the risks identified in Orvana s Annual Information Form. Forward-looking statements are based on management s current plans, estimates, projections, beliefs and opinions, and except as required by law,

- 5 - the Company does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Readers are cautioned not to put undue reliance on forward-looking statements. For further information please contact: Natalie Frame Investor Relations (289) 200-7640 Roland Horst Chief Executive Officer (416) 369-1629 Website: Email: www.orvana.com contact_us@orvana.com