January Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010
|
|
|
- Augustine Shelton
- 10 years ago
- Views:
Transcription
1 November 2010 January 2014 Underground workings at Debarwa copper-gold deposit Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea
2 Eritrea and the Asmara Project Sudan Zara Bisha Mine Hambok Asmara Massawa Eritrea Asmara Ethiopia Sunridge Gold VMS/Gold Target Area Sunridge Gold VMS/Gold Deposits Nevsun s Bisha VMS Gold-Copper-Zinc Mine Other VMS/Gold Projects 2
3 Asmara Project Overview Completed May 2013! BFS - Central processing facility at Emba Derho with 3 satellite deposits: Emba Derho million tonnes (Measured and Indicated) resource containing 1.0 Blbs Cu, 2.07 Blbs Zn, 506,000 oz Au, 19 M oz Ag Adi Nefas Mt (Indicated) resource at, 10.1% Zn, 3.3 g/t Au, 1.8%Cu & 115 g/t Ag, same format Debarwa Mt (Measured and Indicated) resource containing 200 Mlbs Cu, 74 Mlbs Zn, 180,000 oz Au, 2.94 M oz Ag Gupo Gold Mt (Indicated) resource at 1.52 g/t Au Development and Exploration: Adi Rassi Mt (Inferred) resource at 0.54% copper and 0.33 g/t gold 3 Kodadu Gold Target (Inferred) resource of 990,000 tonnes with an average grade of 1.24 g/t gold & 1.6 g/t silver
4 Eritrea Asmara Safe, beautiful, and the capital of the State of Eritrea Eritrea Population ± 4 million Mining code based on Northern Territory, Australia. Business in English. Excellent infrastructure; paved roads, grid power, paved road to port of Massawa Nevsun Resources has successfully operated the Bisha Mine for almost 2 years showing strong earnings 4
5 Asmara Project Highlights Feasibility Study on the 4 advanced projects completed May 2013 demonstrating very strong economics; NPV (10%) = $692 million, IRR = 34% Feasibility Study outlined a robust mining plan with a 3 phase staged start-up with Phase 1 production beginning in 2015 Phase I (DSO and Gold Production) initial capital costs estimated to be only $46 m Full production to be achieved in 3 years first 8 years average annual production: 65 million lbs. (29,000 t) copper 184 million lbs. (83,000 t) zinc 42,000 oz gold 1 million oz silver Project has government participation (ENAMCO) in a mining friendly jurisdiction Applied for mining license Q Significant exploration potential. Pipeline deposits Adi Rassi and Kodado now 5 th and 6 th resources on the Asmara Project. 5
6 ENAMCO Eritrean National Mining Corporation ( ENAMCO ) to acquire a 30% paid participating interest in the Asmara Project in Eritrea. ENAMCO Standard Agreement Structure: This 30% interest is in addition to ENAMCO s existing right to receive a 10% non-assessable interest that will be carried to production by the participating partners. Eritrea s 10% non-assessable interest would be carried 2/3 s by Sunridge and 1/3 by ENAMCO ENAMCO will contribute 33 1/3 % of all development costs as they are incurred. This reduces Sunridge s capital cost by one third, as well as any ongoing expenditures on the project. ENAMCO exercised their right to acquire the 30% paid participating interest in the Asmara Project in July Negotiations between ENAMCO and Sunridge are ongoing to determine the purchase price for the 30% of the Project and are expected to be complete in early
7 Asmara Project Contained Metals Asmara Project - Contained Metal in Measured and Indicated Resources Deposit Copper millions of lbs Zinc millions of lbs Gold thousands oz Silver million oz Emba Derho , Debarwa Adi Nefas Gupo Gold Totals 1, (574,000 tonnes) 2, (1,158,000 tonnes)
8 Asmara Project Feasibility Study Central processing facility at Emba Derho and an integrated mining operation with 3 satellite deposits Feasibly Study completed May 2013 Lead engineer - SENET Pty Ltd, supported by Snowden, Knight Piesold, and Blue Coast Metallurgy Mining License application Q Ideal for open pit mining Processing Facility to be located near the Emba Derho Deposit 8
9 Asmara Project Feasibility Study - Emba Derho Copper-Zinc-Gold Deposit Favorable geometry for open pit mine Emba Derho Resource Model 9
10 Asmara Project Feasibility Study - Emba Derho Copper-Zinc-Gold Deposit Emba Derho -Summary of Measured Mineral Resource Material Cut-off Tonnes Copper Zinc Gold Silver Type (million) (%) (%) (g/t) (g/t) Cu Supergene 0.5% Cu Copper-rich Primary 0.3% Cu Zinc-rich Primary <0.3% Cu, >1.0% Zn TOTAL Emba Derho -Summary of Indicated Mineral Resource Material Cut-off Tonnes Copper Zinc Gold Silver Type (million) (%) (%) (g/t) (g/t) Cu Supergene 0.5% Cu Copper-rich Primary 0.3% Cu Zinc-rich Primary <0.3% Cu, >1.0% Zn TOTAL Sunridge Gold Corp: Mineral Resource Estimate Update, Emba Derho Deposit, Eritrea. NI Technical Report prepared by Snowden Mining Industry Consultants Inc. for Sunridge Gold Inc. with contributions by Blue Coast Metallurgy Ltd. 110 pages. Effective date 6 February 2012.
11 Asmara Project Feasibility Study - Emba Derho Copper-Zinc-Gold Deposit Emba Derho -Summary of Measured and Indicated Mineral Resource Zone Cut-off grade tonnes Copper Zinc Gold Silver (million) % % g/t g/t Gold Oxide 0.5 g/t Au Cu Supergene 0.5% Cu Copper-rich Primary 0.3% Cu Zinc-rich Primary <0.3% Cu, >1.0% Zn TOTAL 70.0 Sunridge Gold Corp: Mineral Resource Estimate Update, Emba Derho Deposit, Eritrea. NI Technical Report prepared by Snowden Mining Industry Consultants Inc. for Sunridge Gold Inc. with contributions by Blue Coast Metallurgy Ltd. 110 pages. Effective date 6 February
12 Asmara Project Feasibility Study - Emba Derho Copper-Zinc-Gold Deposit Total Contained Metal at Emba Derho Measured and Indicated Zone Cut-off grade Tonnes (miilion) Copper (M llbs) Zinc (M lbs) Gold (k oz) Silver (M oz) Gold Oxide 0.5 g/t Au Cu Supergene 0.5% Cu Copper-rich Primary 0.3% Cu , Zinc-rich Primary <0.3 % Cu, >1.0 % Zn , TOTAL (452,000 tonnes) 2,072.7 (940,000 tonnes) Sunridge Gold Corp: Mineral Resource Estimate Update, Emba Derho Deposit, Eritrea. NI Technical Report prepared by Snowden Mining Industry Consultants Inc. for Sunridge Gold Inc. with contributions by Blue Coast Metallurgy Ltd. 110 pages. Effective date 6 February
13 Asmara Project Feasibility Study - Debarwa Deposit Resource Debarwa -Summary of Measured Mineral Resource Material Type Oxide Transition Cut-off Au 0.5g/t Au 0.5g/t Supergene Cu 0.5% Primary (Cu) Cu 0.5% Primary (Zn) Zn 2.0% Tonnes (,000) Copper (%) Zinc (%) Gold (g/t) Silver (g/t) Totals 434 Debarwa-Summary of Indicated Mineral Resource Material Type Cut-off Tonnes (,000) Copper (%) Zinc (%) Gold (g/t) Silver (g/t) Oxide Au 0.5g/t Transition Au 0.5g/t Supergene Cu 0.5% 1, Primary (Cu) Cu 0.5% Primary (Zn) Zn 2.0% (Cu<0.5%) Totals 2, * Debarwa Copper Gold Deposit Eritrea Technical Report on Additional Drilling and Revised Mineral Resource Estimates. NI Technical Report prepared by and for Sunridge Gold Corp. with contributions by AMC Consultants (UK) Limited and Blue Coast Metallurgy Ltd. 188 pages. Effective date 18 August 2011.
14 Asmara Project Feasibility Study - Debarwa Deposit Resource Location of Direct Shipping Option (DSO) tonnage Debarwa Measured and Indicated Resources* Material Tonnes Copper Zinc Gold Silver Type Cut-off (million) (%) (%) (g/t) (g/t) Oxide Au 0.5g/t Supergene Cu 0.5% Primary Cu 0.5% Totals DSO zone Cu 12.0% * resource estimate completed by AMC Consultants (UK) Ltd, August 11, 2011
15 Asmara Project Feasibility Study - Adi Nefas Resource Adi Nefas: High grade zinc-copper-gold VMS deposit 6 km from Emba Derho High grade material to be blended with Emba Derho Underground mine plan Measured and Indicated Resources* tonnes Gold Silver Copper Zinc Zone Cut-off (million) (g/t) (g/t) (%) (%) Primary Zn 2 % * Sunridge Gold Corp: Mineral Resource Estimate Update, Adi Nefas Property, Eritrea. NI Technical Report prepared by Snowden Mining Industry Consultants Inc. for Sunridge Gold Inc. with contributions by Blue Coast Metallurgy Ltd. 82 pages. Effective date 20 February 2012.
16 Asmara Project Feasibility Study - Gupo Gold Deposit Resource Indicated resource*: Cut of Grade g/t Au Tonnes Average Grade g/t Au Ounces of Gold , ,780 Inferred resource*: Cut of Grade g/t Au Tonnes Average Grade g/t Au Ounces of Gold 0.5 1,808, ,340 * Sunridge Gold Corp: Gupo Gold Mineral Resource Estimate Update, Adi Nefas Property, Eritrea. NI Technical Report prepared by Snowden Mining Industry Consultants Inc. for Sunridge Gold Corp. with contributions by Blue Coast Metallurgy Ltd. 97 pages. Effective date 3 April
17 Asmara Project Feasibility Study Highlights Base Case Highlights (all $ equals US dollars): NPV of $692 million at a 10% discount (pre-tax) NPV of $345 million at a 10% discount (post-tax) Internal rate of return (IRR) pre-tax 34%, post-tax 27% Payback pre-tax 4.1 production years, post-tax 4.6 years Base Case metal prices used - $3.25/lb copper, $1.00/lb zinc, $1,400/oz gold, $25.00/oz silver Initial capital cost Phase IA & IB Direct Shipping Copper Ore & Heap-Leach Gold - $46 million Initial Phase II & III flotation plant capital cost estimate - $357 million Peak Capital Funding - $354 million On site operating costs - $29.42 per tonne average through life of mine
18 Asmara Project Feasibility Study Highlights Average annual metal production over the first 8 years: 65 million pounds (29,000 tonnes) of copper 184 million pounds (83,000 tonnes) of zinc 42,000 ounces of gold 1.0 million ounces of silver Total metal production: 841 million pounds (381,000 tonnes) of copper 1,874 million pounds (850,000 tonnes) of zinc 436,000 ounces of gold 11 million ounces of silver Life of Mine 1 construction year, 15.3 production years
19 Asmara Project Feasibility Study Phase I Initial Capital Required Phase I - DSO and Gold Production (Year 1 Year 5) Phase IA DSO (Year 1 Year 2) Mining of 116,000 tonnes of high-grade DSO with an average grade of 15.6% copper, 2.96 g/t gold, and 76.8 g/t silver from Debarwa ± $46m Crushing at Emba Derho and shipping to smelter Mine and ship in 6 months Phase IB Gold production (Year 1 Year 5) Mining of the 3.0 million tonnes near-surface gold caps at Debarwa and Emba Derho followed by Gupo Gold Process at gold heap-leaching operation near the Emba Derho deposit at a rate of 1.4 million tonnes per year Phase IB average grades 1.48 g/t gold and 8.2 g/t silver Phase IB average recoveries 66.7% gold, 37.7% silver
20 Asmara Project Feasibility Study Phase II & III Initial Capital Required Phase II Supergene Copper Production (Year 2 Year 3.25) Mine and process by flotation 2.4 million tonnes of high-grade copper supergene ore from Debarwa and Emba Derho at rate of 2 million tonnes per year for 1.25 years Phase II average grades 2.25% copper, 0.76 g/t gold, 21.6 g/t silver Phase II average recoveries 79% copper, 51% gold, 58% silver Copper concentrate 25% copper, 4.2 g/t gold, 109 g/t silver Phase III Full Production (Year 3.25 Year 16.3) ± $357m Mine and process by flotation 51.0 million tonnes of primary copper and zinc ore from Emba Derho, Debarwa, and Adi Nefas at a rate of 4 million tonnes per year for 13years Phase III average grades 0.73% copper, 1.91% zinc, 0.36 g/t gold, 12.6 g/t silver Final Waste/Ore ratios 2.5:1 at Emba Derho, 9.8:1 at Debarwa and 1.7:1 at Gupo Adi Nefas to be mined using underground long hole bench retreat ranging between 150,000 and 470,000 tonnes per year for a total of million tonnes mined over 6 years and blended with ore from Emba Derho Phase III recoveries average 86% copper, 86% zinc, 48% gold, 44% silver Copper concentrate 25% copper, 7.9 g/t gold, 255 g/t silver Zinc concentrate 57% zinc
21 Asmara Project Feasibility Study - Reserves Mineral Reserves by Classification Rock type Tonnes (kt) copper (%) Proven zinc (%) gold (g/t) silver (g/t) Emba Derho Primary 4, Debarwa Oxide Debarwa Transition Debarwa Supergene Debarwa Primary Total proven 4,861 Probable Emba Derho Supergene 1, Emba Derho Primary 44, Debarwa Oxide Debarwa Transition Debarwa Supergene Debarwa Primary Adi Nefas Primary 1, Gupo Oxide Gupo Sulfide Total Probable 51,723 Total Proven and Probable 56,584 21
22 Asmara Project Feasibility Study Metal Production by Phase Year Total PRODUCTION Oxide Heap Leach Metal Recovered Gold (ounces) 96,930 11,210 51,213 16,169 17, Metal Recovered Silver (ounces) 294,572 40, ,103 71, Copper Concentrate DSO + Copper Concentrate (Mt) Copper Conc Cu Grade (%) Copper Conc Au Grade (g/t) Copper Conc Ag Grade (g/t) Metal Recovered Copper (Mlb) Metal Recovered Copper (Mt) Metal Recovered Gold (ounces) 339,353 11,084 29,949 28,712 54,775 42,910 34,099 26,101 31,519 15,921 18,254 9,854 4,540 10,204 10,580 8,984 1,867 Metal Recovered Silver (ounces) 10,927, , , ,016 1,839,914 1,443,118 1,115, ,265 1,060, , , , , , , ,867 61,812 Zinc Concentrate Zinc Concentrate (Mt) Zinc Conc Zn Grade (%) Metal Recovered Zinc (Mlb) 1, Metal Recovered Zinc (Mt) TOTAL RECOVERED METAL Gold (ounces) 436,283 11,210 62,297 46,118 46,231 55,594 42,910 34,099 26,101 31,519 15,921 18,254 9,854 4,540 10,204 10,580 8,984 1,867 Silver (ounces) 11,221,914 40, ,429 1,044, ,266 1,839,936 1,443,118 1,115, ,265 1,060, , , , , , , ,867 61,812 Copper (Mlb) Zinc (Mlb) 1,
23 Asmara Project Feasibility Study Asmara Project Cash Flow (Base Case) 23
24 Asmara Project - Off Site Facilities Concentrate Transport 40t trucks specialized for road conditions Round trip in 8 hours Massawa Port Rotainer container rotations system Estimated 1,000 to 1,200 containers at 4Mtpa System at optimal loading conditions can move 1,000t/hr 24
25 Adi Rassi Copper-Gold Deposit Adi Rassi: Sunridge s 5 th deposit of the Asmara Project, located 10 km east of Debarwa The resource area is open for expansion in most directions Positive initial metallurgical results Copper and gold mineralization associated with quartz veins and breccia zones along a major shear zone that trends north-south over 3 km Cut off % Cu Eq Tonnes ( 000s) Copper (%) Gold (g/t) Copper ( 000 lbs) Gold ( 000 oz) o/p and 0.72 u/g 15, , * Fladgate Exploration Consulting, December 1, 2012
26 Kodadu Gold Target Kodadu Gold Target: Inferred Mineral Resource of 990,000 tonnes with an average grade of 1.24 g/t gold & 1.6 g/t silver Contained metal = 39,000 ounces of gold & 51,000 ounces of silver in the near surface oxide Less than 25 km from planned central operating facility near the Emba Derho deposit Initial metallurgical results show gold can be recovered by heap-leaching The resource area is open for expansion Gold mineralization in a one kilometre shear zone Contained Metal Cut-off Grade Tonnes Gold Grade Silver Grade Gold Silver ('000s) (g/t) (g/t) ('000 oz) ('000 oz) Fladgate Exploration Consulting Corp. - Effective Date 20 May, 2013
27 27 Asmara Project Timeline
28 Outlook Mining License: permitting process for the Asmara mine was initiated in December 2013, along with the submittal of the Social and Environmental Impact Assessment (SEIA) report. The mining license permitting process is expected to take 9-12 months. Eritrean National Mining Corporation ( ENAMCO ): negotiations to determine the price they will pay to purchase 30% of the project from the Company are ongoing and expected to be completed in early Project Financing: discussions initiated with potential debt financing lenders, which include commercial and development banks, export credit agencies and equipment suppliers, commodity off-take companies and royalty and streaming groups. Micon International Limited completed an independent "due diligence" review of the Asmara Project, which is now available to potential lenders. Engineering: eligible engineering firm candidates for engineering, procurement and construction management (EPCM) of the Asmara mine were identified in late Tendering on the EPCM is expected in mid 2014 with basic design work beginning soon after the award of a contract to the successful firm. Continuing exploration activities on pipeline deposits on the Asmara Project; recently initial resource estimates were announced for two new deposits Adi Rassi, a large copper-gold deposit, and Kodadu a surface gold deposit. Interest from major companies: currently in discussions with a number of interested parties that could lead to a potential acquisition of the Company or some/all of the Asmara Project. There can be no assurance that any transaction will occur, or as to the timing, structure or terms of any transaction.
29 Sunridge Gold Management & Directors Michael Hopley President/C.E.O., Director Craig Angus Chairman Greg Davis VP Business Development Scott Ansell VP Project Development David Daoud Exploration Manager Christopher Attwood Operations Manager Dan O Brien Chief Financial Officer Doris Meyer Director & Corporate Secretary Amanuel Arafine Eritrean Country Manager, Eritrea Neil O Brien Director (Senior VP Lundin Mining) Stephen Gatley Director (GM, Lundin Mining) Mark Corra Director (CFO of B2 Gold) Eric Edwards Director 29
30 Share Structure: January 2014 Symbol: SGC: TSX.V SGCNF: OTCQX Shares Outstanding: 210 million Options: wt. avg = $0.91: 15,167,500 Warrants: 64,364,136 Fully Diluted: 290 million Market Cap: ~$40 million Asmara Project Core Storage Facility West Georgia Street, Vancouver, BC, V6E 3C9 T F [email protected] -
31 31 SGC 12 Month Chart
32 SGC Analyst Coverage Haywood Securities Inc. Stefan Ioannou, Tel: (416) Ocean Equities Ltd Adam Lucas, Mining Analyst, Tel: +44 (0)
33 DISCLAIMER: General Disclaimer: Sunridge Gold Corp. "Sunridge", has taken all reasonable care in producing and publishing information contained in this presentation. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained in this presentation. Sunridge does not warrant or make any representations regarding the use, validity, accuracy, completeness or reliability of any claims, statements or information in this presentation. The information is not a substitute for independent professional advice before making any investment decisions and Sunridge recommends seeking independent professional advice before making any investment decisions concerning Sunridge. Furthermore, you may not modify or reproduce in any form, electronic or otherwise, any information in this presentation, except for personal use, unless you have obtained our express prior written consent. Forward-Looking Statements: This presentation includes certain forward-looking statements. All statements other than statements of historical fact, included in this release, including without limitation statements regarding potential mineralization and resources, exploration results, and future plans and objectives of Sunridge are forward-looking statements that involve various degrees of risks and uncertainties. Any mineral resource estimates contained herein are only estimates and no assurance can be given that any particular level of recovery of minerals will be realized or that an identified resource will ever qualify as a commercially mineable or viable deposit which can be legally and economically exploited. In addition, the grade of mineralization ultimately mined may differ from the one indicated by the drilling results and the difference may be material. Any estimated resources described herein should not be interpreted as assurances of mine life or of the profitability of future operations. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Sunridge s expectations include, among others, risks related to the worldwide price of mineral commodities, the actual results of current exploration activities, unexpected delays in project development, conclusions of economic evaluations, changes in market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, uncertainty of future profitability and the uncertainty of access to capital. Although Sunridge has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Sunridge does not assume any obligation to revise or update any forwardlooking statements after the date of this document or to revise them to reflect the occurrence of future unanticipated events, except as may be required pursuant to applicable securities laws. Technical Disclosure This presentation includes disclosure of scientific and technical information, as well as information in relation to the estimation of mineral resources and reserves with respect to Sunridge s mineral properties. Certain information in this presentation is summarized from various technical reports filed on the SEDAR website under Sunridge s profile at The technical reports should be consulted for further information. Sunridge s disclosure of mineral reserve and resource information is governed by National Instrument Standards of Disclosure for Mineral Projects ( NI ) under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the CIM ) Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM. The technical contents of this presentation has been reviewed and approved by Michael J. Hopley, CPG, President and CEO of Sunridge, who is a qualified person within the meaning of NI
34 Appendix: Asmara Project Feasibility Study Average Operating Costs Heap-Leach Phase IB Flotation Phase II & III Mining $/t ore mined Process $/t ore processed TOTALS On site operating costs average $29.42 per tonne through life of mine. 34
35 Appendix: Asmara Project Feasibility Study Capital Costs Phase I Phase II Phase III Total $ million $ million $ million $ million Pre-strip mining and mining equipment (includes all costs incurred until initiation of copper processing by flotation) (excludes HL & DSO opex) Phase I Plant and Equipment Copper circuit facility Zinc circuit facility Site development, utilities and facilities Water facilities Tailings facilities Debarwa facilities Adi Nefas facilities Gupo facilities Adi Nefas development Engineering, procurement, construction management (EPCM) First fills (ie. fuel, reagents etc) Owner s cost s Contingency SUBTOTALS Sustaining Costs 56.0 Social Costs 14.8 Closure Costs 36.6 TOTAL
36 Appendix: Asmara Feasibility Study Sensitivity to Metal Prices: Base Case Prices Low Copper Metal Price Low Metal Price Current Metal Prices May % discount (Pretax) IRR 34% 31% 22% 33% 0% discount (Pretax) 1,791 1,596 1,026 1,638 Payback % discount (Post- tax) IRR 27% 24% 17% 26% 0% discount (Post-tax) 1,276 1, ,166 Payback Metal Prices Copper Zinc Gold 1,400 1,400 1,250 1,449 Silver
37 37 Appendix: Asmara Feasibility North Layout
38 38 Appendix: Asmara Feasibility Debarwa Layout
Corporate Presentation October 2015
TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start
NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW
NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project
Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the
Detour Gold Provides New Life of Mine Plan for Detour Lake
January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan
GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL
FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS
NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce
(NYSE-MKT:XRA, TSX:XRC,
For Immediate Release: NR 15-08 Corporate Update Vancouver, B.C., December 17 th, 2015 Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt:EXB Exeter or the Company ) is pleased to provide the
AVINO SILVER & GOLD MINES LTD.
AVINO SILVER & GOLD MINES LTD. T 604.682.370 Suite 900, 570 Granville Street [email protected] F 604.682.3600 Vancouver, BC V6C 3P www.avino.com August 8, 205 NYSE - MKT: ASM TSX-V: ASM FSE: GV6 Avino Reports
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM
PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British
2010 Minerals Yearbook
2010 Minerals Yearbook ERITREA U.S. Department of the Interior U.S. Geological Survey August 2012 The Mineral Industry of Eritrea By Harold R. Newman and Thomas R. Yager The legal framework that governs
Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.
Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained
TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine
TD Securities Mining Conference JANUARY 26-27, 2016 Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking information within the meaning
For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva
For Immediate Release TSX:ORV Date: February 3, 2016 #01-2016 Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva New Villar Zone discovered within 50m of existing reserves
LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT
LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT Conference Call December 1, 2015 Lydianinternational.co.uk TSX:LYD Cautionary Statements Forward Looking Statements & Other
WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.
WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )
FIJI GOLD LION ONE METALS
FIJI GOLD LION ONE METALS Tuvatu Gold Project January 2016 Presentation Disclaimer Forward Looking Statements and Qualified Person DISCLAIMER The information provided in this presentation is not intended
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
FORWARD LOOKING STATEMENTS
MPH Ventures Corp. (MPS: TSX.V) Advancing Gold and Molybdenum Projects in Canada June 2013 1 FORWARD LOOKING STATEMENTS This presentation may contain forward-looking statements including but not limited
Trip to Pulacayo. Pulacayo - Paca
Disclaimer This Presentation contains forward-looking information as defined under applicable securities law in Canada. Forward-looking information can be identified by the use of words such as "anticipated",
Copper and Gold at Our Core
Copper and Gold at Our Core January 2016 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private
FORWARD-LOOKING STATEMENTS
FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to:
Lalor Project Base Metal Zones and Gold Mineralization January 2009
Lalor Project Base Metal Zones and Gold Mineralization January 2009 1 Forward-Looking Statements All monetary amounts in Canadian dollars unless otherwise stated.. This presentation contains forward-looking
China Gold International Resources Corp. Ltd.
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST
SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST JULY 30, 2015 TSX: FM; LSE: FQM CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT Certain statements and information herein, including all statements that
Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:
March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
Sabina Gold & Silver Corp.
Sabina Gold & Silver Corp. Creating precious metals opportunities in the Canadian North November 2011 Hackett River Camp, looking to west 1 Forward Looking Statements This presentation includes certain
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
Savannah North Scoping Study Looking into the future 3 February 2016
Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement
Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset
Pebble Copper Gold Molybdenum Project Alaska, USA A First World & Top Class Mining Asset February 2008 1 Cautionary and Forward Looking Information Comments This presentation includes certain statements
Aurvista Gold Plans Significant Exploration Program at Douay
NEWS RELEASE For Immediate Issue June 14, 2016 Aurvista Gold Plans Significant Exploration Program at Douay Ø The main gold target is the largely untested northwestern section of the Porphyry Zone; the
THIRD QUARTER EARNINGS NOVEMBER 12, 2015
THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure
Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015
Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest
Focusing on Near Term Production and Exploration in Quebec
Focusing on Near Term Production and Exploration in Quebec AGM January 2016 Forward Looking Statement Forward Looking Statement This presentation may contain forward looking statements, being statements
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
FORWARD LOOKING STATEMENT
FORWARD LOOKING STATEMENT General Disclaimer: Rhyolite Resources Ltd. Rhyolite" has taken all reasonable care in producing and publishing information contained in this presentation. The material may contain
CNSX: TV www.trevali.com
CNSX: TV www.trevali.com March 2010 DISCLAIMER Certain statements contained in this document, including, without limitation, those concerning the economic outlook for the mining industry, expectations
Nevada Focused, Discovery Driven. TSX V. RPM OTCQX: RPMGF www.ryepatchgold.com
Nevada Focused, Discovery Driven TSX V. RPM OTCQX: RPMGF www.ryepatchgold.com Certain statements contained herein, as well as oral statements that may be made by Rye Patch Gold Corp. or by officers, directors
Endeavour Management Presentation
Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,
DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS
DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS (All monetary figures are expressed in Canadian Dollars unless otherwise stated) Toronto, Ontario, May 6, 2008 Dundee Precious Metals Inc. ( DPM
News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS
No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO
BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash
C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5
C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5 Forward Looking Statements This presentation includes certain estimates, projections and forward looking statements within the meaning of Section
Golden Band Resources Inc.
Golden Band Resources Inc. Rodney Orr, VP Corporate Development Saskatchewan Mining Supply Chain Forum, April 4, 2012 TSX.V: GBN OTCQX: GBRIF Notices Rodney Orr, P.Geo., Golden Band s VP of Corporate Development,
How To Know If Goldcorp Is A Successful Company
Second Quarter Conference Call July 30 th, 2009 Management Participants Chuck Jeannes President and Chief Executive Officer Lindsay Hall Chief Financial Officer Steve Reid Chief Operating Officer Jeff
FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS
For Immediate Release TSX.V - FPC FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS (November 23, 2015) Montreal, Québec Falco Resources (FPC: TSX-V) ( Falco ) is pleased
Press Release 30 th October 2015
Press Release 30 th October 2015 SEPTEMBER 2015 QUARTERLY ACTIVITIES REPORT Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-gold projects
FIRST QUARTER CONFERENCE CALL MAY 4, 2010
FIRST QUARTER CONFERENCE CALL MAY 4, 2010 1 Cautionary Statement CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This presentation contains or incorporates by reference forwardlooking statements
Brian Groves CEO & Director
TSX.V:SPA Spanish Mountain Gold: An Advanced-Stage Bulk Tonnage Gold Project August, 2012 1 Note 1. Certain of the statements and information on this presentation constitute forward-looking statements
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
Barkerville Gold Mines Investor presentation q4 2015. Mines are found in the shadows of headframes
Barkerville Gold Mines Investor presentation q4 2015 Mines are found in the shadows of headframes Forward Looking statement This presentation and the material contained herein are confidential and are
2015 Third Quarter Results Webcast October 29, 2015
2015 Third Quarter Results Webcast October 29, 2015 Speaker Randall Oliphant Executive Chairman 2 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED CAUTIONARY NOTE REGARDING FORWARD-LOOKING
BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE
TSX-V/AIM Symbol: BCN April 15, 2016 NEWS RELEASE BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE BACANORA MINERALS LTD.
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
FOR IMMEDIATE RELEASE
FOR IMMEDIATE RELEASE March 19, 2014 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION REPORTS $16.2M NET INCOME AND RECORD ANNUAL METAL PRODUCTION FOR 2014; PROVIDES 2015 PRODUCTION OUTLOOK COLORADO SPRINGS
CANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and
Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance
NEWS RELEASE Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance Chicago, Illinois - January 11, 2016 - Coeur Mining, Inc. (the "Company" or "Coeur") (NYSE:CDE)
Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016
Q4 & FY2015 OPERATING HIGHLIGHTS January 29, 2016 1 FORWARD-LOOKING STATEMENTS This presentation contains certain statements that constitute forward-looking information within the meaning of applicable
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial
THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES Craig Roberts National Bank Financial ABSTRACT While various methods are available to estimate a mining project
Silver Mine Project Investment Opportunity in Scandinavia
Silver Mine Project Investment Opportunity in Scandinavia KPMG Corporate Finance ( KPMG ) has been retained by Sotkamo Silver as exclusive Financial and Strategic adviser in connection with the Project
Gold. Grade. Infrastructure. CORPORATE PRESENTATION
Gold. Grade. Infrastructure. CORPORATE PRESENTATION Disclaimer Certain statements in this presentation constitute forward looking statements or forward looking information within the meaning of applicable
Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade
PRESS RELEASE TSX NYSE MKT: RIC Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade TORONTO, Ontario, Canada, February
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
AGNICO-EAGLE MINES LIMITED
AGNICO-EAGLE MINES LIMITED Corporate Update January 2008 Agnico-Eagle Mines Limited 1 Forward Looking Statements The information in this document has been prepared as at January 15, 2007. Certain statements
Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development
TSX.V:RG OTC-PK: RM IOF FRANKFURT: D4R Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle Exploration and mineral resource development in North America Romios Galore Project, BC Newmont
Forward-Looking Statements
Forward-Looking Statements Except for historical information, this presentation may contain certain forward-looking statements. These statements may involve a number of known and unknown risks and uncertainties
GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.
FOR IMMEDIATE RELEASE JANUARY 26, 2016 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.87 G/T GOLD Colorado
Candelaria and Ojos del Salado Chile
TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits
Sorby Hills Silver Lead Project
ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills
NOVEMBER 2015. January 2013
NOVEMBER 2015 President & CEO: Wayne Reid [email protected] 709-699- 1733 VP Exploration: Robert Duess [email protected] 613-453-7947 January 2013 TSXV: GTA www.gtaresources.com DISCLAIMER This
Cau+onary Notes. Avnel Gold MINING LIMITED 2 TSX:AVK
Cau+onary Notes Forward Looking Statements: This presentation contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities legislation, concerning
Year End 2014 Earnings Conference Call
SECOND FOURTH QUARTER OVERVIEW FINANCIAL REVIEW OPERATIONS REVIEW EXPLORATION & PRE-DEVELOPMENT REVIEW Year End 2014 Earnings Conference Call February 18, 2015 Cautionary Statements HECLA MINING COMPANY
ZARUMA RESOURCES: LUZ DEL COBRE COPPER PROJECT
ZARUMA RESOURCES: LUZ DEL COBRE COPPER PROJECT Luz del Cobre Presentation: Table of Contents Location and Land Position Slide 1 Project Summary Slide 2 Key Economic Projections Slide 3 Geological Setting
TSX-V: CDA WKN: A0M6U5
TSX-V: CDA WKN: A0M6U5 Mill Village Gold Property, Nova Scotia MidTex Oil & Gas, Texas Cash flow Developing cash flow producing gas wells Texas, USA expansion of gas & oil wells Texas, USA Canuc-Nambija
Building our Future. Investor Presentation. November 2015. Efemçukuru Gold Mine, Turkey
Building our Future Investor Presentation November 2015 Efemçukuru Gold Mine, Turkey Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements
For personal use only. MRV Metals Launch February 2016
MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to
TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION
B-1 APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION 1.0 INTRODUCTION The disclosure of the results of exploration and development activity on mineral