SECTION XXXXX STONE COLUMNS PART 1 - GENERAL

Similar documents
SECTION EARTH MOVING

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

C. Section TESTING LABORATORY SERVICE.

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

High Strain Dynamic Load Testing of Drilled Shafts

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION SHEETING, SHORING AND BRACING

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Specification Guidelines: Allan Block Modular Retaining Wall Systems

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION 1 GENERAL REQUIREMENTS

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

GEOTECH ENGINEERING and TESTING

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

SECTION SITE PREPARATION

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

PILE FOUNDATIONS FM 5-134

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

SETTLEMENT MONITORING OF DISCRETE REINFORCED SOIL LAYER BENEATH MAT FOUNDATIONS, CALIFORNIA, USA

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

PROCUREMENT SUBSTITUTION PROCEDURES

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Division 2 Section Section 02795

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Work Type Definition and Submittal Requirements

Washington ,

Lighthouse Engineering, L.L.C.

SECTION SUPPORT OF EXCAVATION

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

CID STREET INFRASTRUCTURE ASSESSMENT

SECTION GUARDRAILS

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

Chapter 9 Remedial Measures

Designed and Engineered to Perform

How to Design and Build a Fence/G traverse Bridge or Graffiti Project

PERMEABLE INTERLOCKING CONCRETE PAVEMENT

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

PVC PIPE PERFORMANCE FACTORS

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

CONSTRUCTION PERMIT REQUIREMENTS

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Section 2100-Trenching and Tunneling

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

DFI CSCE Workshop April 12, 2013 Solutions for Embankments Over Soft Soils Embankments Over Soft Soils

Work Type Definition and Submittal Requirements

SETTLEMENT INSTRUMENTATION & MONITORING

Cold Weather Concrete Practices

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

1. ASTM C Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Chapter 3 Pre-Installation, Foundations and Piers

SECTION 4Aggegate Subbase

Proposed Minimum Subterranean Termite Treatment Standards

CIVL451. Soil Exploration and Characterization

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

BUTE Department of Construction Management and Technology

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

Standard Test Procedures Manual

SECTION STORM DRAIN SYSTEM

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

SECTION PAVEMENT DESIGN

SECTION 411 DRILLED PIERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER

Section Installation of pipe and casing for sanitary sewer by methods of augering.

Section EXCAVATION AND BACKFILL FOR UTILITIES

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma

GLOSSARY OF TERMINOLOGY

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

APPENDIX G SETTLEMENT

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Transcription:

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01 Specification Sections, apply to this Section. 1.2 DESCRIPTION: Work shall consist of designing, furnishing and installing materials, and constructing a ground improvement system at the locations noted on the drawings and as specified herein. Ground improvement system shall be vibro stone columns. 1.3 WORK INCLUDED: A. Provision of all equipment, material, labor, and supervision to design and install stone columns. Design shall rely on subsurface information presented in the project geotechnical report. Removal of spoils from the site (which result from stone column construction), removal of spoils off the working pad, footing excavation, and subgrade preparation following stone column installation is not included. B. Drawings and General Provisions of the Contract, including General and Supplemental Conditions, and Division 1 Specifications, apply to the work in this specification. 1.4 APPROVED INSTALLERS: A. Installers of stone column foundation systems shall have a minimum of 3 years of experience with the installation of stone columns and shall have completed at least 10 projects. 1.5 RELATED WORK: A. Section 033000 Cast in Place Concrete. B. Section 312000 Building Earthwork. C. Geotechnical Report and Recommendations. 1.6 REFERENCE STANDARDS: A. Design: The ground improvement installer shall be responsible for design of a vibro stone column ground improvement system that meets the allowable bearing capacity, and settlement requirements stated on the contract plans. Industry recognized standards or design methods specific to the installer s equipment and construction methods shall be used. B. Modulus and Uplift Testing: 1. ASTM D-1143 Pile Load Test Procedures. 2. ASTM D-1194 Spread Footing Load Test. 3. ASTM-D-3689 Uplift Load Test (if required). C. Materials and Inspection: 1. ASTM D-1241 Aggregate Quality. 2. ASTM STP 399 Dynamic Penetrometer Testing (if applicable). 3. ASTM D-422 Gradation Soils.

1.7 CONFLICTS IN SPECIFICATIONS/REFERENCES: Where specifications and reference documents conflict, the Architect/Engineer shall make the final determination of the applicable document. 1.8 CERTIFICATIONS AND SUBMITTALS: A. The installer shall submit detailed design calculations and construction drawings to the Architect and to the Geotechnical Engineer of Record for approval at least three (3) weeks prior to the start of construction. All plans shall be sealed by a Professional Engineer in the State in which the project is constructed (referred in this specification as the Designer ). B. The Stone Column engineer shall have Errors and Omissions design insurance for the work. The insurance policy should provide a minimum coverage of $2 million per occurrence. C. Modulus and uplift test data - The Installer shall furnish the General Contractor a description of the installation equipment, installation records, complete test data, analysis of the test data and recommended design parameter values based on the modulus test results. The report shall be prepared under supervision of a registered professional engineer. D. Daily Progress Reports The Installer shall furnish a complete and accurate record of stone column installation to the General Contractor. The record shall indicate the pier location, length, average lift thickness and final elevations of the base and top of piers. The record shall also indicate the type and size of the densification equipment used. The Installer shall immediately report any unusual conditions encountered during installation to the General Contractor, to the Designer and to the Testing Agency. 1.9 BASIS OF PAYMENT: A. This work will be paid for at the contract lump sum price for IMPROVEMENT. PART 2 - PRODUCTS 2.1 MATERIALS: A. Aggregate used for piers be selected by the Installer and successfully used in the modulus test. B. Potable water or other suitable source shall be used to increase aggregate moisture content where required. Access to water on site shall be provided to the Installer. C. Installer to coordinate adequate and suitable marshalling areas on the project site for the use of the Installer for the storage of aggregate and equipment. PART 3 - DESIGN REQUIREMENTS 3.1 STONE COLUMN DESIGN: A. The Stone column design stiffness modulus value shall be verified by the results of the modulus test, described in this specification. B. Stone Columns shall be designed in accordance with generally-accepted engineering practice and the methods described in Section 1 of these Specifications. The design shall meet the following criteria. 1. Minimum Allowable Bearing Pressure for Stone column Reinforced Soils:X,XXX psf. 2. Minimum Stone column Area Coverage (for square Spread Footings): 20%. 3. Estimated Total Long-Term Settlement for Footings: XX-inch.

4. Estimated Long-Term Differential Settlement of Adjacent Footings: XX-inch. C. The design submitted by the Installer shall consider the bearing capacity and settlement of all footings supported by stone columns, and shall be in accordance with acceptable engineering practice and these specifications. Total and differential settlement shall be considered. The design life of the structure shall be 50 years. D. The Stone Column system shall be designed to preclude plastic bulging deformations at the top-of pier design stress and to preclude significant tip stresses. The results of the modulus test shall be used to verify the design assumptions. 3.2 DESIGN SUBMITTAL: The Installer shall submit eight (8) sets of detailed design calculations, construction drawings, and shop drawings, (the Design Submittal), for approval at least three (3) weeks prior to the beginning of construction. A detailed explanation of the design parameters for settlement calculations shall be included in the Design Submittal. Additionally, the quality control test program for stone columns, meeting these design requirements, shall be submitted. All computer-generated calculations and drawings shall be prepared and sealed by a Professional Engineer, licensed in the State or Province where the piers are to be built. PART 4 - CONSTRUCTION 4.1 STONE COLUMNS: A. Install stone columns with a down-hole vibrator capable of densifying the aggregate by forcing it radially into the surrounding soil. The vibrator shall be of sufficient size and capacity to construct stone columns to the diameters and lengths shown on the installer s approved construction drawings. B. The probe and follower tubes shall be of sufficient length to reach the elevations shown on the installer s approved construction drawings. The probe, used in combination with the available pressure to the tip jet, shall be capable of penetration to the required tip elevation. Preboring shall be permitted if it is specified in the installer s approved construction procedure submittal. C. The probe and follower shall have visible markings at regular increments to enable measurement of penetration and repenetration depths. D. Provide methods for supplying to the tip of the probe a sufficient quality of air or water to widen the probe hole to allow adequate space for stone backfill placement around the probe. E. The probe shall penetrate into the foundation soil layer to the minimum depths required in the installer s construction plans. F. Lift thickness shall not exceed 4 feet. After penetration to the treatment depth, slowly retrieve the vibrator in 12-inch to 18-inch increments to allow backfill placement. G. Compact the backfill in each lift by repenetrating it at least twice with the vibrating probe to densify and force the stone into the surrounding soil. H. Install stone columns so that each completed column is continuous throughout its length. 4.2 PLAN LOCATION AND ELEVATION OF STONE COLUMNS: The center of each stone column shall be within six inches of the plan locations indicated. The final measurement of the top of piers shall be the lowest point on the aggregate in the last compacted lift. Piers installed outside of the above tolerances and deemed not acceptable shall be rebuilt at no additional expense to the Owner. 4.3 REJECTED STONE COLUMNS: Stone columns improperly located or installed beyond the maximum allowable

tolerances shall be abandoned and replaced with new piers, unless the Designer approves other remedial measures. All material and labor required to replace rejected piers shall be provided at no additional cost to the Owner. PART 5 - QUALITY CONTROL 5.1 QUALITY CONTROL REPRESENTATIVE: A. The Installer shall have a full-time Quality Control (QC) representative to verify and report all QC installation procedures. The Installer shall immediately report any unusual conditions encountered during installation to the Design Engineer, the General Contractor, and to the Testing Agency. B. Stone Column installation shall be monitored by an on board computer monitoring system. Monitoring system shall log stone column number, time of installation, depth, hydraulic pressure applied during the boring process and during the compacting process. Recorded data for each stone column shall be plotted depth/pressure versus time. Installation records for each shall be made available upon request in electronic format within 24 hours of installation. C. The QC procedures shall include the preparation of Stone Column Progress Reports completed during each day of installation and containing the following information: 1. Footing and stone column location. 2. Stone column length and drilled diameter (if pre-drilled). 3. Planned and actual stone column elevations at the top and bottom of the element. 4. Average lift thickness for each stone column. 5. Soil types encountered at the bottom of the stone column and along the length of the element. 6. Depth to groundwater, if encountered. 7. Documentation of any unusual conditions encountered. 8. Type and size of densification equipment used. 5.2 QUALITY CONTROL VERIFICATION PROGRAM: A. The installer shall be responsible for design of a verification program to assure the quality of the construction. The program shall verify that the installed ground improvement system satisfies the performance requirements noted on the contract plans and the design requirements determined by the ground improvement system designer. As a minimum, the verification program shall include the following: 1. Proposed means and methods for verification that the installed stone columns meet the strength and/or stiffness criteria required by the design. This may include, but shall not be limited to, modulus or load tests on individual elements and/or groups, soil borings, and other methods as approved by the Engineer. 2. Quality control program to verify that the ground improvement system is installed in accordance with the designer s specifications and the requirements in this special provision. The quality control program shall include testing and observations by qualified personnel employed by the ground improvement installer or an independent testing laboratory. PART 6 - QUALITY ASSURANCE 6.1 INDEPENDENT ENGINEERING TESTING AGENCY: The Owner or General Contractor is responsible for retaining an

independent engineering testing firm to provide Quality Assurance services. The Testing Agency should be the Geotechnical Engineer of Record. 6.2 RESPONSIBILITIES OF GEOTECHNICAL ENGINEER & INDEPENDENT ENGINEERING TESTING AGENCY: A. The Geotechnical Engineer of Record shall review and approve the Installer s Design Submittal. B. The Testing Agency shall monitor the installation of stone columns to verify that all work is performed in accordance with the approved Design Submittal. C. The Testing Agency & Geotechnical Engineer of Record shall observe footing excavations and densification of stone columns and provide written reports per section 7.3.D. D. The Testing Agency shall report any discrepancies to the Installer and General Contractor immediately. PART 7 - RESPONSIBILITIES OF GENERAL CONTRACTOR 7.1 PREPARATION: A. The Installer shall locate and protect underground and aboveground utilities and other structures from damage during installation of the stone columns. B. The General Contractor will provide the site to the Installer, after earthwork in the area has been completed. C. Site subgrade shall be established by the General Contractor within 6 inches of final design subgrade, as approved by the Design Engineer. 7.2 UTILITY EXCAVATIONS: A. The General Contractor shall coordinate all excavations made subsequent to Stone column installations so that at least five feet of horizontal distance remains between the edge of any installed Stone column and the excavation. In the event that utility excavations are required at horizontal distances of less than five feet from installed Stone columns, the General Contractor shall notify the Stone column Designer to develop construction solutions to minimize impacts on the installed Stone columns. B. Recommended procedures may include: 1. Using cement-treated base to construct portions of the Stone columns subject to future excavations. 2. Replacing excavated soil with compacted crushed stone in the portions of excavations where the stone columns have been disturbed. The placement and compaction of the crushed stone shall meet the following requirements. a. The crushed stone shall meet the gradation specified by the Designer. b. The crushed stone shall be placed in a controlled manner using motorized impact compaction equipment. c. The aggregate should be compacted to 95% of the maximum dry density as determined by the modified Proctor method (ASTM D-1557). d. The Testing Agency shall be on site to observe placement, compaction, and provide density testing. The test results shall be submitted to the Designer and the General Contractor. The subcontractor shall provide notification to the Testing Agency and the Designer when excavation, placement, and compaction will occur and arrange for construction observation and testing.

7.3 FOOTING BOTTOMS: A. Excavation and surface compaction of all footings shall be the responsibility of the General Contractor. B. Foundation excavations to expose the tops of Stone columns shall be made in a workmanlike manner, and shall be protected until concrete placement, with procedures and equipment best suited to (1) prevent softening of the matrix soil between and around the Stone columns before pouring structural concrete, and (2) achieving direct and firm contact between the dense, undisturbed Stone columns and the concrete footing. C. Recommended procedures for achieving these goals are to: 1. Limit over-excavation below the bottom of the footing to 3-inches (including disturbance from the teeth of the excavation equipment, 2. Compaction of surface soil and top of stone columns shall be prepared using a motorized impact compactor ( Wacker Packer, Jumping Jack, or similar). Sled-type tamping devices shall not be used. Compaction shall be performed over the entire footing bottom to compact any loose surface soil and loose surface pier aggregate. 3. Place footing concrete immediately after footing excavation is made and approved, preferably the same day as the excavation. Footing concrete must be placed on the same day if the footing is bearing on expansive or sensitive soils. 4. If same day placement of footing concrete is not possible, place a minimum 3-inch thick lean concrete seal ( mud mat ) immediately after the footing is excavated and approved. D. The following criteria shall apply, and a written inspection report sealed by the project Geotechnical Engineer shall be furnished to the Installer to confirm: 1. That water (which may soften the unconfined matrix soil between and around the Stone columns, and may have detrimental effects on the supporting capability of the stone column reinforced subgrade) has not been allowed to pond in the footing excavation at any time. 2. That all stone columns designed for each footing have been exposed in the footing excavation. 3. That immediately before footing construction, the tops of all the Stone columns exposed in each footing excavation have been inspected and recompacted as necessary with mechanical compaction equipment, and that the tops of any Stone columns which may have been disturbed by footing excavation and related activity have been recompacted to a dry density equivalent to at least 95% of the maximum dry density obtainable by the modified Proctor method (ASTM D-1557). 4. That no excavations or drilled shafts have been made after installation of Stone columns within horizontal distance of five feet from the edge of any pier, without the written approval of the Installer or Designer. END OF SECTION XX XX XX