District wise details of NH works in Uttar Pradesh.

Similar documents
E-Governance Mission Mode Project: Crime & Criminals Tracking Network and Systems

STATE URBAN LIVELIHOOD MISSION (SULM) UTTAR PRADESH

Data Collected through 2001 Census

Forecast Issuing Authority Agro met. Advisory Service Unit, Met. Centre, Lucknow PART-I WEATHER Bulletin No- 69/16 ISSUING DATE:

Future Generali India Insurance Company Limited, Corporate & Registered Office : 6th Floor, Tower - 3, Indiabulls Finance Center, Senapati Bapat

Tata AIA Life Insurance MahaLife Supreme

December

How To Insure A Business

Birla Sun Life Insurance Pradhan Mantri Jeevan Jyoti Bima Yojana

Birla Sun Life Insurance Group CapSecure Pension Plan

Tata AIA Life Insurance Maha Raksha Supreme

IJED: Vol. 9, No. 1, (January-June 2012):

Dr A.P.J. Abdul Kalam Technical University Uttar Pradesh, Lucknow U.P. State Entrance Examination (UPSEE-2016) List of Document Verification Centers

CITIZEN'S CHARTER PREFACE NOTE

SUD Life Insurance Company Limited Master Policy Document - SUD Life Shiksha Suraksha 2 Plan

Non Participating Unit Linked Group Insurance Plan

How To Perform On The B.Tech Theory Exam

Basis of Computation: GAIA Per Student = (in % terms)

S.No. District Date Problems/Suggestions Remarks 1 27/10/2014 FPS wise report for HoF Voter ID Mismatch/Blank Available at DSO and DIO Login

UPDESCO Function of Education and Training Division

Bajaj Allianz Life Insurance Company Limited

EXECUTIVE SUMMARY. 1 The Study Background. 2 Migration in Delhi and NCR

International Journal of Technical Research and Applications e-issn: , Volume 2, Issue 3 (May-June 2014), PP.

Bajaj Allianz Life Pension Guarantee

EMPANELMENT OF STOCK AUDITORS / VALUERS GUIDELINES

SEISMIC ASSESSMENT OF BRICK MASONRY BUILDING Situated Anywhere In Seismic Zone IV of India

OFFICE MANUAL INCOME TAX APPELLATE TRIBUNAL MINISTRY OF LAW & JUSTICE DEPARTMENT OF LEGAL AFFAIRS

Sr. No. Particulars Date. 1 Start date for submission of Application form Start date for deposit of fee by the candidates

Bajaj Allianz Life Insurance Company Limited SCHEDULE Participating Non Linked Endowment Plan Regular Premium

Masters in Business Administration admissions in MBA Uttar Pradesh

Annexure-I. (Referred to in Para 1.2)

NOTICE. LIFE INSURANCE CORPORATION OF INDIA North Central Zone. Engagement of Direct Sales Executives

Theft and Loss of Electricity in an Indian State

Ministry Of Minority Affairs Selected List of Merit Cum Means

FAQ s for the Session

Literacy Rate of Muslim Women in Uttar Pradesh (India)

Two Weeks Faculty Development Programme on Entrepreneurship

GRADATION LIST OF INDIAN FOREST SERVICE OFFICERS OF UTTAR PRADESH CADRE

DR. MOHD. SHAKIR KHAN

VINNDHYA CIRCUIT PROCESSORS SYSTEM - Kanpur, Uttar Pradesh - January 2014 to Present

Citizens Charter. where every individual is committed

National Medical College Telemedicine Network

APPENDIX-I UNITED PROVINCES STAMP RULES,1942 CHAPTER 1

Handicrafts. Chapter Introduction

List of Orders for Major Rehabilitation Works Received / Executed by SANFIELD (INDIA) LTD.

No.M.92(01)/2011-C1 Date:

1 st HALF YEARLY MONITORING REPORT OF SSA AND MDM

An insurance plan with the advantage of Liquidity

Dr. Bhim Rao Ambedkar Engineering College of Information Technology Banda

LIST OF AIDED/GOVERNMENT COLLEGES

Divakar Yadav Dependable Systems and Software Engineering School of Electronics and Computer Science University of Southampton Southampton, UK SO171BJ

HealthAssure: A long-term critical. Key Advantages of HealthAssure

Society for Promotion of Libraries (SPL) Libraries: Towards Digital Paradigm NCLTDP-2014

PUBLIC SERVICE COMMISSION, UTTAR PRADESH

FAQ on ECS - Credit Clearing

Chapter 2 Brief Overview of the Yamuna River Basin and Issues

List of Institutions/Colleges Affiliated to U.P. Technical University

OVERVEIW OF URBAN PLANNING A BREIF

A CRITICAL ANALYSIS OF ECONOMIC REFORMS IN RICE PRODUCTION IN UTTAR PRADESH

Dr. Bhim Rao Ambedkar Engineering College of Information Technology Banda

1. Introduction Emergency Support Function -3 Power.

Policy Perspectives Fresh Approach in CGD Business. Presented By: Rajesh Vedvyas Executive Director(Mktg.) GAIL(India) Ltd.

LIST OF POS LOCATIONS

Vivek Aggarwal Managing Director, MP Road Dev. Corporation Bhopal (M.P.), INDIA

LEA Associates South Asia Pvt. Ltd. A LEA Group Company Consulting Engineers & Planners

Dr. Bhim Rao Ambedkar Engineering College of Information Technology Banda

Some Critical issues on Groundwater in India. June Centre for Water Policy 86-D, AD block, Shalimar Bagh Delhi

RAJYA SABHA MONDAY, THE 9 TH MARCH, 2015 (The Rajya Sabha met in the Parliament House at a.m.)

Crop Yield Estimation at District Level by Combining Improvement of Crop Statistics Scheme Data and Census Data

7 National e-governance Plan. 7.1 Background

Current condition of the Yamuna River - an overview of flow, pollution load and human use

ADVERTISEMENT. Sarfaesi Valuers who are already empanelled with the Bank need to apply afresh for continuing their empanelment.

The Regional Plan 2001 had identified the following counter magnet areas to the NCR for first stage intervention.

PRESS KIT 2015 EGIS IN INDIA CONTACT. Tilak Chowdhury. Communications Tel.: / TILAK.C@egis-india.

Capability Statement

U.P. TECHNICAL UNIVERSITY, LUCKNOW List of Institutions. Alphabetical ( )

Closing All India Ranks (Spot Round)

audit What is an Internal Audit I C A I Diamond Jubilee Year

RESUME. 1. March 20, 2009 onwards: Gautam Buddha University, Greater Noida

Dr S.K. GUPTA Scientist D Central Ground Water Board. 25 th FEB. 2014

RESUME OF PROFESSOR NAWAB ALI KHAN

Infrastructure & Industrial Investment Policy. Infrastructure & Industrial Investment Policy

Top 15 Engineering Colleges Ranked by State

ASCON : FDRC Building No 202, Shankar Vihar awes.school@gmail.com (Near APS) Delhi Cantt

High Speed Rail in India

CURRICULAM VITAE. Dr. ASWANI KUMAR ACADEMIC. Organization Designation From To Teaching Responsibilities INTERGRAL University,

Expression of Interest for

TRAFFIC MANAGEMENT PLAN

MAHATMAGANDHI UNIVERSITY. Courses of other Universities in the Distance/Private stream recognised by Mahatma Gandhi University

Reforms in Vulnerable Power Distribution Sector in Odisha BOT Model

SVKM s Narsee Monjee Institute of Management Studies (NMIMS)

National Career Service

Summary of the Traffic Studies and Forecasts on the Project Highway Undertaken by the Consultant

Live the life you think you deserve

t6,/ 2. Appointed candidates on such posts shall be governed under New Pension Scheme which is applicable at present.

SVKM s Narsee Monjee Institute of Management Studies (NMIMS)

List of disapproved colleges for Establishment of New Medical Colleges for the Academic Year

LIST OF SBP- SCHOLAR LOAN INSTITUTIONS

Freight Transport : Indian Scenario

How To Secure Gas Supplies For The Cgd Sector

Transcription:

District wise details of NH works in Uttar Pradesh Sr No 1000 sq 1 Agra 4,027 NH-2 6 lane of Delhi-Agra section of NH-2 (23 km) NH-3 Construction of Agra Bypass connecting NH-2 & NH-3 (32 km) NH-11 Proposal being framed by State PWD for submission to Ministry Included in Annual Plan for development to two lane with paved shoulder NH-93 Aligarh- Agra Section of NH-93 Feseability study for 4 lane is being taken up NH-123 DPR being taken up Newly declared NH NOC not received(15 Km in UP) Bids For 2 Aligarh 3,747 NH-91 4 laning Ghaziabad - Aligarh Section of NH-91 PCOD has been issued on 23062015 and tolling has started from 24062015 NH-93 Aligarh- Kanpur Section of NH-93 Feseability study for 4 lane is being taken up 3 Allahabad 5,425 NH-2 Delhi-Kolkata Section of NH-2 Already 4 laned 4 lane to 6 NH-27 Work of 4 laning under Appointed l date b issued k in May 2016 NH-76 DPR for development is under NH-76E DPR for development is under NH-96 Const of paved shoulder including drain work from km 141800 to 14600 of NH-96 4 Ambedkar Nagar 2,372 NH-232 2 lane with paved shoulders of Raebareilly-Tanda section / Akbarpur NH-233 4 laning of Ghaghra Bridge-Varanasi section of NH-233 (Pkg I) 5 Auraiya 2,051 NH-2 6-laning of Etawah-Chakeri section of NH-2 NH-91A Strengthening including reconst-ruction / widening of culvert from 6100 to 8500 of NH-91A 6 Azamgarh 4,210 NH-233 4 laning of Ghaghra Bridge-Varanasi section of NH-233 7 Bagpat 1,389 NH-334B Bids for Newly declared NH NOC not received(60 Km in UP) 8 Bahraich 5,751 NH-28C and 730 Rehabilitation and upgradation of NH 28 C from km 4300 to 9300 (Jarwal road Junction to Bahraich Section )in the State of Uttar Pradesh to two lane with paved shoulder under NHDP IV on EPC Basis (REVISED SANCTION) Rehabilitation and Up-gradation of Sisiya-Nanpara section (Km1888 to 226100) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode 9 Ballia 2,981 NH-19 DPR for development is under 10 Balrampur 2,927 NH-330 and 730 Widening to 2 lane PSD & Strng from km 31000 to 32500 of NH-730 EPC MODE Rehabilitation and Up-gradation of Tulsipur- Barhani Section (Km 351+000 to Km 385+000) of NH-730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh 11 Banda 4,418 NH-76, 232 Rehabilitation and Up-gradation of from Km285000 to 326000 of NH-76 (Kalupur-Lalata road) to two lane with paved shoulder on EPC mode in the State of Uttar Pradesh km 21500 to 28500 2 lane with paved shoulder by State Govt Budjet PR from km 19200 to 21000 of NH-76(35) 2 lane with paved shoulders of Raebareilly-Banda section 12 Barabanki 3,825 NH-28 Alreay 4 lane under OMT for Page 1 of 6

Sr No 1000 sq NH-28 C Rehabilitation and upgradation of NH-28C from km 000 to 4300 (Barabanki to Jarwal road Junction Section )in the State of Uttar Pradesh to two lane with paved shoulder under NHDP IV on EPC Basis (REVISED SANCTION) 13 Bareilly 4,120 NH 24 Four laning of Bareilly-Sitapur section of NH-24 NH 74 2 lane with paved shoulder of Bareilly-Sitarganj section of NH-74 14 Basti 3,033 NH 28 Alreay 4 lane under OMT for NH 233 Rehabilitation and upgradation of Indo Nepal Border to Rudhauli Section (Km0+00 to 65+870) of NH 233 on EPC basis Rehabilitation and upgradation of Rudhauli to Basti side approach of Ghaghra Bridge Section (Km65+870 to 122+270) of NH 233 on EPC basis 15 Bijnor 4,561 NH 119 DPR for development under NH 74 DPR for development under 16 Budaun 5,168 State road Connected by state 4 Lane road 4 Laning by PWD connectivity 17 Bulandshahr 3,717 NH 91 4/6 laning Ghaziabad - Aligarh Section of NH-91 P-COD has been issued and NH 235 4 laning of Meerut-Bulandshahar section of NH-235 Work awarded 18 Chandauli 2,554 NH 2, 6 laning of Varanasi-Aurangabad section of NH-2 NH 97 DPR proposed in Annual Plan of the Ministry NH 219 DPR being taken up Newly declared NH NOC not received(5 Km in UP) 19 Chitrakoot 3,205 NH 76 Rehabilitation and Up gradation of from Km285000 to 326000 of NH 76 (Kalupur Lalata road) to two lane with paved shoulder on EPC mode in the State of Uttar Pradesh km 21500 to 28500 2 lane with paved shoulder by State Govt Budjet NH 731A DPR being taken up Newly declared NH NOC not received(160 Km in UP) Bids for 20 Deoria 2,535 NH 727A DPR being taken up Newly declared NH NOC not received(100 Km in UP)ids for NH 227A DPR being taken up Newly declared NH NOC not received(218 Km in UP)bids for 21 Etah 4,446 NH 91 Aligarh Kanpur section Feseability study for 4 lane is being taken up 22 Etawah 2,288 NH 2 6 laning of Agra-Etawah section of NH-2 Work awarded 6-laning of Etawah-Chakeri section of NH-2 NH 91A DPR being taken up Bids for NH 92 IRQP & STG work km 000 to 6000, 69850 to 7800 (State Govt Bids for Budjet) 23 Faizabad 2,764 NH 28 Alreay 4 lane under OMT for NH 96 Strengthening with provision of paved shoulder in km 000 to 46470 of NH 96(330) EPC MODE under progres 90% complete NH 330A DPR fordevelopment under 24 Farrukhabad / 2,279 Not connected Proposed for connectivity by NH In principle declared NH* Fatehgarh 25 Fatehpur 4,152 NH 2 Delhi-Kolkata Section of NH-2 4-lane completed 4-lane to 6- lane is being taken up NH 232 2 laning with paved shoulders of Raebareilly-Banda section 26 Firozabad 2,361 NH 2 6 laning of Agra-Etawah section of NH-2 Work awarded Page 2 of 6

Sr No 1000 sq 27 Gautam Buddha Nagar / NOIDA 1,268 NH 91 4/6 laning Ghaziabad - Aligarh Section of NH-91 P-COD has been issued and tolling has started 28 Ghaziabad 1,955 NH 24 Construction of Delhi-Meerut Expressway Pkg II - Work awarded NH 58 Initial stretch of 52 Km denotified from the list of NHs NH 91 4 laning of Ghaziabad-Aligarh section of NH-91 P-COD has been issued and 29 Ghazipur 3,377 NH 19 DPR for developmetn under NH 29 4 laning of Varanasi-Gorakhpur section of NH-29, Pkg II Work awarded NH 97 DPR being taken up Bids for 30 Gonda 4,425 NH 330 DPR being taken up Newly declared NH NOC not received(96 Km in UP)Bids for NH 330B DPR being taken up Newly declared NH NOC not received(48 Km in UP)Bids for 31 Gorakhpur 3,321 NH 28 Alreay 4 lane under OMT for NH 29 4 laning of Gorakhpur-Mau section of NH-29 of Pkg IV Work awarded NH 29E Rehabilitation and upgradation of NH 29E from km 000 to Work in Progress 8000 (Sonauli to Gorakhpur section) in the State of Uttar Pradesh to two lanes with paved shoulders under NHDP IV on EPC Basis NH 227A DPR being taken up Newly declared NH NOC not received(218 Km in UP) Bids for NH 727A DPR being taken up Newly declared NH NOC not received(100 Km in UP) Bids for 32 Hamirpur 4,316 NH 86 Kanpur - Kabrai Section of NH-86 Already 2 laned + Paved 33 Hardoi 5,986 Not connected In principle declared NH # 34 Hathras 1,751 NH 93 Aligarh- Agra Section of 93 Already 2 laned + Paved Shoulder including Hathras bypass 35 Jalaun / Orai 4,565 NH 25 Jhansi Kanpur section of NH-25 existing 4-lane highway completed 36 Jaunpur 4,038 NH 56 4 laning of Varanasi-Sultanpur section of NH-56 (Pkg I) NH 231 2 Lane with PS Completed 37 Jhansi 5,024 NH 25 Jhansi-Kanpur section existing 4-lane highway completed NH 26 Jhansi-Lalitpur section existing 4-lane highway completed NH 75 DPR in NH 76 Rehabilitation and Up gradation of Harpalpur Sugira section (Km89600 to 133520) of NH 76 (New NH No339) in the State of Uttar Pradesh to two lane with paved shoulder under EPC mode PR from km 7000 to 80730 of NH 76(39) 38 Jyotiba Phule 2,320 NH 24 4 laning work completed Nagar / Amroha 39 Kannauj 1,994 NH 91 Aligarh Kanpur Section of NH-91 Feseability study for 4 lane is being taken up NH 91A Strengthening including reconst ruction / widening of culvert Bids for from 6100 to 8500 of NH 91A DPR for development of entire reach is being taken up 40 Kanpur Dehat / 3,146 NH 2 6-laning of Etawah-Chakeri section of NH-2 Akbarpur NH 2A 41 Kanpur Nagar / 3,030 NH 2 6-laning of Etawah-Chakeri section of NH-2 Kanpur NH 25 4 laning of Jajmau-Ramadevi section of NH-25 NH 86 Kanpur - Kabrai Section of NH-86 work completed Page 3 of 6

Sr No 1000 sq NH 91 Widening and Strengthening to 6 lane from km 41400 to 41900 of NH 91under For remainig portion, Feseability study for 4 lane is being taken up from Aligarh to Kanpur 42 Kaushambi 1,835 731A DPR being taken up Newly declared NH NOC not received(160 Km in UP) Bids for 43 Kheri / Lakhimpur 7,680 NH 730 Rehabilitation and Up-gradation of Lakhimpur -Sisiya section (Km14000 to 180000) of NH-730 to two lanes with paved shoulder on EP mode in the State of Uttar Pradesh NH 730A Rehabilitation and Up gradation of Puranpur Khutar section (Km38000 to 82000) of NH 730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode Widening & strengthening from km000 to 5067of NH 730 (EPC MODE) under Work in Progress 44 Kushinagar / 2,910 NH 28B two lane with paved shoulder of NH 28B from km 000 to 2500 Work in Progress Padrauna (State Govt Budget) DPR being taken up for development of entire reach of NH 28B NH 730 Widening & strengthening from km50500 to 53800 of NH 730 Work in Progress (EPC MODE) NH 727A DPR being taken up Newly declared NH NOC not received(100 Km in UP) Bids for 45 Lalitpur 5,039 NH 26 Jhansi Lalitpur section of NH-26 Already 4- laned 46 Lucknow 2,528 NH 24 Delhi Lucknow Section of NH-24 State Capital has been provided NH 24A Already 4 lane 4- lane connectivity with NH 24B Lucknow - Raebareli Section of NH-24 various NHs around it, viz, NH- NH 25 Lucknow - Kanpur Section of NH-25 24, 24B, 28, 25 and 56 In NH 28 Lucknow - Muzaffarpur Section of NH-28 addition, Lucknow ring road (90 km) has also been proposed NH 56 4 laning of Lucknow -Sultanpur Section from km 11500 to Financial bids opened work to 134700 (km 1232) be awarded NH 25A Already 4 lane Part of Lucknow Ring Road NH 56A Already 4 lane Part of Lucknow Ring Road NH 56B Already 4 lane Part of Lucknow Ring Road 47 Mahoba 2,849 NH 76 two lane with paved shoulder of NH 76 from km 16250 to 17800 (State Govt Budget) DPR for remaining stretches under Rehabilitation and Up gradation of Harpalpur Sugira section (Km89600 to 133520) of NH 76 (New NH No339) in the State of Uttar Pradesh to two lane with paved shoulder under EPC mode NH 86 IRQP from km 000 to 2200 of NH 86(34) IN 48 Maharajganj 2,951 NH 730 Widening & strengthening from km 45400 to 47090, 47400 to 48400 of NH 730 EPC MODE In Widening & strengthening from km50500 to 53800 of NH 730 In (EPC MODE) NH 29E Rehabilitation and upgradation of NH 29E from km 000 to In 8000 (Sonauli to Gorakhpur section) in the State of Uttar Pradesh to two lanes with paved shoulders under NHDP IV on EPC Basis (REVISED SANCTION) 49 Mainpuri 2,746 NH 91 Aligarh- Kanpur Section Feseability study for 4 lane is being taken up NH 92 DPR being taken up Bids for 50 Mathura 3,332 NH 2 6 laning of Agra-Etawah section of NH-2 Work awarded, appointed date is to be given 51 Mau 1,713 NH 29 6 laning of Delhi-Agra section of NH-2 (km 834) 52 Meerut 2,521 NH 58 4 laning of Gorakhpur-Mau section of NH-29, Pkg IV Work awarded NH 119 DPR under NH 235 4 laning of Meerut-Bulandshahar section of NH-235 Work awarded NH 334B DPR being taken up Newly declared NH NOC not received(60 Km in UP) Bids for NH 709A DPR being taken up Newly declared NH NOC not received(94 Km in UP) Bids for Page 4 of 6

Sr No 1000 sq 53 Mirzapur 4,522 NH 7 Varanasi Hanumanah Section of NH-7 Feasibility study is being taken up NH 76E IRQP from km 46800 to 47700 of NH 76E(35) DPR for development under 54 Moradabad 3,646 NH 24 4 laning of Moradabad-Bareilly section of NH-24, PCOD issued NH 93 2 laning with paved shoulders of Moradabad-Aligarh Work awarded section of NH-93 55 Muzaffarnagar 4,008 NH 58 Meerut-Muzaffarnagar-Haridwar section 4-lane completed NH 334A DPR being taken up Newly declared NH NOC not received(15 Km in UP) 56 Pilibhit 3,499 NH 74 Two lanning with paved shoulders of Sitarganj-Bareilly Section of NH-74 NH 730 Rehabilitation and Up gradation of Puranpur Khutar section (Km38000 to 82000) of NH 730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode NH 730A Widening of existing single lane carriageway to two lane carriageway with paved shoulder and strengthening from Km51000 (50675) to 105000 of NH 730A 57 Pratapgarh 3,717 NH 96 Rehabilitation and Up gradation of Pratapgarh to Allahabad Bypass Road & Junction section of NH 96 (New NH No330) from existing km 100+800 to km 135+230 [Design Ch100800 to Ch 135500] to four lanes with paved shoulders in the state of Uttar Pradesh under EPC mode Work recently awarded in May Appointed date to be given NH 231 Raebareli Jaunpur Section of NH-231 Work Completed NH 731A DPR being taken up Newly declared NH NOC not received(160 Km in UP) Bids for NH 931 IRQP work completed in entire reach 58 RaeBareli 4,586 NH 24B 2 laning with paved shoulders of Raebareilly-Allahabad section of NH-24 B NH 231 Raebareli Jaunpur Section Work Completed NH 232 2 laning with paved shoulders of Raebareilly-Banda section NH 330A IRQP from Km000 to 4600 of NH 330A DPR for development of entire stretch is under DPR for development under NH 931A Strengthening work completed in entire reach 59 Rampur 2,367 NH 24 4 laning of Moradabad-Bareilly section of NH-24 PCOD isued NH 87 Rampur-Rudrapur section of NH-87 Work awarded 60 Saharanpur 3,689 NH 73 Dehradun Sahranpur Section of NH-73 Work Awarded 72A Sahranpur Yamunanager section of NH-72 A Work Awarded 61 Sant Kabir Nagar / 1,442 NH 28 Alreay 4 lane under OMT for Khalilabad NH 227A DPR being taken up Newly declared NH NOC not received(218 Km in UP) Bids for 62 Sant Ravidas Nagar / Gyanpur Shahjahanpur 959 NH 2 Delhi-Kolkata Section of NH-2 4-lane completed 4-lane to 6- lane is being taken up 63 4,575 NH 24 Four laning of Bareilly-Sitapur section of NH-24 on DBFOT Mode NH 730A Widening of existing single lane carriageway to two lane carriageway with paved shoulder and strengthening from Work recently awarded in May Appointed date to be given Km51000 (50675) to 105000 of NH 730A Widng with PS & Strng from Km000 to 50675 of NH 730A EPC MODE 64 Shravasti 1,126 NH 730 Rehabilitation and Up gradation of Bahraich Shrawasti section (Km24840 to 31000) of NH 730 in the State of Uttar Pradesh to two lanes with paved shoulder 65 Siddharthnagar / (Naugarh) 2,752 NH 233 and 730 PR FROM 38500 TO 42000 OF NH 730 DPR for its development under 66 Sitapur 5,743 NH 24 Four laning of NH-24 of Bareilly-Sitapur section of NH-24 on DBFOT Mode 67 Sonbhadra / 6,788 NH 75E Work completed Robertsganj 68 Sultanpur 4,436 NH 56 4 laning of Lucknow -Sultanpur Section of NH-56 Financial bids opened NH 96 Strengthening with provision of paved shoulder in km 000 to 46470 of NH 96(330) EPC MODE Page 5 of 6

Sr No 1000 sq NH 232 2 lane with paved shoulders Raebareilly-Tanda section of NH-232 69 Unnao 4,558 NH 25 Jhansi Kanpur Lucknow Section Work Completed NH 232A DPR to be taken up 70 Varanasi 1,578 NH 2 6 laning of Varanasi-Aurangabad section of NH-2 NH 7 DPR for developmetn under NH 29 Widng & Streng PSD from km 2225 to 7600 of NH 29(31) In nearing completion 4 laning of Varanasi-Gorakhpur section of NH-29 of Pkg II Work awarded NH 56 Four laning in Varnasi Babtpur Airport (17Km) In Progress Four laning in Varnasi-Sultanpur section of NH-56, Pkg I 71 Manyavar Kanshiram Nagar (Kasganj) 72 Prabuddha Nagar / Shamli NH 233 1,993 State road connectivity Capacity augmentation to 2 lane with paved shoulder configuration on National Highways from km 288200 to km 29200 of NH 233(28) 4 laning Varanasi-Ghaghra Bridge section of NH-233, Pkg III State Road connectivity by 4 Lane Road 4 Laning by PWD 1,240 NH 709A DPR being taken up Newly declared NH NOC not received(94 Km in UP) Bids for 73 Panchsheel Nagar 1,124 NH 24 Construction of Delhi-Meerut Expressway Pkg III - Work awarded / Hapur 74 Bhim Nagar (Sambhal) / 75 Chhatrapati Shahuji Maharaj Nagar / Gauriganj NH 235 4 laning of Meerut-Bulandshahar section of NH-235 Work awarded 2,422 NH 93 2 laning with paved shoulders of Moradabad-Aligarh Work awarded section of NH-93 NH 232 2 lane with paved shoulders of Raebareilly-Tanda section NH 330A IRQP from Km000 to 4600 of NH 330A in DPR for development under NH 931 IRQP work completed in entire reach IRQP work completed in entire reach NH 931A Strengthening work completed in entire reach Strengthening work completed in entire reach Page 6 of 6