Altoona Water Authority. Infrastructure Overview



Similar documents
Kansas City s Overflow Control Program

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

Town of New Castle Utility Department Introduction

California Wastewater

PENNSYLVANIA 42 (STATE) (NUMBER)

DRAFT Public Outreach Document for What s an SSMP?

WASTEWATER TREATMENT OBJECTIVES

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

William E. Dunn Water Reclamation Facility. Facility Overview & Information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

Cambridge Wastewater Treatment Facility

Unauthorized Discharges and Sanitary Sewer Overflows

NEVADA CITY WASTEWATER TREATMENT INQUIRY

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

How To Water System

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

City of Mebane Wastewater Collection and Treatment Facility

Sewerage Management System for Reduction of River Pollution

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT

Engineers Edge, LLC PDH & Professional Training

Environmental Science 101 Waste. Fall Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.

The Clean Water Project What Is The Stormwater Impact?

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Type of Sewer Systems. Solomon Seyoum

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

Florida Department of Environmental Protection

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

What is a CSO / SSO? Sewer Overflows. Prevalence of CSOs in the US. Magnitude of Problem (Local)

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

St. John s Harbour Clean-Up Phase 2. Project Description

Omaha Combined Sewer Overflow (CSO) Control Program

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

ERIE COUNTY COMMUNITY FACILITIES

Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

SECTION 3 SANITARY SEWER DESIGN

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia

SANITARY SEWER BACKUP. Causes & Prevention

Asset Management Answering the 5 Core Questions

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN

Department Business Plan. Utilities

The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2

Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor

Executive Summary Consent Decree

What Our Water s Worth

SECTION 810 SEWER LINE CLEANING

Click to edit Master title style

DID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER

SHORELINE SANITATION

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

LOTT ~WateJi Alliance

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

4 Water supply description

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

HUBER Vacuum Rotation Membrane VRM Bioreactor

Sanitary Sewer Master Plan

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems

The City of Boulder 75 th Street Wastewater Treatment Facility

KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL

Who is responsible for making sure that wastewater is treated properly?

HYDROVEX. CSO, SSO and Stormwater Management Specialist Products and Services for North America

Transcription:

Altoona Water Authority Infrastructure Overview

Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater in a manner that protects public heath and the environment. Our commitment is to ensure a cost-efficient operation, render the highest standard of customer service, and maintain an active role within the community.

History The Altoona City Authority was created by the City of Altoona in 1946 for the purpose of financing capital improvement projects. The Authority assumed operational responsibility of the water system from the City in 1981 and of the wastewater system in 1986. In 2009, our name was officially changed to the Altoona Water Authority.

About Us We are the largest dual-operating authority (water and wastewater) between Pittsburgh and Harrisburg. Over the last 25 years, the Altoona Water Authority has constructed 40+ major capital improvement projects to comply with government-mandated regulations, at a cost approaching $200,000,000.

Water Service Overview The Altoona Water Authority supplies public water to 60% of Blair County. The water system extends from Tyrone Borough in the north to Duncansville in the south. The water system serves a population of about 70,000 people, with approximately 23,000 customer accounts in eleven municipalities. In addition to domestic water service, the Authority maintains public, commercial, and industrial accounts. The Authority also sells water in bulk to Hollidaysburg, Bellwood, Blair Township, and Freedom Township.

Water System History The present surface water sources were once two separate systems. The Altoona City Authority acquired the Blair Gap system in 1981. The dams and reservoirs original to the Authority are: Lake Altoona, Cochran Dam, Kittanning Point, Little Allegheny, Mill Run, and Homer s Gap. They were constructed from the 1870s to the 1950s. The former Blair Gap system was constructed by the Pennsylvania Railroad from 1880 to 1920. Its reservoirs were: Tipton, Bellwood, Kettle, Blair Gap, and Plane 9. It also included Muleshoe Reservoir, which is now owned by Hollidaysburg Borough.

Water Production and Treatment The Authority s eleven surface water reservoirs have a combined storage volume of 2.85 billion gallons, and in total are capable of yielding up to 14.6 million gallons of water per day. The Authority s seven water treatment plants have a combined treatment capacity of 28.5 million gallons daily, which is almost two times the net safe yield of the reservoir systems. In 2012, their combined production averaged 8.7 million gallons of water each day.

Kittanning Point Reservoir William L. Cochran Impounding Dam Lake Altoona Andronic Pappas Water Treatment Plant

Mill Run Reservoir Plane 9 Dam & Water Treatment Plant Kettle Reservoir & Water Treatment Plant Homer Gap Water Treatment Plant

Tipton Dam Tipton Dam, Reservoir, and Water Treatment Plant Blair Gap Dam

Water Production and Treatment The Altoona Water Authority has one of the most technologically advanced water treatment systems in the eastern United States. Our treatment techniques include: Ozonation Direct filtration Continuously backwashed / filter-to-waste / mixed media filters In 1999, the Authority received the Governor s Award for Environmental Excellence in Technology Innovation for its water treatment facilities.

Ozone Generators Traveling Bridge Filters Ozone & Rapid Mix Chemical Addition

Water Storage and Distribution The Authority operates sixteen finished water storage tanks, with a combined storage capacity of 28.3 million gallons. The water system is comprised of about 390 miles of transmission and distribution main piping, ranging in diameter from 4 to 24. The water system has more than 1900 hydrants for fire protection. The Authority operates nine pumping stations throughout the system for various purposes, such as: Filling storage tanks Transferring water from one service area to another Maintaining hydraulic gradient

Oakton Water Storage Tanks Prospect Water Storage Tank

Plane 9 Water Storage Tank Fairview Hills Water Storage Tank Prospect Water Storage Tank

Pumping Station Interiors Installation of a fire hydrant

Wastewater Service Overview The Altoona Water Authority wastewater collection system serves a population of about 50,000 people, with approximately 19,000 customer accounts in the City of Altoona and in parts of Logan and Allegheny Townships. The Logan Township and Allegheny Township collection systems are also connected to and treated by the Altoona Water Authority s wastewater system.

Wastewater Service Overview The wastewater collection system is divided into two drainage basins: the Westerly and the Easterly. Each basin has its own treatment plant. In a portion of central Altoona, the wastewater system is combined it collects storm water as well as sanitary sewage.

Wastewater Collection and Treatment Portions of the sewer system were constructed more than 125 years ago. The wastewater system is comprised of over 230 miles of collection and conveyance sewers, ranging in size from 4 to 80. The system is accessible via approximately 3200 manholes. The Authority operates 3 wastewater pumping stations (Spring Run, East Juniata, and Logan Hills).

Wastewater Collection and Treatment During wet weather events, the Authority utilizes two Combined Sewer Overflows (CSOs) to capture the first flush from the combined (storm/sanitary) portion of the system. The CSOs have a 2.9 million gallon storage and pumping system to release wastewater to our treatment plants at a controlled rate. The Altoona Water Authority system was one of the first in the United States to integrate the treatment of wet weather flows, combined sewer overflow discharges, and normal wastewater flows.

Wastewater Collection and Treatment The Easterly Wastewater Treatment Plant treats an average of 4.1 million gallons daily. The Westerly Wastewater Treatment Plant treats an average of 5.9 million gallons daily. During wet weather events, each facility is capable of treating up to 20 million gallons per day.

Wastewater Collection and Treatment Both of our state-of-the-art wastewater treatment plants provide advanced secondary treatment capability, normally removing 95% of organic and suspended solids via the single state nitrification, activated sludge process. In 2013, the American Academy of Environmental Engineers awarded its Top Environmental Project in the US for the Authority s upgrades to its Westerly Wastewater Treatment Plant.

66 Combined Sewer Installation, Union Ave Spring Run Wastewater Pumping Station

Storage Tank Construction, Bellwood Ave CSO Discharge Pumps, Bellwood Ave CSO

Westerly Wastewater Treatment Facility Just off Route 764 144 Westerly Treatment Plant Rd, Duncansville PA Easterly Wastewater Treatment Facility 1522 Old 6 th Ave Rd, Altoona PA

Bar Screens & Grit Removal Overflow Storage Tanks Ultraviolet Disinfection Tanks Biological Aeration Tanks

Flow/Air Distribution Channel Sludge Digestion Tanks Operation & Control Building Pipe Gallery Tunnel

For More Information Please visit our website: http://www.altoonawater.com Or contact Customer Service: 900 Chestnut Ave Altoona PA 16601 (814) 949-2540