PENNSYLVANIA 42 (STATE) (NUMBER)
|
|
|
- Kory Hamilton
- 10 years ago
- Views:
Transcription
1 PENNSYLVANIA 42 (STATE) (NUMBER) PENNSYLVANIA INFRASTRUCTURE INVESTMENT AUTHORITY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION EXPLANATION OF HEADINGS NEEDS CATEGORY: I - SECONDARY TREATMENT II - TREATMENT MORE STRINGENT THAN SECONDARY IIIA - INFILTRATION/INFLOW CORRECTION IIIB - MAJOR SEWER SYSTEM REHABILITATION IVA - NEW COLLECTOR SEWERS AND APPURTENANCES IVB - NEW INTERCEPTORS AND APPURTENANCES V - CORRECTION OF COMBINED SEWER OVERFLOWS PROJECT TYPE: STP - SEWAGE TREATMENT PLANT STPMOD - SEWAGE TREATMENT PLANT MODIFICATION INT - INTERCEPTOR PS - PUMP STATION FM - FORCE MAIN SS - SEWER SYSTEM SSREH - SEWER SYSTEM REHABILITATION PROJECT NUMBER: LOAN #: NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT NUMBER DEP PROJECT IDENTIFICATION NUMBER PENNVEST LOAN NUMBER OF FUNDED PROJECT ESTIMATED ELIGIBLE NEEDS FOR PROJECT Note: Green projects pertain to those considered for funding after the issuance of EPA s Procedures for Implementing Certain Provisions of the Fiscal Year 2010 Appropriation Affecting the Clean Water and Safe Drinking Water State Revolving Fund Programs dated 4/21/2010
2
3 Hickory Twp - Endeavor Wastewater System P.O. Box 44 Endeavor, PA Forest NW PA LOAN #: $210,000 $365,000 IVB: $575,000 CS STP SS DEP RATING: 70 DEP RANKING: 1 of 16 PV RATING: 75 Confirmed onlot malfunctioning systems and a wildcat with seven (7) homes tied to it exist in this community. Environmental benefits include reducing or eliminating surface water contamination resulting from malfunctioning onlot systems and a wildcat sewer. The project will serve 16 homes. The system will consist of approximately 3,500 linear feet of low-pressure wastewater main, 16 grinder pump units and a 6000 gpd wastewater treatment facility. Business Case Req'd: Green Funding:.00
4 WEST PROVIDENCE TOWNSHIP MA WASTEWATER SYSTEM IMPROVEMENTS Bedford $5,000,000 CS East Fifth Avenue SC IVB: PS SS Everett, PA PA DEP RATING: 55 LOAN #: $5,000,000 DEP RANKING: 2 of 16 PV RATING: 60 The Authority currently experiences high volumes of inflow and infiltration causing overflow situations at its main pump station, pump station #1. Additionally, the high flows have caused bypass and overflow events at the Everett Borough wastewater treatment facility. The project will reduce the influence of inflow and infiltration on the existing wastewater collection system, in accordance with the Authority's March 21, 2012 Consent Order and Agreement. In addition, several modifications will be made to the existing pump stations to improve operations. Environmental benefits include reducing insufficiently treated sewage sent to the Authority's waterways during wet weather. The project will involve the replacement of approximately 35,000 linear feet of existing wastewater main, primarily terra cotta pipe, with new PVC collection lines. Approximately 150 existing manholes will also be replaced, along with all related appurtenance and restoration. Several operational improvements will also be made at the Authority's six existing wastewater pump stations. Wet wells will be replaced at pump stations #1 - #3 to provide for additional storage and pumping capacity. Emergency generators will be installed at pump stations #2 and #3. Monitoring and alarm systems will be installed at all six Authority stations. Business Case Req'd: Green Funding:.00
5 WILKINS TWP - LINHART AREA SEWER SEPARATION PROJECT Allegheny CS Peffer Road SW IVB: SS Turtle Creek, PA PA $830,000 DEP RATING: 53 LOAN #: $830,000 DEP RANKING: 3 of 16 PV RATING: 68 Wilkins Township, a First Class Township, owns and operates a combined sewer system. The proposed Linhart Area Sewer Separation Project is in compliance with the Consent Order and Agreement entered into with the PA DEP to eliminate wet weather sewage overflows and reduce groundwater infiltration and inflow. The project will eliminate one Combined Sewer Overflow (CSO#2/TR-03) that discharges directly to Thompson Run creek and will reduce groundwater inflow and infiltration into the downstream sanitary sewer system. Environmental benefits include reducing insufficiently treated sewage sent to Thompson Run during wet weather. The proposed project is the separation of the combined sewer system in the Linhart Area of Wilkins Township, Allegheny County, Pennsylvania. The proposed project includes the installation of approximately 2,400 LF of 8" PVC sanitary sewer and 23 manholes; Installation of approximately 830 LF of 12" storm sewer, 4 inlets and 7 manholes and making required disconnections between the sanitary and storm sewer system throughout the Linhart Area sewershed. Business Case Req'd: Green Funding:.00
6 GLENDALE VLY MA - YEAROUND WASTEWATER INTERCONNECTION Cambria CS Beaver Valley Road SW IVB: INT Flinton, PA PA $1,220,000 DEP RATING: 52 LOAN #: $1,220,000 DEP RANKING: 4 of 16 PV RATING: 57 Both the Yearound treatment plant and pump station have outlived their service life. The Act 537 Plan Amendment documents the overflow conditions at the existing Yearound plant. In addition to issues at the treatment plant, overflows and operational problems have occurred at the wastewater pump station. The Authority is currently under a Consent Order and Agreement from DEP to address these issues by the end of Environmental benefits include reducing insufficiently treated sewage sent to Kibler Run during wet weather The Glendale Valley Municipal Authority is proposing a new wastewater line to interconnect the existing Glendale Yearound system with the Beaver Valley system that was completed in The project consists of installing 14,000 linear feet of interceptor line connecting the Yearound treatment plant influent to the new Glendale Valley STP. Business Case Req'd: Green Funding:.00
7 Johnstown City - Oakhurst Sanitary/Storm Sewer Separation Project Phase I Cambria CS Main Street SW IVB: SS Johnstown, PA PA $10,900,000 DEP RATING: 52 LOAN #: $10,900,000 DEP RANKING: 5 of 16 PV RATING: 87 Wet weather overflows to stream from sanitary sewers exist. This specific project will improve public health and safety by removing the single SSO located within the project area. Eliminating this SSO will also improve the quality of the downstream waterways, Strayer and St. Clair Run. This is one phase of a multi-phase project. Sanitary sewer replacement and rehabilitation including house lateral inspection ports in a portion of the Oakhurst Area of Johnstown. Business Case Req'd: Green Funding:.00
8 ALTOONA WATER AUTHORITY - PLEASANT VALLEY BLVD INTERCEPTOR SEWER REPLACEMENT Blair CS Chestnut Avenue SC IVB: $5,384,650 PS INT Altoona, PA PA $1,140,350 DEP RATING: 44 LOAN #: $6,525,000 DEP RANKING: 6 of 16 PV RATING: 94 A portion of the Pleasant Valley Blvd interceptor is hydraulically overloaded. During heavy rainfall, manholes overflow and sewage back-ups have been reported. To prevent manhole overflows and sewage back-ups, the Authority pumps sewage from several manholes during rainfall events. Environmental benefits include reducing insufficiently treated sewage sent to the Authority's waterways during wet weather. The 21" Pleasant Valley Blvd interceptor will be replaced with 30" and 36" diameter interceptor. Since a portion of the existing 21" sewer is 30' deep, a pump station is proposed to pump wet weather flow. The dry weather flow will continue to flow through the existing 21" interceptor. The project also involves the repair and renovation of the existing Easterly and Westerly CSO facilities. Business Case Req'd: Green Funding:.00
9 HAWTHORN REDBANK REDBANK MA - SS PROJECT - PHASE B1 (FAIRMOUNT CITY AREA) Clarion $3,381,750 CS P.O. Box 241 NW IVB: SS PS Hawthorn, PA PA DEP RATING: 44 LOAN #: $3,381,750 DEP RANKING: 7 of 16 PV RATING: 59 Fairmount City area of Redbank Township, Clarion County has a confirmed on-lot malfunction rate of 70.4%. Environmental benefits include reducing insufficiently treated sewage sent to the Authority's waterways from malfunctioning on-lot systems. Construction of approximately 23,500 linear feet of 8" gravity sewers and 4,910 linear feet of forcemain. Business Case Req'd: Green Funding:.00
10 HARRISBURG AUTHORITY - ADV. WWTF IMPROVEMENTS PJT. Dauphin $10,734,600 CS Locust Street, Suite 102 SC $42,938,400 IVB: STPMOD Harrisburg, PA PA DEP RATING: 43 LOAN #: $53,673,000 DEP RANKING: 8 of 16 PV RATING: 68 The Harrisburg Authority is required by their NPDES Permit and Consent Order and Agreement to build facilities to treat ammonia and nutrient reductions. This project is necessary for the protection of the Susquehanna River and the Chesapeake Bay. Environmental benefits include reducing algae formation promoting a healthy aquatic environment in the Chesapeake Bay. The Harrisburg Authority will be constructing an upgraded wastewater treatment facility to meet more stringent effluent limits and Chesapeake Bay requirements. The treatment facility will provide service to the residents, businesses within the City of Harrisburg and surrounding municipalities. Business Case Req'd: Green Funding:.00
11 Lancaster City - North PS Preliminary Treatment Facility & Diversion Chamber Lancaster CS North Duke Street SC IVB: CSO Lancaster, PA PA $8,668,000 DEP RATING: 43 LOAN #: $8,668,000 DEP RANKING: 9 of 16 PV RATING: 58 Construction of this project will maximize flow to the wastewater treatment plant and there will be less solids and floatables in the CSO discharge. This will help meet Part C of the NPDES permit conditions. Environmental benefits include reducing insufficiently treated sewage sent to the Conestoga River during wet weather. The proposed project involves construction of a new diversion chamber and preliminary treatment. The deflection screen in the new diversion chamber will allow less solids and floatables in the CSO. Preliminary treatment involves two course screens and two grit removal units. The preliminary units will be housed in a brick building. Flows from the diversion chamber will be increased from 26 mgd to 38 mgd. Green Project: Yes Green Category: Energy Efficiency Business Case Req'd: No Green Funding: $135,909.00
12 VANDERGRIFT BOROUGH COMBINED SEWER SEPARATION PHASE 2 Westmoreland CS Grant Avenue SW IVB: SS Vandergrift, PA PA $10,880,300 DEP RATING: 43 LOAN #: $10,880,300 DEP RANKING: 10 of 16 PV RATING: 73 The combined sewer system overflows during rain events. Environmental benefits include reducing insufficiently treated sewage sent to the Kiskiminetas River durning wet weather. This is Phase 2 of a combined sewer separation project eliminating 2 wet weather CSO discharge points. This project includes installing 30,750 LF of 8" sanitary sewer, 2,000 LF of 10" sanitary sewer, 700 LF of 12" sanitary sewer, 1,450 LF of 15" sanitary sewer, 8,200 LF of 10", 12", 15", 18", 24", 36", and 42" storm sewer and 1,200 lateral inspection ports. Treatment is provided at the existing Kiski Valley STP. Business Case Req'd: Green Funding:.00
13 HAWTHORN REDBANK REDBANK MA AREA SS PROJECT - PHASE B2 - OAKRIDGE AREA Clarion $3,343,500 CS P O Box 241 NW IVB: SS Hawthorn, PA PA DEP RATING: 42 LOAN #: $3,343,500 DEP RANKING: 11 of 16 PV RATING: 57 This application is for Phase B2 (Oakridge Area & previously eliminated Mayport Area) which is the final phase. Nearly 58% of the onlot septic systems in the project area were found to be malfunctioning. This project will eliminate these malfunctioning, potential and suspect systems and provide a safer standard of living for the area. Nearly 128 EDU's will be provided public sewers. Environmental benefits include reducing insufficiently treated sewage sent to the community's waterways from malfunctioning onlot systems. The project consists of constructing approximately 17,000 LF of 8" sanitary sewer in the Viilage of Oakridge, Armstrong County, PA. Also, roughly 8,800 LF of 8" and 12" sanitary sewer line will be constructed in the Mayport Area. This portion of the system was previously eliminated in Phase A due to budget constraints. The sewers will connect to a 200,000 GPD SBR WWTP that was funded by a previous Pennvest funding offer. Business Case Req'd: Green Funding:.00
14 UPPER YODER TOWNSHIP AUTHORITY REHABILITATION PROJECT Cambria CS Elm Street SW IVB: SSREH Johnstown, PA PA $8,750,000 DEP RATING: 42 LOAN #: $8,750,000 DEP RANKING: 12 of 16 PV RATING: 47 The project is mandated to gain compliance with the State Order directing the municipalities connected to the Johnstown Sewage Treatment Plant to eliminate wet weather overflows from the sewer system. Environmental benefits include reducing insufficiently treated sewage sent to the City's waterways during wet weather. The rehabilitation project will repair/replace over 93,000 feet of sewer mains, repair over 500 manholes, and repair/replace over 1280 laterals within the public rights-ofway. Business Case Req'd: Green Funding:.00
15 SMETHPORT BORO AUTH - WASTEWATER TREATMENT PLANT FINE SCREEN McKean $805,000 CS W. Main St. NW IVB: STPMOD Smethport, PA PA DEP RATING: 32 LOAN #: $805,000 DEP RANKING: 13 of 16 PV RATING: 47 One of the problems experienced at the WWTP is excessive rags in the influent wet well. Currently, rags are removed manually from the bypass bar screens. The bar screens are not the best in handling the excessive rag problem. Some of the rags pass through to the treatment units and float on top of the wastewater in the aeration tanks, clog the solids handling pumps reintroducing solids, including copper, into the system violating the NPDES Permit relative to copper and total suspended solids. Environmental benefits include reducing insufficiently treated sewage sent to Potato Creek. The project consists of the construction of a new screenings building including the installation of one (1) new mechanical bar screen with a capacity of 7.5 mgd with 1/4" spacing, washer compactor, manual bar screen and site grading. Business Case Req'd: Green Funding:.00
16 DANVILLE MUNICIPAL AUTHORITY - MAIN INTERCEPTOR REPLACEMENT PROJECT Montour CS P O Box 179 NC IVB: $7,809,000 INT PS Danville, PA PA DEP RATING: 22 LOAN #: $7,809,000 DEP RANKING: 14 of 16 PV RATING: 62 This project addresses the following problems: wet weather surcharges due to inadequate capacity, slopes, sags, conveyance capability and elevations; basement backups; infiltration and inflow (I/I); flooding/submergence of manhole within stream high-water levels; dry weather exfiltration discharges of sanitary sewage from collection system; compliance with PADEP-approved Corrective Action Plan (CAP) which includes a sewer connection prohibition; and ability to provide for economic development. Environmental benefits include reducing insufficiently treated sewage sent to the Authority's waterways during wet weather. The project includes approximately 11,000 LF of new 6-inch through 42-inch sanitary sewer mains, 985 LF of 6-inch forcemain, 2,415 LF of rehabilitation and lining of existing 10-inch through 36-inch sanitary sewers, 56 vertical feet of rehabilitation to manholes, 62 new manholes, a new pumping station, two (2) bulk customer flow meters, and associated restoration. Business Case Req'd: Green Funding:.00
17 CANTON BORO AUTH- WASTEWATER TREATMENT PLANT UPGRADE Bradford $8,900,000 CS Park Place NC IVB: STPMOD Canton, PA PA DEP RATING: 14 LOAN #: $8,900,000 DEP RANKING: 15 of 16 PV RATING: 44 The existing wastewater treatment plant is in excess of 30 years old and many systems need to be replaced. The current treatment technology is not condusive to the Authority meeting future discharge limits related to nutrient removal. Environmental benefits include reducing algae formation promoting a healthy aquatic environment in the Chesapeake Bay. This project involves renovating the existing treatment facility to an SBR treatment process that removes organic matter, ammonia via nitrification and total nitrogen via denitrification. The project will also include influent screening, raw sewage pumping, grit removal and handling facilities, chemical feed systems, ultraviolet disinfection, utility water system, aerobic sludge digesters, sludge dewatering and disposal facilities, septage receiving station, new control and operations building, renovation to existing buildings and various additions and modifications to exisitng piping and electrical systems. The plant currently treats MGD Annual Monthly Average Flow Rate and MGD Maximum Monthly Average Flow Rate. This construction project will not increase existing plant capacity. Business Case Req'd: Green Funding:.00
18 Galeton Boro Auth - WWTP Blower System Replacement Project Potter $1,362,000 CS P.O. Box 222 NC IVB: STPMOD Galeton, PA PA DEP RATING: 6 LOAN #: $1,362,000 DEP RANKING: 16 of 16 PV RATING: 26 Existing aeration system for the STP is outdated and reached its useful life. Environmental benefits include reducing the potential of insufficiently treated sewage sent to the Borough's waterways. The project consists of replacing the aeration system with fine bubble diffusion and the blower motors with positive displacement blowers powered by variable frequency drives. Additionally, new catwalks, scrapers, and weirs will be installed in the clarifiers. The project is categorically green as it will result in an estimated 50% of electrical energy savings. Green Project: Yes Green Category: Energy Efficiency Business Case Req'd: No Green Funding: $1,362,000.00
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
Altoona Water Authority. Infrastructure Overview
Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall
CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
Sanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
The City of Boulder 75 th Street Wastewater Treatment Facility
The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known
SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS
SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS This section will describe the Town s existing wastewater management systems. This includes on-site disposal systems and private collection systems. The
26th Ward Wastewater Treatment Plant Wet Weather Operating Plan
26th Ward Wastewater Treatment Plant Prepared by: New York City Department of Environmental Protection Bureau of Wastewater Treatment July 2010 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1-1 1.1 BACKGROUND...
FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN
FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN ENGINEERING REPORT 408 College Street, West Fayetteville, TN 37334 (931)433-1522 CONSOLIDATED TECHNOLOGIES,
ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
What is a CSO / SSO? Sewer Overflows. Prevalence of CSOs in the US. Magnitude of Problem (Local)
Sewer Overflows Combined Sewer Overflows (CSOs( CSOs) Older, large cities built combined networks to convey sewage and stormwater Stormwater overwhelmed sewage flow, but only for short periods To reduce
City of Mebane Wastewater Collection and Treatment Facility
City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014 - June 30, 2015 City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014
Allegany County Combined Sewer Overflows - Long Term Control Plan
Allegany County Combined Sewer Overflows - Long Term Control Plan On December 14, 2001 the Maryland Department of the Environment (MDE) filed a Consent Decree and Judgment (Consolidated Case No. 01-C-00-18342-L)
ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015
ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 I. PROJECT IDENTIFICATION Applicant: Authorized Representative: Village of Eau Claire
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum
Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)
Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability
EPA Region 4 Introduction to Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs
EPA Region 4 Introduction to Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs Version 1.0 PURPOSE & DISCLAIMER This document is the work
TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN
TOWN OF CHESTERTON, INDIANA COMBINED SEWER OVERFLOW LONG TERM CONTROL PLAN Prepared For: Town Of Chesterton Utilities Chesterton, Indiana Prepared By: Engineers Architects Scientists Planners Surveyors
Collection Systems Technology Fact Sheet Sewers, Conventional Gravity
United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
LOTT ~WateJi Alliance
LOTT ~WateJi Alliance May 5, 2015 Lacey Olympia Tumwater Thurston County David Dougherty, P.E. Water Quality Program Washington State Department Of Ecology Southwest Regional Office P.O. Box 47775 Olympia,
SANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs)
Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs) ABSTRACT Brian L. Tripp, PE, BCEE, 1 Jeremy Brashears, PE, 1 & Mark Fisher, PE, 2 1 WK Dickson
Cambridge Wastewater Treatment Facility
Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
Executive Summary Consent Decree
OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate
Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor
Update on the Metro Nashville Consent Decree Program Scott Potter Ron Taylor 1 Why We Are Here Planned actions to meet Clean Water Act The types of projects that will be constructed The impacts of these
Sanitary Sewer Overflow(SSO)/Bypass Notification Form Instructions
Bureau of Resource Protection Wastewater Management Progr Sanitary Sewer Overflow(SSO)/Bypass Who must notify DEP about an overflow or bypass, and when? Any owner or operator of the following facilities:
Sewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
How To Improve Water Quality In East Pacificon
WATER STORIES EAST PROVIDENCE, RI We are proud to partner with East Providence on this very important project. Together we developed an innovative, sustainable solution that promotes public, economic
CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities
CHAPTER 10-2 SEWAGE COLLECTION AND TREATMENT FACILITIES Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities 1.1 SANITARY SEWER COLLECTION SYSTEM The City of Washougal operates
DEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
What Is An On-Lot Sewage Disposal System?
What Is An On-Lot Sewage Disposal System? Most rural homes and communities in Monroe County are not served by a public sewer system. In order to dispose of the wastewater (sewage) generated by homes and
Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering
DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009
APPLICATION FOR ADDITION OF TRANSPORTED WASTES IN WASTEWATER TREATMENT FACILITIES Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 This application is to be
Bay Park Sewage Treatment Plant Super Storm Sandy Recovery
County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park
Wastewater Treatment System Rehabilitation Project
Wastewater Treatment System Rehabilitation Project An overview The City of Shelton, WA / January 2010 Before After SHELTON WASTEWATER TREATMENT IMPROVMENTS PROJECT Enabled by extensive grant-funding, loans
Number 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
City of Monroe Wastewater System Report
2013 City of Monroe Wastewater System Report Protecting the environment is a top priority for the City of Monroe Water Resources Department. We are pleased to present our annual Wastewater System Report.
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
Example Operation, Management and Emergency Response Plan (O, M and ER Plan) for Northfield Village WWTF
Example Operation, Management and Emergency Response Plan (O, M and ER Plan) for Northfield Village WWTF The attached Example O,M and ER Plan was developed by Chief Operator Patrick DeMasi and Assistant
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
HOW A SEPTIC SYSTEM FUNCTIONS
New Milford Septic Services Old Fashioned Service Modern Technology Since 1940 Licensed Septic Installers and Cleaners 226 Pumpkin Hill Road New Milford, CT 06776 860-354-5492 HOW A SEPTIC SYSTEM FUNCTIONS
Tim Schneller, P.E. GBA Engineers and Architects
Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.
SANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
California Wastewater
Abridged Edition L A Y P E R S O N S G U I D E T O California Wastewater Prepared by the Water Education Foundation Contents The Layperson s Guide to California Wastewater is prepared and distributed by
An Equal Opportunity Employer
The ARAMARK Tower 1101 Market Street Philadelphia, Pennsylvania 19107-2994 Howard M. Neukrug, P.E. Commissioner SEWAGE FACILITIES PLANNING FOR DEVELOPMENTS LOCATED WITHIN THE CITY OF PHILADELPHIA The Pennsylvania
Unauthorized Discharges and Sanitary Sewer Overflows
TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental
NEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
NPDES Permit No. IL0021695. Notice No. JCH:12012302.bah. Public Notice Beginning Date: November 27, 2012. Public Notice Ending Date: December 27, 2012
Notice No. JCH:12012302.bah Public Notice/Fact Sheet Issued By: Public Notice Beginning Date: November 27, 2012 Public Notice Ending Date: December 27, 2012 National Pollutant Discharge Elimination System
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.
SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
Homeowner s Guide to Maintaining a Sewage Treatment System
Homeowner s Guide to Maintaining a Sewage Treatment System Warren County Combined Health District 416 South East Street Lebanon, OH 45036 513-695-1220 Sewage Treatment Systems Septic Tank and Soil Absorption
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
BASEMENT FLOODING. Prevention Guide for. Homeowners
BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result
How do storm water and wastewater networks function together with the wastewater treatment plant? Theo G. Schmitt, Kaiserslautern University (Germany)
Urban FG Siedlungswasserwirtschaft Water Management KfWInternational Conference on Efficient Use of Energy in Water Supply and Wastewater Disposal in Southeastern Europe and Turkey November 26-27, 2013
Sanitary Sewer Overflows Response to EPA Rule Making
Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY
City of Charlottetown Wastewater Treatment Expansion & Upgrading
City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and
Frequently Asked Questions about Septic Systems
What is a septic tank? Where is my septic tank located? Do septic tanks last forever? What should and should not go into my septic tank? How can I tell if my septic tank is working properly? Why should
Sanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT
INSTRUCTIONS/INFORMATION HOW TO PROPERLY FILL OUT THE INDIVIDUAL MECHANICAL TREATMENT PLANT WARRANTY INSPECTION / SERVICE REPORT Section 1. SITE INFORMATION: All fields in this form must be filled in accurately
Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN
Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN I. PURPOSE The Municipality / Authority has structured this Sanitary Sewer Overflow Response Plan to satisfy
Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and
Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection
Emerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
William E. Dunn Water Reclamation Facility. Facility Overview & Information
William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa
Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems
Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values
ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
NPDES Permit No. IL0020737. Notice No. SKT:13120601.bah. Public Notice Beginning Date: April 9, 2014. Public Notice Ending Date: May 9, 2014
Public Notice/Fact Sheet Issued By: Notice No. SKT:13120601.bah Public Notice Beginning Date: April 9, 2014 Public Notice Ending Date: May 9, 2014 National Pollutant Discharge Elimination System (NPDES)
Technical Feasibility of a Wet Weather Flow Treatment Facility
Wastewater Master Plan DWSD Project No. CS-1314 Technical Feasibility of a Wet Weather Flow Treatment Facility Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: Tetra
THE SANITARY SEWER SYSTEM
THE SANITARY SEWER SYSTEM The Water Services Department is responsible for the planning and construction of sewers, pump stations, and treatment facilities serving Kansas City and certain surrounding areas.
Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows
Scattergraph Principles and Practice Characterization of Sanitary Sewer and Combined Sewer Overflows Kevin L. Enfinger, P.E. and Patrick L. Stevens, P.E. ADS Environmental Services 494 Research Drive Huntsville,
St. John s Harbour Clean-Up Phase 2. Project Description
St. John s Harbour Clean-Up Phase 2 Project Description February 2003 NEWFOUNDLAND DESIGN ASSOCIATES LIMITED 1 Introduction The City of St. John s, the adjoining City of Mount Pearl and the Town of Paradise
TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS
TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS Prepared for The Town of Lakeshore 419 Notre Dame Street, Belle River Ontario
TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program
TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates Private Sewer Lateral Inspection and Repair Program SEWER SYSTEM- BACKGROUND 116 miles of gravity sanitary sewer pipelines 1 mile of force main
