SKY S RESPONSE TO OFCOM S CONSULTATION ON NEW SPECTRUM FOR AUDIO PMSE

Similar documents
Response of Channel 5 Broadcasting Ltd to Ofcom s Consultation on Securing Long Term Benefits from Scarce Spectrum Resources

Issue 1. BT response to the Ofcom consultation on Securing long term benefits from scarce spectrum resources a strategy for UHF bands IV and V

The 700 MHz Band. Impact of the UHF spectrum reallocation on TV markets in Europe. 38 th EPRA meeting, Vilnius, October 2013

Statement on proposals for the Freeview HD genre and on amendments to Digital UK s LCN Policy

AGENDA. Coffee break (11:30-11:50)

RSPG public consultation related to the draft opinion on EU spectrum policy implications of the digital dividend.

FOXTEL Response. Friday Septemer 3, Australian Communications and Media Authority Five-year Spectrum Outlook

Decision to make the 700 MHz band available for mobile data - statement

Driving the evolution of digital terrestrial television

REPORT TO THE EUROPEAN COMMISSION RESULTS OF THE WORK OF THE HIGH LEVEL GROUP. By Pascal Lamy ON THE FUTURE USE OF THE UHF BAND ( MHZ)

Spectrum management strategy. Ofcom s strategic direction and priorities for managing spectrum over the next 10 years

THE USE OF BAND III IN EUROPE

ARD and ZDF welcome the opportunity to present their comments on the Consultation document.

Variation of 900 MHz, 1800 MHz and 2100 MHz Mobile Licences A consultation

Ministry of Technology, Communication and Innovation

Mobile TV: The time to act is now

DAB Digital Radio Broadcasting. Dr. Campanella Michele

AN INTRODUCTION TO DIGITAL MODULATION

Report on Collective Use of Spectrum (CUS) and other spectrum sharing approaches

Intellect response to the Ofcom Consultation:

Strategic Review of Satellite and Space Science use of Spectrum. Satellite workshop 3 July 2015

Report to the Secretary of State (Culture, Media and Sport) on the operation of the media ownership rules listed under Section 391 of the

Shure WireleSS Frequency Guide

Why and how Germany is going HEVC! Herbert Tillmann

9 The continuing evolution of television

Proposal to give a Direction setting must-carry obligations on the terrestrial transmission network Consultation document

Below we provide general comments on the use of the C-band and, more specifically, on the UKE proposals.

Television Access Services for People with Sensory Impairments. July 2010

UK Radio Licence Interface Requirement 2036 For Mobile Asset Tracking Services

Case studies on migration from Analogue to DTTB of Hungary

Ministry of Information and Broadcasting Services

The Ministry is seeking feedback on demand for four Digital Terrestrial Television Licence sets that the Government is proposing to allocate.

Ofcom s Third Review of Public Service Broadcasting Terms of Reference

ARD and ZDF Comments on the Draft RSPG Opinion on the Radio Spectrum Policy Programme

Before the FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C ) ) ) ) ) ) ) COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

The Co-Existence of Broadcasting and Mobile Services

New markets HEVC DVB T2 Germany. Herbert Tillmann

Benefits of digital broadcasting

ETNO Reflection Document in reply to the EC consultation on Future networks and the Internet early challenges regarding the Internet of things

Superfast Cornwall Extension Programme To further extend coverage of Superfast Broadband across Cornwall

Joint response to Ofcom s consultation on cognitive access to the interleaved spectrum

Response to Ofcom s Programme-making and Special Events Future Spectrum Access Consultation

The GSMA strongly support Denmark licensing the / MHz band 2 in a manner that will accommodate future use of

Property rights in UHF and 2.6GHz spectrum

The role of independent producers and independent production quotas in local TV

What is ? Why are standards important?

Technical Advisory Group

Improving spectrum access for consumers in the 5 GHz band

UK Interface Requirement 2063

Radio-frequency channel arrangements for high-capacity fixed wireless systems operating in the lower 6 GHz (5 925 to MHz) band

HMG Review of Business Broadband. Call for evidence MAY 2016

BBC Trust Distribution Framework for BBC Services

TR 036 TV PROGRAMME ACCOMMODATION IN A DVB-T2 MULTIPLEX FOR (U)HDTV WITH HEVC VIDEO CODING TECHNICAL REPORT VERSION 1.0

Delta College Frequently Asked Questions About The FCC Broadcast Spectrum Incentive Auction

Data Communications Company 2 nd Floor, Ludgate House 245 Blackfriars Road London, SE1 9UF

Local and Ultra Local Content in Broadcast Mobile TV

4G: Fourth generation mobile phone standards and technology. Provides faster mobile data speeds than the 3G standards that it succeeds.

Comux UK Ltd. Fixed Services Offer. 12 September Birmingham Science Park Aston Faraday Wharf Holt Street Birmingham B7 4BB UK

ST HELENA TELECOMMUNICATIONS ORDINANCE, CAP 106 LICENCE TO OPERATE BROADCASTING STATIONS AND TO BROADCAST SERVICES (TELEVISION BROADCASTING LICENCE)

DIGITAL SATELLITE TELEVISION - SPECTRUM MANAGEMENT (PAPER D)

Telephone Numbering Safeguarding the Future of Numbers

Ofcom and Internet Technology

Section 3. The growth of digital television 3

Whitepaper n The Next Generation in Wireless Technology

The Importance of the Global C-band Allocation for Satellite Communications Services

Planning for ac Adoption with Ekahau Site Survey 6.0

LLAWN03, Llandudno (image: Paul Sampson) Arts Grants for Organisations. Getting Started

CUSTOMER SERVICE SATISFACTION WAVE 4

How To Help The Internet Of Things (Iot) Work With The Government

DIGITAL TELEVISION AND RADIO SERVICES IN IRELAND AN INTRODUCTION

LTE on Shared Bands (LEONARD)

4G LTE Opportunities & Challenges in DTT arena

Laying the foundations for next generation mobile services Update on bands above 6 GHz

The centre of government: an update

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS No. [XXXX]

COMPATIBILITY AND SHARING ANALYSIS BETWEEN DVB T AND RADIO MICROPHONES IN BANDS IV AND V

DRAFT Local Digital Television Programme Service (L-DTPS) licence application form

2.3 and 3.4 GHz spectrum award

Cognitive Radio / TV White Space Standardisation

OPERATIONAL CASE STUDY PRACTICE EXAM ANSWERS

EU energy and climate policies beyond 2020

立 法 會 Legislative Council

RADIO SPECTRUM POLICY GROUP. RSPG Opinion on a long-term strategy on the future use of the UHF band ( MHz) in the European Union

Shared service centres

Australian Broadcasting Corporation. The Australian Media and Communications Authority

December 2006 TECHNOLOGY STORY. NOC revelation in digital revolution

98/34/EC Notification Number: 2001/0326/UK

Ministry of Economy and Sustainable Development. Digital Terrestrial TV Broadcasting Switchover Action Plan and Recommendations

Our Ref Direct Line Ext Date

TECHNICAL INFORMATION FOR FREQUENCY PLANNING IN-BUILDING COAXIAL CABLE DISTRIBUTION SYSTEM (IBCCDS)

Online Infringement of Copyright and the Digital Economy Act 2010 Draft Initial Obligations Code

BPI response to the Draft Ofcom Annual Plan

GUIDELINES FOR PILOT INTERVENTIONS.

Infrastructure. spectrum decisions. Telecommunication Development Sector

Consultation on salary sacrifice for the provision of benefits in kind

1. What are your views on Ofcom s proposed priorities for 2007/2008?

Siemens Energy & Automation. structured. WIRING Product Training Series: Advanced Video Session 3

Guidance regarding the licensing position on the provider of a service and the sub-letting of capacity

Future use of the MHz band. Report for Abertis, Arqiva, BBC, BNE, EBU and TDF

The UK Spectrum Strategy. Delivering the best value from spectrum for the UK

Transcription:

1. 1.1 1.2 1.3 1.4 1.5 2. 2.1 2.2 2.3 2.4 Introduction SKY S RESPONSE TO OFCOM S CONSULTATION ON NEW SPECTRUM FOR AUDIO PMSE Sky welcomes the opportunity to comment on Ofcom s consultation on new spectrum for audio PMSE ( the consultation ). Sky is an extensive user of PMSE equipment in the creation of our original programming content which makes an important contribution to the fulfilment of a number of Ofcom s duties, including ensuring the availability of a wide range of television services which are of high quality and appeal to a variety of tastes and interests, and to media plurality. The reduction in available spectrum as a result of the clearance of the 700 MHz band will constitute a significant change for PMSE users over a relatively short time period. Moreover, this upheaval comes less than five years after the completion of digital switchover, a process which also necessitated largescale equipment replacements. Sky is broadly supportive of Ofcom s decision to make the 700 MHz band available for mobile use. Such a change is likely to result in a more efficient use of spectrum, and will help meet growing demand for mobile data. However, the consequences of the clearance for PMSE users will have to be closely and carefully managed. Sky has expressed concern on a number of occasions in 2015 to senior Ofcom officials about the lack of any clear roadmap which will enable PMSE operations to be maintained in future. While the consultation s proposals for alternative spectrum are welcome, Ofcom must urgently prioritise and lead a comprehensive industry-wide programme of work to manage and fund the transition of PMSE users into new bands. Sky would be a willing and active participant in such a programme. Clearing the 700 MHz band will have a significant impact on PMSE users particularly busy studio complexes such as Sky s As the consultation acknowledges, making the 700 MHz band available for mobile use will significantly reduce the spectrum available for certain PMSE uses. The available spectrum for wireless microphones, IEMs and stage intercoms will be reduced by around 30% at the very least. Depending on finalised DTT network plans, some locations will experience an even greater loss of access. Ofcom s analysis of the impact of this change focuses, in the main, on special events rather than programme making as a whole. For example, the spectrum supply use cases examined in paragraph 3.16 consider high demand sporting, theatre and live music events that may not be served by sufficient interleaved spectrum following change of use of the 700 MHz band. However, Ofcom s analysis fails to consider the impact of reduced spectrum availability on a busy TV studio complex such as the one Sky operates in Osterley. The impact of the 700 MHz clearance will be just as significant if not more so on these operations as for large special events with high PMSE demand. Sky Studios currently utilises 26 UHF channels for PMSE audio equipment out of the 40 channels allocated in the 470-790 MHz frequencies. Clearance of the 700 MHz band will result in at least 13 UHF channels no longer being available for use, reducing the total available channels that current equipment can work in to 27. With DTT broadcasting in some of these channels and additional protection requirements, it is likely that less than 19 channels will remain available for PMSE use. Not

only would this would prevent any growth in PMSE use in our studio complex 1, it would also place our existing activities under severe strain even after mitigating steps were taken. 3. 3.1 3.2 3.3 Ofcom s proposals for mitigation require immediate action if they are to be effective The consultation examines whether PMSE audio applications could share spectrum from the 960-1164 MHz and 1529-1559 MHz bands with incumbent users on a regional basis. Of the two, Ofcom s preferred choice is the lower 960 1164 band because of its proximity to spectrum currently used for PMSE audio and the likelihood of its current designation remaining. Ofcom anticipates that, after applying protection for the incumbents by avoiding frequencies in the locations that they are used, the spectrum which could be made available will be sufficient to enable PMSE audio operations to continue. Sky broadly agrees with Ofcom s analysis around the relative suitability of these bands for PMSE audio equipment, and their potential for mitigating the reduction in the availability of UHF spectrum. We provide some specific comments at Annex A. However, identifying potential replacement bands is only the first step in what will be a significant mitigation programme. Sky is deeply concerned that additional measures which will be crucial components of effective mitigation have yet to be sufficiently advanced. Cost of transition to PMSE users 3.4 3.5 3.6 3.7 The costs of replacing existing PMSE equipment will be material. At present, none of Sky s existing audio PMSE equipment has the ability to operate at the higher frequency proposed of 960-1164 MHz. Indeed, some of the equipment owned by Sky does not have the capacity to work in the UHF band that remains after the 700 MHz clearance 2. A significant portion of our inventory will therefore need to be replaced. Alongside these costs, Sky is likely to face additional and therefore unplanned expenditure due to associated changes in broadcast infrastructure. Sky notes that in Ofcom s statement on 700 MHz, it estimated equipment replacement costs of between 13m-21m, with additional costs of 10m-13m relating to other aspects such as staff training and recruitment. The consultation states that decisions on any funding for PMSE users affected by the 700 MHz programme are a matter for Government 3. Sky notes that the Government announced in its Autumn Statement that 550m of funding will be made available to make the 700 MHz band available for mobile use. Furthermore, it is notable that in previous changes of spectrum use that have impacted on PMSE, Ofcom itself gave funding commitments. For instance, in deciding to clear the 800 MHz band, Ofcom committed to provide funding for the move of PMSE users from channel 69, stating that these commitments to minimising disruption [are] crucial to making it possible for PMSE users to continue providing important services 4. Sky observes no particular difference in circumstances between the clearance of the 800 MHz band and the future 700 MHz programme, and therefore considers that a similar funding arrangement should be made available. Additionally, Sky notes that this previous approach was based on the estimated life-cycle of equipment. Much of the existing equipment has only recently been purchased as a result of previous changes in spectrum allocation. 1 Sky has plans to re-locate the current Sky News studios more centrally in our Osterley studio complex, which would necessitate a 5-10% increase in our PMSE spectrum requirements. 2 Sky has shared detailed information with Ofcom previously outlining our current PMSE inventory we would be happy to share an update of this on a confidential basis. 3 The consultation, paragraph 5.8. 4 Paragraph 2.3, Clearing the 800 MHz band, Ofcom, August 2010. 2

European harmonisation 3.8 3.9 3.10 3.11 3.12 3.13 The consultation states that Ofcom has already engaged with other European administrations, sharing its proposals for alternative bands for audio PMSE. Sky considers that harmonisation is crucial in ensuring there is sufficient certainty for manufacturers, and is concerned at the impact that delays in this area could have. As Ofcom would no doubt acknowledge, European acceptance will not be a straightforward process. It will require detailed, careful study of the new spectrum to ensure it is clean enough (i.e. free from interference) to provide the extremely high level of reliability required for PMSE operations. Manufacturers are likely to require economies of scale across a number of markets in order to commit to developing new equipment that will work at higher frequencies. For this reason, greater European harmonisation with Ofcom s proposals is crucial. On the basis of previous harmonisation processes, it is reasonable to expect a period of up to two years to secure European agreement on spectrum changes (i.e. early 2018). If manufacturers conclude that there is a market, equipment re-design and approval could take another two years (i.e. with products being brought to market by early 2020), although it is possible that some of this process could run in parallel with the European spectrum agreement process. Nevertheless, Sky notes that Ofcom s proposed timetable for 700 MHz clearance may begin as early as 2019. There is consequently a significant risk that replacement equipment is not available in the necessary volumes as the clearance programme begins. A flexible transitional arrangement would go some way to mitigating this risk. Sky notes the innovative approaches to dynamic spectrum allocation that Ofcom has proposed as part of its work on TV white spaces, including the use of geo location databases. Ofcom could further its duties with respect spectrum efficiency by ensuring that any cleared 700MHz spectrum continued to be made available post-2019 through a geo location database until such time as it is deployed for mobile services. Ofcom s mitigation programme 3.14 3.15 In summary, Sky has significant concerns about the feasibility of this process. We agree that at a high level the bands that Ofcom have identified are appropriate and could serve to mitigate the loss of the 700 MHz bands. But without certainty on costs, buy-in from the manufacturers, or timely European approval and harmonisation, a large-scale change programme appears challenging to deliver by the time the clearance programme commences. This puts current approaches to programme making in jeopardy. Sky considers that Ofcom should commence detailed implementation work as a matter of urgency, establishing a dedicated joint group to manage the transition. Such a group should include defined workstreams, inter alia: Interference planning European harmonisation Manufacturer engagement A funding mechanism for replacement equipment Additional research and development as required Transitional arrangements prior to deployment 3

3.16 4. 4.1 4.2 4.3 4.4 Ofcom should adequately resource this joint group to ensure it is active in its engagement with industry and other stakeholders alike. In managing this transition, it will be vital that Ofcom and Government maintain an ongoing dialogue with PMSE users. Ofcom should also incentivise the DTT platform to seek greater spectrum efficiency Ofcom has a duty to promote the efficient management of radio spectrum. Sky considers that an appropriate policy objective would, in this context, be to explore and incentivise methods of reducing the amount of spectrum that the DTT platform currently uses as part of the wider 700 MHz programme. For example, efficiencies could be delivered through technological developments, be that a wider adoption of the existing transmission standard of DVB-T2/MPEG 4, or new video compression standards such as HEVC. Similarly, more innovative approaches to network planning such as Single Frequency Networks could be explored as another way of increasing the amount of spectrum available for other purposes. Sky would support any industry moves to adopt new technological standards. But there are limited incentives for multiplex operators to seek greater efficiencies, so Ofcom s involvement may be necessary to keep the UK competitive internationally. In particular, Ofcom s current policy of setting prices for DTT spectrum only on the basis of cost recovery patently does nothing to incentivise multiplex operators to adopt more efficient technology standards. Any measures which deliver a more efficient DTT platform would go some way to alleviating the impact on PMSE. With a 30% reduction of available channels proposed as part of this move, any additional spectrum in these bands would have significant incremental benefits. Sky December 2015 4

ANNEX A Comments on Ofcom s analysis of possible future bands for PMSE Overall, Sky considers that the analysis carried out by Ofcom and its consultants JCSys of possible future bands for PMSE looks sound and convincing. However, there are a number of points that Sky considers require clarification or further consideration: There is confusion in terms over channels it s used for 8 MHz audio channels in paragraph 2.13, whereas in paragraph 4.37, Table 5 refers to 1 MHz channels. In paragraph 3.20 there is some analysis of the variation in spectral efficiency between PMSE deployments. This analysis does not note that this inefficiency is largely to avoid self-interference in larger PMSE installations through inter-modulation products. Paragraph 4.25 provides a brief description of the JTIDS (Joint Tactical Information Distribution System for military applications) typically being used at 10,000 feet or higher. However, given the need for ultrareliable operation, Sky does not consider that this provides the level of certainty necessary to ensure that there will be no interference around Sky s studio in Osterley, or central London near the Houses of Parliament. Safety critical applications that use the 960-1164 band are covered in paragraph 4.41, along with the proposed manual system for securing PMSE allocations which is similar to that used today. Given the recent emergence of geo-location technology it is unclear why this is not being considered, and indeed why these bands could not also be considered for TV white space deployment.