CODE OF PRACTICE FOR CITY SERVICES & LAND DEVELOPMENT ENGINEERING STANDARDS MANUAL SECTION 2 EARTHWORKS

Similar documents
SECTION SITE PREPARATION

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Guide to Subdivision and Land Development

3. QUALITY ASSURANCE REQUIREMENTS

SERVICES 2015 ISO 18001

NRC INSPECTION MANUAL

SECTION EARTH MOVING

Geotechnical Building Works (GBW) Submission Requirements

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

Daryl Henehan, Consent Planner Natural Resources. JOHN AND RIA WILMS - REPORT REP Report prepared for hearing of 3 May 2010

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Architectural Processing and Inspections for Home Mortgage Insurance

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

Work Type Definition and Submittal Requirements

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

Definition of Tower from the Bradley County Zoning Resolution

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Planning for Casey s Community

February 4, Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010)

Guidelines for On-site Wastewater Management

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No M (Supersedes Report No.

Appendix C. Municipal Planning and Site Restoration Considerations

CIVIL ENGINEERING ASSOCIATE, 7246

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

The information and materials contained in this disc are provided as is and as available.

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations

Stormwater/Wetland Pond Construction Inspection Checklist

Trenching and Excavation Safety

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

720 Contour Grading. General. References. Resources. Definitions

CITY OF SUBIACO. PLANNING POLICY 1.4 (September 2013) PUBLIC NOTIFICATION OF PLANNING PROPOSALS

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

National Diploma in Surveying (Level 6) with an optional strand in Mine Surveying Level 6

G. Common Defects in Buildings - Leakage

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

SECTION PAVEMENT DESIGN

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Part 3: Quality Assurance

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL

Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors

SUBDIVISION AND DEVELOPMENT REGULATION

$tate of \!tennessee

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Assessment. Ian Uglow Technical Director, SLR Consulting 7 th October 2010

This plan forms one part of a suite of Asset Management Plans that have been developed:

RESUME Lee A. Knuppel, P.E.

House Code. House Code

Practice Note

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

Riprap-lined Swale (RS)

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

BUILDING OR RENOVATING

Conditions of Contract

City of Shelbyville Site Inspection Checklist

Standard terms and conditions

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE. General Provisions

GEOTECH ENGINEERING and TESTING

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

Professional Engineers Providing Structural Engineering Services In Buildings

CIVL451. Soil Exploration and Characterization

Owner-User Pressure Equipment Integrity Management Requirements

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

Chapter 9 Remedial Measures

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

GENERAL SPECIFICATION

Drinking Water Quality Management Plan Review and Audit Guideline

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

Application Form - Contracting Firm

Excavation & Trenching Procedure

Access Track Construction Standard and Specification

Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure

C. Section TESTING LABORATORY SERVICE.

Emergency Spillways (Sediment basins)

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance

Transcription:

CODE OF PRACTICE FOR CITY SERVICES & LAND DEVELOPMENT ENGINEERING STANDARDS MANUAL SECTION 2 EARTHWORKS

2.1 SCOPE...3 2.2 PERFORMANCE CRITERIA...3 2.3 TECHNICAL RESPONSIBILITIES...3 2.4 INVESTIGATIONS AND REPORTING...4 2.5 SETTLEMENT AND SLOPE STABILITY CRITERIA...8 2.6 COMPACTION STANDARDS...8 2.7 EARTHWORKS DESIGN REQUIREMENTS...8 2.8 EARTHWORKS CONSTRUCTION REQUIREMENTS...9 2.9 EARTHWORKS COMPLETION REQUIREMENTS...9 2.10 MAINTENANCE AND REPAIRS...9 Issue 3.5 Reviewed February 2005 Section 2 Page 2

SECTION 2.0 EARTHWORKS 2.1 SCOPE The purpose of this part of the Engineering Standards Manual is to provide: a) The engineering requirements for earthworks associated with subdivision and land development projects. b) The criteria for performance. c) Methods for design and construction control. d) Methods for the assessment and protection of slope stability. e) Methods of assessing the suitability of both natural and filled ground for the founding of roads, buildings, services and other works. f) Methods for the control of erosion and siltation. This part of the standard does not provide methods for: a) Evaluation of existing natural ground or uncontrolled fill. b) Assessing retaining wall and backfill construction. c) Contractual aspects of earthfills. d) A verification method for the New Zealand Building Code Section B1. 2.2 PERFORMANCE CRITERIA Earthworks shall: Meet all criteria of the District Plan Not unnecessarily alter ground levels on the contour of the land Be sale and stable and geotechnically sound Provide an accessible building platform within each allotment of a subdivision appropriate to the zoning of the land Provide adequate foundations for roads and services Not unnecessarily alter the natural land form or interfere with natural features unless otherwise consented to pursuant to the District Plan Cater for surface and ground water flows Not generate undue nuisance from noise, dust or vegetation disposal 2.3 TECHNICAL RESPONSIBILITIES 2.3.1 Where any land subdivision or development involves bulk earthworks, the assessment of slope stability, or the detailed evaluation of the suitability of natural ground for the foundations of buildings, streets, services or other works, then a soils engineer shall be appointed by the developer to carry out the following functions: Issue 3.5 Reviewed February 2005 Section 2 Page 3

a) Prior to detailed planning of any development to undertake site inspection and such investigations of subsurface conditions as may be required. b) Before work commences to review the drawings and specifications defining the earthworks proposed, and submit a written report on foundation and stability aspects and any proposed departures from this Code and associated standards. c) Before work commences and during construction to determine the extent of further specialists soils engineering services required (including investigation and geological work). d) Before and during construction to determine the method and frequency of construction control tests to be carried out, determine the reliability of the testing and to evaluate the significance of test results and field inspection reports in assessing the quality of the finished work. e) During construction to provide regular inspection. Wwhile a daily visit might be regarded as reasonable on earthwork construction on minor projects, inspection on a nearly full time basis is often necessary on major projects. f) On completion to submit a written report attesting to the compliance of the earthworks with the specifications, and as to the suitability of the development for building construction. 2.3.2 All geotechnical investigation and completion reports shall be prepared by a Professional Engineer who is experienced in the practice of geotechnical engineering and registered under the Engineers Registration Act 1924 and who has professional indemnity insurance. 2.3.3 The owner s representative may act as the soils engineer if possessing the aforementioned qualifications and experience. 2.3.4 The construction control testing shall be carried out by a competent person, under the control of the soils engineer in a laboratory with International Accreditation New Zealand registration, or similar approved accreditation authority registration, in all relevant tests. 2.4 INVESTIGATIONS AND REPORTING Site investigations and reporting shall be carried out in accordance with: NZS 4402:1986 Methods of Testing Soils for Civil Engineering Purposes; NZS 4431:1989 Code of Practice for Earth fill for Residential Development; NZS 4404: 2004 Code of Practice for Land Urban Subdivision. Together, these documents provide a rational approach to undertaking site investigations and preparing associated reports for projects involving bulk earthworks. Issue 3.5 Reviewed February 2005 Section 2 Page 4

PHASE INVESTIGATIONS REPORTING REGULATORY 1 Preliminary Investigation* Preliminary geotechnical assessment report and sketch design 2 Comprehensive Investigation Geotechnical Investigation Report Subdivision Concept Plans and initial discussion Resource Consent Application Scheme Plan Approval (Section 223 Certificate) Engineering Design Submission and Approval Design amendments and reapprovals 3 Supplementary Investigation* Supplementary Reports and Detailed Engineering 4 Construction Observation Field reporting and information gathering and feedback to design 5 Specific Restrictions, Subdivision Release (Section Geotechnical Completion 224 Certificate) Report and As Builts 6 Performance Evaluation Supplementary Reports Ongoing reports on long term restrictions or requirements. Table 2.1 provides a typical methodology for investigations and reporting for subdivisional development. * This investigation and associated reports may be integrated with the comprehensive investigation depending on the size and impact of the proposed development. 2.4.1 PRELIMINARY INVESTIGATION 2.4.1.1 The purpose of the preliminary investigation is: a) To access the general suitability of a site for its proposed use b) To gain an appreciation of design requirements c) To ascertain possible construction difficulties d) To enable the preparation of concept reports and plans for initial discussions e) To identify obvious hazards f) To determine the requirements for a comprehensive geotechnical investigation. 2.4.1.2 The preliminary investigation should cover the following factors: a) Ownership of the land b) Regional geology c) Topography and predominant features d) Drainage and ground water regimes e) Local subsoil conditions f) Stability 2.4.1.3 The preliminary investigation should be based on: a) A visual inspection of the site b) A review of existing information - Geotechnical maps - Existing reports (where readily available) - Aerial photographs c) Local knowledge (where available) Issue 3.5 Reviewed February 2005 Section 2 Page 5

2.4.2 COMPREHENSIVE INVESTIGATION AND GEOTECHNICAL INVESTIGATION REPORT 2.4.2.1 The purpose of the comprehensive investigation is: d) To enable the preparation of a Geotechnical Investigation Report e) To identify hazards and recommend mitigating measures f) To identify special foundation and siting requirements g) To enable the preparation of a detailed earthworks design h) To enable the development of a construction methodology 2.4.2.2 The Geotechnical Investigation Report should cover the following factors: a) The factors for a preparatory evaluation (2.4.1.2) but in more detail b) Special design or construction requirements c) Special foundation requirements d) Services e) Access f) Effluent Disposal g) Non-engineered fills h) A statement of professional opinion as to the suitability of the land for the proposed development refer NZS 4404 : 1981 Appendix A. 2.4.2.3 The Comprehensive Investigation and Geot4echnical Investigation Report should be based on: a) The requirements for a preparatory report (2.4.1.2) but in more detail b) Subsoil investigation c) Slope stability analysis d) Experience from adjoining or similar projects. 2.4.3 SUPPLEMENTARY INVESTIGATIONS AND REPORTS 2.4.3.1 The purpose of a supplementary investigation is: a) To obtain specific design details, e.g. CBR s b) To analyse construction exigencies c) To make amendments to the Investigation Report 2.4.3.2 The supplementary reports should cover the following factors: a) Connections with the Comprehensive Report b) Design and construction requirements for special items such as road subgrades and retaining walls 2.4.3.3 The supplementary investigations and reports should be based on the specific requirements for the purpose. Issue 3.5 Reviewed February 2005 Section 2 Page 6

2.4.4 CONSTRUCTION OBSERVATION AND REPORTING 2.4.4.1 The purpose of construction observation and reporting is: a) To enable the preparation of an Eathworks Completion Report b) To verify the quality of construction c) To monitor the quality of construction d) To gather information Note: The supplementary and construction reports should be written as addenda to the investigation or completion reports as appropriate 2.4.4.2 Construction reports should cover the following factors: a) Earthworks volumes b) Compaction tests and laboratory reports c) General observations d) Construction procedures 2.4.4.3 Construction observation and reporting should be based on: a) Regular inspections and testing b) Laboratory test results 2.4.5 EARTHWORKS COMPLETION REPORT 2.4.5.1 The purpose of an Earthworks Completion Report is: a) To confirm and elaborate on the findings of the Investigation Report. b) To describe all the activities associated with the extent of earthworks. c) To provide a professional statement of adequacy and compliance. d) To confirm and define specific site requirements. 2.4.5.2 Earthworks completion reports should contain: a) A description of construction activities. b) A description of the control testing (and results) carried out. c) Identification and re-evaluation of situations arising during construction. d) Descriptions of specific foundation and siting limitations or requirements. This may result in notices being registered on the titles of the affected sites, the earliest possible notification of these requirements should therefore be given. e) A registered engineers certification of the works. Issue 3.5 Reviewed February 2005 Section 2 Page 7

2.5 SETTLEMENT AND SLOPE STABILITY CRITERIA Settlement and slope stability criteria shall be assessed in accordance with section 2.5.3.2 of NZS 4404:1981, which describes the settlement, bearing capacity, shrinkage and expansion and slope stability factors that need to be determined in providing a suitable foundation platform. 2.6 COMPACTION STANDARDS Compaction standards shall be in accordance with Section 205.5 of NZS 4404:1981, which describes the relative compaction, air voids, shear strength, relative density and field relative compaction tests that need to be carried out on fill material during the investigation and construction phases of a project. 2.7 EARTHWORKS DESIGN REQUIREMENTS 2.7.1 Earthworks design shall be carried out in accordance with the requirements of the Geotechnical Investigation Report. 2.7.2 Earthworks designs shall show: a) Existing and proposed contours b) The extent of works c) Underfill drainage d) Rock profiles where appropriate e) Stockpiling areas f) Stabilising measures g) Existing services 2.7.2 MINIMUM REQUIREMENTS: a) Slopes steeper than 1 vertical to 5 horizontal shall be subject to specific design. b) Works within adjoining properties shall require the approval of the affected landowners. c) Ponding or flow restrictions to natural stormwater runoff shall not be permitted, unless by specific agreement for temporary situations. d) Cuts and fills of over 4.0m shall be subject to specific design including the type of underfill drainage required to cope with the higher lands. e) Existing services affected by earthworks shall be evaluated for adequacy and shall be upgraded or relocated as necessary. Issue 3.5 Reviewed February 2005 Section 2 Page 8

2.8 EARTHWORKS CONSTRUCTION REQUIREMENTS Earthworks shall be carried out in accordance with the provisions of the District Plan, TP90 (ARC) and NZS 4404:2004, which covers: a) The specifications for clearing, stripping, stockpiling, benching, cuts drainage, ground water control and inspections. b) The fill construction requirements for placement, batters and testing. c) Temporary drainage and erosion control during construction. d) Inspection and quality control requirements and methodology. 2.9 EARTHWORKS COMPLETION REQUIREMENTS Upon completion of the earthworks the following details shall be provided to the Senior Subdivisions Engineer. a) A geotechnical completion report including a statement of professional opinion as to the suitability of the land for its intended use refer NZS 4404:2004 Appendix B. b) A list of sites with particular foundation requirements or restrictions that require notices to be registered on their titles. c) As built plans showing - depth of fill contours - finished contours - subsoil drainage - restricted areas (consent notices or similar) 2.10 MAINTENANCE AND REPAIRS 2.10.1 SCOPE This section covers the maintenance and repair requirements relating to land forms and associated structures. Most repairs and maintenance in this section will not be carried out by Council or under its supervision. 2.10.2 SLIP, SLUMPS, FALLS 2.10.2.1 Any sudden persistent or unusual ground movements should be notified to a Customer Care Engineer. 2.10.2.2 The ground movement shall be inspected by Council officers who shall make recommendations on the next steps to be taken, whether further investigation or remedial works are required. 2.10.2.3 Depending upon the nature of the ground movement the Service Management Manager shall decide whether the remedial works are to be undertaken by the Council or affected landowners. Issue 3.5 Reviewed February 2005 Section 2 Page 9

2.10.2.4 Retaining structure, drainage and excavations may be subject to obtaining a building consent. 2.10.3 RETAINING STRUCTURES 2.10.3.1 Repairs to retaining structures should be carried out under close control and may be subject to obtaining a building consent. 2.10.3.2 The maintenance of retaining structures should not involve more than clearing of overgrowth and making sure that the drainage systems are functioning properly. 2.10.4 SUBSOIL DRAINAGE 2.10.4.1 The failure of underfill or subsoil drains could result in significant alterations to the ground water regimes and subsequently cause potentially disastrous slope failures. 2.10.4.2 Upon notification of a potential ground water problem a Council officer shall inspect the site and make recommendations on the next steps or whether further investigation is required. Where possible, subsoil drainage outlets shall also be inspected. 2.10.4.3 All remedial works on subsoil drainage shall be subject to specific design and approval. Issue 3.5 Reviewed February 2005 Section 2 Page 10