MUELLER A-20806/A ADJUSTABLE VERTICAL INDICATOR POST STARTING YEAR DATE 2011

Similar documents
Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

INDICATOR POST STYLE 2945 A TELESCOPING BARREL ASSEMBLY UL AND FM APPROVED

Fire Hydrant Troubleshooting

WE-350 Series ¼ Turn Electric Actuator

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT

Mueller B-101 and A-3 Drilling and Tapping Machines

Installation Instructions S

! WARNING. Before using product, read and understand instructions.

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Installation Instructions

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

2100 AD Mirror Elevator Ball Nut Replacement Procedure

FullFloXF. 2-Way and 3-Way Diverter Valve and Check Valve. Installaton and Operation Instructions

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

American- Darling 5¼" B-84-B-5.

TECHNICAL DATA. Dry 122a. November 12, 2013

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

TD01211 PIN: NX nd Edition. Water Motor Alarm MODEL: NX010 TECHNICAL DATA

CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

ATS Overhead Table Shelf System INSTRUCTION MANUAL

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M (Angle) Schematic. Standard Components

MP8000 Series Pneumatic Valve Actuators

Overview PARTS LIST. B. Lever mounting base C. Flush handle assembly D. Grey/Blue float stop E. Grey float (Full Flush) F. Flush valve washer

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

DYNA RIDER FOOTBOARD KIT

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

Sprinkler Guards Model C Model D

Fisher 249 Caged Displacer Sensors

Mechanical Joint Restraints

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Technical Data. Installation

PRESSURE REDUCING CONTROL VALVE

Slide the new steering column shaft through the steering column from the driver compartment.

Stainless Steel Single and Dual Circulation Kits

Product Manual. CVS Type 67AFR Filter Regulator. Introduction. Installation. Description

NEWCO VALVES Newmans Inc., Newmans Valve Ltd. NEWCO/OIC Cast Valve Operation & Maintenance Manual

TWO-WAY DIVERTER WITH THREE-WAY HAND SHOWER

Easy Tool Retracting System CMC-SR2159ER36

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

4077 AIRPARK DRIVE STANDISH, MICHIGAN PHONE FAX

Sprinkler Identification Numbers

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

4. Combi valves. 7. Fire hydrants. 8. Check valves. 9. Air valves

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

SureSite Magnetic Liquid Level Indicator

758 Heavy-duty Ratchet Guy Wire Cutter

RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, 1 Inch and 2 Inch (DN25 and DN50) for Dual-Purpose Residential Water Supply General Description

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW

Gripper Kit for the Boe-Bot Robot (#28202)

BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS

Installation Instructions

SECTION DUCTILE IRON PIPE AND FITTINGS

SWIM N DUNK CHALLENGE RESIDENTIAL BASKETBALL GAMES And COMMERCIAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

In-Ground Basketball System Owners Manual

AMPSEAL* Automotive Plug Connector and Header Assembly

Fisher CV500 Rotary Globe Control Valve

POWERS Controls No. 4 Pneumatic Damper Actuator

Rollator Cane and Brake Replacement SAFETY SUMMARY (CONTINUED)

TS93 EMR T/PT/TDE. Surface applied door closer

Strut Spring Compressor

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

INSTALL/REMOVAL INSTRUCTIONS: WINDOW LIFT MOTOR

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Rebuild Instructions for and Transmission

OPERATING INSTRUCTIONS AND PARTS LIST FOR U U UNDERGROUND HOSE REELS

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List

Toroidal Conductivity Sensor

Operating Instructions

Front axle components, overview

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

2.4M SERIES 1241 ANTENNA

BUTTERFLY VALVES. An industry leader in underground and in-plant applications. STYLE STYLE Consult factory for sizes

TYPE E Main Valve Sizes 3 /8 through 12

Trash Pumps Models: 56200, , 56201, , 56300, , 56301,

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

QT Residential Blower Metal Residential Blower

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

Front brakes (FN- 3), servicing

INSTALLATION INSTRUCTIONS

IMPACT SPRINKLER TROUBLESHOOTING GUIDE

Model SW-20 and SW K-factor Extended Coverage Ordinary Hazard Horizontal Sidewall Sprinklers (Standard Response) General Description

BUTTERFLY VALVES. An industry leader in underground and in-plant applications. STYLE STYLE Consult factory for sizes

Series MJC Multiple Jet Controls DN20, DN25, DN40, and DN50, 12 bar BSPT Inlet & Outlets Threads General Description.

PLUMBING VALVES HOUSTON ORLANDO GREENVILLE 800/ / / TOTAL MAINTENANCE SOLUTIONS

Transcription:

INSTALLATION INSTRUCTIONS MUELLER A-20806/A-20807 STARTING YEAR DATE 2011 GENERAL DESCRIPTION Vertical Indicator Posts (Ref. Figure A) are designed to operate non-rising stem (inside screw) gate valves, which are used to control an underground water supply to automatic sprinkler, water spray deluge, foam-water deluge, or standpipe fire protection systems. They permit operation of underground valves while providing an above ground visual indication as to whether the valves are open or shut, in addition to a means for locking the valves in a particular position. Indicator posts provide for valve operation from outside of the protected property and, therefore, the opportunity for more prompt valve operation in an emergency situation. Model A-20806/A-20807 Indicator Posts feature a telescoping Stem that can be adjusted to its final position without field cutting of the Stem. The telescoping Stem also permits: easier setting of the OPEN and SHUT Target Plates (before the Post is extended to its final position); easier adjustment of the post length during the initial installation; and, ready re-adjustment of the post length, if there is a modification in the location of the final grade. A-20806 Indicator Posts will accommodate 4 through 14 inch size post indicator valves (PIV) requiring 14 to 43 turns to open and that are listed or approved for fire protection system service. The A-20807 Post will accommodate 16-24 inch size post indicator valves requiring 49 to 75 turns to open. Indicator Posts are provided standard order for use with left hand opening valves; however, they may be special ordered for use with right hand opening valves or converted in the field for use with a right hand opening valve by changing the left hand opening Post Head to a right hand opening Post Head. Indicator Posts accept direct attachment of a 1/2 inch NPT mounting electric supervisory switching device which can be used by proprietary and central stations to monitor the open position of the Indicator Post. Detailed information on the attachment of the Model PCVS-2 Supervisory Control Valve Switch (supplied by customer), which has two sets of SPDT Form C contacts, is given in the Technical Data section. APPROVALS AND STANDARDS Model A-20806/A-20807 Indicator Posts are listed by Underwriters Laboratories Inc. (UL) and Underwriters Laboratories Inc. for use in Canada (C-UL). Model A-20806 Indicator Posts are approved by Factory Mutual Research Corporation. Fig. A TYPICAL INSTALLATION OF: A-20806-4 -14 POST INDICATOR VALVES A-20807-16 -24 POST INDICATOR VALVES The Model PCVS-2 Supervisory Control Valve Switch is listed by Underwriters Laboratories, Inc. and Underwriters Laboratories of Canada. It is approved by the Factory Mutual Research Corporation. The PCVS-2 listings and approval are under the name of Potter Electric Signal Company. WARNING The Model A-20806/A-20807 Indicator Posts described herein must be installed and maintained in compliance with this document, as well as with the applicable standards of the National Fire Protection Association, in addition to the standards of any other authorities having jurisdiction. Failure to do so may impair the integrity of these devices. The owner is responsible for maintaining their fire protection system and devices in proper operating condition. The installing contractor or manufacturer should be contacted relative to any questions. 1

MUELLER A-20806/A-20807 INSTALLATION INSTRUCTIONS TECHNICAL DATA Indicator Posts: The A-20806/A-20807 Indicator Post bolts directly onto the stuffing box flange of 4 through 24 inch post indicator valves (PIV) employing 2 inch operating nuts. The Bell attaches to a PIV mounting flange having four bolt holes spaced at 90 on a 10-1/2 inch diameter bolt circle. The Bell has 3/4 inch clearance holes for the mounting bolts. The A-20806 Indicator Post has a Threaded Sleeve which can readily accommodate field positioning of the OPEN and SHUT Targets for 4 through 14 inch PIVs requiring 14 to 43 turns to open. The A-20807 has a Threaded Sleeve for 16 through 24 inch PIVs requiring 49 to 75 turns to open. The A-20806/A-20807 Indicator Post is available in six different Order Lengths. Each Order Length provides for adjustment of dimension D in Figure B, as indicated in Table 3. The Post Head can be adjusted relative to the Lower Barrel by using the two Set Screws located at the base of the Upper Barrel. The Stem requires no field cutting within the indicated adjustment range of each Order Length. Tables 4a and 4b indicate the nominal trench depths which can be accommodated by each Order Length, for the 4 through 24 inch Mueller Resilient Wedge PIVs based on the typical diameter of underground pipe. For PIVs with different B dimensions, the minimum and maximum trench depths which will be accommodated by each Order Length can be calculated from the relationships given in Figure B. Standard order Posts are factory set with the OPEN and SHUT Targets positioned for use with left hand (counterclockwise) opening valves. An arrow on the Post Head indicates the left hand direction of opening. The position of the Targets may be reversed in the field, in order to accommodate a right hand opening valve, provided that the Post Head is changed to one indicating right hand opening. The Post Heads are ductile iron per ASTM B536 (Grade 64-45-12) and the Bells are cast iron per ASTM A126 (Grade B). The Cap is polypropylene. The Windows are made from plexiglass. The Lower Barrel is PVC DR14 (UL Listed). The Upper Barrel, Upper Stem, Lower Stem, Coupling, Coupling Insert, and A-20807 Wrench are carbon steel. The A-20806 Wrench and Operating Nut for both posts are ductile iron per ASTM A536. The Targets for both posts are Nylon. The A-20806 Threaded Sleeve is Nylon; the A-20807 Threaded Sleeve is Aluminum. The Post Head, Upper Barrel, and Wrench are painted red. Fig. B NOMINAL INSTALLATION DIMENSIONS FOR MODEL A-20806/A-20807 S ORDER LENGTH DETERMINATION: TO DETERMINE WHICH ORDER LENGTH IS NECESSARY (I.E., A, B, C, D, E, OR F ) FOR A GIVEN TRENCH DEPTH, FIRST CALCULATE DIMENSION D AS FOLLOWS, AND THEN SELECT THE APPROPRIATE ORDER LENGTH FROM TABLE 3 THAT WILL BEST ACCOMMODATE THE MINIMUM REQUIRED LENGTH D. D (REQ D) = TD - B - C REFER TO TABLE 4A AND TABLE 4B FOR NOMINAL TRENCH DEPTHS WHEN USING MUELLER VALVES. MINIMUM AND MAXIMUM TRENCH DEPTH DETERMINATION: THE MINIMUM AND MAXIMUM TRENCH DEPTHS WHICH WILL BE ACCOMMODATED BY SPECIFIC ORDER LENGTH CAN BE CALCULATED AS FOLLOWS BY USING THE MINIMUM AND MAXIMUM D DIMENSIONS GIVEN IN TABLE 3 TD (min.) = D (min) + B + C TD (max.) = D (max.) + B + C 2

INSTALLATION INSTRUCTIONS Table 1 Dimension B for Mueller Resilient Wedge Post Indicator Valves MUELLER A-20806/A-20807 Table 2 Dimension C - 1/2 of Pipe O.D. (Typical for underground pipe) Valve Size Dimensions in Inches B Turns To Open 4" 10.95 14 6" 14.91 20-1/2 8" 18.02 26-1/2 10" 21.62 33 12" 24.52 38-1/2 14" 29.13 43-1/2 16" 32.35 49 18" 38.35 57 20" 41.48 63 24" 47.94 75 Table 4a Nominal Trench Depths for Mueller A-20806 Resilient Wedge Post Indicator Valves Pipe Size Dimension C in Inches 4" 2.40 6" 3.45 8" 4.53 10" 5.55 12" 6.60 14" 7.65 16" 8.70 18" 9.75 20" 10.80 24" 12.90 Table 3 Dimension D Adjustment Range ORDER LENGTH MIN MAX A 17.25 39.25 B 36.00 60.25 C 57.00 81.25 D 78.00 102.25 E 99.00 123.25 F 120.00 144.25 Valve Size A B C D E F Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. 4" 2' - 7" 4' - 5" 4' - 1" 6' - 2" 5' - 10" 7' - 11" 7' - 6" 9' - 8" 9' - 4" 11' - 5" 11' - 1" 13' - 2" 6" 3' - 0" 4' - 10" 4' - 6" 6' - 7" 6' - 3" 8' - 4" 8' - 0" 10' - 1" 9' - 9" 11' - 10" 11' - 6" 13' - 7" 8" 3' - 4" 5' - 2" 4' - 11" 6' - 11" 6' - 8" 8' - 8" 8' - 5" 10' - 5" 10' - 2" 12' - 2" 11' - 11" 13' - 11" 10" 3' - 8" 5' - 6" 5' - 3" 7' - 3" 6' - 10" 9' - 0" 8' - 9" 10' - 9" 10' - 6" 12' - 6" 12' - 3" 14' - 3" 12" 4' - 0" 5' - 10" 5' - 7" 7' - 7" 7' - 4" 9' - 4" 9' - 1" 11' - 1" 10' - 10" 12' - 10" 12' - 7" 14' - 7" 14" 4' - 6" 6' - 4" 6' - 1" 8' - 1" 7' - 10" 9' - 10" 9' - 7" 11' - 7" 11' - 4" 13' - 4" 13' - 1" 15' - 1" Table 4b Nominal Trench Depths for Mueller A-20807 Resilient Wedge Post Indicator Valves Valve Size A B C D E F Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. 16" 4' - 10" 6' - 8" 6' - 5" 8' - 5" 8' - 2" 10' - 2" 9' - 11" 15' - 4" 11' - 8" 13' - 8" 13' - 5" 15' - 5" 18" 5' - 5" 7' - 3" 7' - 0" 9' - 0" 8' - 9" 10' - 9" 10' - 6" 16' - 6" 12' - 3" 14' - 3" 14' - 0" 16' - 0" 20" 5' - 10" 7' - 8" 7' - 4" 9' - 5" 9' - 1" 11' - 2" 10' - 10" 17' - 3" 12' - 7" 14' - 8" 14' - 4" 16' - 5" 24" 6' - 6" 8' - 4" 8' - 1" 10' - 1" 9' - 10" 11' - 10" 11' - 7" 18' - 9" 13' - 4" 15' - 4" 15' - 1" 17' - 1" *For the 14 and 16 Mueller IBBM Double Disc Gate Valve or Non-Mueller valves, see the instruction on page 2. 3

MUELLER A-20806/A-20807 INSTALLATION INSTRUCTIONS Supervisory Control Valve Switch: Figures E and F illustrate attachment of the Model PCVS-2 Supervisory Control Valve Switch (supplied by customer). The PCVS-2 has two switches with SPDT (Form C) contacts. Screw type wiring terminals are marked as to their COM, NO or NC designation. Each set of contacts is rated as follows: 125/250 VAC...5.00 Amps 0 to 30 VCD... 2.50 Amps INSTALLATION Post Targets must be positioned for use with the appropriate number of turns to open the post indicator valve. Improper positioning of the Targets can result in an erroneous indication of the open or shut position of the valve. The A-20806 Indicator Post will accommodate positioning of the Targets to operate PIVs requiring 14 to 43 turns to open; the A-20807 Indicator Post will accommodate positioning the Targets to operate PIVs requiring 49 to 75 turns to open. NOTE The Targets for the A-20806 Indicator Post have been factory set for use with a 6 inch Mueller PIV and the Targets for the A-20807 Indicator Post have been factory set for a 24 inch Mueller PIV. Consequently, Steps 6 through 10 need not be performed when installing the A-20806 Post with a 6 inch Mueller PIV (or with a PIV that requires 20-1/2 turns to open) or the A-20807 Post with a 24 inch Mueller PIV (or with a PIV that requires 75 turns to open). 1. Post Head 2. Upper Barrel 3. Lower Barrel 4. Bell 5. Lower Stem Assembly a. Lower Stem b. Coupling c. Coupling insert d. Cotter Pin, 1/4 x 3 (2 req d) 6. Hex Head Cap Screw 3/4-10UNC x 1 (5 req d) 7. Hex Socket Set Screw 3/4-10UNC x 1 8. Pipe Plug, 1/2 NPT 9. Window (2 req d) 11. Wrench 12. Upper Stem Assembly a. Operating Nut b. Spring Pin, 1/8 x 2-1/4 c. Cotter Pin, 1/8 x 1-1/2 d. Threaded sleeve e. Upper Stem 13. Weather Cap 14. Retaining Ring 15. OPEN Target 16. SHUT Target 17. Hex Head Cap Screw, 5/8-11UNC x 2-1/4 (4 req d) 18. Hex Nut, 5/8-11UNC (4 req d) 19. Washer 2 3 5a 5c 6 6 11 9 8 12a 12b 7 12d 15 16 12c 12e 13 14 19 1 Proceed to install the Post as follows: 5b 1. Completely close the PIV. 4 5d 2. Place approximately 5 inch high blocks onto the stuffing box flange of the installed valve. Set the Indicator Post onto the blocks and generally centered over the PIV operating nut. 6 5d 3. Slide out the Shipping Disk (17), and allow the Coupling (5b) to drop down over the PIV operating nut. Attach the Coupling to the operating nut with the Cotter Pin (5d). 4. Remove the blocks and lower the Indicator Post onto the PIV stuffing box flange. Bolt the Bell and stuffing box flange together using the four Cap Screws and Nuts (18, 19). Also at this time make certain that the three Cap Screws (6) securing the Bell (4) to the Lower Barrel (3) are uniformly tightened. Fig. C 17 18 MODEL A-20806/A-20807 VERTICAL INDIATOR POST ASSEMBLY 4

INSTALLATION INSTRUCTIONS MUELLER A-20806/A-20807 If the pipe is sloped, it may be necessary to shim some of the Cap Screws (18) with steel washers, so that the Post will be plumb and the Stem will run true with the center of the Post Head. Coupling clearances can accommodate a maximum pipe slope of 5 degrees. It is recommended that a spirit level be used to set the vertical alignment of the Indicator Post. 5. Order Lengths C through F, partially backfill the trench to a level 4 feet below the final grade. Backfilling at this point will help maintain vertical alignment of the Indicator Post while completing the installation. 6. Loosen the Set Screw (7), and lift the Post Head/ Upper Stem Assembly (1, 12) just high enough to insert a philips head screwdriver through Hole A in the Upper Stem (12e). The philips head screwdriver will temporarily hold the Post Head (1) above the upper Barrel (2). 7. Remove the Wrench (11), pry off the Cap (13), remove the Retaining Ring (14), remove the Washer (20)*, and then lift the Post Head clear of the Upper Stem Assembly (12). 8. Position the Targets per Figure D. 9. Replace the Post Head (1), Washer (20)*, Retaining Ring (14), and Cap (13). 10. Remove the phillips head screwdriver, lower the Post Head, and tighten the Set Screw (7). 11. Using the Wrench (11), open and close the valve and check to see that the SHUT and OPEN Targets are clearly in view in the Windows, at their respective positions, and that there is no feeling of binding of the Upper or Lower Stem Assemblies (5, 12). It is recommended that the turns to open/close be counted and compared to the valve manufacturer s specification, in order to verify full valve opening. If there is any indication of binding of the internal operating parts, the vertical alignment of the Indicator Post must be corrected. If the Target Plates are not properly in view, completely close the PIV and then repeat Steps 6 through 11. 12. Loosen the two Cap Screws (6) at the base of the Upper Barrel (2) and then slide the Post Head up until the Bury A-20806 1. SET SHUT TARGET FIRST. 2. FOR 16 MUELLER VALVES (prior to 2012) SET TO DIMENSION X (3.5 ) 3. FOR VALVES MANUFACTURED BY OTHER THAN MUELLER COMPANY, SET TO DIMENSION X CALCULATED AS FOLLOWS: NO. OF TURNS TO OPEN VALVE X IN INCHES = 14 A-20807 1. SET SHUT TARGET FIRST. 2. FOR VALVES MANUFACTURED BY OTHER THAN MUELLER COMPANY, SET TO DIMENSION X CALCULATED AS FOLLOWS: Fig. D NO. OF TURNS TO OPEN VALVE X IN INCHES = 22 POSITIONING OF TARGETS Line of the Post Head coincides with the planned finished grade. Tighten the two Set Screws (6) at the base of the Post Head with a torque of 40 to 60 ft.lbs. When properly installed, the centerline of the Target Windows will be 30 inches above the finish grade. 13. Back-fill to final grade and repeat Step 11. 14. Tighten the switch mounting hole plug if the Model PCVS-2 Supervisory Control Valve Switch is not to be immediately attached. 15. Proceed to install the Model PCVS-2 Supervisory Control Valve Switch (supplied by customer) - continued on next page. *A-20806 build before 2012. 5

MUELLER A-20806/A-20807 INSTALLATION INSTRUCTIONS 15a. Remove the Cover from the PCVS assembly, and then loosen the Trip Rod Locking Screw. Adjust the position of the Trip Rod so that it extends about 1-3/8 inches beyond the Nipple, and then securely tighten the Trip Rod Locking Screw. 15b. Rotate the Post Operating Nut until the PIV is fully open. Note the position of one of the OPEN Targets in its Window. 15c. Rotate the Operating Stem until the OPEN Targets are out of the Post Windows. Note the direction in which the OPEN Target will move when it is returned to the Post Window. 15d. Remove the Nipple from the PCVS assembly, and then with the Locknut screwed over the Nipple threads, hand tighten the Nipple into the 1/2 inch NPT hole provided in the Post Head, and then tighten the Locknut against the Post Head to secure the Nipple firmly in place. Fig. E ATTACHMENT OF THE PCVS-2 SWITCH FOR LEFT HAND OPENING VALVES 15e. Refer to Figure E or F as appropriate, and note the direction in which the Trip Rod must move when the OPEN Target is returned to the Post Window. Slide the PCVS assembly as far as possible onto the Nipple while maintaining proper orientation of the PCVS assembly, and then tighten the Set Screw that holds the PCVS assembly onto the Nipple. 15f. Attach leads from an electrical continuity meter to the appropriate terminals. 15g. Return the valve to its fully open position. Verify that the OPEN Target returns to the position noted in Step b. Also, verify that the Switch contacts change position within two turns of the valve being fully open. 15h. Begin to return the valve to its closed position. Verify that the Switch contacts change back to their original position within two turns from full open. NOTE If the Upper Stem Assembly binds before the OPEN Target reaches its full open position, or the switch contacts do not change position as described in Steps g and h, then the Targets must be readjusted. If the Targets require readjustment, close the PIV, remove the PCVS assembly, and repeat Steps 6 and 11; however, when positioning the Targets, rotate both Targets at the same time as necessary so that the OPEN target will trip Fig. F ATTACHMENT OF THE PCVS-2 SWITCH FOR RIGHT HAND OPENING VALVES the Actuator Rod of the PCVS Switch. Repositioning of the OPEN and SHUT Targets relative to each other should not be necessary. Repeat Steps b through h. 15i. Remove the electrical continuity test leads. The external field wiring connections can now be made to the PCVS Switch. NOTE Use of a weathertight conduit connector with a gasket seal is recommended. 6

INSTALLATION INSTRUCTIONS MUELLER A-20806/A-20807 CARE AND MAINTENANCE Model A-20806/A-20807 Indicator Posts do not require any regular schedule maintenance. It is recommended that Indicator Posts used to operate fire protection system water control valves be locked in the fullyopen position using the Post Wrench as shown in Figure A. The locks must be sturdy and resistant to breakage except by heavy bolt cutters. It is also recommended that once a month a visual inspection procedure be followed, with the following items checked: 1. The Post Head, Upper Barrel, and Windows have not been damaged. 2. The Targets indicate that the valve is open. 3. The Wrench is in place on the Indicator Post, and it is properly locked open. In addition, on a quarterly basis, the Indicator Post should be closed two turns and then reopened tight to verify that the PIV is in the full open position and properly engages with the Post and, that the Supervisory Switch contacts (if applicable) properly change position. Any damaged parts must be immediately replaced. The Indicator Post should also be physically tried to be sure that the valve is in the fully-open position, if there are any damaged parts, sign of tampering, or the position of the valve is questionable. Before closing a fire protection system main valve for maintenance work on either the Indicator Post or fire protection systems which it controls, permission to shut down the affected fire protection systems must first be obtained from the proper authorities and all personnel who may be affected by this decision must be notified. It is recommended that fire protection systems be inspected by a qualified Inspection Service. REPLACEMENT PARTS: Specify: (specify description) for use with Model A-20806/A-20807 Indicator Post, Part No. (specify). 1. O.L. Post Head (A-20806)... 148692 1. O.R. Post Head (A-20806)... 148649 1. O.L. Post Head (A-20807)... 241029 1. O.R. Post Head (A-20807)... 241030 2. Upper Barrel... 147307 3. Lower Barrel A... 148760 3. Lower Barrel B... 148761 3. Lower Barrel C... 148762 3. Lower Barrel D... 148763 3. Lower Barrel E... 148764 3. Lower Barrel F... 148765 4. Bell... 148689 5a. Lower Stem Assembly A... 287073 5a. Lower Stem Assembly B... 287074 5a. Lower Stem Assembly C... 287075 5a. Lower Stem Assembly D... 287076 5a. Lower Stem Assembly E... 287077 5a. Lower Stem Assembly F... 287078 5b. Coupling... 290155 5c. Coupling Insert... 290156 5d. Long Cotter Pin... 290154 6. Hex Head Cap Screw, 3/4-10 UNC x 1... 190560 7. Hex Socket Set Screw 3/4-10 UNC x 1... 198428 8. Pipe Plug 3/4 NPT... 198582 9. Window... 290146 11. Wrench (A-20806)...148690-1 11. Wrench (A-20807)... 241013 12. Upper Stem Assembly (A-20806)... 287079 12. Upper Stem Assembly (A-20807)... 287645 12a. A Square Op Nut...Right 14969-1 12a. A Square Op Nut... Left 148691 12b. Springpin... 190330 12c. Short Cotter Pin... 290158 12d. Threaded Sleeve (A-20806)... 148634 12d. Threaded Sleeve (A-20807)... 241011 12e. Upperstem... 148633 13. Weather Cap... 290143 14. Retaining Ring... 290157 15. Target Open (A-20806)... 290144 15. Target Open (A-20807)... 290552 16. Target Shut (A-20806)... 290145 16. Target Shut (A-20807)... 290553 17. Hex Bolt... 290191 18. Hex Nut... 190939 19. Washer*... 290175 *Washer use discontinued in 2011 NOTE: For models with handwheels, contact customer service for replacement parts. 7

MUELLER A-20806/A-20807 INSTALLATION INSTRUCTIONS CUSTOMER SERVICE - Decatur, IL (217) 423-4471 Canada Mueller Canada Inc., Barrie, ON (705) 719-4959 Form 12111 - Rev 6/11 Printed in U.S.A. 8