Residential Construction Permitting Process Southfield, Michigan

Similar documents
RESIDENTIAL BUILDING PERMIT REQUIREMENTS

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

Bureau Veritas Contact Information

City of Mandeville. Guidelines for Construction and Development

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Town of Beaumont. Lot Grading Guidelines

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

The City of Basehor, Kansas

Development Services Guidelines

MOBILE HOME LAW. Revised November 2001

SITE IMPROVEMENT PLANS CHECKLIST

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

DESCRIPTION OF WORK:

A Guide for the Homeowner/Builder

B. Improve the appearance and character of areas surrounding new development.

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Town of Surf City Community Development. General Permit Information

TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

City of Douglas Commercial Building Permit Site Application

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

ORDINANCE NO

Commercial Construction Permit Application

City of Milford, Connecticut Information Regarding Permits

Bond Release Process for New Subdivision Developments in Fairfax County

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

New Home Construction Packet

Single-Family Permit Handbook. City of Bellevue. Welcome! When is a permit required? Development Services Handout P-1

Town of Trumbull, Connecticut Information Regarding Permits

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Demolition of 50% or more of an above grade main structure requires a demolition permit.

SECTION 5 DRAFTING STANDARDS

Preliminary Plan Application and Checklist

City of Valdosta Land Development Regulations. Table of Contents

Single Family Residential Building Permit Questions & Answers

SECTION SITE PREPARATION

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Parrish Park Homeowners Association. Architecture Committee Guidelines for Property & Home Improvements. June 2002

C I T Y O F P E A R S A L L

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Sample Drawing Package for One and Two Family Dwelling Applications

17 East Main Street Cuba,NewYork Code Enforcement

PERMITS REQUIRED & PERMIT EXEMPTIONS

Building Permit, Fire Inspection and Operating Permit Fee Schedule

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

Development Services Guidelines

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Building Permits Permit Counter

Planning and Zoning Commission Johnston, Iowa June 29, 2015

WHEN IS A PERMIT REQUIRED?

Residential Building Permits

Residential Plan Routing Information

TREE PERMIT APPLICATION Private Property- Section MBMC COMMUNITY DEVELOPMENT DEPARTMENT

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

Charter Township of Shelby Harry Reese Building Director

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

Development Variance Permit Application Package

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

On Your Lot Building How To Get Started

Residential Building Permit Process

Standard Site Drainage and Erosion Control Details (August 15, 2006)

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

2. What building projects are exempted? (permit not required)

Contractor Information 2011

FLOOD DAMAGE PREVENTION ORDINANCE

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

SECTION SELECTIVE DEMOLITION

How To Write A Building Code In Kendall County

INCORPORATED VILLAGE OF OYSTER BAY COVE TOWN OF OYSTER BAY, NASSAU COUNTY, N.Y. OFFICE BUILDING INSPECTOR FEE SCHEDULE

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Waterleaf ARB Application

Site Plan Review Regulation Amendments draft of 8/31/15

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Teller County, Colorado Floodplain Development Permit Application

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Right-of Way Use Permit Application

ARTICLE 22: FEE SCHEDULE

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

SECTION 1 - BUILDING CODE

Building Permits: When are they required?

Residential Building Permits Information

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)

SECTION 15 FLOODPLAIN MANAGEMENT

Important Information for Owners of Buildings in Flood Zones

CHARLOTTE COUNTY Community Development Department

CITY OF PITTSBURGH Department of City Planning 200 Ross Street, Pittsburgh, PA (fax)

Transcription:

Residential Construction Permitting Process Southfield, Michigan

July 6, 2006 BEFORE STARTING CONSTRUCTION Before beginning a building project, whether new construction, alterations or repairs, the homeowner and/or builder should be aware that permits may be required. As a general rule, any construction involving a structural change to a building, complete or partial rehabilitation or renovation, new or re-roofing, or any new construction, will require a building permit. Work not requiring permits includes: most routine maintenance and repair, such as painting, caulking, vinyl sheet flooring, new cabinets and tuckpointing. It is important to note that the City of Southfield and State of Michigan Law requires separate permits for electrical, plumbing, and heating systems. Homeowners should take care to select qualified, licensed contractors to perform this work. PERMITS ARE A NECESSITY Building permit guidelines in the City of Southfield have been instituted to protect the public health, safety and welfare. The process protects residents from the hazards of unsafe construction and helps residents understand local laws and ordinances. Since the City of Southfield requires all builders to be licensed by the State of Michigan, residents can be assured the companies and independent contractors they employ for construction on their property meet State licensing requirements. By obtaining a building permit, residents provide code officials with the means to inspect construction sites, ensuring that acceptable standards are met and appropriate materials used. The City of Southfield appreciates the cooperation of its residents and licensed builders. Any approvals required from the Zoning Board of Appeals (ZBA) must be obtained prior to the issuance of a building permit. ZBA approvals are required for moving any structure into or within the City, or for any waiver required by an administrative body at the City. Obtain ZBA applications at the counter of the Building Department at Southfie ld City Hall, 26000 Evergreen Road (at Civic Center Drive). Existing structures to be moved into or within the City require a special preliminary inspection from the Building Department; a house-moving permit from the Traffic Engineering Department; and additional clearances/permits coordinated through Traffic Engineering, (248) 796-4860. WHAT TYPES OF CONSTRUCTION NEED A BUILDING PERMIT A building permit is a license giving legal permission to begin construction of a building project. All residential construction requires a building permit. Builders must be licensed by the State of Michigan. Contractors for electrical, mechanical and plumbing also are licensed by the State of Michigan. Typical projects requiring building permits include, but are not limited to: New buildings Additions Renovations Demolitions Prefabricated structures Electrical systems Plumbing systems - 2 -

Heating, air conditioning, or ventilating Temporary buildings Miscellaneous residential including fireplaces, pools, decks, re-roofing or new roof, sheds and garages Miscellaneous commercial projects (parking lots, etc.) The following repairs are considered normal maintenance if they are not part of a structural addition or completion and will not increase the property s assessed valuatio n. These projects still may require permits. Check with the Building Department before beginning any of these projects to determine if a permit is needed: Outside painting Repairing or replacing siding, roof, porches, steps, sidewalks or driveways Repainting, repairing or replacing existing masonry Replacement of awnings Adding or replacing gutters and downspouts RESIDENTIAL CONSTRUCTION PERMIT PROCEDURES There are four City of Southfield departments from which approvals must be obtained in order to construct a new home in the City. The four departments are the Planning Department, Engineering Department, Building Department and Water & Sewerage Department. Applicants are encouraged to submit complete plans and associated paperwork to all departments simultaneously to expedite the approval process. Each department involved in the process requires specific documentation to be filed and fees to be paid in advance. No building or site construction can commence until initial approvals are obtained from all four departments. A final Certificate of Occupancy will not be given until all requirements are met. The four city departments (as listed above) will provide information and answer any questions regarding the building permit application. The Building Department works in conjunction with the departments of Engineering, Planning and Water & Sewerage. PLANNING DEPARTMENT REVIEW PROCEDURES Initial Requirements Step 1: Submit 2 sets of Tree Survey Plans superimposed onto the Engineered Site Plans (signed and sealed by a registered Engineer or Surveyor). There is no fee for the tree removal permit. Include the following information on the tree survey/site plan: Location of all trees of 8" caliper and over on the site and 25' beyond the property line. In the instances where very large lots are being developed, locate all trees 50' beyond the limit of construction. The tree number (Trees need to be tagged in the field by a survey crew). The tree name (Species). The caliper size (Diameter at Breast Height, DBH) of the tree. The crown spread of the tree. (The width of the tree crown, outside branch tip to outside branch tip). The rating of the tree (A sliding scale with A = excellent condition to D=poor, dead or in decline). The elevation at the base of the tree. - 3 -

If wetlands or flood plains exist on site Step 2: Submit an Application for Wetland, Flood plain and Watercourse Boundary Determination. Step 3: Pay Wetland/Flood Plain Boundary Determination fee. Step 4: Upon receipt of Wetland Boundary Determination report or floodplain information, provide a site plan indicating exact boundaries per an engineered survey as part of the site plan submission. Requirements after initial review, but prior to receiving Building Permits Step 5: Pay Tree Bond monies as directed by the Planning Department for tree replacement. Step 6: Install Tree Protection Fence as directed by the Planning Department. Step 7: Obtain Planning Department approval by calling (248) 796-4150, 24 hours in advance, for a Tree Protection Fence inspection. Requirements for Certificate of Occupancy Step 8: Plant tree replacements as directed by the Planning Department. Bond to be refunded after final tree replacement inspection. Step 9: Obtain Planning Department approval by calling (248) 796-4150, 24 hours in advance, for tree replacement inspection. Fees: Wetland/Flood Plain Boundary Determination $750.00 Contact info: Planning Department. 26000 Evergreen Rd. Southfield, MI 48076 (248) 796-4150 ENGINEERING DEPARTMENT REVIEW PROCEDURES Initial Requirements Step 1: Submit 6 sealed sets of drainage plans for the complete site, signed and sealed by a Registered Engineer or Surveyor. Step 2: Pay Engineering Department review fee. Step 3: Submit the Soils Engineering Evaluation for houses constructed on steep slopes. If within 500 feet of a stream Step 4: Apply for the Site Drainage and/or Soil Erosion and Sedimentation Control Permit. Step 5: Pay the Inspection and bond fee. Step 6: Indicate the soil erosion and sedimentation controls on the drainage plan and include details. Step 7: Submit one additional set of plans for a total of seven sets. Requirements after initial review, but Prior to receiving Building Permits Step 8: Install soil erosion control fencing, if required by the Engineering Department. Step 9: Obtain Engineering Department approval by calling (248) 796-4810, three days in advance, for a soil erosion control fence inspection. Step 10: Obtain culvert permit for installation of culvert as required. Pay permit fee. Engineering Department establishes the grade and stakes the grade upon request. Requirements for Certificate of Occupancy Step 11: Submit three copies of the sealed final approved Grading Certificate (as built grading plan). Allow three days for final Engineering inspection. Complete the following: - 4 -

Site must be fine-graded. Front, side and rear yards must be topsoiled, seeded and mulched or topsoiled and sodded, if weather permits. (see Building Section for bond requirements). All walkways and driveways must be paved. Procedures for Filing Site Drainage/Soil Erosion and Sediment Control To expedite the review of plans as required by Chapter 19, Southfield City Code, the following requirements are provided to aid Engineers and Surveyors in preparing site drainage plans for submission to the Engineering Department: Step 12: Submit six (6) sealed sets of Drainage Plans for the complete site, signed and sealed by a registered Engineer, Surveyor or Architect. The drawing shall be on a maximum 24" x 36" sheet and shall include a location map. The directional arrow for "North" shall point either toward the top of the page or to the left of the page. The scale is to be an engineer's scale from 1" =20' to 1" = 100'. The Plans shall include the following: 1. Elevations (using City of Southfield datum) Existing and proposed grades around the perimeter of the lot. Existing and proposed grades at the building corners Proposed first floor Finish grade at adjacent buildings Sidewalks (public and private) Ditch Line Road centerline and edge Surrounding area 100 feet beyond site limits (on a grid of 50 feet or less, as required) 2. Dimensions Site boundaries Proposed setback and side yards Setback and side yards of adjacent buildings 3. Property description 4. Bench Mark of City of Southfield Datum 5. Right-of-way width 6. Type and width of road surface 7. Proposed drainage pattern 8. All existing and proposed utilities Note: The final building grade shall be established and maintained at an elevation that will provide a minimum five percent (5%) slope away from the building or house for a minimum distance of ten feet (10'), and the balance of the building or house site shall be graded to provide positive surface drainage from that point to the street, ditch or other drainage course. - 5 -

Fees: Inspection fee $400.00 Road Restoration Cash Bond $1,000.00 Engineering Department $150.00 review Culvert Permit $50.00 each Erosion Inspection $10.00/acre Permit to Occupy 2.0% of estimated cost of public utilities Sidewalk $0.25/square foot Driveway approach $0.25/square foot (concrete only) Curb Cut waived Ditch Enclosure $50.00 each Parking Lot Pavement $100.00 Utility Permits Utility rights-of-way installations 1.9% of the estimated cost of construction with a minimum of $75.00 Telecommunications Permits Cash bond $5,000.00 Review fee Minimum $75.00 Installations within rights-ofway $.10/linear foot for underground installation Aerial installation $.03/linear foot Contact info: Engineering Department. 26000 Evergreen Rd. Southfield, MI 48076 (248) 796-4810 BUILDING DEPARTMENT REVIEW PROCEDURES Initial Requirements Step 1: Submit approved application for septic field, (if necessary due to lack of sanitary sewer facilities within 200'). Application must be made at the Oakland County Health Department. The contact phone number for Oakland County is (248) 424-7198. Step 2: Complete a Building Permit Application. Step 3: Submit 1 set of Engineered Site Plans Step 4: Submit 2 sets of Structural and Heating Pla ns (with Building Plans). Architect s or Engineer s State of Michigan seal is required for dwellings 3500 sq.ft. and over. Step 5: Submit 2 copies of the Michigan Uniform Energy Code Calculations (ASHRE 90-75). Step 6: Submit 2 copies of Pre-manufactured fireplace installation instructions and specifications, if applicable. Step 7: Pay plan review fee to the Building Department. Step 8: Pay bond fee to the Building Department. Step 9: Contact the Homeowner Association in the neighborhood to check for possible deed restrictions regarding fencing, sheds, etc. To find the correct Association, contact the Housing and Neighborhood Information Center at (248) 796-5140. Requirements after initial review but prior to receiving Building Permits Step 10: Upon phone notification of approval by City Building Department Staff, pay the total of the following additional costs as set forth by City Ordinance fee schedule: - 6 -

Permit Fee Administrative Fee Certificate of Occupancy Fee Structural Review Fee, if applicable Requirements after Building Permit is issued but prior to rough inspections Step 11: Licensed Master Plumber must obtain the Plumbing Permit Step 12: Licensed Master Electrician must obtain the Electrical Permit Step 13: Licensed Heating and Cooling Company must obtain the HVAC Permit Step 14: Submit Foundation Certification Step 15: A homeowner may obtain a Building Permit without a builder s license. Step 16: Residential electrical, plumbing & mechanical permits must be obtained by a licensed contractor. Step 17: Pay all mechanical permit fees. Requirements for Certificate of Occupancy Step 18: Contact the Building Department Specialist at (248) 796-4100, five days in advance. Step 19: Complete Planning and Engineering Certificate of Occupancy requirements prior to a request for final building inspections. Step 20: Obtain all final electrical, plumbing and HVAC inspections prior to final building inspection. Step 21: Site must be graded, top soiled and either seeded and mulched, or sodded. Pay landscape performance bond to the Building Department, if winter season does not allow seeding or sodding to occur on site. Winter season dates shall be November 15 through March 31 and shall be subject to weather and frost conditions at that time. Step 22: Pay a monthly rubbish fee from the date of occupancy through June 30 of the following year at the time of Certificate of Occupancy issuance. Fees: Plan review fee $75 Bond fee $200 Rubbish $12.62/month Contact Info: Building Department. 2600 Evergreen Rd. Southfield, MI 48076 (248) 796-4100 For all Building Trades Inspections, call the lines listed below, a minimum of 24 hours in advance. Any call after 3pm. will not be handled until the next working day. Plumbing Division (248) 796-4100 Electrical Division (248) 796-4100 Heating Division (248) 796-4100 WATER AND SEWERAGE DEPARTMENT REVIEW PROCEDURES Initial Requirements: Step 1: Submit Water Department Tap permit application for water, water meter and/or sewer. Application must be made at the Water Department, located at 25501 Clara Lane, (248) 796-4850. The following information must be provided by the applicant for the completion of the permit: Property address Property sidwell number Property owner s name, address and phone number Sewer contractor s name, address and phone number Size of the water service and the size of the water meter to be installed - 7 -

Step 2: Step 3: Fees are paid for at the Building Department at 26000 Evergreen Road, prior to issuance of a Building Permit. A separate plumbing permit is required from the Building Department prior to installing water and/or sewer lines. Contact Water Department, 24 hours in advance, to schedule the installation of the water shut-off valve by the Water Department. Requirements after Building Permit has been issued: Step 4: A water meter template must be installed for rough plumbing. This template will be issued upon request, after full payment of the tap permit. Step 5: Contact Water Department, 24 hours in advance, to schedule the installation of the water meter and the remote reader by the Water Department. Contact Info: Water Department. 26000 Evergreen Rd. Southfield, MI 48076 (248) 796-4850 - 8 -