How To Train Your Manufacturer To Change



Similar documents
KEBA 2014 We reserve the right to make technical modifications. No liability accepted for information provided. All rights reserved.

AS9100 Quality Manual

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Supplier Quality Assurance Requirements Manual

Purchase Order Clauses and Conditions

GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP) REQUIREMENTS GUIDE

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

CITY OF HIGHLAND PARK

Vendor Requirements and Compliances

Gulfstream Production Certificate Operations

CITY OF DALLAS. Request for Competitive Sealed Proposal (RFCSP) BUZ1524. For. SCADA Repair, Parts and Support

ORACLE QUALITY ORACLE DATA SHEET KEY FEATURES

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/ ARCHIVING

Enterprise EDI. (Electronic Data Interchange) ~ Supplier Manual ~

Schottky barrier quadruple diode

REFERENTIEL- SODERN. Autre référence / Other reference :

STANLEY HEALTHCARE SUPPORT POLICY

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Product Development and Commercialization Lifecycle

GE Power Electronics Business Total Quality Management for Suppliers

INTRODUCTION: PURPOSE:

Quality Management System General

Commercialization Life Cycle

Quality Manual PA

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Supplier Quality Assurance Requirements Manual

Supplier Quality Requirements and Clauses

AeroScout Industrial Support Policy

REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI

JOHN DEERE DIFFERENTIAL CORRECTION SOFTWARE LICENSE AGREEMENT

Exar Corporation Quality Manual

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

Self Testing and Product Qualification Processes

Guideline for. General Automotive Quality Agreement for Electronic Components

Primal Innovation, LLC 201 Tech Drive Sanford, FL Small, Veteran Owned, Service-Disabled Business (407)

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

PRECISION MICRODYNAMICS QUOTE / CONTRACT TERMS & CONDITIONS

Planar PIN diode in a SOD323 very small plastic SMD package.

Product Liability Risk Control Checklist

Copy Exact Awareness Training. GT Supplier Change Control

COMPLIANCE WITH LAWS, CODES, AND STANDARDS

Article 1: Subject. Article 2: Orders - Order Confirmation

Physical Inventory Guidelines

REVENUE REGULATIONS NO issued on December 29, 2009 defines the requirements, obligations and responsibilities imposed on taxpayers for the

SOT Packing method

ITEM DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

Module 1 - Hardware Acquisition and Installation TABLE OF CONTENTS. Version 3.0

Terms and Conditions of Purchase

Supplier Product / Process Change Notification Requirements

Seradex White Paper. Engineering Change Process. A Discussion of Issues in the Manufacturing OrderStream

Supplier Quality Requirements F16 Program

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers.

Quality Agreement Template

Supplier quality guideline. VOSS Automotive Group Issue Rev00

Overview. Scope of Work

DOCUMENT CONTROL PROCEDURE

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

SYSTEM SOFTWARE AND OR HARDWARE SUPPORT SERVICES (PREMIUM 24x7)

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

Q2A First Article Inspection (FAI) AS9102

Direct Alloys LLC. An Online Premium Metals Clearinghouse 901 Broad Street Utica, NY Fax

Supply Chain Management Services

Quality Systems Manual

UK Vendor Website - Terms of Use Agreement

XANGATI END USER SOFTWARE LICENSE TERMS AND CONDITIONS

Request for Expressions of Interest 3777EOI Fleet Management Software

1. Your Acceptance 2. LKIS App Access 3. Intellectual Property Rights 4. Warranty Disclaimer

User Guide Overview to Access, Passwords, Navigation and Notifications

Tripwire, Inc. Appliance Discontinuation Policy April 2016

Turbo Resources International Quality Procedure

SUPPLIER PAYMENT GUIDE EUROPE

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT. This handbook is for guidance only. Do not cite this document as a requirement.

Youngevity Essential Life Sciences & Youngevity International, Inc.

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Supply Chain Merchandise Logistics E-Commerce Operational Processes & Standards

Baseline Questionnaire

Electronic Communication Supplier Guide

REQUEST FOR QUALIFICATIONS. For ENGINEERING SERVICES

Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon

MAXIMO 7 TRAINING GUIDE INVENTORY MANAGEMENT FLORIDA INTERNATIONAL UNIVERSITY NE 1 st Ave M1008 Miami, FL 33137

Internet connection (high speed recommended) Microsoft Excel (installed locally) Adobe Reader 8.1 or later (installed locally)

USERS SHOULD READ THE FOLLOWING TERMS CAREFULLY BEFORE CONSULTING OR USING THIS WEBSITE.

STATE OF MAINE DEPARTMENT OF EDUCATION RFP # PAYROLL SERVICES FOR TEMPORARY RESOURCES

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS)

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

Quality Management System Manual Revision L

ALL PRODUCTS MFG & SUPPLY

BASE CONSTRUCTION INC

Transcription:

Product Change Notification (PCN) Training For Manufacturers FEBRUARY 2012 REVISION B

Disclaimer

Training Objective Product Change Notification (PCN) Training for Manufacturers is intended for all Flextronics Manufacturers. The Training Is Designed To: Inform Manufacturers About Flextronics Product Change Policy And Disclaimer Identify Manufacturer Responsibilities Regarding Product Change Notification Management Define Reportable And Non Reportable Change Requirements (Interchangeable And Non Interchangeable Changes) Document Key Information Required For Generating PCNs Coach Manufacturers On When And How To Notify Flextronics Of Changes (Temporary Or Permanent) Being Made To Their Products And/or Processes Provide Reference Information On Change Types And Descriptions

Training Roadmap I. Product Change Policy, Disclaimer, and Manufacturer Responsibility Flextronics Product Change Policy and Disclaimer Manufacturer Responsibility II. Product Change Notification (PCN) and Change Definitions Defining Change - Interchangeable and Non Interchangeable Changes PCN Document III. Documenting and Communicating PCNs Documenting PCNs - Mandatory Information End of Life (EOL) PCNs Communicating PCNs IV. References Reference to Change Types and Descriptions Acronyms

I. Product Change Notification Process Flextronics Policy, Disclaimer, and Manufacturer Responsibility

Flextronics Product Change Policy and Disclaimer Flextronics Policy All proposed temporary or permanent changes affecting material form, fit, or function status shall be submitted using the required Flextronics PCN process. As Per Flextronics General Supplier Quality Requirements (GPO-GPO-3-018-00), PCNs and information shall be submitted as follows: All PCNs shall be submitted minimum 90 days prior to implementation PCNs for product discontinuance shall be submitted 180 days prior to last order dates and 365 days prior to last shipment release dates. Exceptions to this requirement may be based on pre-existing contractual requirements that are deemed to take precedence. Flextronics Disclaimer The receipt of a Manufacturer s PCN (including EOLs) by Flextronics, does not signify acceptance of the proposed product or process change.

Manufacturer Responsibility Flextronics Manufacturers must have a Change Communication Process in place to promptly and accurately notify Flextronics of changes to Manufacturer products. Change communication must include all proposed temporary/permanent changes in parts, materials, and processes in production. Flextronics Manufacturers are responsible for managing changes made by subordinate manufacturers within their supply chain. Note: The Product Change Notification process for subordinate manufacturers is the same as the process for direct manufacturers.

II. Product Change Notification (PCN) and Change Definitions

Defining Change 1. Interchangeable Changes Any change will be considered Interchangeable if ALL of the following criteria are met: No change to the component or assembly Form, based on the product specifications. New features will be considered interchangeable if they do not violate existing requirements No change to the component or assembly Fit, based on the appropriate drawings and tolerances No change to the component or assembly Function, based on relevant product specifications, including (but not limited to) performance, safety, reliability, and environmental specifications. Manufacturers are NOT expected to generate PCNs on Interchangeable Changes unless they are contractually obligated to do so.

Defining Change 2. Non Interchangeable Changes If any adjustments or modifications of new or existing product are required to meet conditions of Form, Fit, or Function the changes are considered Non Interchangeable The following changes will always be considered Non Interchangeable: Addition Of New Requirements To Component / Assembly Form New Controlled Dimensions Or Tolerance Modifications Removal Of An Existing Requirement Addition Of A New Requirement Change of Fabrication Site, Country Of Origin, New Subcontractor, etc. New Component Or Raw Material Cosmetic Changes Name Changes (Change In Name Of Company) Nomenclature Changes (Change In Name Of Part Or Process) Packaging Changes Logistics Changes If Previous Interchangeable Changes Have Created Issues Manufacturers MUST generate PCNs on Non Interchangeable Changes.

PCN Documents The PCN Document: Is Created By Manufacturer As Part Of The Flextronics Change Management Process Informs Flextronics Of An Impending Change To A Part Or Product Provided by the Manufacturer Shall Be Transmitted Via Email Is Sent Within Required PCN Lead Time Shall Be Communicated In English Shall Be Accessible In Terms Of Document Protection And Allow Copying Must Be Complete And Accurate The Manufacturer: Shall Submit At Least One PCN Document Per PCN Shall Submit Attached Documents In MS Excel, MS Word, Or Adobe (PDF) Format

III. Documenting and Communicating PCNs

Documenting PCNs : Mandatory Information PCNs must be communicated at least 90 days prior to shipment of affected parts (EOL PCNs - 180 days prior to last order dates and 365 days prior to last shipment release dates) Manufacturer PCNs MUST contain: PCN Number PCN Issue Date Part Number / MPN Part Name Change Description Reason for Change PCN Effective Date Manufacturer Contact Number assigned by Manufacturer to the PCN document. This number must be referenced on all correspondence related to the PCN. If Mfr does not assign a PCN number, Flextronics will assign a number and issue a Corrective Action Request requesting the Manufacturer assign a number or confirm the use of the Flex-assigned number. Date on which PCN is issued to Flextronics Number assigned to the component / part. Also called Manufacturer Part Number (MPN) Name of the part undergoing change Description of the change Reason the change is being made to the part / product Date on which change described in PCN comes into effect Manufacturer information including name (point of contact), manufacturer address, email address, and other contact details

Example of a PCN Document

Example of a PCN Document

EOL PCNs EOL Notification is a Change Notice from Manufacturer regarding parts that will no longer be provided. EOL submission is accomplished using the PCN process which includes EOL Change Type. EOL PCNs MUST be submitted to Flextronics 180 days prior to last order dates and 365 days prior to last shipment release dates. EOL PCN MUST include the following, in addition to standard PCN mandatory fields: EOL Part Number / MPN EOL Part Name Reason for product discontinuation Last Time Buy Date Last Ship Date Equivalent alternative product, if available Unique Part number assigned by Manufacturer Name of Part being discontinued Mandatory information must be provided Final Date for purchase of discontinued product Final Delivery Date of discontinued product Alternative Part replacing discontinued part

Example of an EOL PCN

Example of an EOL PCN

Communicating PCNs Where - Flextronics email Manufacturers must submit PCNs electronically to pcn@flextronics.com When - PCN Lead Time PCNs shall be submitted to Flextronics minimum 90 days prior to implementation unless contractually agreed upon. A PCN involving an End of Life (EOL) part shall be submitted 180 days prior to last order date and 365 days prior to last shipment release date. How - PCN Format PCN attachments shall be in MS Excel, MS Word, or Adobe (PDF) formats that allow content copying or extraction. MPN Lists (Part Numbers) shall be in MS Excel or Adobe (PDF) format. Document formats that prevent copying are not permissible. These include Bitmaps,.jpg files, web links,.gif files, HTML documents, and ASCII text files. Flextronics rates Manufacturer PCNs on timeliness, accuracy, completeness, and clarity of information.these ratings are included in the Manufacturer s overall performance rating.

PCN Process Flow Flextronics communicates with Mfr only if clarification is required

Summary Manufacturers are responsible for submitting all change notifications to Flextronics via email using the email address pcn@flextronics.com. Manufacturers are responsible for implementing and maintaining an appropriate change management system that allows them to meet Flextronics change reporting requirements. Manufacturers are responsible for reporting all non-interchangeable changes and interchangeable changes based on this training and their contractual requirements Manufacturers should include all mandatory information in their PCN and EOL documents. Manufacturers shall report normal changes 90 days prior to implementation and EOL changes 180 days prior to last order date and 365 days prior to final shipment release date. Manufacturers should report changes via email and in preferred formats as detailed in the training.

IV. References

Reference : Change Types and Descriptions Change Type Change Description Acronym Acquisition (Complete) One company acquires another company in its entirety ACQC Acquisition (Partial) One company acquires part of another company or acquires a specific product line ACQP Design Change / Data Sheet Spec Change Fabrication Site Change / Qualification / Country of Origin /New Subcontractor New Component or Raw Material Added Non-interchangeable design modification including (but not limited to) dimensions, performance, modification to spec, software changes, new or modified CTF (critical to function) parameters, includes new die revisions All changes to fabrication site, qualification levels, country of origin, or additions of subcontractors must be reported All changes to components or raw material must be reported; this includes adding alternate sources, changing brands, switching to components that weren t included in previous qualifications or environmental declarations DESIGN FAB MATL

Reference : Change Types and Descriptions Change Type Change Description Acronym Cosmetic Change Obsolescence All changes that will be visible must be reported (New color, texture, etc) this includes changes to inspection criteria that may result in different cosmetic quality Obsolete, End of Life, Discontinued Products, some Die Rev changes and ordering part number nomenclature changes. Any PCN that creates obsolescence of a part (other than Acquisitions). Die Revision Changes that do not change the ordering MPN should be categorized COSMETIC OBS Name Change All changes to manufacturer or distributor name must be reported NAME Nomenclature Change All changes to MPN nomenclature must be reported; including elimination of product options NOM Reversal Supplier reverses an existing PCN REV

Reference : Change Types and Descriptions Change Type Change Description Acronym Process Change Environmental Announcement Packaging and Media Storage and Handling Logistics A non-interchangeable process change is being made (Rework, inspection, test, etc) A non-interchangeable equipment change is being made (New process, manual to auto, etc) New compliancy features offered for existing parts (that don t involve any changes to the product) or new product environmental announcements All Changes to media must be reported (New media, tray to tape, change in product identification information of outer and internal packing material/labeling, changes to internal/external packaging, etc) A non-interchangeable environmental requirements change is being made (Temperature, humidity, Moisture Sensitivity Level (MSL), etc.). All Changes in logistics/distribution/shipping channel or method (especially for sensitive product) must be reported PROC ENV PKG STORE LOG

Reference : Change Types and Descriptions Change Type Change Description Acronym Roadmap Continuous improvement notifications, etc RMAP Quality Alert Notifications Notifications regarding quality issues on components QAN Multiple Types Change overlaps with multiple change types. MULTI Other PCNs not covered under any of the other existing classes OTH

Acronyms Acronym Description PCN Product Change Notification EOL End of Life MSL Moisture Sensitivity Level ACQC Acquisition (complete) ACQP Acquisition (partial) DESIGN Design / Data Sheet Spec Changes FAB Fabrication Site change / qualification MATL New Component or Raw Material Added COSMETIC Cosmetic Changes OBS Obsolescence NAME Name Change

Acronyms Acronym Description NOM Nomenclature Change REV Reversal of a PCN PROC Process Change ENV Environmental Announcement PKG Packaging and Media STORE Storage and Handling LOG Logistics RMAP Roadmap QAN Quality Alert Notifications MULTI Multiple Types OTHR Other

For Further Questions Please Contact: PCN Team pcn@flextronics.com The information in this presentation is the intellectual property of Flextronics. Any changes or omissions from its original format outside Flextronics are considered void and not representative of this organization. Any forwarding to third parties or publication even of parts thereof requires express and written approval by Flextronics. Hardcopy printouts of this file should be treated as reference only. It is the user s responsibility to validate that the hardcopy represents the most current revision by consulting the online reference or the relevant documentation center.

Thank You!