Meeting the Dual Goal of Energy Access and Sustainability CSP Deployment in Developing Countries

Similar documents
Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

GOVERNMENT OF INDIA PRESS INFORMATION BUREAU *****

STATE WISE DATA As on

Press Note on Poverty Estimates,

Press Note on Poverty Estimates,

Web Edition: PROVISIONAL POPULATION TOTALS. Chapter 5. Census of India 2001 Series 1, India, Paper 1 of Chapter 5

State Data Centre. Round Table Conference 30 th July 2009

Chapter 3 LITERACY AND EDUCATION

Analysis of state-wise RPO Regulation across India

Sub: States Fiscal Consolidation ( )

DRAFT National Mission on Small Hydro

Hum a n Re s o u r c e s in He a lt h Se c t o r

Women s Energy Justice Network: CDM Financing and Microlending for Appropriate Technology REEEP Output # N3123

DENSITY OF POPULATION. Figures Map Table/Statements Notes

ALL INDIA WEATHER SUMMARY AND FORECAST BULLETIN

ESTIMATION OF LIFE EXPECTANCY AT BIRTH

National Iodine Deficiency Disorders Control Programme

Government of India Ministry of New and Renewable Energy MNRE

PRICE DISSEMINATION PROJECT

At a Glance. Constructed Over 3.0 million sq. ft. in Retail, Entertainment, Commercial, Parking & Residential Assets. Planned (next 3 years)

VAT FORMS/WAY BILLS REQUIRED FOR DIFFERENT STATES IN INDIA

qualifications a second discipline or for ex-servicemen upper age succeeding pages. CODE Age

Strategy for Providing 24x7 Power Supply. Forum of Regulators

IDENTIFICATION OF DEALERS

Wind Power Programme in India

FAQS FOR MEMBERS OF COMMODITY DERIVATIVES EXCHANGES

NeGP Infrastructure Components (State Data Centre, SWAN, SSDG)

INDIA S NATIONAL INITIATIVES AND EXPERIENCES RELATED TO WIND RESOURCE ASSESSMENT


Renewable Energy Certificate Mechanism

ESTIMATES OF MORTALITY INDICATORS

34-1/2013/DAF Dr. Ambedkar Foundation Ministry of Social Justice & Empowerment

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF


Renewable Energy Technology Diffusion to Mitigate Climate Change Impact

Overview of Infrastructure and Construction Machinery Industry in India Opportunities and Challenges Rajesh Nath Managing Director VDMA India

WORKING PAPER. India: Implementing incentives focused on energy. Anuradha R.V., Sumiti Yadava (Clarus Law Associates)

Loan Details. Document on Educational Loans

INDIA RENEWABLE ENERGY STATUS REPORT May 14. NOVONOUS

BASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 TABLE DF-3 CAPITAL ADEQUACY

SOCIAL BACKGROUND OF OFFICERS IN THE INDIAN ADMINISTRATIVE SERVICE SANTOSH GOYAL

Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India

Chapter-5. Special Economic Zones (Sezs) and Export Oriented Units (Eous)

Farmers Cultural Practices. Availability of Planting Material

TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR

Eligibility for Scholarship: If a candidate is selected, the scholarship shall be paid for pursuing studies in India only.

Indian Institute of Tourism and Travel Management

REPORT ON THE WORKING OF THE WORKMEN S COMPENSATION ACT, 1923 FOR THE YEAR 2009

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

Government of India Earth System Science Organization Ministry of Earth Sciences India Meteorological Department

State-wise List of Directors (Health Services)

I M P L E M E N TAT I O N O F T H E R E N E WA B L E E N E R GY C E R T I F I CAT E ( R EC) F RA M E WO R K I N I N D I A

Policy Implementation and Impact Review: A Case of MGNREGA in India

Ministry of Tourism. Market Research Division. Government of India. Evaluation Study for the Scheme of Market Research - Professional Services

Self- Help Groups, a model for Economic Growth in Nagaland

APPLICATION FORMAT. (To be filled by Applicant and duly certified by Head/Principal/Dean of the Institution/University)

Tamil Nadu Electricity Regulatory Commission

NOTICE. Government of India, (Department of Animal Husbandry, Dairying and Fisheries), Ministry of Agriculture Krishi Bhawan, New Delhi

Sample Reports of Value Added Tax

MAULANA AZAD EDUCATION FOUNDATION APPLICATION FORM FOR MAULANA AZAD NATIONAL SCHOLARSHIP FOR MERITORIOUS GIRLS STUDENT BELONGING TO MINORITIES

Planning for Teachers, Headmasters/Principals and Master Trainers Training

GROWTH, DEVELOPMENT AND POVERTY IN INDIA AND NEPAL

In Focus. India s Renewable Energy Certificate Market

Chapter-5. Special Economic Zones (SEZs) and Export Oriented Units (EOUs) Special Economic Zones (SEZs)

This booklet has been prepared with the support under the GoI-UNDP Disaster Risk Reduction Programme ( )

CONTENTS NATIONAL TABLES

Rooftop Solar PV Power : Potential,Growth and Issues related to

Mercom Capital Group India Solar Market Update

GOVERNMENT OF INDIA UNSTARRED QUESTION NO 822 ANSWERED ON NORMS FOR BPL

INDIA. Road Accidents in India Issues & Dimensions. Ministry of Road Transport & Highways Government of India

Analysis of Solar Energy Industry in India & Its Future Prospects

GENDERED VULNERABILITY

ROAD USER TAXES IN INDIA

List of State Nodal Agencies. Andhra Pradesh

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

How To Calculate The National Education System

MAULANA AZAD NATIONAL SCHOLARSHIP SCHEME FOR MERITORIOUS GIRL STUDENTS BELONGING TO MINORITIES

Youth development in India: does poverty matter?

Pupil-Teacher Ratios in Schools and their Implications. February 2014 Azim Premji Foundation

Tamil Nadu WiNd ENErgy ProfilE

Access to Banking Services and Poverty Reduction: A State-wise Assessment in India

National Water Quality Monitoring Programme

AIR from 1948 to onwards

n Analysis of Census 2001

Name of Service Provider : Tata Teleservices Limited (Broadband Service) Customer Complaints Redressal Report for the Quarter ending - March 2015

Consumer Price Index Numbers - Separately for Rural and Urban Areas and also Combined (Rural plus Urban)

Business Models for Off grid solar for Electricity Access in Rural/Urban India

Withholding Tax Configuration Country India Version

Diploma Course in Guidance and Counselling (2013) INFORMATION BROCHURE

IN THIS POLICY, THE INVESTMENT RISK IN INVESTMENT PORTFOLIO IS BORNE BY THE POLICYHOLDER.

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

List of Principal/Revenue Secretaries of States/UTs

Graphical Representation of Data Chapter 3

Admissions to MS Bioengineering at Christian Medical College, Vellore

TWO NEW RESEARCH REPORTS ON RENEWABLE ENERGY IN INDIA

2.1 Act means, unless expressly stated otherwise, the Public Liability Insurance Act 1991 as amended from time to time.

Financial Results Q3 & 9M FY February 11, 2016

Presentation Title ( Arial, Font size 28 )

Proforma indicating possible areas for collaboration by Community Colleges of foreign countries with Indian States/UTs/Institutions/Colleges

Regional Institute of Education (RIE), Bhubaneswar (National Council of Educational Research and Training) Sachivalaya Marg, Bhubaneswar

Transcription:

World Renewable Energy Forum May 13-17, 2012 Denver, Colorado (USA) Meeting the Dual Goal of Energy Access and Sustainability CSP Deployment in Developing Countries Present Status of India Presented by: Rajiv Bansal SECRETARY CENTRAL ELECTRICITY REGULATORY COMMISSION

Indian Solar Resource The best sites in India are in the north west of the country

Policy and Regulatory Framework: Solar Promotion in India: Technology agnostic The Electricity Act, 2003: RPO Tariff Policy :Separate RPOs for solar Jawaharlal Nehru National Solar Mission REC Mechanism: Separate Solar REC Announcement of solar policy by some States State-wise RPO Orders by Regulators Exemption from environmental clearance for solar power projects

Solar RPO Amendment to National Tariff Policy has mandated solar specific renewable purchase obligation of 0.25% by March, 2013, gradually increasing to 3% by 2022. At the National level total electricity generation in 2011-12 was ~ 879 billion units 0.25% solar RPO means 2.20 million units : 1250 MW solar power generation capacity Most of the States have announced solar specific RPOs Many States (Gujarat 968.5 MW, Maharashtra 125 MW + 80 MW, Karnataka-80 MW, Rajasthan-100 MW) have announced specific plans. 4

State wise Solar RPOs Status State 2012-13 2013-14 2014-15 2015-16 AP 0.25% 0.25% 0.25% 0.25% Assam 0.15% 0.20% 0.25% Bihar 0.75% 1.00% 1.25% Chhattisgarh 0.5% Delhi 0.20% 0.25% 0.30% 0.35% Gujarat 1.00% Haryana 0.75% 1% 1.25% Himachal Pradesh 0.25% 0.25% 0.25% 0.25% J & K 0.25% Jharkhand 1% Karnataka 0.25% 0.25% 0.25% 0.25% Kerala 0.25% 0.25% 0.25% 0.25% MP 0.6% 0.8% 1.0% Maharashtra 0.25% 0.50% 0.50% 0.50% Rajasthan 0.50% 0.75%

State wise Solar RPOs Status State 2012-13 2013-14 2014-15 2015-16 Manipur 0.25% Meghalaya 0.4% Mizoram 0.25% Nagaland 0.25% Orissa 0.15% 0.20% 0.25% 0.30% Punjab 0.13% 0.19% Tripura 0.10% Tamil Nadu 0.05% UP 1% Uttarakhand 0.05% UTs & Goa 0.40%

State wise Solar Power requirement Solar Installed RPO Capacity (MW) Solar Power Required (MW) State 2011-12 as on 31.05.2011 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 Andhra Pradesh 0.25% 14268 143 294 454 622 799 984 1179 1381 1592 1812 2226 Arunachal Pradesh 0.25% 135 1 3 4 6 8 9 11 13 15 17 21 Assam 0.25% 951 10 20 30 41 53 66 79 92 106 121 148 Bihar 0.25% 1854 19 38 59 81 104 128 153 179 207 235 289 Chhattisgarh 0.25% 4632 46 95 147 202 259 320 383 448 517 588 723 Delhi 0.25% 5800 58 119 184 253 325 400 479 561 647 737 905 Goa & UT 0.25% 822 8 17 26 36 46 57 68 80 92 104 128 Gujarat 0.25% 13722 137 283 436 598 768 947 1133 1328 1531 1743 2141 Haryana 0.25% 5880 59 121 187 256 329 406 486 569 656 747 917 Himachal Pradesh 0.25% 2201 22 45 70 96 123 152 182 213 246 280 343 Jammu & Kashmir 0.25% 2167 22 45 69 94 121 150 179 210 242 275 338 Jharkhand 0.25% 1979 20 41 63 86 111 137 163 192 221 251 309 Karnataka 0.25% 9530 95 196 303 416 534 658 787 923 1064 1210 1487 Kerala 0.25% 3573 36 74 114 156 200 247 295 346 399 454 557 Madhya Pradesh 0.25% 8114 81 167 258 354 454 560 670 785 906 1030 1266 Maharashtra 0.25% 20271 203 418 645 884 1135 1399 1674 1962 2262 2574 3162 Manipur 0.25% 152 2 3 5 7 9 10 13 15 17 19 24 Meghalaya 0.25% 258 3 5 8 11 14 18 21 25 29 33 40 Mizoram 0.25% 102 1 2 3 4 6 7 8 10 11 13 16 Nagaland 0.25% 75 1 2 2 3 4 5 6 7 8 10 12 Orissa 0.25% 5299 53 109 169 231 297 366 438 513 591 673 827 Punjab 0.25% 6690 67 138 213 292 375 462 553 648 747 850 1044 Rajasthan 0.25% 7508 75 155 239 327 420 518 620 727 838 954 1171 Sikkim 0.25% 154 2 3 5 7 9 11 13 15 17 20 24 Tamil Nadu 0.25% 9803 98 202 312 427 549 676 810 949 1094 1245 1529 Tripura 0.25% 249 2 5 8 11 14 17 21 24 28 32 39 Uttar Pradesh 0.25% 9848 98 203 313 429 551 680 813 953 1099 1251 1536 Uttarakhand 0.25% 2309 23 48 73 101 129 159 191 224 258 293 360 West Bengal 0.25% 8155 82 168 259 356 457 563 674 789 910 1036 1272 Total 146501 1465 3018 4659 6387 8204 10109 12101 14181 16350 18606 22854

Jawaharlal Nehru National Solar Mission (JNNSM) JNNSM was launched by the Government of India in January 2010. JNNSM is one of the major global initiatives in promotion of solar energy technologies. Mission aims to achieve grid tariff parity by 2022 through Large scale utilization, rapid diffusion and& deployment at a scale which leads to cost reduction R&D and technology demonstration Local manufacturing and support infrastructure 8

JNNSM Road Map Application Segment Grid solar power incl. roof top & distribution grid connected plants Target for Phase I (2010-13) Cumulative Target for Phase 2 (2013-17) 1,100 MW 4,000-10,000 MW Cumulative Target for Phase 3 (2017-22) 20,000 MW Off-grid solar applications 200 MW 1,000 MW 2,000 MW Solar collectors 7 million sq meters 15 million sq meters 20 million sq meters 9

Grid Solar Power - Large Plants 1,000 MW Capacity solar power (connected to 33 KV or higher grid) through bundling 500 MW Solar thermal 500 MW Solar PV 500 MW Solar Thermal To be completed in 28 months after signing PPA Permitted plant capacity for a new project: 20 MW to 100 MW for solar thermal 10

Grid Solar Thermal Power-New projects Solar Thermal : 7 projects for 470 MW selected in December, 2010 through competitive bidding Average Tariff Rs. 11.48/kWh (0.23 C/kWh) CSP Projects scheduled to be synchronized in early 2013 2.5 MW capacity of a 10 MW CSP project (under FiT) synchronized to the grid in May, 2011 11

10 MW capacity project at Bikaner by ACME: 2.5 MW Commissioned 2.5 MW capacity

Solar REC 1 MWh = 1 REC Solar REC will be traded between floor rate effective April 2012 as Rs. 9300/MWh ($186/MWh) Forbearance price is Rs. 13400/MWh ($268/MWh) Valid up to control period 2016-17 3 Solar PV projects registered under REC framework of 8.o55 MW 13

R&D Strategy Research at Academic/Research Institutions on materials & devices with long term perspective Applied Research on existing processes and developing new technologies Technology Validation aimed at field evaluation of materials, components and systems Development of Centers of Excellence in thematic areas of research in the area of Solar Energy. Support for Incubation and Innovation International collaborations with institutional/industrial 14

R&D Activities 36 R&D projects under implementation Centers of Excellence in research and education - 5 Centers sanctioned Technology Validation - 1 MW solar thermal power with storage; field trials of thermal systems for industrial process heat Testing & Training - 6 test labs for PV & 6 for solar thermal systems International collaborations - Joint projects with USA, Japan, Germany, Spain 51 new centers set up for Solar Radiation Data collection 15

National Solar Thermal Power Testing, Simulation and Research Facility 1MWe Solar Thermal Power Plant - Research and Demonstration plant - Combination of different collector fields (Direct and Indirect Steam Generation) Parabolic Trough Field -8700 sq. m -3.3 MWth (Design) Linear Fresnel Field - 7200 sq. m - 2.2 MWth (Design) Turbine operating conditions: saturated steam at 350 deg. C and 40 bar

1 MW with 16 hour thermal storage Project at Mount Abu By WRST with co-funding from German Ministry and Indian industry.

Ground Measurements of Solar Radiation Andhra Pradesh 6 Gujarat 11 Haryana 1 Madhya Pradesh 3 Karnataka 5 Rajasthan 12 Chhattisgarh 1 Ladakh 1 Maharashtra 3 Pudducherry 1 Tamil Nadu 6 C-WET is implementing the project for setting up 51 ground monitoring stations Centralized data collection, analysis and calibration of measuring sensors

Solar Energy Centre Solar Energy Centre (SEC) near New Delhi under the Ministry is the lead Centre for testing and training in solar energy in the country SEC has NABL accredited testing facilities for PV module qualification as per Indian and International standards SEC is imparting training in solar energy at various levels SEC is regularly conducting international training programmes in solar energy with MEA Demonstration of several solar PV and thermal applications including setting up of 1 MW capacity solar thermal simulation and validation facility at SEC is under progress 19

Solar PV outdoor test bed at SEC

Other Initiatives 30% domestic content in the cost of solar thermal power projects has been made mandatory for the Phase 1 projects Strengthening of transmission network for evacuation of solar power in Rajasthan, Gujarat and some other States Pilot projects on solar thermal power to address issues related to air cooling, hybridization, large thermal storage, new technologies etc. Proposal to set up National Institute for Solar Energy (NISE) which will include Solar Energy Centre. Consultation process for launching Phase-II to be started now to maintain continuity in implementation of grid solar power projects 21

Institutional Arrangements Solar Energy Corporation of India (SECI) set up as a Company Not for Profit under Section 25 of Company Act for implementation of activities under the Mission Mission Steering Group Solar Energy Research Advisory Council, 22

CERC Initiatives Capital cost Rs. 13 Crore/MW (2600 $/kw), With out storage Higher capital cost for projects with storage but with higher CUF levelized tariff much not different Capacity Utilization Factor: 23% Levelized Tariff : Rs. 12.46/kWh (0.25 C/kWh) Project specific tariff provision for CSP project with thermal storage and Hybrid projects Solar Thermal 09-10 10-11 11-12 12-13 Capital Cost :Rs. Crore/MW ($/kw) 13 (2600) 15.30 (3060) 15 (3000) 13 (2600) Tariff :Rs. /kwh (Cent/kWh) 13.45 (0.27) 15.31 (0.306) 15.04 (0.30) 12.46 (0.25)

Barriers to CSP Deployment Cost: current high capital cost Drastic cost reduction in PV Financing: A significant barrier Financier are unfamiliar with CSP investment Manufacturing scale-up Currently lack of Domestic manufacturing facility Solar Data Reliable long term DNI and weather data

Way Forward For developing countries CSP with storage facility to meet peak demand Thermal storage to provide more cost-effective approaches to achieving renewable energy dispatchability Solar Hybrid system for existing plants (Steam and gas turbines) Solar Parks for large-scale CSP projects Establish one or more Demonstration Solar Parks for small-scale, commercial demonstration systems for different technology Establish projects to improve on DNI data availability, by both adding ground based data gathering and also to reverse analyse, correlate and re-calibrate all existing forms of historical data Make all such data freely available and easily accessible Innovative financing scheme for CSP projects

Thank You!