HUD Lead Safe Work Practice Training - Planning Tool

Similar documents
Don t Spread Lead. A Do-It-Yourself Guide to Lead-Safe Painting, Repair, and Home Improvement

Don t Spread Lead. A Do-It-Yourself Guide to Lead-Safe Painting, Repair, and Home Improvement

Asbestos Work Permit Procedures

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

Lead Exposure Management Plan

Procedures for Cutting and Handling of Asbestos Cement Pipe. City of Richmond Public Works Operations

LEAD-BASED PAINT HAZARD POLICY

DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS

Summary of Georgia s Lead-Based Paint (LBP) Renovation, Repair and Painting (RRP) Rules For Contractors, Property Managers, and Maintenance Personnel

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

State of Illinois Illinois Department of Public Health OUT. Homeowner s Lead-based Paint Abatement Guide

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

Fact Sheet on Asbestos

UI Procedures for Asbestos Management

Asbestos in Your Home

Essential Maintenance For a Lead-Safe Home

have been provided with information on whether they do or do not contain asbestos before starting work;

LEGAL REVIEW & UPDATE

Technical Information Paper No

Idaho Falls School District 91 Effective Date January 25, 2010

Renovation, Repair and Painting

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR. License Requirements & Work Practice Standards

Steps to LEAD SAFE. Renovation, Repair and Painting LEAD

University of Tennessee Safety Program

LEAD SAFE. Renovation, Repair and Painting ATTENTION. Steps to LEAD

Cleaning up after sewage backup

Subject: FO-HK Restroom Cleaning

Asbestos in your home

Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR ).

Brock University Facilities Management Operating Procedures

EVERYONE'S RESPONSIBILITY

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

How to Clean Up Spilled Mercury (for Homes)

Guidelines for Mold Remediation (Removal)

Asbestos. from the Home. Removing. Read this booklet for:

Asbestos Management Procedures

Safety & Risk Management Policies and Procedures

Effects of Lead Exposure Role of Town Health Officers Construction and compliance Familiarity various rules and regulations

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part , Subpart Z Asbestos

Chemotherapy Spill Response:

LEAD COMPLIANCE PLAN University of California Santa Cruz

ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT

DESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE

BODILY FLUID CLEAN UP PROCEDURES

If you think your home might have asbestos, read this pamphlet to learn some simple steps to protect your family.

McDonald s Kitchen Cleaning Instructions. Prepared for: Employees of McDonald s

Asbestos Management. 2. Introduction. Contents

Biosafety Spill Response Guide

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS IN THE HOME

Guidance sheet 4: Chemical Spill Management

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

ASBESTOS IN YOUR HOME

Cleaning up spilled mercury in the home

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

UBC Plant Operations Asbestos Work Procedures April 2004

PI s Name Date Bldg./Rm# CDC Biosafety Level 3 (BSL-3)

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

NOTES: NEVER use an ordinary vacuum or shop vacuum to clean up mercury

Chapter 13: LEAD-BASED PAINT

File: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010

Standard Operating Procedure for Blood Borne Infectious Disease Control Measures at Calvin College

Contents Purpose... 1 Objectives... 1 Applicability... 1 Definitions... 2 Background... 2 Responsibilities

Sample Asbestos Management Plan. [ Name of Facility ] ASBESTOS MANAGEMENT PLAN

Preparing the Work Area

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

APPENDIX B. EPA s Investigating, Evaluating, and Remediating Moisture and Mold Problems (see EPA website for complete details)

Safety Policy Manual Policy No. 144

Asbestos Removal Procedures for Homeowners

BLR s Safety Training Presentations

Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project

STANDARD OPERATING PROCEDURES SPILL RESPONSE AND CLEAN-UP OUTSIDE BIOSAFETY CABINET

Biological Safety Program

WOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT

ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS

ASBESTOS MANAGEMENT PROGRAM

Sterile Dressing Change with Tegaderm CHG for Central Venous Catheter (CVC)

Facts about Asbestos. Council policy

CLEAN UP FOR VOMITING & DIARRHEAL EVENT IN RETAIL FOOD FACILITIES

How To Care For Asbestos

asbestos management SECTION 21 SECTION CONTENTS ADDITIONAL READING Asbestos Management / Page1 / SECTION 21 TULANE UNIVERSITY

MOLD REMEDIATION KEY STEPS

Summary Why get rid of cockroaches?

Addendum 1 Clarifications

ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions

How to Properly Remove Spray-on Popcorn Ceilings

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Lead Management. Presented by: Gary Chinn (815) President, Best Technology Systems

Good Housekeeping BMP

ASBESTOS CONTROL PLAN

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

How to Properly Remove Cement Asbestos Board Siding

MOLD REMEDIATION PROCEDURES

Bird and bat droppings

Page 1 of 2. Dear Occupant:

UV100A Ultraviolet Air Treatment System

How to Properly Remove Sheet Vinyl Flooring with Asbestos

Transcription:

1

INTRODUCTION This Lead-based Paint Maintenance Planning Tool is a guide designed to develop a custom fit checklist to conduct lead-based paint maintenance activities in a safe manner. It provides basic information on proper and improper lead hazard work practices. You know how important it is to have and use proper tools. Use this tool to help you learn to Work Smart, Work Clean, and Work Wet which means to Work Lead Safe. Use the guide to plan each job that may involve lead-based paint. The cards are laminated so that they can be used, erased, and reused. You can photocopy the cards with the filed assignments and completed measures check-off and save the completed copy for each job. To plan a specific job, answer the questions and circle the materials and equipment and work practices that are appropriate to the specific job to be performed. Below is a list of cards and an explanation of how to use them. Lead Job Check List Use the job checklist to help you recognize risky activities; plan and perform your work; and protect yourself,fellow workers, the residents, and your family from lead hazards. Materials Identify the materials (disposables) needed for the particular job by circling the picture or words. Equipment Circle the equipment needed for the particular job. 2

INTRODUCTION Personal Protection Assign the protection the worker will need by circling the picture or words. Work Practices Circle the work practices that are appropriate to the task. Prohibited and Unsafe Practices Avoid these practices that jeopardize the health and safety of workers and residents. Cleanup Circle the cleanup practices appropriate to the job. As Tasks are completed by the worker, the work practices are checked-off as used. For example, when you plan, circle tape, when you use it, cross it off. Carpet Removal Follow the different work practices required for this commonly performed activity. Decontamination Circle practices that are appropriate to the job. Quality Assurance When the job is finished, do a protecting check. The job is complete when you can answer all of the questions by circling Yes or NA (Not Applicable). Note: Remember that in Federally Assisted Property, clearance is required and must be accomplished in compliance with 40 CFR Part 745 and 24 CFR Part 35 as these regulations apply to the project. In this case the job is not over until clearance is achieved. 3

Planning Tool Page 3 LEAD JOB CHECKLIST Resident Name: Job # Phone: Address/Apt.# 1. Was the building built before 1978? Yes No If you don t know when the building was built, treat the paint as lead-based paint. If the building was built after 1978, then lead-based paint is probably not present and this is not a lead job. If the building was built before 1978, then treat the paint as lead-based paint, unless a paint inspection report says that no lead-based paint is present. 4

Planning Tool Page 3 LEAD JOB CHECKLIST 2. Could this job: (Y=Yes, N=No) Create dust that may contain lead? Disturb known or suspected lead-based paint? Require cleanup of dust or debris that may contain lead? Y N Y N Y N Disturb known or suspected lead contaminated soil? Y N 5

Planning Tool Page 3 LEAD JOB CHECKLIST 3. If Yes to any of the above, or if you don t know the answer to any of the questions, assume you are dealing with lead-based paint, and circle the level of risk below. LOW RISK = Low levels of dust expected to be generated, and surface and paint in good condition, and Less than two (2) square feet. HIGH RISK = High levels of dust expected to be generated, or Surface and paint in poor condition, or Greater than two (2) square feet. 6

Planning Tool Page 4 LEAD JOB CHECKLIST 4. Who will do the job? Personnel must be properly trained and skilled, if they will have to wear a respirator, they must be medically qualified, fit-tested, and trained. Name Name 7

5. How will residents be notified and affected? Planning Tool Page 4 LEAD JOB CHECKLIST Notification: Phone Letter Time Date Work area instructions to residents Job scheduled: FROM: Time/Date TO: Time/ Date Resident asked to leave unit: FROM: Time/Date TO: Time/ Date Resident asked to move personal items? Yes No Temporary accommodations needed for resident? Yes No If Yes accommodation provided? Yes No If Yes WHERE PHONE # 8

Planning Tool Page 4 LEAD JOB CHECKLIST 6. How will work be performed to minimize exposure to lead? Circle specific cards to use for this job: Materials Card Cleanup Cards Equipment Card Carpet Removal Card Personal Protection Card Decontamination Card Work Practices Card Quality Control Card Prohibited and Unsafe Practices 9

Circle needed materials. (Note for high risk.) Planning Tool Page 5 MATERIALS Circle Needed equipment ( Note for high risk.) Heavy Duty Plastic Sheeting Tape All-Purpose Cleaner, or cleaner made specifically for lead LEAD WASTE Disposable Towels Heavy Duty Plastic Bags Tack Pads RAGS Rags String Mop Heads 10

Circle needed materials. (Note for high risk.) Planning Tool Page 6 EQUIPMENT Circle Needed equipment ( Note for high risk.) Spray Mister Broom (Wet Sweep Only) Mop & Bucket Stapler Dust Pan Scraper HEPA HEPA Vacuum Utility Knife WARNING LEAD HAZARD Signs & Barriers Mini - Containment 11

Circle needed materials. (Note for high risk.) Planning Tool Page 7 ΠΕΡΣΟΝΑΛ ΠΡΟΤΕΧΤΙΟΝ Circle needed protection (Note: for high risk) Protective Eye Wear Latex/ Rubber Gloves Disposable Cotton Gloves 12

Circle needed materials. (Note for high risk.) Planning Tool Page 8 PERSONAL PROTECTION Circle needed protection (Note: for high risk) Respirators w/hepa Filters Disposable Full-Body Coveralls/Recyclable Clothing 13

Planning Tool Page 9 Circle needed materials. (Note for high risk.) WORK PRACTICES Work Smart Protect and inform residents Wear proper personal protective clothing. Be alert to special situations. Shutdown HVAC and/or isolate vents. Remove and protect resident belongings. Install heavy duty plastic firmly and securely. Isolate area with heavy duty plastic sheeting 14

Circle needed materials. (Note for high risk.) Planning Tool Page 10 WORK PRACTICES Work Wet Mist work area with water Wet scrape, sand, pry, saw, plane, drill, and remove painted materials. Foam drilling area. 15

Planning Tool Page 10 Circle needed materials. (Note for high risk.) WORK PRACTICES Tack Pad Clean As You Go Minimize Dust Releases Dust Containment Work Clean Use a tack pad. Install catch bags under work. Keep debris picked up. Control settled dust. Use mini-enclosures. 16

Planning Tool Page 11 PROHIBITED PRACTICES NO MECHANICAL GRINDING/SANDING WITHOUT HEPA ATTACHMENTS NO EXTENSIVE DRY SANDING OR SCRAPING ABOVE DE MINIMUS LEVELS NO OPEN FLAME BURNING, HEAT GUN HOTTER THAN 1,100 O F, OR WELDING/FLAME CUTTING NO METHYLENE CHLORIDE BASED STRIPPERS IN POORLY VENTILATED SPACES. HEPA Methylene Chloride Stripper 17

Planning Tool Page 12 UNSAFE PRACTICES NO VACUUMING WITH HOUSEHOLD VACUUM NO MISTING OF WATER NEAR ELECTRIC OUTLETS/FIXTURES NO WASHING IN RESIDENT S SINK OR LAVATORY NO DISPOSAL OF WASTE IN RESIDENT TRASH NO DISPOSAL OF WATER IN RESIDENT SINKS/ BATHTUBS OR YARD AREAS 18

Planning Tool Page 13 CLEANUP LOW RISK 1. Place large debris in heavy duty plastic bags. 2. Wet wipe tools 3. Mist debris on work area heavy duty plastic film. 4. Fold heavy duty plastic film dirty side in. Place in heavy duty plastic bag and label. 5. Wet wipe work area with cleaner. 6. Rinse work area with water. 19

7. Wet wipe with cleaner under and 2' beyond area that was covered with heavy duty plastic film. 8. Rinse wipe with water under and 2' beyond area that was covered with heavy duty plastic film. 9. Gooseneck seal and label heavy duty plastic bag. 10. Remove all materials, tools and bagged debris from work area and residence. 11. Properly dispose of bagged debris. Planning Tool Page 14 CLEANUP LOW RISK 20

Planning Tool Page 15 HEPA 1. Place large debris in heavy duty plastic bags. 2. Place contaminated tools/equipment in heavy duty plastic bag and seal. 3. Mist small debris on plastic film in the work area. 4. Remove mini containment and place on heavy duty plastic bag. 5. Properly remove coveralls. Place in heavy duty plastic bag. 6. Fold plastic film dirty side in. Place in heavy duty plastic bag and label. 7. Wet wipe with cleaner the area that was repaired. 8. Rinse wipe with water the area that was repaired. 9. HEPA vacuum under and 2' beyond area that was covered with plastic film. CLEANUP-HIGH RISK 21

Planning Tool Page 16 HEPA CLEANUP-HIGH RISK 10. Wet mop with cleaner under and 2 beyond area that was covered with plastic sheeting. Wring mop in separate bucket. 11. Rinse mop with water under and 2 beyond area that was covered with plastic sheeting. Wring mop in separate bucket. 12. HEPA vacuum under and 2 beyond area that was covered with plastic sheeting again. 13. Gooseneck seal and label heavy duty plastic bag. 14. Remove all materials, tools and bagged debris from the work area and residence. 15. Properly dispose of bagged debris. 22

Circle needed work practices Planning Tool Page 17 CLEANUP-HIGH RISK CARPET 1. Mist carpet. 2. Loosen wall to wall from tack strips or glued areas. 3. Cut carpet to manageable portions with utility knife. 4. Roll carpet pile side in, enclose in heavy duty plastic sheeting, seal with tape, and remove while misting carpet backing from area. PAD 5. Cut padding to manageable portions with utility knife. 6. Roll pad while misting. 7. Wrap carpet & padding in heavy duty plastic sheeting. 23

Circle needed work practices Planning Tool Page 18 CLEANUP-HIGH RISK FLOOR HEPA vacuum floor area. Rinse/mop floor area and baseboards with cleaner. Wet mop floor area HEPA vacuum floor and baseboards with area again. 24

Circle needed materials. (Note for high risk.) Planning Tool Page 19 DECONTAMINATION PERSONAL Vacuum clothing with HEPA vacuum. Wipe hands and face with disposable towels. Wash face and hands with soap and water before eating, drinking, smoking, or applying cosmetics and at finish of job. Shower with soap. Recyclable coveralls go to the special laundry. Launder clothes separately. EQUIPMENT Clean tools and equipment away from the work area. 25

Planning Tool Page 20 QUALITY ASSURANCE Did you do your part to inform and protect everyone from lead poisoning? Work properly completed as requested Yes No N/A* Work areas cleaned properly Yes No N/A Contaminated debris properly bagged, sealed and labeled Yes No N/A Contaminated debris, tools, materials, and equipment removed from house. Yes No N/A Residents notified of job completion Yes No N/A Other lead problems noted Yes No N/A If Yes,other lead problems reported Yes No N/A Signature Name Unit/Address *N/A means not applicable. 26

This Planning Tool is an important part of the Lead-Based Paint Maintenance Training Program developed for the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Housing and Urban Development (HUD) by the National Environmental Training Association (NETA) under EPA grant CX- 824712. The training package includes a training guide, 60 minutes of integrated video, the Planning Tool, and originals to copy for overheads and student handouts. It is designed for trainers and supervisors to train maintenance personnel on safe procedures to use when maintaining dwellings that contain lead-based paint. The Training Program provides basic instruction on proper and prohibited lead-based paint maintenance and control measures and explains how to use the Planning Tool. CAUTION: Completion of this course does not meet U.S. EPA requirements for lead-based paint abatement training. Additional training and Statecertification are required to conduct lead-based paint abatement work safely. Information on how to obtain additional copies of this Planning Tool and the training package is available from the Lead Paint Compliance Assistance Center toll free at 1-866-HUD-1012 (1-866-483-1012). Copies of the laminated Planning Tool may be purchased from NETA, phone number 602-956-6099, or by fax number 602-956-6692, or from HUD-USER, phone number 1-800-245-2691. Also available from HUD- USER is a free EPA brochure Reducing Lead Hazards When Remodeling Your Home (EPA Publication #747-R-94-002, April 1994). You may obtain more information on High Risk lead operations and maintenance practices for the U.S. Housing and Urban Development Guidelines for the Evaluation and Control of Lead-Based Paint in Housing, phone number 1-800-245-2691 or the National Institutes of Building Sciences (NIBS) Lead-Based Paint: Operations and Maintenance Work Practices Manual for Homes & Buildings, phone number 202-289-7800. 27