MFI s CHALLENGES TO USE CEDIT SCOING Cultural Constraint Challenge Solution Change esistance Scoring as a tool for challenging goals Lack of Developme

Similar documents
Risks Integrated Management Tool

Advanced Contact Center Solutions

Value of information

Business Management Suite BUSINESS MANAGEMENT MADE SIMPLE FOR SALES, MARKETING, FINANCE & OPERATIONS

Executive presentation. A new vision in consulting

Enabling Consumption based Cloud Services for the Masses Powua & Telecoms

Thus, we continue to focus on our mission of being the most efficient, profitable, and safe

PMI Project Management International Congress Location Lima, October 29th and 30th 2009 Location Arequipa, November 2nd 2009

Resume Loyalty Marketing Services

Operational Risk Information System

Francisco Márquez 146 Colonia Condesa México D:F. C.P Tel (55) Fax (55)

ARGENTINA MISSIONLINE LOGISTICS SA EXCLUSIVE MEMBER. Name: SALTA 3503 LA LUCILA B1637BXG BUENOS AIRES - ARGENTINA. Phone:

Cloud Self Service Mobile Business Intelligence MAKE INFORMED DECISIONS WITH BIG DATA ANALYTICS, CLOUD BI, & SELF SERVICE MOBILITY OPTIONS

GENERATING THE MOST PREDICTIVE COLLECTIONS RISK ASSESSMENT

Introduction. Why the PPI? Center for Agriculture & Rural Development (CARD):

SIAL CANADA 2011 CONTACT INFORMATION TOURISM, FOREIGN INVESTMENT AND EXPORTS PROMOTION

High Power Wireless Networks

Manuel Velazquez April 09 ID:#

Investment opportunities in Andean Region of Peru

Controlling the Money Supply: Bond Purchases in the Open Market


Hotel, Tourism and Leisure. Global leader in hospitality consulting. Latin America/Caribbean

In a Global World, Partnerships Open the Door to a Go-To-Market

Universidad de los Andes School of Engineering

OUTSOURCING IN LATIN AMERICA


World Bank SME Questionnaire December 2006

FAS Construction Management Services in Mexico

Appendix B Subsidiaries (List of subsidiaries covered by The Bank of Nova Scotia s Global Certification under the U.S.A.

ONE COMPANY ALL COUNTRIES. Your professional Incoming Partner in South America

Routes Development in Lima

Portfolio Risk Management. Module 8

RAIDEN ENERGY CHILE RAIDEN ENERGY CHILE BRIEF PRESENTATION

SUPPLY PROCUREMENT NOTICE CONTRACT SPECIFICATIONS

Business Analytics and Credit Scoring

Telefónica Global Solutions. Channel Partner Program Expand your limits through our global scale

Information Management initiatives in Latin-American Countries. By: John Salazar October 2011

EFL Case Study: Using the EFL Score to Enhance Credit Bureau Data. Equifax Peru. Executive Summary:

FINANCIAL AID.

THE NUTS AND BOLTS OF IN HOUSE FINANCING. Pat Nanda C.E.O. CBD Credit

2006 UNIVERSIDAD DE AQUINO BOLIVIA UDABOL, Santa Cruz de la Sierra, Bolivia. Post Graduate Degree in Arbitration and Conciliation, October 2006

MEMORANDUM OF UNDERSTANDING. between ASIAN DEVELOPMENT BANK. and CORPORACION ANDINA DE FOMENTO

Credit Scorecards for SME Finance The Process of Improving Risk Measurement and Management

Technische Universität Berlin Germany Undergraduate. Université François- Rabelais de Tours France Undergraduate

Credit Scoring for Microfinance


INTERNATIONAL FACTORING

Secure, Efficient Document Sharing: Finally a Reality for the Healthcare Industry A Case Study

Como la tecnología genera oportunidades para emprender


Argentina Brasil Chile Colombia España. México Perú Trinidad y Tobago Venezuela Centro América.

GENERAL INFORMATION. (Presented by the Secretariat)

TBS International Limited. Jefferies 2 nd Annual Shipping Conference

Association of Panamerican Veterinary Medical Colleges

An Application of the Cox Proportional Hazards Model to the Construction of Objective Vintages for Credit in Financial Institutions, Using PROC PHREG

the Cloud

- Assumption of the Presidency and Vice- Presidency charges - Seminar opening speeches

GENERAL INFORMATION. (Presented by the Secretariat)

Regional Project Concept Template (Category A)

TABLE 2 CONSANGUINEOUS MARRIAGE IN THE AMERICAS

RAIDEN ENERGY CHILE BRIEF PRESENTATION. For more information please take contact with us:

INVOICE REQUIREMENTS. The following data must appear in the invoice for its correct payment processing: Procter & Gamble information LE 376

Atlas Ticketing Solution The Future is Already On Board

May 9, 2013 Advice Letter 4484-G

Agricultural finance for smallholder farmers: Rethinking traditional microfinance risk and cost management approaches

Data Modeling & Bureau Scoring Experian for CreditChex

Argentina s Economy: A death foretold again, or a surprise rescue? Claudio M. Loser Centennial- Latin America March 2014

Deriving Call Data Record Insights through Self Service BI Reporting

ediscovery: Managing Costs & Avoiding Pitfalls

KOM INTERNATIONAL COMPANY OVERVIEW. Supply Chain Consultants Since 1963

Vision Precision Value

This is how we are remembered...

About US. Residential; Commercial (Retail & Offices); Industrial Storage; Properties Administrations.

FREIGHT FORWARDING & LOGISTICS. We make Mexico easy!

HOTELSLIMA Miraflores

In Business Intelligence Advisory we are convinced that we must always be sure that we heard and understood correctly what you need.

Colombia is good with words. See it for yourself in the Frankfurt Book Fair 2011.

INTERNATIONAL MBA IE BUSINESS SCHOOL

IE Business School s.

Learning in Twenty-First Century Schools. Note 1. Series Introduction. Carlos Gargiulo

HOW PREDICTIVE ANALYTICS DRIVES PROFITABILITY IN ASSET FINANCE

WHITEPAPER. How to Credit Score with Predictive Analytics

Kyle A. Frazier CG/LA Infrastructure June 3-4, 2015

OPORTUNIDADES SALES & MARKETING DE OPPORTUNITIES

DIGI-TOUCH Color Touch Screen Controller

Microinsurance NOTE 3 Partnerships: Microfinance Institutions and Commercial Insurers

RWE npower Investor Meeting. Paul Massara, CEO RWE npower 23 April 2013

MEbA (MICROFINANCE FOR ECOSYSTEM-BASED ADAPTATION TO CLIMATE CHANGE)

Complementing capabilities. Maximizing possibilities.

CASE STUDY CARDS: DRIVING PROFITABLE GROWTH

Invitation to the Seminar on Risk Management in International Factoring Mexico City, Mexico December 2015

Personal Saving Rate (S Households /Y) SAVING AND INVESTMENT. Federal Surplus or Deficit (-) Total Private Saving Rate (S Private /Y) 12/18/2009

BETTER LENDING AND BETTER CLIENTS: CREDIT BUREAU IMPACT ON MICROFINANCE

THE UNIVERSITY. Inaugurated its academic activities in Private, autonomous, accredited, non profit institution.

SUPPLEMENTAL INFORMATION 4.10 STUDENTS PARTICIPATING OF INTERNATIONAL ACADEMIC EXCHANGE PROGRAMS

Thailand Financial Inclusion in Thai Credit Bureau s View. by Surapol Opasatien - CEO National Credit Bureau Co., Ltd

We take each step of your project with you. Grupo Bancolombia has all its resources and support at your disposal at each stage of your infrastructure

Endesa Chile YE14 Results

Deutsche Bank. Andean Region Conference. London, May, 2016

FINANCE for the POOR Equipment Leasing and Lending: A Guide for Microfinance 1

Transcription:

HOW TO INTODUCE CEDIT SCOING FO MICOFINANCE LENDING LiSim September 2007

MFI s CHALLENGES TO USE CEDIT SCOING Cultural Constraint Challenge Solution Change esistance Scoring as a tool for challenging goals Lack of Development Vision Scoring as a Threat Intensive Training for all related staff Databases Availability Challenge Solution Not enough quantity and quality data bases Expert models

MFI s CHALLENGES TO USE CEDIT SCOING Technological esources Challenge Not enough and specific technological resources for the microfinance market Solution Technological tools may be adjusted from other massive segments Key factor for a profitable portfolio at microfinance

HOW DOES CEDIT SCOING AFFECT POLICIES Policies eview Scoring helps to validate aspects inside policies and improve all the approval process. Necessity Validation To accept risky population and to miss target population Avoid Policies Target Population High isk Low isk Policies Population Target Statistical Evaluation Decision eal isk Profile Low isk ejected Population High isk Low isk Approved Population High isk Total 100% Policy Evaluation Wrong Policy ight Policy ight Policy Wrong Policy Average isk

HOW DOES CEDIT SCOING AFFECT POLICIES Scoring Policies Multiples characteristics One single characteristic at a time A ange HIGH ISK AVEAGE HIGH ISK AVEAGE LOW ISK LOW ISK score A B C D E F G H I J K TOTAL Bad Total # Total % # PES % PES 4000 43.48% 9200 2.47% 2500 36.76% 6800 1.82% 5800 33.72% 17200 4.61% 10100 27.01% 37400 10.03% 9100 24.80% 36700 9.84% 5200 13.33% 39000 10.46% 4500 10.47% 43000 11.53% 2700 5.74% 47000 12.60% 1700 4.15% 41000 10.99% 770 1.73% 44500 11.93% 450 0.88% 51200 13.73% 46820 12.55% 373000 100.00% High isk = ejection A = Approve Average / High = Disbursement with short term, low amount, high interest. = eject Average / Low = Disbursement with average/short term, average/low amount, average interest rate Low isk = No restrictions. *Scoring keeps only basic policies Looks ight Clients Policies Looks ight Products Scoring To Current Products To Potential Clients

HOW DOES CEDIT SCOING AFFECT POLICIES Approval Process (Scoring Evaluation methodology) 1 Start First data collection (enough as to apply basic policies) Traditional Process 2 High isk (Automatically ejection) Yes Notification and Disbursement 3 No Basic and Bureau Policies application 3 Clients Database Average isk? Standard Evaluation No Yes 3 No Does the client fits the policies Scoring Yes Behavior Database Intensive Verification (Second Visit + eference consulting) Light Verification (eference consulting) Sociodemographic and Business Data Collection Segmented isk Evaluation Application Score Calculus End Match Verification? Yes 1 2 No 3

CLIENTS ELATIONSHIP TOUGH SCOING Collection Process: Behavior models to segment population and apply differentiated strategies regarding payment probability. Approval Process: Applications Models for new clients; More and best new clients CLIENT CYCLE Provisions estimation: enewal and Cross Sells Process: Behavior Models to improve the renewal and cross sells process regarding risk and consumption tendencies Behavior models for an accurate expected loss estimation. (as included in BASEL II)

SCOING SISTEMS MAINTENANCE It s extremely important to validate integrally the right implementation model. Implementation Stage Monitoring eports Data Quality ejection Levels Scoring Impact Maintenance Process A maintenance is required depending on an evaluation report alert Behavior Stability Scorecard Evaluation An integral review of the current variables behavior An evaluation of additional variables for possible inclusion in the model.

CONCLUSIONS Scoring implementation challenges have always alternatives of success. Scoring gets more attention to clients, due to it maximizes the approvals by reducing the policies and customizing the services offered to the client s risk. Integral risk management through predictive CM. The maintenance is important to guarantee the appropriate performance of the Score Card.

THANK YOU VEY MUCH FO YOU ATTENTION For additional information, please do not hesitate to contact me: Lilian Simbaqueba LiSim C.E.O lsimbaqueba@lisim.biz Phone: 57 1 602 20 20 Address: Cll. 94 A No. 11 A 39 Bogotá - Colombia

OU COMPANY LiSim ECUADO Av. La epública 307 y Diego de Almagro Oficina 7B. Tel: 593-22529341/2550459 Quito LiSim COLOMBIA Calle 94 A No. 11A-39 Tel : 57(1) 6022020 Bogotá D.C. Colombia LiSim BOLIVIA Calle Benito Juárez #48 Casa 5 La Florida LiSim PEU Tel (5912) 274 0753 Av. José Pardo 223, Piso 9, Miraflores. La Paz Tel: 511 2160016 Fax: 511 3722518 Lima LiSim CHILE Simón Bolívar 5917 M Teléfono: (56 2) 2278118 Santiago de Chile LiSim AGENTINA econquista 661 Piso 4 C1003ABM Tel (5411) 43156700 Buenos Aires LiSim MEXICO S. De.L. de C.V. San Borja, 816-I. Colonia del Valle. C.P. 03100 Teléfonos: (52 55) 5559-7437 México, D.F. E-Mail: ventas@lisim.com