Bosnia and Herzegovina 2014 Floods Disaster. Case Study Maglaj May 2014 Floods

Similar documents
PRESENTERS: BACHELOR OF ARTS- PSYCHOLOGY

BOSNIA AND HERZEGOVINA RECOVERY NEEDS ASSESSMENT

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

DISASTERS & EMERGENCIES

ASSESSMENT AND MANAGEMENT OF CONTAMINATED SITES IN FLOOD DISASTER IN SERBIA 2014

TERMS of REFERENCE (ToR)

2013 Flood Recovery Framework

Elbe flood in 2002 and 2006 in terms of emergency management

Promote Business Continuity Planning for Disaster Resiliency in Vietnamese economy

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

UNITED NATIONS DEVELOPMENT PROGRAMME BUREAU FOR CRISIS PREVENTION AND RECOVERY DISASTER RISK REDUCTION AND RECOVERY TEAM

Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities

FINAL PROJECT REPORT. "Emergency Preparedness and Response Disaster Risk Management" Content. 1. General Project Information

Indonesian National Network on Disaster Resource Partnership (DRP)

Development and Recovering From Disaster

EMERGENCY MANAGEMENT AGAINST THE NATURAL DISASTERS OF TURKEY: MITIGATION, RESPONSE AND RECOVERY ISSUES

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual

Community Capacity Case Study: The Meadows

Multi-Hazard Disaster Risk Assessment (v2)

Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action ( )

Ensuring Accountability in Disaster Risk Management and Reconstruction

Disaster management challenges in the Danube region related to environmental risks

International Disaster Response Tools

Developing Capacities for Risk Management and Resilience

Contribution to Suggestions for Future Commission Priorities Disaster Risk Knowledge Centre

BASIC EMERGENCY MANAGEMENT FOR ELECTED OFFICIALS. M a r y l a n d M a y o r s A s s o c i a t i o n. W i n t e r C o n f e r e n c e A n n a p o l i s

Barre City City-wide Policy and Program Options

13 PROPOSED REGION OF YORK EMERGENCY MANAGEMENT BY-LAW

REPUBLIC OF SOUTH AFRICA DISASTER MANAGEMENT AMENDMENT BILL

Conference Statement:

EN 31IC/11/R7 Original: English Adopted

Disaster Preparedness and Response World Health Organization Regional Office for Europe. Introduction to the VRAM

Graduate School of Disaster Prevention Kangwon National University.

families in Bosnia and Herzegovina

Islamic Relief Worldwide

School Disaster Management Planning Template

B E F O R E T H E E M E R G E N C Y

DISASTER MANAGEMENT SYSTEM IN NEPAL POLICY ISSUES AND SOLUTIONS

A Guide to the Role of Community Flood Wardens

Animals in Disasters

Centre International de Droit Comparé de l Environnement CIDCE. Comments on the Zero draft of the Post 2015 framework for disaster risk reduction

Emergency Plan Of Action update

Monthly Humanitarian Bulletin Indonesia

International Training Program 2010 Management of Flood Control and Disaster Mitigation LOGO

Maryland Emergency Operations Plan

IASC Inter-Agency Standing Committee

Job Creation after Disasters

Prevention of natural disasters in Bosnia and Herzegovina

Doing Business, Small & Medium Enterprise Support and Information Access

Benin, Bosnia and Herzegovina, Chile, Costa Rica, Georgia, Guatemala, Jordan, Nicaragua, Norway, Portugal and Qatar: draft resolution

Comprehensive Risk Assessment for Urban and National Resilience

The Role of Elected Officials During Disasters. The Florida Division of Emergency Management

How To Manage A Flood In Mozambique

WATERSHED COORDINATOR FOR FOURMILE WATERSHED COALITION

An overview of Brazilian experience in organizing the flood management: an institutional and technical approach

Dr. Donald A. Wilhite School of Natural Resources University of Nebraska-Lincoln

LAW ON EMERGENCY SITUATIONS I BASIC PROVISIONS

Public-Private Sector Partnerships in Disaster Reduction Private sector companies are major contributors in response to disasters worldwide

<click here for the DREF budget, here for contact details, or here to view the map of the affected area>

District Disaster Risk Management Planning

MANAGING NATURAL HAZARDS IN JAMAICA

Basic system of measures for flood damage mitigation in Japan. Preparedness for major floods

NATIONAL POLICY ON THE INCIDENT MANAGEMENT SYSTEM

Swedish crisismanagement and Floods Directive

The Local Government Self- Assessment Tool. Taking stock, celebrating achievements and planning for DRR in Addis Ababa

Flood Mitigation Efforts in the Red River Basin. Slobodan P. Simonovic University of Manitoba University of Western Ontario

REQUEST FOR PROPOSAL (RFP) For Consultancy Services

Cooperation assessment São Paulo and the Netherlands

EMERGENCY MANAGEMENT BRITISH COLUMBIA A STRATEGY TO ADVANCE SUPPORT FOR LOCAL AUTHORITY EMERGENCY MANAGEMENT PROGRAMS OCTOBER 14, 2015

Safe and Climate Resilient Cities Lessons learnt (hopefully) from recent works. Federica Ranghieri The World Bank

Regulatory Framework for Disaster Recovery Planning for the ICT Industry

Landslides & Mudflows

ready? are you [ ] An Elected Official s Guide to Emergency Management

Istanbul Seismic Risk Mitigation and Emergency Preparedness Project

Emergency Management Audit For Businesses

DISASTER RISK DETECTION AND MANAGEMENT COURSES SETUP SCENARIO AT MAKERERE UNIVERSITY. Makerere University

DISASTER PREPAREDNESS IN MEDICAL EMERGENCIES

Saving children & FAMILIES in Emergencies

Chapter 6. Emergency Services

Symposium on Climate Risk Management

Best Practice of Flood Hazard Map in Japan

Implementation Date: May 5, Table of Contents. Section Description Page. 1.0 Description Initial Response 2

TERRITORIAL PLANNING FOR THE MANAGEMENT OF RISK IN EUROPE

GEF PACIFIC IWRM PROJECT RESULTS NOTE

ARTICLE 147. Emergency Management Agency.

UNITED NATIONS CHILDREN S FUND

Armenia. Alvaro Antonyan Armenian National Survey for Seismic Protection. HFA in Armenia Recent Developments

FLOOD RISKS IN LONDON

Third United Nations World Conference on Disaster Risk Reduction Working Session 2: Risk Identification and Assessment. Speakers

Community Emergency Planning Guide

DISASTER RISK MANAGEMENT IN CAMBODIA

The purpose of ESF #9 is to identify search, rescue, and recovery roles and responsibilities within the City of Tucson during a disaster.

Business Continuity Management & Disaster Recovery GETTING STARTED Checklist for Local Businesses & Organisations

18-22 January 2005, Kobe, Hyogo, Japan. Building the Resilience of Nations and Communities to Disasters.

Security Risk Assessment Tool

Management of flooding downstream of dams

ASSOCIATION OF CARIBBEAN STATES (ACS) 19th MEETING OF THE SPECIAL COMMITTEE FOR DISASTER RISK REDUCTION. Bogotá, Colombia, August

Danubius Basic NetWork

How To Help Businesses In Thailand

Disaster risk reduction & emergency response for WASH

Transcription:

23rd OSCE ECONOMIC AND ENVIRONMENTAL FORUM Water governance in the OSCE area increasing security and stability through co-operation CONCLUDING MEETING Prague, 14 16 September 2015 Session 6 OSCE Mission to Bosnia and Herzegovina EEF.FR/3/15 21 September 2015 ENGLISH only Bosnia and Herzegovina 2014 Floods Disaster Case Study Maglaj May 2014 Floods Background Due to extremely heavy rainfall leading up to14 May 2014, when a quarter of the average annual rainfall fell in a period of 4 days (approx. 300 l/m2), water in the vicinity of the spring of the river Bosna and its tributaries burst their banks and flooded the surrounding areas in the Sarajevo Canton. This was followed by a flood wave which affected areas downstream, all the way to the confluence of the river Bosna with the river Sava at Šamac. The 2014 floods are the biggest humanitarian disaster in Bosnia and Herzegovina since the end of the war in the former Yugoslavia. Over 90,000 people lost their homes, and a large number of schools, health centres and other buildings were damaged or destroyed. The floods also caused landslides which dislocated previously marked mine fields. The preliminary emergency phase, where the main objective was to save the lives of flood victims, was essentially completed 10 days after the occurrence of critical flooding, subsequent to which the disaster recovery and consequence-mitigation phase commenced. 1

Background BiH 2014 floods disaster (data provided by the Ministry of Security of BiH) 73 municipalities (50%) in BiH affected by the floods 100,000 homes damaged or destroyed 230 schools and hospitals damaged or destroyed 66,080 persons evacuated 7,176 landslides activated Total damage estimated at 2 billion EUR Maglaj 2014 floods disaster (Municipal report on the 2014 floods) 1,686 households affected (5,396 individuals) 296 small and medium enterprises damaged or destroyed 70 landslides activated 49 houses entirely destroyed due to the landslides Total damage estimated at 85 million EUR Photographs 2

OSCE Response In the aftermath of the floods, post-flood OSCE Temporary Premises have been established in Bijeljina, Maglaj, Orašje, Prijedor and Šamac As of 1 September, only the Temporary Premises in Maglaj remains open The objective of Temporary Premises has been to monitor political, economic and social developments in flood-affected areas, provide logistical and technical assistance to local authorities and recovery/relief organizations/agencies, and help strengthen early-warning capacities Following the emergency phase and the first recovery phase Municipality of Maglaj voiced an interest in assessing the situation, concerned with documenting the details and identifying lessons learned in the aftermath of the floods and resulting landslides which dislocated previously-marked mine fields The Case Study Recognizing the OSCE as a valuable and reliable partner in the field, Municipality of Maglaj approached the OSCE Mission to Bosnia and Herzegovina and asked for assistance to local authorities in conducting a flood-related case study with the aim of establishing an objective overview of the situation and Municipal response to the May 2014 floods In technical terms the consultant contracted by the OSCE used the Risk Vulnerability Assessment (RVA) methodology By the decision of the Mayor of Maglaj, the local authorities appointed a working group consisting of local experts to support the work of the consultant in his technical assessment, as well as through wider consultation with other stakeholders 3

Objectives of the Study To document the different aspects of the the Maglaj May 2014 flood disaster, with a view to increasing disaster management capacities and flood resilience of the Maglaj Municipality; To improve the overall disaster preparedness of the Maglaj Municipality through identification of weaknesses and proposal of necessary measures and actions; To identify lessons learnt by analysing the chronology of events and preparedness of all municipal structures before, during and after the disaster; To translate the proposed measures into projects to be implemented by local, national and international institutions and organizations. Findings Multiple hazards and vulnerability factors exist in the Maglaj Municipality (frequent floods, landslides, drought, forest fires, unexploded ordnances, etc.); The Municipality s disaster prevention and mitigation capacities as well as environment protection policies are very poorly organized, insufficiently financed and inadequately managed, owing in large part to the overall lack of integrated risk management in BiH; Local flood hazard planning, watershed management and impact assessment and prevention is structurally underdeveloped both infrastructure and human resources; Timely and tailor-made intervention by international organizations, including the EU, UNDP, USAID, CRS, Islamic Relief, Hilfswerk, Tika, and the OSCE, greatly facilitated rapid recovery of communities after the floods. 4

Conclusions and recommendations Use the lessons learnt from the May 2014 flooding of the Maglaj Municipality to prevent and adequately respond to future disasters; Start developing effective flood preparedness and mitigation system by enhancing co-operation, co-ordination and information sharing between institutions, citizens and authorities at all levels; Improve the understanding of local policymakers of the relevance of managing risk in connection to land-use management, economic and housing development in flood-prone areas and deforestation to increasing the Municipality s flood resilience; Conclusions and recommendations Strengthen the Municipality s emergency response capacity to manage natural disaster risks - providing adequate facilities, equipment and training for the functioning of civil protection services; Develop an effective flood alert, forecast and warning system in the Municipality to better detect the risk of a flood-triggering situation; Conduct a targeted public campaign to raise awareness among citizens on the role of the municipal civil protection unit in emergency situations. 5

Steps forward After intensive consultations with the local stakeholders, the Study was adopted by Maglaj Municipal Assembly as an official Municipal Document The Study is accessible to the public on the Municipal webpage The Study will be presented at wider regional forums to support the improvement of the general country civil protection systems Photographs 6