1 BOSNIA AND HERZEGOVINA RECOVERY NEEDS ASSESSMENT Floods May EXECUTIVE SUMMARY The authorities of Bosnia and Herzegovina at all levels have conducted an assessment of the post disaster recovery needs stemming from the devastating floods which affected large parts of the country from May The European Union, the United Nations and the World Bank, within the framework of the Joint Declaration signed in 2008, supported this process by providing resources and technical support. The assessment was conducted over three weeks from 25 May to 17 June and reflects damages, effects, impact and needs on the basis of information available at the time of writing. Methodology The assessment makes use of data from existing secondary sources, reports and records provided by different levels of government, relevant sectorial agencies, as well as information from other available sources, including maps, records and media reports. To complement and validate all the information collected, primary sources on effects and needs have been utilized, including rapid surveys on livelihoods, housing and public services and facilities. The assessment has been undertaken for six sectors and three thematic groups. Practitioners from domestic authorities at all levels have collaborated with international experts. A methodological training workshop familiarized all actors involved with a common methodology based on the best international practices and standards. Sector teams visited affected areas across the country to consult with entities, cantonal and municipal authorities, other relevant public/community representatives, NGOs, and stakeholders, including UN and EU operations on the ground. No fewer than 26 municipalities were visited, several of them more than once with specific thematic or sector interest. Characterization of the event Extraordinary rainfall affected Bosnia and Herzegovina between 14 and 19 May 2014, the largest precipitation in 120 years. Water retention by soil and slopes was surpassed. These effects were aggravated by pre-existing environmental degradation associated with environmental degradation factors such as deforestation, intrusion in river beds and construction in hazardous risk exposed areas. 1
2 The whole of the watershed leading to the river Sava was overwhelmed and peaked, generating flash floods and carrying debris downstream creating a path of destruction and desolation. The accumulated downstream flow of water, mud and debris caused widespread floods in the plain. As the river Sava peaked, drainage from the plain was made impossible causing the retention of water in lowlands for an extended period. A large number of municipalities immediately declared a state of emergency, with others following at a later stage. It is estimated that a total of 81 local governments suffered damages, losses, as well as social or environmental impacts of a varying degree. Around 90,000 persons were temporarily displaced from their homes and more than 40,000 took extended refuge in public or private shelters or moved in temporarily with relatives or friends. Quantification of the damages, losses and effects The assessment provides a quantification of the partial or total destruction of assets that will have to be repaired, replaced or reconstructed. It also provides an estimate of the related losses, which include losses in production, income, livelihoods and employment as well as diminished access to services and goods, increased costs for society and government, and altered risk. In sum, the total economic impact of the disaster (destruction or severe damage to property, infrastructure and goods as well the effects of destruction on livelihoods, incomes and production, among other factors) is estimated to have reached 3.98 Billion BAM. Most of it impacted the private sector; families, small, medium and large businesses, and agricultural producers, including an undefined number of vulnerable sectors of the population. For the Federation of Bosnia and Herzegovina (FBiH) the total effects (damages and losses) are 2.03 Billion BAM, with 1.89 Billion BAM for Republika Srpska (RS) and Million BAM for the Brcko District of Bosnia and Herzegovina (BD). The floods are estimated to have caused the equivalent of nearly 15 percent of GDP in damages (9.3 percent of GDP) and losses (5.6 percent) in 2014 in Bosnia and Herzegovina (BiH). This amounts to around 2.49 Billion BAM of damages and 1.49 Billion BAM of losses. The hardest hit economic sectors were agriculture, transport and productive activities. As a result, the economy of Bosnia and Herzegovina is expected to contract by 0.7 percent in The floods are expected to put further strain on public finances, raising the fiscal deficit from a baseline of 2 percent of GDP to 4.5 percent in A significant public sector financing gap of 1.7 percent of GDP has opened up, despite identified additional (to pre-floods needs) financing from domestic and international sources. The trade deficit is likely to come under pressure, widening to 34 percent of GDP in 2014 while the current account deficit is projected to increase from the baseline 7.8 to 9.7 percent of GDP in The damages are not uniform in character along different sectors and affected municipalities due to their different origin, i.e. landslides, floods or erosion, and intensity of the event. 2
3 Table 1- Summary of damages and losses Damages Losses Total Agriculture 204,090, ,070, ,160,000 Education 15,720,000 1,300,000 17,020,000 Energy 97,140, ,280, ,420,000 Floods protection 96,300,000-96,300,000 Health 11,330,000 92,180, ,510,000 Housing and household items 830,800,000 55,600, ,400,000 Livelihoods and Employment 677,800, ,260,000 1,551,060,000 Public Services and Facilities 35,920,000 17,700,000 53,620,000 Transport and Communications 511,960, ,080, ,040,000 Water and Sanitation 10,640,000 4,050,000 14,690,000 Gender - 16,550,000 16,550,000 Total 2,491,700,000 1,493,070,000 3,984,770,000 Post-disaster needs In unison with authorities of Bosnia and Herzegovina at all levels the recovery needs are organized into short, medium and long-term priorities. The allocation of short, medium and long-term priority needs have been determined with consideration for the mobilization of resources, internal budget capabilities, and the international donor and International Financial Institutions (IFI) assistance. To divert and avoid increases in the nation s imbalances, expenditures and recovery investments must remain pragmatic and possible for the country s capacities to absorb. Table 2 - Summary of Recovery and Reconstruction Needs Recovery Needs Reconstruction Needs Agriculture 68,220,000 20,670,000 Education 10,400,000 17,300,000 Energy 6,680, ,710,000 Flood protection - 358,800,000 Gender 17,550,000 - Health 92,680,000 11,330,000 Housing and household items 15,040, ,880,000 Livelihoods and employment 183,640, ,000,000 Public Services and Facilities 19,900,000 40,350,000 Security 77,680,000 - Transport - 691,150,000 Water and Sanitation 7,550,000 10,640,000 Total 499,340,000 2,954,830,000 3
4 Having in mind the country s existing capacities in terms of governance and available resources, as well as disaster risk reduction considerations, the early recovery period will be essential and will focus on mitigating the short-term impact of the disaster through restoring critical services and infrastructure, sustaining livelihoods, and reducing vulnerability and future risks in longer-term rehabilitation. Concerns remain with regards to the absorption capacities of both governance structures as well as the private sector that will need to form a close partnership in spearheading the recovery effort. Table 3 - Scheduling of recovery and reconstruction needs Short-term Medium-term Long-term Recovery Needs 256,370, ,410,000 63,560,000 Reconstruction Needs 1,019,302,000 1,232,984, ,534,000 Sectoral Overview 1. Agriculture Agriculture remains one of the most important sectors of the economy in Bosnia and Herzegovina. The rural population accounts for 60% of the total population and the agriculture sector is the mainstay for the majority of rural inhabitants, as well as employing 20% of the total working population. 52 most affected municipalities experienced severe damages to their environment and infrastructure, lives and well-being; 30 municipalities in the RS and 22 in FBiH. Approximately 70,000 hectares of arable and planted land were affected. Crops were impacted at various stages of development and 25,000 households have now seen their income and livelihoods permanently altered. The floods occurred at a very critical time in the agricultural calendar. The crop sub-sector bears the bulk of the damages and losses whereas the livestock sub-sector is the second most affected. Fishery and forestry have been impacted to a lesser extent. The total damages are estimated to the amount of Million BAM (91.74 Million FBIH, Million RS and 6.8 Million BD), excluding the damages to farms, housing, irrigation and agro-processing industries. The overall estimate of losses amounts to Million BAM (32.58 Million FBIH, Million RS and 1.24 Million BD), with a large share related to the agricultural production sub-sector, amounting to over Million BAM (80.5%), followed by the livestock sub-sector totaled at 31.6 Million BAM (19.5%). The Agriculture Recovery Plan will be based on: i) an immediate response to address the urgent needs required to maintain and restore productivity and the income of the affected population; ii) mid-term transition from Relief to Development interventions and iii) development interventions focused on disaster risk reduction (DRR) and climate change adaptation (CCA). The Build Back Better approach will be mainstreamed into the medium and long-term activities, and under specific circumstances be applied in the initial recovery phase. 4
5 The overall recovery and reconstruction is estimated at Million BAM (40.00 Million FBiH, Million RS and 2.67 Million BD), of which 43% (38.3 Million BAM) is for immediate response and early recovery needs; 34% (30.23 Million BAM) for the rehabilitation of the sector in the medium-term; and 23% (20.44 Million BAM) for the long-term. The agricultural sub-sector consisting of cereals, fruit plantations, vegetables and fodder crops, makes up 87% of the overall agricultural production in need of restoration. Urgent assistance to recuperate livestock productivity, given the numbers of livestocks death, is a further immediate requirement. Education 74 municipalities (42 in FBiH, 31 in RS, and BD) were identified as affected based on secondary reports, municipal documentation and field visits. There are 9 severely affected areas (Samac, Odzak, Orasje, Brcko, Bijeljina, Doboj, Maglaj, Zepce, Domaljevac-Samac) where more than 50% of the affected population, and children, live. It is estimated that 60,000 children have been directly affected. The education sector infrastructure suffered damages to 121 institutions, out of which 13 are preschools, 81 primary schools, 22 secondary schools, 1 boarding school, and 4 higher education institutions. Total cost of damages and losses is estimated at 17.1 Million BAM, of which 9.2 Million in FBIH, 7.9 Million in RS and 10,000 BAM in BD. The bulk of the damages were caused by the destruction of school premises through flash flooding and/or residual water as well as landslides. Educational institutions were identified as in need of intervention even prior to the floods. The Build Back Better (BBB) principle will be applied here as well with the need to reconstruct in a quality and flood-resistant manner, in order to prevent further damages through similar events. Reconstruction should also consider other improvements, such as access for children and people with disabilities (e.g. wide doors and ramps). The total cost for reconstruction and recovery activities is estimated at 27.7 Million BAM (12.81 Million FBIH, Million RS and 1.98 Million BD). Reconstruction phase, called for in the short-term, is of crucial importance and needs to be finalized before the start of the school year (September 2014). Recovery will include the provision of individual school kits and educational content during the summer break for children in the most affected areas. A number of so-called child-friendly spaces, designed to provide a safe, structured and protective environment for children and families, will also be established. Recovery needs will entail Disaster Risk Reduction (DRR) awareness raising activities to provide better preparedness for future events. Health The direct damages to health facilities have been limited and owing to a rapid response by health authorities to redirect staff and patients to unaffected facilities. Interruption of health services was both localized and minimal. However, the effects of the overall damages and losses in livelihoods and employment will translate into considerable losses to the Health Insurance Funds, as affected 5
6 populations and enterprises will be limited in their ability to pay the required premiums. In addition to the increased demand for health services in the immediate aftermath of the disaster, extra investment will be needed in disease surveillance, immunization, environmental health services, including vector and rodent control, as well as mental health services which will all need to be enhanced for an extended period of time. The damages suffered in physical infrastructure and resources may also place at increased risk a percentage of the population with non-communicable, chronic ailments. In sum, the total estimated damage to health infrastructure amounts to BAM 11.3 million, of which 3.33 is in FBIH, and 8.0 in RS. BD reported no damages to its health infrastructure. Losses, however, are more much more significant and are projected at Million BAM in total, of which in FBIH and in RS. Reconstruction needs in the health sector entail investment in flood-damaged health facilities and assets that have been lost or destroyed in a spirit that reflects continued commitment to building back better. Recovery needs will include compensation for the loss of revenue for the respective health funds and public health institutes as well as additional funding to address costs of increased morbidity and access to health services for uninsured patients who lost their livelihoods. Priority public health programmes (maintaining enhanced disease surveillance until the health risks return to pre-disaster level, disease prevention campaigns, including immunisation and vector control to mitigate new health risks, long-term mental health/psychosocial treatment, support to vulnerable groups of population) were all accounted for, while the representatives of health authorities in FBiH and RS stressed that these programmes need to be continuously supported and maintained for a longer period of time than is estimated to be needed for the actual recovery phase. In addition, the health authorities in FBiH and RS identified the need for strengthening of preparedness and disaster risk management. The priorities, as expressed by the health authorities in BiH, include swiftly restoring full service delivery capacity in the affected areas, ensuring continuity of care and treatment for the affected populations, and addressing new health risks which arose as the consequence of the flooding. In summary, the total damages and losses for the RS were estimated at BAM Million and for FBiH at BAM Million, amounting to BAM Million in estimated reconstruction and recovery needs for the whole of BiH. These are inclusive of costs of reconstruction and repair to a better standard of the affected facilities and the compensation (recovery) of the increased costs and loss of revenue expected. Certain amount (500,000 BAM) is considered for the strengthening of the ministries of health preparedness and disaster risk management. Public Services and Facilities The flooding of May 2014 disrupted the provision of all public services in the majority of the municipalities affected, with a number suffering near-total devastation of service infrastructure and facilities. Four municipal administrations suffered major devastation of primary service infrastructure along with a number of law enforcement facilities and institutions of the judiciary located in the affected municipalities. A total of 210,000 citizes were affected by the partial or complete suspension of public 6
7 services with 50,000 of the most vulnerable deprived of welfare support provided by a network of municipal social service facilities. The total losses and damages to public facilities are estimated at Million BAM, to include 18.9 Million BAM in damages to physical infrastructure, 16.6 Million BAM in lost equipment and other assets, 360,300 BAM damages to municipal records, as well as 6.7 Million BAM in lost revenues and 11 Million BAM deployed in emergency response. The breakdown between the two entities for damages and losses is as follows: Million BAM FBIH and Million BAM RS. Reduced income experienced by all affected institutions, coupled with substantial emergency spending of available resources in immediate response, has resulted in a reduction in institutional capacities to deliver quality services Recovery and reconstruction will place an additional burden on local governments already drained by emergency response and diminishing revenues. Four local governments will require substantial reconstruction of physical Infrastructure and the full or partial replacement of assets, to include computers, servers and other office equipment. The process of recovering municipal files, however, is likely to be less straightforward and expedient. Unlike vital records, land registry information and social service beneficiary files were kept in the form of paper records and will require the formation of verification commissions that will validate requests by individual claimants in regards to land ownership and eligible benefits. In order to mitigate vulnerability to similar events in the future, the principle of build-back-better will need to be applied to ensure disaster resilience. This opportunity should also be utilized to ensure better access to facilities for the disabled and to improve on energy efficiency profiles of affected local governments. The overall figure for recovery and reconstruction in this sector is estimated at Million BAM (30.49 Million FBIH and Million RS), with 19.9 Million BAM (11.62 Million FBIH and 8.28 Million RS) going towards recovery and Million BAM (18.87 Million FBIH and Million RS) earmarked for reconstruction. As a matter of priority, one-stop-shop citizen support centers will need to be reestablished as they represent the primary interface of residents with government institutions. Welfare support facilities will need to be refurbished in order to deal with an increasing number of vulnerable groups that are seeking support as a result of the flooding. Finally, in order to ensure rule of law at the municipal level, judicial institutions must be reconstructed and equipped to guarantee that the existing backlog does not increase further. Housing The housing sector suffered severe damages associated both with the vast extension of the flooding, covering both urban and rural housing, as well as destruction of houses by landslides. Associated with the destruction, or damage, to the houses was the destruction of household goods and valuable items such as documentation, family heirlooms and other valuables difficult to price. Over 43,000 houses and flats were flooded and 1,952 houses were destroyed due to landslides. The total extent of the damages and losses amounts to Million BAM ( Million FBIH, Million RS and Million BD), all of it suffered by privately owned households. The losses incurred, given the level of destruction, 7
8 arise from the need for temporary shelter, demolition and removal of rubble and debris,, as well as land acquisition and the provision of essential services for the relocation of housing units that have been destroyed by landslides. The recovery and reconstruction strategy must include all affected communities, engaging both men and women in the planning and implementation of relevant activities. The strategy for the reconstruction of destroyed houses due to landslides must ensure that they rebuild in areas that are not at risk. Recovery and reconstruction in the housing sector must equally take into consideration recovery in other sectors, including livelihoods, transport, electricity, water and sanitation, agriculture and access to social services, including health and education. In sum, an estimated Million BAM will be necessary for the recovery and reconstruction process, out of which Million BAM will be necessary in the short and medium-term to achieve a full recovery. The recovery needs include the cost of temporary shelter, demolition and removal of rubble and debris. In the medium and long-term phases, priorities will entail the development of specific subprojects for the repair of houses; their approval by donors and/or the State and/or the Entities; implementation of subprojects and monitoring at State, Entity and/or Municipal levels. As a matter of priority in the first 12 months post disaster, the following actions should be taken: Identification of hazardous buildings and structures which 1) are at risk of collapsing; and 2) are in areas at risk of landslides; Detailed identification and consolidation of information on all damages and related losses to the housing sector; Development by the state coordinating body of a criteria for the identification and selection of beneficiaries with a priority given to those that are temporarily displaced and meet the social vulnerability criteria; Development by the state coordinating body of the beneficiary selection procedure; Development by the state coordination body of technical standards for the reconstruction and rehabilitation of housing units; Allocating budget funds at the entity / state level which would be used for reconstruction/relocation of houses; Establishment of a state managed coordination mechanism to assure that donations are allocated to the priority areas; Development by the Municipalities and Brcko District of a detailed list of potential beneficiaries in the priority areas; Identification and overcoming of legal obstacles to collection and disbursement of donations for housing and other infrastructure at entity and state level; Development of specific subprojects for the repair of houses; Approval by donors and/or the State and/or the Entities; Implementation of subprojects; Monitoring at State, Entity and/or Municipal levels 8
9 For those flood-affected households that incurred repairable damages to their homes and flats and are able to return, priority interventions in the short-term include the repair of their homes through contractors or the provision of shelter recovery kits (tools, construction materials, protective equipment, etc.) that will enable them to self-recover their dwellings. As many have lost their livelihoods, shelter recovery strategies should equally consider livelihoods recovery/restoration that will allow returnees to generate income. In the short-term, this could include cash-for-work (focusing on debris removal and infrastructure reconstruction, including homes and community infrastructure), as well as the restoration of productive assets. The goal of the 12-month post disaster should be to repair at least 25% of the damaged houses, with priority given to those that are currently displaced and meet the social vulnerability criteria. Funds for the repair of houses should be made available immediately given the fact that no works can be carried out during the winter months. Durable housing solutions must be found for those who are not able to return immediately to their homes because their dwellings have been either completely destroyed, are located in an at-risk area (due to landslides or mines), or they require special assistance (mentally or physically disabled, elderly, etc.). Durable solutions also include the need for an interim / temporary solution. Energy As soon as heavy rains started on May 14, utility companies went into crisis mode and, as a preventive measure, disconnected vulnerable transmission and distribution lines and substations. More than 100,000 users in the country were disconnected as a result. As a direct consequence of floods a number of facilities were damaged or destroyed. From the period of May 14-19, electricity transmission company (TRANSCO) and electricity utility companies progressively re-established electricity supply where possible; however some areas were left without power either because the equipment was heavily damaged, and/or the flood level of the area and landslides created a safety hazard. The impact of the floods on the energy sector was registered through damages to generation facilities, transmission and distribution networks, as well as coalmines that supply the thermal electricity generating plants. Damages to the distribution network are mostly restricted to low lying flood-prone areas, whereas most damages to the transmission network came from devastating landslides. Impact to coal mines was the result of a mix of flooding and landslides. The total value of damages and losses at the state level was estimated at BAM 199,416,569. At the entity level, FBiH has a share in damages and losses of 64.3% (128.2 Million BAM), RS with 35.2% (70.1 Million BAM) and BD with 0.5% (1.1 Million BAM). The reported damages and losses on TRANSCO amount to 4.3 million BAM, which are split between FBiH and the RS in accordance with the companies shareholder ownership structure (FBiH 58.89% and the RS 41.11%) and are reflected above. The extensive flooding has aptly illustrated the vulnerability of the energy sector in the country. Immediate steps in recovery should be aimed at increasing the resilience of power utilities to emergency 9
10 scenarios. Therefore, a carefully planned recovery strategy is of the utmost importance. Overall recovery needs are estimated to Million BAM (94.59 Million FBIH, Million RS and 3.51 Million BD). Short-term recommendations, encompassing up to 12 months, should focus on: providing meters and safe energizing of transmission and distribution systems; recovering generation supply capacity; rapid restoration of transmission and distribution network; rehabilitation of damages to high, medium and low voltage systems; restoration of the inventory of equipment and spare parts that were used in the emergency phase; rehabilitation of small hydro power plants; rehabilitation of affected business premises; ensuring all affected facilities are restored to operation with better disaster resilience capacity 10
11 severely affected, to which the informal employment sector must be added, estimated at between 30% to 40% according to various relevant surveys. The overall reconstruction and recovery needs are estimated in total at 1, Million BAM ( Million FBIH, Million RS and Million BD), of which 32% ( Million BAM Million FBIH, Million RS and 4.33 Million BD) are for immediate reconstruction and recovery needs; 63% ( Million BAM Million FBIH, Million RS and 8.75 Million BD ) for medium term reconstruction and recovery needs; and 4% (45.92 Million BAM Million FBIH, Million RS and 0.95 Million BD) for the long-term recovery needs. The Recovery and Decent Employment Promotion Strategy should consist of a package of multiple key interrelated components or entry points to bridge the continuum from immediate job preservation to longer-term local development. This includes better disaster coping mechanisms and workers protection while at workplace. In the short-term (up to 12 months), the following measures could be implemented: 11
12 Transport The estimated cost for damages in total for the transportation and communications sector is 512 Million BAM, of which in FBIH, in RS and 12.6 in BD. Losses have been estimated on the basis of information available during the assessment to the total amount of million BAM, based on the affected traffic flows due to the interruption or longer time required for travel. The breakdown of total damages and losses is Million BAM for FBIH, in RS and 1.5 in BD. For the recovery and reconstruction process short, medium and long-term needs are inclusive of risk reducing measures and resilience building ( Build Back Better ). The total estimated amount is the result of using 35% of the damages cost (approximately 180 Million BAM). The exact amount needed requires in-depth studies of soil dynamics of slopes, estimate return period of similar level flooding and engineering studies, which are recommended to be undertaken for the long-term reconstruction. The Transport and Communications sector recovery plan is probably one of the most important as many of the other sectors rely on transport. The plan should entail the following: Remove debris and landslip material from the roads and railways. Cleaning the areas affected is quick and relatively inexpensive and enables transport and therefore the economy to start moving. This should be done in the priority of main, regional and then local network; Repair minor damage, once again in the priority of main, regional and local; Undertake surveys on all the landslip areas that are affecting the transport assets (other landslide areas will also need to be surveyed by other sectors); Analyze the landslips as necessary; Survey and analyze the damage to the tunnels; Survey and analyze the damage to the bridges and culverts; Undertake design of the proposed new/replacement rail or highway and the associated landslides; Construction of new/replacement asset Water and sanitation Access to clean water due to the intensive rains and floods was compromised by the limited damages suffered by the water utilities, serving some 60% of the country s population. Nonetheless, the restoration of basic water supply and sanitation services in flood affected area was relatively quick, and in the majority of affected communities it took under one week to bring water supply systems back into operation, and around two weeks to restore water supply quality to drinking water standards. The impact on the facilities has been estimated at Million BAM, of which 6.58 in FBIH, 6.85 in RS and 1.26 in BD. Out of the total, Million BAM are damages and 4.05 Million BAM are losses. The losses are due to service interruption caused by damage to pipelines and pumps. Losses were especially felt due to decrease in demand from affected households and industrial customers. A total of approximately Million BAM (8.08 Million FBIH, 8.35 Million RS and 1.76 Million BD) will be needed 12
13 to fully restore water supply and sanitation infrastructure and resume full service delivery at improved standards and quality by the public water utilities. 13
Job Creation after Disasters
Job Creation after Disasters Prepared for WAAS Conference on Full Employment, 01 July 2014, Sarajevo, BiH Donato Kiniger-Passigli Coordinator, Fragile States and Disaster Response Group Measuring the impact
Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery
Key things to Know About Environment as a Cross Cutting Issue In Early Recovery This brief note provides an overview of key things to know about environment for early recovery actors, including Early Recovery
AFRICAN DEVELOPMENT BANK
AFRICAN DEVELOPMENT BANK SUDAN PROPOSAL FOR EMERGENCY ASSISTANCE GRANT OF USD MILLION RELATED TO THE FLOODS EXPERIENCED IN THE BLUE AND WHITE NILE STATES OREB DEPARTMENT June 203 ACRONYMS TABLE OF CONTENTS
Community Infrastructure (CI) Recovery. Krishna S. Vatsa Regional Disaster Reduction Advisor BCPR, UNDP
Community Infrastructure (CI) Recovery Krishna S. Vatsa Regional Disaster Reduction Advisor BCPR, UNDP Defining Community Infrastructure (CI) CI primarily refers to small scale basic physical structures,
2013 Flood Recovery Framework
PFC2013-0646 ATTACHMENT 2013 Flood Recovery Framework calgary.ca contact 3-1-1 Onward/ Calgary: A great place to make a living; a great place to make a life. Contents Context...4 Weather conditions...5
Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual
Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection
Global water resources under increasing pressure from rapidly growing demands and climate change, according to new UN World Water Development Report
WWDR4 Background Information Brief Global water resources under increasing pressure from rapidly growing demands and climate change, according to new UN World Water Development Report As demand for water
UNDP Recovery Activities: Examples from Indonesia and Haiti
UNDP Recovery Activities: Examples from Indonesia and Haiti Hossein Sarem Kalali, UNDP The Second Expert Group Meeting on the Great East Japan Earthquake Learning from the Mega Tsunami Disaster 16 18 December
UNITED NATIONS CHILDREN S FUND
UNITED NATIONS CHILDREN S FUND Office in Serbia is seeking qualified Consultant for supporting infusion of Disaster Risk Reduction across Education Curriculum for Primary and Secondary Schools in Serbia
$10.85 billion. The recommended cost option for recovery & reconstruction. Estimated damage equivalent to 5.8% of Pakistan s 2009/2010 GDP
Estimated damage equivalent to 5.8% of Pakistan s 29/21 GDP Maximum flood extent Jul. 31 - Sept. 28 Pakistan: Flooding Damage and Needs Overview for Key Humanitarian Sectors $1.85 billion The recommended
Maryland Emergency Operations Plan
Maryland Emergency Operations Plan Purpose The purpose of the Maryland Emergency Operations Plan (EOP) is to outline an approach and designate responsibilities intended to minimize the consequences of
Animals in Disasters
MODULE B UNIT 6 Animals in Disasters Recovering from a Disaster Overview Federal, State, and local governments work together in any major emergency. Emergency assistance funding is based on the concept
TERMS of REFERENCE (ToR)
TERMS of REFERENCE (ToR) Project Name: Building Disaster Resilient Communities in Cambodia ActionAid (Cambodia) - DRR Program OVERALL PURPOSE OF THE CONSULTANCY Undertake an independent research study
Long Term Recovery and Rehabilitation. Issues for discussion. Recovery
Long Term Recovery and Rehabilitation Issues for discussion Recovery The restoration, and improvement where appropriate, of facilities, livelihoods and living conditions of disaster-affected communities,
Chatham County Disaster Recovery Plan Recovery Planning Update. Mark Misczak, Brock Long, & Corey Reynolds Hagerty Consulting April 7, 2015
Chatham County Disaster Recovery Plan Recovery Planning Update Mark Misczak, Brock Long, & Corey Reynolds Hagerty Consulting April 7, 2015 Welcome Introduction to Recovery Planning Recovery Planning Process
The INEE Minimum Standards Linkages to the Sphere Minimum Standards
The INEE Minimum Standards Linkages to the Sphere Minimum Standards Coordination and collaboration between education and other humanitarian sectors is essential to ensure an effective response that addresses
Recovery Action Plan Guidelines
Recovery Action Plan Guidelines July 2011 TABLE OF CONTENTS Section 1: Introduction... 3 Audience... 3 Background... 3 Purpose... 3 Section 2: Development of a Recovery Action Plan... 4 Information Sources...
(1) State of Disaster and Issues Stemming from Tropical Storm Ondoy and Typhoon Pepeng
Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: Republic of the Philippines Project: Post Ondoy and Pepeng Short-Term Infrastructure Rehabilitation Project Loan Agreement: May 26,
Sustainable Recovery and Reconstruction Framework (SURRF)
Sustainable Recovery and Reconstruction Framework (SURRF) Presented by Iwan Gunawan, Sr. Disaster Management Adviser, Original Presentation by Saroj Kumar Jha Program Manager Global Facility for Disaster
The Local Government Self- Assessment Tool. Taking stock, celebrating achievements and planning for DRR in Addis Ababa
The Local Government Self- Assessment Tool Taking stock, celebrating achievements and planning for DRR in Addis Ababa Background Throughout history, disaster events have disrupted urban life. With more
RURAL COMMUNITY REHABILITATION THROUGH EMERGENCY PUBLIC WORKS IN RESPONSE TO THE ISLANDS DEADLY FLASH-FLOOD DAMAGE IN THE SOLOMON 1 BACKGROUND
RURAL COMMUNITY REHABILITATION THROUGH EMERGENCY PUBLIC WORKS IN RESPONSE TO THE DEADLY FLASH-FLOOD DAMAGE IN THE SOLOMON ISLANDS Report of the pilot programme April 2014 1 BACKGROUND 1. The Solomon Islands
KINGDOM OF CAMBODIA NATION RELIGION KING MINISTRY OF EDUCATION, YOUTH AND SPORT FLOOD ASSESSMENT REPORT ON IMPACTS AND DAMAGES ON EDUCATION SECTOR
Final Draft KINGDOM OF CAMBODIA NATION RELIGION KING MINISTRY OF EDUCATION, YOUTH AND SPORT FLOOD ASSESSMENT REPORT ON IMPACTS AND DAMAGES ON EDUCATION SECTOR DECEMBER 2013 1 Contents ****** FOREWORD*****...
<click here for the DREF budget, here for contact details, or here to view the map of the affected area>
Serbia: Floods DREF operation n MDRRS005 GLIDE n FL-2010-000250-SRB 8 December, 2010 The International Federation s Disaster Relief Emergency Fund (DREF) is a source of un-earmarked money created by the
DISASTERS & EMERGENCIES
DISASTERS & EMERGENCIES DEFINITIONS Training Package WHO/EHA Panafrican Emergency Training Centre, Addis Ababa Updated March 2002 by EHA 1 WORLDWIDE Number of People Affected by Disasters Million 400 350
DISASTER MANAGEMENT. Goals To instill an understanding of the disaster management process
DISASTER MANAGEMENT Goals To instill an understanding of the disaster management process Learning outcomes After completing this session, you will be able to Affirm the usefulness of integrating management
Town of Canmore Flood Recovery Action Plan January 2014. canmore stands strong canmore stands strong
Town of Canmore Flood Recovery Action Plan January 2014 Town of Canmore Flood Recovery Action Plan l January 2014 Table of Contents Executive Summary 3 The Perfect Ugly Storm 4 Emergency Response 5 Impacts
SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities
Climate Resilience Sector Project (RRP TON 46351) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE 1. Sector Performance, Problems, and Opportunities 1. Tonga is being affected by climate change,
ESF 14. Long-Term Community Recovery
1. Purpose This annex provides an overview of the general process to be followed in recovering from the economic results of a natural disaster or other major emergency that may impact Coos County. It outlines
Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).
Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall
INDONESIA - LAW ON WATER RESOURCES,
Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in
Disaster & Disability: The Role of the local government to minimize the community risk during the disaster.
Disaster & Disability: The Role of the local government to minimize the community risk during the disaster. Shahidul Haque Chief Executive Social Assistance and Rehabilitation for the Physically Vulnerable
ZAMBIA EMERGENCY HUMANITARIAN FOOD ASSISTANCE TO FLOOD VICTIMS
AFRICAN DE DEVELOPMENT BANK Prepared by: OSAN Original: English ZAMBIA EMERGENCY HUMANITARIAN FOOD ASSISTANCE TO FLOOD VICTIMS DEPARTMENT OF AGRICULTURE AND AGRO-INDUSTRY, OSAN April 2008 The Government
DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI
DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI July, 2013 1. Foreword 2. Preface 3. Introduction 4. Policy linkages 5. Broad Policy Direction 6. Policy Priority Areas Provides the
Estimating Post-Disaster Recovery and Reconstruction Requirements. J. Roberto Jovel Team Leader India PDNA Project
Estimating Post-Disaster Recovery and Reconstruction Requirements J. Roberto Jovel Team Leader India PDNA Project Contents of Presentation 1. The effects and impacts of disasters 2. Estimation of post-disaster
Barre City City-wide Policy and Program Options
Barre City (VERI Land Use Regulations Update policies allowing fill in flood hazard areas. RPC, DEC River Management, VLCT, Allowing landowners to elevate buildings using fill may help protect an individual
Overview of the Local Government Self-Assessment Tool for Disaster Resilience
Overview of the Local Government Self-Assessment Tool for Disaster Resilience Why use the Local Government Self-Assessment Tool? Using the Local Government Self-Assessment Tool will help to set baselines,
Briefing Note. Crisis Overview. Afghanistan. Floods. Date: 24 April - 2 May 2014
Briefing Note 1 Afghanistan Floods Date: 24 April - 2 May 2014 Crisis Overview Torrential rains on 24 and 25 April led to flash floods affecting 27 districts in western, northern and northeastern Afghanistan.
Disaster Risk Reduction (DRR)
Disaster Risk Reduction (DRR) A. Introduction 1. In order to address the impacts of the May 12 Wenchuan Earthquake, the Government of China will implement an effective, comprehensive and sustainable recovery
CARE s Pakistan Flood Emergency Fund
CARE s Pakistan Flood Emergency Fund Overview Severe flooding has claimed more than 1,000 lives and affected some 14 million people across Pakistan. Please lend your support to CARE s emergency response.
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
CONSULTANT - CALL FOR APPLICATIONS: EXPERTS AND TRAINERS ROSTER (UN WOMEN GLOBAL)
CONSULTANT - CALL FOR APPLICATIONS: EXPERTS AND TRAINERS ROSTER (UN WOMEN GLOBAL) Location : Application Deadline : Type of Contract : Post Level : Languages Required : Duration of Initial Contract : To
Gender Aspects of Disaster Recovery and Reconstruction. Presentation. Session 3. Slide 1. Mainstreaming Gender for Equitable Disaster Recovery
Gender Aspects of Disaster Recovery and Reconstruction Presentation Session 3 Slide 1 Mainstreaming Gender for Equitable Disaster Recovery This last presentation describes some of the tools that help in
Ensuring Accountability in Disaster Risk Management and Reconstruction
Ensuring Accountability in Disaster Risk Management and Reconstruction Date: 08 December 2015 Time: 8.30 am until 4.30 pm Venue: Jaic Hilton Hotel, Colombo, Sri Lanka Organised by SPARC, University of
Indonesian National Network on Disaster Resource Partnership (DRP)
2011/EPWG/WKSP/021 Session 4 Indonesian National Network on Disaster Resource Partnership (DRP) Submitted by: Indonesia Workshop on Private Sector Emergency Preparedness Sendai, Japan 1-3 August 2011 Presentation
PRESENTERS: BACHELOR OF ARTS- PSYCHOLOGY
KIBET J. NELLY PRESENTERS: MAGAI N. DORCAS BACHELOR OF ARTS- PSYCHOLOGY DISASTER? A serious disruption of the functioning of a community or society causing widespread human, material, economic or environmental
Disaster Recovery Managing and Leveraging Multiple Funding Sources
Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development
Employment creation in innovative public work programs: Phase III
EPr1 Employment creation in innovative public work programs: Phase III 129 130 As of the end of October 2014, Egypt was host to some 140,000 registered Syrian refugees. While the influx of refugees has
Table of Contents ESF-3-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and
Emergency Support Function #14 RECOVERY & MITIGATION
Emergency Support Function #14 RECOVERY & MITIGATION Lead Agencies Virginia Department of Emergency Management (VDEM) Department of Housing and Community Development (DHCD) Support Agencies and Organizations
Why should communities invest in resiliency? What are the steps communities can take to become more resilient?
Community Preparedness for Flood Resiliency Nina Peek, AICP New York Planning Federation Board of Directors Senior Technical Director AKRF, Inc. Focus of Today s Presentation Why should communities invest
Resolution adopted by the General Assembly. [without reference to a Main Committee (A/64/L.43 and Add.1)]
United Nations A/RES/64/251 General Assembly Distr.: General 30 April 2010 Sixty-fourth session Agenda item 70 (a) Resolution adopted by the General Assembly [without reference to a Main Committee (A/64/L.43
Disaster Risk Assessment:
Disaster Risk Assessment: Understanding the Process Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline What is Risk Assessment? What are the issues & challenges? How to design a disaster
ANNEX 3 ESF-3 - PUBLIC WORKS AND ENGINEERING. SC Budget and Control Board, Division of Procurement Services, Materials Management Office
ANNEX 3 ESF-3 - PUBLIC WORKS AND ENGINEERING PRIMARY: SUPPORT: SC Budget and Control Board, Division of Procurement Services, Materials Management Office Clemson University Regulatory and Public Service
How To Build Disaster Resilience
Monitoring and Evaluation of Disaster Recovery & Risk Reduction Disaster and Crisis Recovery Operations for Increased Resilience JVI, September 10-14, 2012 A Strong Case for M&E in Reconstruction As development
Conference Statement:
Conference Statement: Strengthen Resilient Recovery and Reconstruction in the Post-2015 Framework for Disaster Risk Reduction Preamble: The growing incidence of high-impact disasters has made countries
Emergency Plan Of Action update
Emergency Plan Of Action update Tajikistan: Floods DREF n MDRTJ019 Update n 1 Date of issue: 30 June 2014 Operation n MDRTJ019 Glide n FL-2014-000063-TJK Timeframe covered by this update: 11 May 2014 23
How we work. International Federation of Red Cross and Red Crescent Societies, Geneva 2012
Summary of the IFRC Recovery programming guidance 2012 How we work Strategy 2020 voices the collective determination of the IFRC to move forward in tackling the major challenges that confront humanity
Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities
Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities Jacob Greenstein Ph.D, PE, EGAT/ I&E EGAT workshop-december 2009 1 Natural disasters-new trends Natural
MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery
MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN ESF14-Long Term Community Recovery Planning Team Support Agency Coffeyville Public Works Independence Public Works Montgomery County Public Works 1/15/2009
MACROECONOMIC AND FISCAL ASSESSMENT
Public Sector Financial Management Program (RRP SAM 46384) A. BACKGROUND MACROECONOMIC AND FISCAL ASSESSMENT 1. Samoa is composed of about 10 islands, 4 inhabited, and several uninhabited islets situated
1. The Law on Solidarity Fund for the Republic of Srpska s Recovery
The Government has introduced a set of ten laws which provide solutions for dealing with this difficult situation caused by the floods. The Laws define the forms of assistance for the recovery from all
Questions and Answers about the prevention of occupational diseases
World Day for Safety and Health at Work 28 April 2013 Questions and Answers about the prevention of occupational diseases Occupational diseases cause huge suffering and loss in the world of work. Yet,
Climate Change Activities in Mauritius
FROM INTEGRATED CLIMATE STRATEGIES TO CLIMATE FINANCE EFFECTIVENESS: THE ROLE OF MAINSTREAMING AND INSTITUTIONAL STRENGTHENING Climate Change Activities in Mauritius 14 th November 2013 Climate Change
HEALTH INFORMATION MANAGEMENT In Emergency
HEALTH INFORMATION MANAGEMENT In Emergency Regional training course on emergency response operation, Hue, Viet Nam, 23-27 Feb, 2009 Learning Objectives By the end of this session, the participant should
Management of Water and Fisheries Resources to Improve Community Livelihoods in Battambang
GEF Small Grants Programme Community-Based Adaptation in Small Island Developing States - SIDS CBA Management of Water and Fisheries Resources to Improve Community Livelihoods in Battambang Project No:
Emergency Support Function #14 Long Term Community Recovery and Mitigation
Emergency Support Function #14 Long Term Community Recovery and Mitigation Primary Agency FEMA Board of Visitors Radford University Cabinet Secondary/Support Agencies Radford University Office of Emergency
City of Jakarta (Tanggerang) Total Greater Jakarta (Jabotabek) Area width 649.71 1294.38 3833.21 5777.30
1. The Disaster A heavy rainfall during the period of Jan 29-Feb 2 2007 has caused flood in some areas in greater Jakarta area. Floods are recurring phenomena in Jakarta area, it has happened regularly
American Planning Association
American Planning Association Planning for Post-Disaster Recovery Session 1 Moderator: Tim Gelston, FEMA Region 8 Speakers: Kenneth C. Topping, FAICP, Topping Associates International J. Barry Hokanson,
How To Manage A Flood In Mozambique
Flood Risk Management in Mozambique and Sub-regional Trans-boundary Issues UNFCCC regional expert meeting on loss and damage in Addis Ababa, Ethiopia from 13 to 15 June 2012 Ron Cadribo, UNISDR DRR Advisor,
FACT SHEET #20, FISCAL YEAR (FY) 2015 JUNE 12, 2015
NEPAL EARTHQUAKE FACT SHEET #20, FISCAL YEAR (FY) 2015 JUNE 12, 2015 NUMBERS AT A GLANCE 2.8 million Estimated Number of People in Need of Humanitarian Assistance UN June 2, 2015 HIGHLIGHTS USAID s Disaster
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the
Centre International de Droit Comparé de l Environnement CIDCE. Comments on the Zero draft of the Post 2015 framework for disaster risk reduction
Centre International de Droit Comparé de l Environnement CIDCE Comments on the Zero draft of the Post 2015 framework for disaster risk reduction Paragraph n (1,2,3,...), page Comments A. Preambule 5. page
Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action (2013-2014)
Karlstad, Sweden Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Mayor: Ulf Nyqvist Name of focal point: -Anna -Sjödin Organization: -Karlstad Municipality Title/Position:
Triangle Alliance Conference DISASTERS & HISTORIC PRESERVATION. October 23, 2009
Triangle Alliance Conference DISASTERS & HISTORIC PRESERVATION October 23, 2009 Topic Outline FEMA s Mission Programs: Individual Assistance, Public Assistance, Mitigation, National Preparedness Environmental
HOUSING AND LAND RIGHTS NETWORK H a b i t a t I n t e r n a t i o n a l C o a l i t i o n
HOUSING AND LAND RIGHTS NETWORK H a b i t a t I n t e r n a t i o n a l C o a l i t i o n National Habitat III Parallel-reporting Tool Evaluation of Habitat II Implementation Following the commitments
DRYLAND SYSTEMS Science for better food security and livelihoods in the dry areas
DRYLAND SYSTEMS Science for better food security and livelihoods in the dry areas CGIAR Research Program on Dryland Agricultural Production Systems The global research partnership to improve agricultural
Technical Consultant
Terms of Reference Technical Consultant Providing services in the framework of a Study for Rehabilitation of Zemo Samgori Irrigation System, Georgie (ref. ORIO13/GE/01) Introduction The Ministry of Agriculture
EN 31IC/11/R7 Original: English Adopted
EN 31IC/11/R7 Original: English Adopted 31st INTERNATIONAL CONFERENCE OF THE RED CROSS AND RED CRESCENT Geneva, Switzerland 28 November 1 December 2011 Strengthening normative frameworks and addressing
Guideline for Stress Testing the Climate Resilience of Urban Areas
Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0
How To Manage A Disaster In India
Institutional Arrangements for Disaster Management in India Prof. N. Vinod Chandra Menon Member National Disaster Management Authority Government of India Features of an Emergency Situation Sense of urgency
Community Emergency Planning Guide
Community Emergency Planning Guide Our district has experienced numerous events over past years. Evidence from previous emergencies has shown that communities that plan and manage their own needs before,
Challenges. Estimated Damages from 100-Year Flood
Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of
The Dynamics of Disaster Economics: The Philippines Recovery and Response to Typhoon Haiyan (Yolanda)
The Dynamics of Disaster Economics: The Philippines Recovery and Response to Typhoon Haiyan (Yolanda) Antonio Louis A. Holmes Industrial Engineering Department, De La Salle University-Manila 2401 Taft
Disaster Risk Reduction and Building Resilience to Climate Change Impacts
Disaster Risk Reduction and Building Resilience to Climate Change Impacts Luna Abu-Swaireh ([email protected]) May 2015 United Nations Office for Disaster Risk Reduction (UNISDR) Droughts Floods Storms
CLIMATE CHANGE VULNERABILITY ASSESSMENT OF CAPE VERDE
CLIMATE CHANGE VULNERABILITY ASSESSMENT OF CAPE VERDE SUMMARY FOR POLICY MAKERS panoramio.com 1 Ministry of Environment, Housing and Territory Planning B.P. 115 Praia Cape Verde http://www.governo.cv United
Multi-Hazard Disaster Risk Assessment (v2)
Multi-Hazard Disaster Risk Assessment (v2) This How to Note is part of a series of Guidance Notes designed to assist DFID Country Offices in embedding disaster resilience in their country programmes. This
Disaster Recovery Plan. NGO Emergency Operations
Disaster Recovery Plan NGO Emergency Operations When a disaster happens there is a natural tendency to optimize the capacity to respond quickly in order to find the best solutions to reduce the effect
Disaster risk reduction & emergency response for WASH
February 2009 WSSCC Reference Note Disaster risk reduction & emergency response for WASH The Water Supply and Sanitation Collaborative Council (WSSCC) is a global multi-stakeholder partnership organisation
NREGA for Water Management
National Rural Employment Guarantee Act NREGA for Water Management 30 th October, 2009 Dr. Rita Sharma Secretary to Government of India Ministry of Rural Development NREGA objective supplement wage-employment
HUMANITARIAN AFFAIRS THINK TANK
HUMANITARIAN AFFAIRS THINK TANK KEY LESSONS TO LEARN FOR TYPHOON HAIYAN RESPONSE BY MEAL Humanitarian Technical Working Group, Save the Children NOVEMBER 2013 KEY LESSONS TO LEARN FOR TYPHOON HAIYAN RESPONSE