MIRAMESH GR FOR VEGETATED WALLS & SLOPES

Similar documents
CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

DESIGN GUIDELINES FOR EARTH RETENTION

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Specification Guidelines: Allan Block Modular Retaining Wall Systems

ROAD CONSTRUCTION. Pavement Base Reinforcement Subgrade Stabilization

1. ASTM C Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

SECTION EARTH MOVING

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Storm Drain Inlet Protection - IP

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

Storm Drain Inlet Protection

Installation Guidelines for Segmental Block Wall. Contents 1. INTRODUCTION MATERIALS... 2

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Permeable Pavement Construction Guide

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Building Your Interlocking Concrete Pavement to Last a Lifetime

Storm Drain Inlet Protection

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Installation PowerPoint for Grasscrete Formers

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Section SEWER PIPE INSTALLATION AND TESTING

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Table 4.9 Storm Drain Inlet Protetion Applicable for

THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS. Attention

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Erosion Control Blanket (ECB)

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

How To Retaining Wall Guide

6 RETROFITTING POST & PIER HOUSES

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

SC-07 STORM DRAIN INLET PROTECTION

Welded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road,

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

City of Shelbyville Site Inspection Checklist

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Emergency Spillways (Sediment basins)

SECTION 1 GENERAL REQUIREMENTS

Stormwater/Wetland Pond Construction Inspection Checklist

Unit Price Averages Reports

C. Section TESTING LABORATORY SERVICE.

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

The Most Advanced Name in Drainage Systems. Geotextile Products

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

Drainage Solutions in Modern Sports Field Applications presented by Hank Bell Sales Manager/Airfield Systems, LLC. Edmond, OK

Construction Specification for Concrete Curb and Concrete Curb and Gutter

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Appendix C. Re-vegetation and Rehabilitation Sub-Plan

Team Skills Challenge Event # 1 Plant Layout Score Sheet

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Soils and Aggregates Division

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

LS 2540 SEWER LATERALS AND INSPECTION TEES

The Verdura Wall check with your local building department

SECTION SHEETING, SHORING AND BRACING

Wastewater Capital Projects Management Standard Construction Specification

Appendix C. Municipal Planning and Site Restoration Considerations

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

Section 2100-Trenching and Tunneling

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

SECTION PRECAST CONCRETE UTILITY STRUCTURES

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

Section 402. STORM SEWERS

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION SITE PREPARATION

AG 9-4 ArborGard+ tree trunk protector

STREET TREE PLANTING APPLICATION

Specifications for Residential Property Owners Connection to New Public Sewer

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Sample Punch List. Garth Ruffner Landscape Architect (916) Page 1 of 5

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES

INSTALLATION GUIDE. americanwick.com WICK (9425)

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

Watershed Works Manual

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Town of Beaumont. Lot Grading Guidelines

Acceptance Codes APPENDIX - A. Acceptance Criteria

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Transcription:

MIRAMESH GR FOR VEGETATED WALLS & SLOPES Prepared by: TenCate TM Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel. (706) 693 2226 Fax (706) 693 2044 www.tencate.com May 18, 2010 1

GENERAL Miramesh GR is composed of green high-tenacity monofilament polypropylene yarns that are woven together to produce an open mesh biaxial geotextile. Miramesh GR is specifically designed for secondary reinforcement and surface erosion protection for steepened slope and retaining wall applications. Miramesh GR allows for vegetation growth, while holding back soil at the face. In wrapping the face of a retaining wall with Miramesh GR, removable facing supports (e.g. wooden forms) or left-in-place welded wire mesh forms are typically used. The recommended maximum vertical spacing between layers of Miramesh GR is 18 inches (450 mm). The following figure shows a typical Miramesh GR vegetated wall/slope. In assessing these two facia options, there are several considerations. For instance, using a wire mesh face support will typically result in higher material costs, yet lower labor costs than using temporary wooden formwork. However, the wire mesh may provide additional long-term face protection from ultraviolet light degradation and potential vandalism. Further, the use of temporary wooden formwork will require access from the exterior of the slope/wall face in order to insert and remove forms. 2

Inspection The owner or the owner s engineer is responsible for certifying that the contractor meets all the requirements of the specification, including material submittals and proper installation of the geosynthetic reinforcements. The Contractor shall check the geosynthetic upon delivery to ensure that the proper material has been received during all periods of shipment and storage. All geosynthetic materials shall be protected from temperatures greater than 140 F, and all deleterious material that might otherwise become affixed to the geosynthetic and adversely affect its performance. Site Preparation The foundation soil shall be excavated to the line and grades as shown on the construction drawings or as directed by the Project Engineer. Over-excavated areas shall be filled with compacted backfill material as per project specifications or as directed by the Engineer. As a minimum, foundation soil shall be proof rolled and level prior to backfill and geosynthetic placement. This exercise should be performed prior to each subsequent geosynthetic layer installed. Placement of Drainage Materials Perforated schedule 40 or equivalent pipe, surrounded in drain rock, and wrapped in geotextile, may be placed at the base of the wall/slope as shown on the Construction Drawings. The pipe shall be laid at a minimum longitudinal gradient of 1%. The pipe shall be connected to the specified outlets with T-connectors. Outlet pipes, which pass through the base of the wall facia, shall be wrapped with a geotextile to prevent loss of infill materials. Outlet pipes shall be connected to the site drainage system or discharged in front of the wall in a manner that will not cause surface erosion. Compact all fill placed against the drainage system. Placement of Welded Wire Mesh Facia Place the wire baskets adjacent to one another at the elevation shown on the plans. Ties may be used to keep wire baskets aligned. Note: the first two vertical rows of welded wire baskets may be pushed forward during compaction of the backfill (It may be necessary to adjust their setback or install vertical braces along the proposed alignment of the wall facia at a minimum spacing of 60 inches center to center). Geosynthetic Reinforcement Placement The geosynthetic reinforcement (Miragrid XT geogrids or Mirafi PET fabric) shall be laid at the proper elevation and orientation as shown on the construction drawings or as directed by the Engineer. Correct orientation of the geosynthetic shall be verified by Contractor. The geosynthetic shall be cut to length as shown on the construction drawings using a razor knife, scissors, sharp knife, or equivalent. 3

The geosynthetic reinforcement leading edge shall be placed up to the front of the welded wire mesh form and tensioned by hand until taut, free of wrinkles and lying flat. Adjacent geosynthetic panels, in the case of 100 percent coverage in plan view, should be butted up to one another, as necessary to ensure 100 percent coverage, unless otherwise specified on the construction drawings. The geosynthetic reinforcement and Miramesh GR may need to be slit (perpendicular to the wall face) to stagger the wire basket support struts. Geosynthetic panels may be secured in-place with staples, pins, sand bags, or backfill as required by fill properties, fill placement procedures, or weather conditions, or as directed by the Engineer. The geosynthetic may not be overlapped or connected mechanically to form splices in the primary strength direction. Single panel lengths are required in the primary strength direction. Therefore the geosynthetic should be installed in one continuous piece with the primary strength direction extending the full length of the reinforced area. No overlapping is required between adjacent rolls unless specified by the Engineer. Miramesh GR Placement Install Miramesh GR parallel to the wall/slope face, or as directed by the project engineer. Place the Miramesh GR against the inside front face of welded wire mesh form with 4 of embedment. When placing the Miramesh GR, drape the geotextile over the wire face, allowing for the required wrap embedment (typically 2.5 ). Install the reinforcing struts at 24 inch center to center (typical). When the fill soil has been placed and compacted to the elevation of the next welded wire form, the Miramesh GR shall be laid back on top of the compacted soil, pulled taut and secured with compacted soil. Place geosynthetic reinforcement from the facia to the required embedment length. Slide the next welded wire facia unit into place against the prongs (optional) of the lower unit. 4

Place only the amount of geosynthetic required for immediately pending work to prevent undue damage. After a layer of geosynthetic has been placed, the succeeding layer of soil shall be placed, compacted and prepared as appropriate. After the specified soil layer has been placed, the next geosynthetic layer and/or facing unit shall be installed. Miramesh GR should be seeded/vegetated as recommended by the project engineer. Fill Placement Fill should be placed in 6-8 inch thick lifts near the face of the wire baskets and then proceed toward the tails of the Miramesh GR and Geosynthetic reinforcement to help tension the grid/fabric. Backfill material shall be compacted to a minimum 90% modified proctor or as directed by the project engineer. Backfill shall be placed, spread and compacted in such a manner as to minimize the development of wrinkles in and/or movement of the geosynthetic. Backfill shall also be placed in such a manner as to minimize the disturbance and/or the misalignment of the wall facing. A minimum fill thickness of 6 inches is required prior to the operation of tracked vehicles over the geosynthetic. Turning of tracked vehicles should be kept to a minimum to prevent tracks from displacing the fill and damaging the geosynthetic. Rubber tired equipment may pass over the geosynthetic reinforcement at low speeds, less than 5 mph. Sudden braking and sharp turns shall be avoided. Any geosynthetic damaged during installation shall be replaced by the Contractor. Backfill within 3 ft. of the wall/slope face will typically be compacted with hand equipment. Density tests shall be made every lift or as directed by the Project Engineer. Backfill shall be graded away from the wall crest and rolled at the end of each work day to prevent the freezing and/or the ponding of water on the surface of the reinforced soil mass. The site shall be maintained to prevent the flow of water from adjacent areas from entering the wall area from overtopping the retaining wall during construction and after the completion of the wall. 5

Seed Placement While Backfilling Miramesh GR is manufactured with an open weave that holds soil in, but allows vegetation to grow through it. A mix of seed (optional if hydroseeding) and topsoil be placed directly against the Miramesh GR fabric face for each lift, as shown below. Hydroseeding/ Hydromulching Wall Face To vegetate the wall by hydroseeding, the welded wire baskets should be set back with a 4 (typical) offset at each lift, as shown below. This results in an overall batter of 78. Each 4 shelf will create a flat surface for vegetative growth. The face should be hydro seeded during the local growing season. The face should be watered prior to hydroseeding. An irrigation system and maintenance program may be needed depending on local climate and environmental conditions. 6

Seed Selection Seed performs best when planted during spring or early autumn. Three general climate zones are shown below. Areas in the cool climate zone use cool season grasses. Areas in the warm climate zone use warm climate grasses. The transition zones typically use a mixture of both cool and warm season grasses, but generally favor cool climate grasses more. Local suppliers generally have excellent knowledge of seed selection for their local climate and environment. The table below shows some common seed choices. WARM SEASON Buffalo Centipede Common Bermuda Hybrid Bermuda St Augustine Tall Fescue Moesia COOL SEASON Bent grass Bluegrass Fine Fescue Ryegrass Tall Fescue 7

Live Branch Cuttings Live branch cuttings or rooted woody stem cuttings of plants that root easily may be used with the Miramesh GR /wire mesh facia. Live branch cuttings should be ½ to 1 in diameter and placed between Miramesh GR layers, as shown below. Live cuttings should only be harvested while the dormant. Installation of live cuttings should be performed between the fall and early spring, while the cuttings are still dormant. Cuttings should be stored in a cool moist area that is well shaded (never store cuttings in direct sun). Choosing the correct species for a given environment is very important for long-term success. In wet environments, willows are very successful. In dry climates, upland species perform better. In dry climates, a watering system may be required to vegetate native and non-native species of plants. Live Staking Live staking may be performed with the Miramesh GR /wire mesh facia. Live stakes are woody stem cuttings of plants that root easily. Live stakes should be taken while a plant is dormant (before spring) and planted directly into the face of the wall/slope. Live stakes should be spaced 2 3 apart in all directions. Installation of live stakings should be performed between the fall and early spring, while the plants are still dormant. Live staking should be performed only in very moist environments or with plants known to survive in the local environment. Disclaimer: TenCate assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. TenCate disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation any implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment, materials, or information furnished herewith. This document should not be construed as engineering advice. 2010 TenCate Geosynthetics North America 8