CHELAN COUNTY INFORMATION AND PROCEDURES FOR A BINDING SITE PLAN APPLICATION

Similar documents
APPLICATION FOR TENTATIVE MAPS

THREE MILE PLAN/URBAN GROWTH BOUNDARY INTERGOVERNMENTAL AGREEMENT

Washington City Subdivision Development Application Checklist

PRE APPLICATION CONFERENCE - INTRODUCTION

PROPERTY LINE ADJUSTMENT APPLICATION

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Definition of Tower from the Bradley County Zoning Resolution

Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT

1. INTRODUCTION 5. THE PERMIT PROCESS

New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID (208)

Floodplain Development Land Use Review

ZONING HEARING BOARD APPLICATION CHECKLIST

CITY OF AURORA S STANDARDS FOR DOCUMENT FORMAT, CERTIFICATES, STATEMENTS AND EASEMENTS

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

New Water/Sewer Connection Application Packet Residential. City of Plummer P.O. Box B, Plummer, ID (208)

Development Variance Permit Application Package

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

INSTRUCTIONS FOR COMPLETING COMPONENT 1 EXCEPTION TO THE REQUIREMENT TO REVISE THE OFFICIAL PLAN

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760) ARTS AND CRAFTS SHOW PERMIT

BEFORE YOU BUILD GUIDE

Minor Accommodation Planning Review Application

Bureau Veritas Contact Information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

City of Douglas Commercial Building Permit Site Application

COMP PLAN SUBMITTAL CHECKLIST

KERN COUNTY PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

SITE PLAN REVIEW APPLICATION

COASTAL DEVELOPMENT PERMIT

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Single-Family Permit Handbook. City of Bellevue. Welcome! When is a permit required? Development Services Handout P-1

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

EASTTOWN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA APPLICATION FOR ZONING PERMIT

APPLICATION FOR SPECIAL EXCEPTION USE

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

2-Party Shared Well Users Agreement (If Applicable)

MOBILE HOME LAW. Revised November 2001

A. General Information

Cellular Antenna Proposal Form

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

SUBDIVISION AND DEVELOPMENT REGULATION

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

APPLICATION FOR INDIVIDUAL WATER & WASTEWATER FACILTIES

Manufactured Home Application Packet

Package Treatment Plant Policy and Procedure

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

3. The submittal shall include a proposed scope of work to confirm the provided project description;

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

Kittitas County Interim Water Mitigation Certificate Application Guidelines

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

IS THIS APPLICATION BEING SUBMITTED IN RESPONSE TO A COASTAL VIOLATION? YES NO IF YES, YOU MUST INDICATE NOV OR C&D NUMBER

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Right-of Way Use Permit Application

Ferry County Out Building Application

*** PUBLIC NOTICE ***

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room

CHECKLIST FOR ESTABLISHING A DAY CARE CENTER (Revised )

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

LOT CONSOLIDATION (for contiguous lots)

INTRODUCTION TO ZONING DISTRICT REGULATIONS

General Application DESCRIPTION OF PROPOSAL:

PUBLIC NOTICE Application for Permit

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

Information Packet SOLAR ENERGY SYSTEM (SES) WHEN IS A SOLAR ENERGY SYSTEM ZONEING PERMIT NECESSARY? Application for Solar Energy System

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

APPLICATION FOR CONDITIONAL USE PERMIT PROPOSED USES WITHIN EXISTING BUILDING

ADMINISTRATIVE LAND SPLIT APPLICATION

City of Miramar Building Division

Electronic Signature and Fee Payment Confirmation

References (Statutes/Resos/Policies): Title 32 C.R.S.,, Land Development Regulation, Zoning Resolution; CC92-47; CC97-544;CC03-388, CC05-398

DATE STAMP RECEIVED BY OFFICE OF PLANNING

For Office Use: Filing Date: Case Number: Zoning District:

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

DEVELOPMENT DUE DILIGENCE CHECKLIST

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

PRE-APPLICATION NEIGHBORHOOD MEETING INSTRUCTIONS

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

CPED STAFF REPORT Prepared for the City Planning Commission

Site Plan Review Regulation Amendments draft of 8/31/15

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

HEARING BOARDS 444 SW 2 nd Avenue, 7 th Floor Miami, Florida Telephone Fax

8.1 APPENDIX A. SUBDIVISION DATA REQUIREMENTS

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

Wildlife Habitat Conservation and Management Program

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

SECTION 5 DRAFTING STANDARDS

Section 801 Driveway Access Onto Public Right-of-Ways

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

Transcription:

CHELAN COUNTY INFORMATION AND PROCEDURES FOR A BINDING SITE PLAN APPLICATION This packet is designed to assist you in preparing your application for a binding site plan application. Applications may be submitted to the Chelan County Planning Department, 411 Washington St., Wenatchee, WA 98801 between 8 a.m. and 5 p.m. If the binding site plan will generate more than forty (40) average daily trips (ADT) a pre-application conference with County staff to discuss binding site plan requirements prior to preparing the application is required, if not, a pre-application conference is recommended. Contact the Planning Department to set a date and time and to determine if your parcel size, land use zoning and overall density will accommodate the number of lots you wish to create with your application. Please provide the following information at the time of submittal. If any of this information is not provided we will not be able to process your application until the information is provided.! A completed preliminary plat application form and applicable non-refundable fees. (Including Planning and Health District review and processing fees, and receipt number for Public Work s fees)! Assessor s Parcel Map! If on-site sewage systems are proposed, site evaluations are required for each proposed system location, prepared by a Professional engineer, qualified designer or soil scientist.! A completed environmental checklist signed and dated by the applicant or designated agent which includes the $180.00 application fee.! Twelve (12) copies of the preliminary binding site plan showing the perimeter survey, only one copy needed, if on 8 ½ x 11 sheet.! Two (2) sets of road plans and profiles for all proposed roads and improvement specifications; and easements. Roads not dedicated to the public shall be clearly marked as such on the face of the binding site plan.! Any analysis or mitigation plans required through the application of Chelan County s Critical Areas Resolutions as now constituted or as they may be subsequently amended. 1

! Any other items determined to be required in the pre-application meeting. NOTE: APPLICATION FEES ARE NON-REFUNDABLE. THERE ARE NO GUARANTEES THAT YOUR BINDING SITE PLAN WILL BE APPROVED. Upon receiving a complete application a file will be setup and the binding site plan will be routed to appropriate reviewing agencies. Each agency will review your application and provide the planning department with a list of comments and/or items that you must provide in order to obtain their approval of the preliminary plat. A notice of application will be posted at the site and published and sent to surrounding property owners within 300 feet of the action. There is a 14-day comment period for the Notice of Application. After the comment period has expired the threshold determination for the proposed binding site plan can be made. See the Environmental checklist for details on the determination process. The administrator shall approve, conditionally approve, disapprove, or return for modification the application within ninety (90) days of the issuance of the determination of completeness. Any questions regarding this process should be directed to the Chelan County Planning Department, (509) 667-6225. Our office hours are 8 a.m. to 5 p.m. Monday through Friday except holidays. JURISDICTIONS TO BE CONTACTED Chelan County Building and Planning Dept Chelan Count Public Works 411 Washington St., Wenatchee, WA 98801 350 Orondo St., Wenatchee, WA (509) 667-6225 667-6415 Chelan/Douglas Health District Chelan County Assessor 200 Valley Mall Parkway, East Wenatchee, WA 350 Orondo St., Wenatchee, WA PO Box 429, Wenatchee, WA 98807 (509) 667-6365 (509) 886-6450 Date Received: Received by: Received by US Mail: Accepted: Returned: Fees Paid: Receipt No: PW Receipt No: Date Stamp: 2

CHELAN COUNTY MAJOR SUBDIVISION APPLICATION (Rev. 6/27/01) SECTION I: APPLICANT INFORMATION 1. If an amendment, relate to Application/File # 2. Identify Use or Activity for which the permit is requested: 3. Was there a pre-application conference? Yes No Name: 4. Project Name: 5. Applicant: Phone: Address: City & State: Bus. Phone: Zip Code: 6. Owner: Phone: Address: City & State: Bus. Phone: Zip Code: 7. Owner: Phone: Address: City & State: Bus. Phone: Zip Code: 8. Surveyor: License #: Address: City & State: Phone: Zip Code: 9. Detailed Description of Request: 3

SECTION II: PARCEL/SITE INFORMATION 10. Site Address: 11. Assessor s Parcel Number(s): 12. Location: Section: Township: Range: Related Parcels: 13. Please give detailed driving directions to the site: 14. Legal Description (Attach legal description unless lot and block): Attach a copy of the Assessor s Parcel Map. 15. Zoning Designation: 16. * Comprehensive Plan Designation: 17. Are you located in an urban growth area? 18. What is the current use of the site? 19. Identify existing structures and improvements on site: 20. Is the site near an airport? 21. Is the site within a 100-year flood plain? 22. Are there wetlands, water bodies, rivers or streams on the site or within 200 feet of the site? If yes, identify: 23. * What is the Shoreline Environment Designation? 24. Are there steep slopes on the site? 25. * Is the site in a Fish and Wildlife Habitat Conservation Area? 26. Are there any known cultural or archeological resources on the site? * Please contact or come to the planning department with an assessor s parcel number and map to determine these items. 4

27. Will landfill be required? If yes, Approximate cubic yards 28. Will excavation be required If yes, approximate cubic yards 29. Are there drainage ways on site or within 1000 feet of the site? 30. Are there any geologically hazardous areas on the site or within 1000 feet of the site including the following: Avalanche areas Areas susceptible to erosion Landslide hazardous areas Areas of Historic slope failure Seismic hazard areas 31. Is the site located on an alluvial fan or within 1000 feet of any alluvial fan? 32. Are slopes on site in excess of 45 degrees or is the site within 1000 feet of any area with a slope of forty five percent or steeper? 33. Are there any springs, seeps, ponds or wetlands on the site? 34. What is the average grade of the site? 35. Identify the School District in which the property is located: 36. Identify the Fire District in which the property is located: 37. Identify the Irrigation District within the site is located: 38. Please describe adjacent land uses in all directions around the subject property: North: South: East: West: 39. Roads: Name of the road the property fronts on (Contact the Public Works department if you have any questions) Identify type of Road: County Road Primitive County Road Private Road Driveway Forest Service Road State/US Highway Access Easement Width of existing road surface: Type of existing road surface: Paved/two shot Gravel Dirt Asphalt 40. Lot Size and Dimensions: 5

41. If all or part of the property has been involved in a previous short subdivision, provide name and number. SECTION III: UTILITIES The site/proposal will be or is served by: 42. Water: Well Private System Public System City System Identify Provider: Is site in a water district? If yes, identify 43. Sanitation: Septic Sewer System Identify Provider: 44. Power: Is electrical power available to the site? If yes, identify provider:pud REA 45. Phone: Yes No Name of utility: 46. Natural Gas: Yes No Name of utility: 47. Cable: Yes No Name of utility: 48. Irrigation: Yes No Name of Provider: 49. Private Irrigation Yes No 50. Number of water shares Are water shares to be divided? 51. Garbage Service Yes No Name of Utility 52. Nearest town or city: SECTION IV: GENERAL INFORMATION 53. Has site preparation been started on the site? If so, explain to what extent. 54. If the proposal is commercial or industrial, what are the hours of operation? 6

55. What type of landscaping, fencing and buffering will be used to shield the proposed use from adjoining properties? 56. Do you have any plans for future additions, expansions, or further activity related to or connected with the proposal? Explain. 57. Are there any other applications pending for governmental approvals for this or other proposals affecting the property covered by this proposal? If yes, please list. 58. Please provide a development schedule with the approximated dates that you propose to commence and complete construction. In order to be accepted for a Determination of Completeness, all land use permit applications must include a complete application, including an Assessor s parcel map, vicinity map that identifies the boundaries of the subject property and all properties within a one mile radius, a complete site plan, all applicable fees and applicable review criteria questions specific to each category of permit application. SECTION V: AUTHORIZATION I hereby certify that this application has been made with the consent of the lawful property owner(s) and that all information submitted with this application is complete and correct. False statements, errors, and/or omissions may be sufficient cause for denial of the request. This application gives consent to the county to enter the properties listed above. Applicant Name: Parcel # Applicant Signature: Date: (If applicant is other than owner, an ownership certification must be complete and signed) 7

SECTION VI. OWNERSHIP CERTIFICATION IF A PERSON OTHER THAN THE PROPERTY OWNER IS SIGNING THIS APPLICATION, AN OWNERSHIP CERTIFICATION MUST ALSO BE SUBMITTED. I, here by certify that I am the major property owner, authorized agent, or officer of the corporation owning property described in the attached application and I have familiarized myself with the rules and regulations of Chelan County with respect to making this application and that the statements, answers and information contained therein are in all respects true and correct to the best of my knowledge and belief. Further, I posses full legal authority and rights necessary to exercise control over the subject property. I certify or declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Address City and State Zip Code Phone Date Signature for (Give corporation or company name) At ACKNOWLEDGEMENT (Here signator must state place of signing which may be different than address.) State of Washington } } Chelan County } On this day personally appeared before me to be known the individual described in and who executed within and foregoing instrument and acknowledge to me that signed the same as free and voluntary act and deed for the uses and purposed therein mentioned. NOTARY PUBLIC in and for the State of Washington Residing in Date: 8

SITE PLAN MAP REQUIREMENTS! The boundaries of the section (or portion thereof) within which the plat lies.! The boundary lines of the binding site plan and the lots within it including their distances.! The locations and widths of all roads, easements, and important natural features and improvements within and bordering the binding site plan.! The boundaries of all parcels dedicated or reserved for public or community uses.! The location of all existing and proposed water distribution systems including their type and ownership and well radii if appropriate, sewage disposal systems, storm sewer systems, irrigation systems, and natural drainage system.! The delineation of 100 year floodplains when present.! Drawn to a standard engineering scale not to exceed 1 = 100. Indicate the scale used. Must include north arrow.! The delineation of all water bodies, wetlands and riparian areas within the proposed binding site plan and within two hundred (200) feet of the boundaries of the proposal.! Zoning designation of the subject parcel and of adjacent parcels. I hereby certify that the information on this site plan is accurate and complete. I further understand if the information is incomplete, incorrect, or not provided the application will not be accepted as a complete application. Applicant Name: Parcel #: Applicant Signature: Date: 9