- 50mm silver extrusion frame. graphics. finishes, shown below. dimensions:

Similar documents
features and benefits: dimensions: Hardware additional information: Graphic material: Dye-sublimated fabric Tabletop color options:

Vector Frame Monitor Kiosk 02

10 ModLite Minimal (Option 4) Trade Show Display Booth

10 ModLite Curve Trade Show Display Booth

features and benefits: dimensions: Approximate weight with cases: 122 lbs / 28.1kgs Shipping Packing case(s): 1 OCE 1 OCH

features and benefits: dimensions: Hardware Assembled unit: Tabletop/2x2: w x h x 12.8 d mm(w) x 1509.

features and benefits:

features and benefits:

Hybrid Pro Counter 11

Coyote popup features

Coyote popup features

Coyote popup features

Banner Clip Installation

Retail Reception kiosk

Instructions for assembly of your Pop-Up Display

compact pop up display options

POPUP DISPLAY SYSTEMS

Exhibitor Expanding. Shed some light on your display!

Coyote popup features

DIY CABINET REFACING INSTALLATION GUIDE

Installation Instructions HighRock 4x4 TM

Hybrid Display System

MIRAGE. Set-Up Instructions.

INSTRUCTIONS: LocknCharge Laptop Carts

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

Skyline Exhibits Table Top Displays Set-Up Instructions

OWNER S MANUAL Table Tennis Table Patent Pending

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Here are trade show displays I'm sure will meet your goals. I can also find items priced within your expected budget.

Premier & Deluxe 3-Season Room Sliding Glass Door

Tabletops. Lightweight and Convenient

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

PORTABLE MODULAR DISPLAY DESCRIPTION KIT 115, 129, & 135

redcherry Contents PAGE INDOOR CATALOGUE (t) +27 (0) (e) (w)

CAR SEAT/ STROLLER INSTRUCTION MANUAL

Assembly Instructions

Base Cabinet Assembly Instructions

rental solutions tradeshow rental made easy

WHERE FORM MEETS FABRIC

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

Portable Displays & Accessories

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

Pulleys and Belt. Install the Major Accessory and Pulley. Install the Motor Pulley NOTE. Align the Motor Pulley and the Tool Pulley NOTE

TS93 EMR T/PT/TDE. Surface applied door closer

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

CA-6050 Solar Power Unit. User Guide. Designed to work with the Norsonic range of sound level meters to provide a DC supply in remote locations.

BROUGHT TO YOU BY: events.exhibitors-handbook.com

Owner's Manual & Assembly Instructions

92-00 Civic/ Integra/ Del Sol/ CRX Rear Kit Part No

Speed-Mat Rectangle Cutter

Assembly GUIDE. display wine cellar kits. Required. Suggested. Questions? or visit wineracksamerica.com

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Micro Cart User's Guide

Ariva Powerful Marketing Displays. Exhibit & Display Solutions

2013 RENTAL CATALOG Kensington Road Brighton, Michigan Tel:

Basic Spring Motor Roller Shades

ESTATE WAGON MODEL 300 OWNER MANUAL

ORBITAL EXPRESS TM TRUSS

Post Mount Light Installation*

Standard Royal Inspiration Station

KEYPAD LOCK RETROFIT KIT

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

Rack Installation Instructions

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual.


PORTABLE EXHIBIT SOLUTIONS

Display Hardware.

HP 16/18-Port Cable Management Kit Installation Guide

Hollow or Cinder Block Wall Mount Job Aid

Models A spe n, Econoline C o l o n i al. and Savoy. Installation Instructions. Contractors Wardrobe

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

MBSAW. Meat Cutting Band Saw With Meat Grinder Assembly & Operating Instructions

1. SAFETY RULES WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR PERSONAL INJURY, MOUNT FAN TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT".

Installation Instructions:

User Manual. Instructions for installing the Sure Stitch on the Next Generation Quilting Frame. Parts Included:

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

Chelsea Loft Bed WARNING:

TOYOTA TUNDRA 2015 Billet Grille w/led DRL

Arctic Leash Instruction Manual Alaskan Products Company LLC.

Wanda Technology Inc. Side Post Aluminum Umbrella OWNER S MANUAL

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

MGB Chrome Bumper Conversion

RAIN COLLECTOR S HELF MANUAL

Snow Blower Cab. Owners Manual. Heavy Duty Vinyl Cover Heavy Gauge Tubular Steel Frame. Model No Safety Assembly Operation Maintenance Parts

Rating when used as a weight carrying hitch without spring bars:

1500 Follow Spot Yoke

INSTALLATION INSTRUCTIONS

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Light Weight Style, Flexibility & Performance

Installation Guide 2010 BMW S1000RR Full Exhaust System

50 TO 60 INSTALLATION INSTRUCTIONS v1.0

2006 JUDY SERVICE GUIDE

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

All-Season Sunroom Sliding Glass Door Installation Instructions

Item #: BTOL Assembly Instructions

AM/FM ANTENNA RELOCATION KIT

Transcription:

smartwall kit 24 VF-K-24 The innovative, contemporary and clean appearance of the Vector Frame TM line of exhibit kits will captivate your audience. Kits feature push-fit fabric graphics, easy-to-assemble extrusion frames, accent lighting, tables, counters, literature accessories, monitor mounts and interior LED edge lighting where indicated. features and benefits: - 50mm silver extrusion frame - Kit includes frame, four fabric graphic - Single-sided SEG dye-sublimated push-fit fabric panels, two fabric graphic counters, two graphics monitor mounts, two 120 watt lights, and - Counters available in four thermoform three wheeled molded cases finishes, shown below - Lifetime hardware warranty against - Max monitor weight = 25 lbs / 11.3 kgs manufacturer defects dimensions: Hardware Assembled Unit: 219.5 w x 102 h x 22.25 d 5575.3mm(w) x 2590.8mm(h) x 565.15mm(d) Counter 03: 38.5 w x 40.5 h x 19.88 d 977.9mm(w) x 1028.7mm(h) x 504.952mm(d) Shipping Shipping Dimensions - ships in 3 cases: 3 OCH2 cases: 52 l x 30 w x 15 h 1320.8mm(l) x 762mm(w) x 381mm(h) Approximate shipping weight (entire kit): 325.34 lbs / 147.57 kgs Graphic Total visual area: Panel A: 11.81 w x 94.5 h 300mm(w) x 2400mm(h) Panel B: 10.25 w x 94.5 h 260mm(w) x 2400mm(h) Panel C: 141.73 w x 94.5 h 3600mm(w) x 2400mm(h) Panel D: 111.25 w x 94.5 h 2825mm(w) x 2400mm(h) Counter 04: Front (wraps around counter): 73.125 w x 39.25 h 1857mm(w) x 997mm(h) Back: 11.35 w x 39.25 h 288mm(w) x 997mm(h) Please be sure to include a 2 bleed around the perimeter. 08.13.15 Nimlok Display and Exhibit Solutions Worldwide For questions contact your local Nimlok distributor additional information: Graphic material: Dye-sublimated fabric Counter holds max 50 lbs / 22.68 kgs Lights Included: Lumina 200 120 watt floodlight, curved arm, black finish, 19.5 from end to end Tabletop color options: silver black mahogany natural smartwall

Parts Included: Code Qty Description VF-K-16-A-G x1 300MM (11.81 )W X 2400MM (94.5 )H FABRIC GRAPHIC W/FCE-2 ALL SIDES VF-K-16-B-G x1 260MM (10.25 )W X 2400MM (94.5 )H FABRIC GRAPHIC W/FCE-2 ALL SIDES VF-K-16-C-G x1 3600MM (141.73 )W X 2400MM (94.5 )H FABRIC GRAPHIC W/FCE-2 ALL SIDES VF-K-16-D-G x1 2825MM (111.25 )W X 2400MM (94.5 )H FABRIC GRAPHIC W/FCE-2 ALL SIDES PMFC2-90-CAP x4 PMFC2 90 DEGREE EXTRUSION CAP STS-1 x8 SLIM TRUSS SPACER MM-MB x2 MEDIUM MONITOR BRACKET FOR MONITORS 15-40 LUM-200-ORL-B LN-3P-LT-FXT x2 BLACK 200W HALOGEN LIGHT FIXTURE ETL APPROVED IB2 x7 PH INLINE CONNECTOR CB9-S x4 50MM SQUARE PHCF2 CORNER BRACKET CB9-R x4 50MM ROUND PHCF2 CORNER BRACKET CB9 x4 CB9 CORNER BRACKET F22 x4 1193MM (46.97 ) PMFC2-90 EXTRUSION - WITH IB2 LOCK HOLES BOTH SIDES F30 x4 1200MM (47.24 ) PHFC2 EXTRUSION WITH IB2 HOLE ONE SIDE - WITH LOCK ONE END F32 x2 1200MM (47.24 ) PHFC2 EXTRUSION WITH IB2 HOLE TWO SIDES F34 x4 1155MM (45.47 ) PHFC2 EXTRUSION WITH IB2 HOLE ONE SIDE - WITH LOCK ONE END F37 x4 900MM (35.43 ) PHFC2 EXTRUSION WITH IB2 HOLE ONE SIDE - WITH LOCK ONE END F42 x4 450MM (17.72 ) PHFC2 EXTRUSION WITH IB2 HOLE ONE SIDE - WITH LOCK ONE END F44 x2 210MM (8.28 ) PHFC2 EXTRUSION WITH LOCKS TWO ENDS TUBE-30-1155 x4 1155MM X 30MM TUBE WITH ES30 HOLES BOTH ENDS TC-30-S x2 INLINE CONNECTOR FOR 30 TUBING VE-45 x2 PH4SC-300MM (11.81 ) EXTRUSION WITH TENSION GLIDES VE-67 x4 1155MM (45.47 ) 50MM PM2S SQUARE EXTRUSION WITH STOP AT 155MM WITH LOCK ONE END VE-76 x4 100MM (3.94 ) PH1 EXTRUSION WITH LOCKS TWO ENDS VE-85 x2 1155MM LENGTH OF PH1 EXTRUSION - WITH IB2 LOCK HOLES ONE SIDE - SLIDE LOCK ONE SIDE Exploded view Assembed view

Step 1: Assemble Right End Frame Arrange pieces on the floor as shown in the diagram below. Assemble frame by locking CB9-R s and CB9-S s to the F42s and F34. Press snap on button to lock TUBE-30-1155 to CB10-R on top and bottom. When locking be sure to turn each cam a little bit and then go back and tighten to the proper tension. Take care to turn locks only half a turn. Slide the IB2 into the extrusion to connect side. Tighten to the proper tension to lock extrusions together.

Step 2: Assemble Middle Frame Arrange pieces on the floor as shown in the diagram below. Assemble frame by locking CB9-R s and CB9-S s to the F42s and F22. Press snap button to lock TUBE-30-1155 to CB10-R on top and bottom. When locking be sure to turn each cam a little bit and then go back and tighten to the proper tension. Take care to turn locks only half a turn. Slide the IB2 into the extrusion to connect side. Tighten to the proper tension to lock extrusions together.

Step 3: Assemble Right Frame Arrange pieces on the floor as shown in the diagram below. Assemble frame by locking F37 to VE-85. Slide the IB2 into the extrusion to connect. Lock extrusions together with middle and end frames. When locking be sure to turn each cam a little bit and then go back and tighten to the proper tension. Take care to turn locks only half a turn. Tighten to the proper tension to lock extrusions together.

Step 4: Assemble Truss End Section Arrange pieces on the floor as shown in the diagram below. To assemble frame, lock CB9-S to F44, F34 and F22s. Slide the IB2 into the extrusion to connect sides. Tighten to the proper tension to lock extrusions together. Install graphic by pressing the FCE-2 edge of graphic into the channel of the extrusion. Start in upper left corner and insert in remaining corners, then push graphic into each side. Assure graphics are tightly inserted.

Step 5: Assemble Center Frame Arrange pieces on the floor as shown in the diagram below. To assemble frame, start at bottom locking VE-67 to the F30s and F32s. Slide the IB2 into the extrusion to connect sides. When locking be sure to turn each cam a little bit and then go back and tighten to the proper tension. Take care to turn locks only half a turn. Tighten to the proper tension to lock extrusions together. *Important: before securing F30s to F32 at top, make sure to slide into middle front channel of VE-67 two square head bolts for monitor mount.

Step 6: Attach Graphics & Monitor Mount Install graphic(s) by pressing the FCE-2 edge of graphic into the channel of the extrusion. Start in upper left corner and insert in remaining corners, then push graphic into each side. Align graphic with cutout for VE-76. Assure graphics are tightly inserted. Secure monitor mounts with washer and wingnut. Push fabric with FCE-2 edge folded over into each corner of frame. Press into the middle of the inside channel and continue around perimeter. To remove graphic, use the pull tab and gently pull graphic from frame. Graphic Storage & Care: Graphics should be folded with the graphic facing inward and stored in a ziplock / sealable plastic bag. Spot clean by wiping with a damp white cloth. If washing is necessary, use a commercial size front-loading washing machine, gental cycle with cool water. Line dry flat. Dry cleaning is NOT recommended to prevent shrinkage.

Step 7: Attach Lights Slide light clip onto each light. Then slide light into the extrusion channel at an angle and gently lower down and repeat for each light.

Parts Included: Code Qty Description F40 x2 600MM (23.62 ) PHFC2 EXTRUSION WITH LOCKS TWO ENDS F43 x4 300MM (11.81 ) PHFC2 EXTRUSION WITH LOCKS TWO ENDS F48 x4 100MM (3.94 ) PHFC2 EXTRUSION WITH LOCKS TWO ENDS F24 x2 986MM (38.32 ) PMFC2-90 EXTRUSION - WITH IB2 LOCK HOLES BOTH SIDES CB10-R x8 50MM ROUND PHCF2 CORNER BRACKET VFC-04-CT x1 COUNTERTOP FOR VECTOR COUNTER VFC-04 VFC-04-CT-S x1 INTERNAL SHELF FOR VECTOR COUNTER VFC-04 VFC-03-B-G x1 291MM (11.48 ) X 1000MM (39.38 )H FABRIC GRAPHIC W/FCE-2 ALL SIDES VFC-04-A-G x1 1860MM (73.25 )W X 1000MM (39.38 )H FABRIC GRAPHIC W/FCE-2 ALL SIDES TUBE-30-910 x4 910MM (35.82 ) LENGTH 30MM (1.18 ) TUBE PMFC2-90 CAP x4 PMFC2 90 DEGREE EXTRUSION CAP VE-80 x4 288MM (11.34 ) PH1 EXTRUSION WITH IB2 LOCK HOLES BOTH SIDES VE-68 x1 910MM (35.82 ) 50MM PM2S SQUARE EXTRUSION WITH LOCKS TWO ENDS PE-1000 x2 1000MM (39.38 ) PE EXTRUSION Overhead view Assembed view Exploded view

Step 1: Assemble Counter Frame Arrange pieces on the floor as shown in the diagram below. Assemble frame sides by locking F43s and TUBE-30-910s to the CB10-Rs. Continue frame assembly by locking F40 to VE-68 to the extrusion. When locking be sure to turn each cam a little bit and then go back and tighten to the proper tension. Take care to turn locks only a quarter turn, so as to not strip the locks by over tightening.

Step 2: Install Internal Shelf Assemble shelf support frame by securing VE-80 to PE-1000 extrusion. With VE-80 secured to PE-1000, slide PE-1000 into counter frame as shown below. Lock each frame to F-24 using Allen Key. Install internal shelf (VFC-02-CT-S) on top of VE-80s. ASSEMBLE SHELF SUPPORT FRAME 2 FRAMES PE-1000 VE-80 VE-80 TOP VIEW F-24 VE-80 TOP VIEW VE-80

Step 3: Apply Graphics & Attach Countertop Apply push-fit fabric graphic(s) by pressing the FCE-2 edge of graphic into the channel of the extrusion. Start in upper left corner, go across the top and then down the sides to the bottom. Repeat for each side. Assure each graphic is tightly inserted. When taking graphics off, take care to gently pull by attached pull tab. Next, gently place the countertop onto the completed frame. Lock countertop into place using Hex Key.