Work Health and Safety Policy

Similar documents
Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

WORKING IN CONFINED SPACES GUIDELINES

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

Lockout / Tagout Program

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

Lockout - Tagout Program

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

BWC Division of Safety and Hygiene

Control of Hazardous Energy (Lockout / Tagout)

Page85. Lock-out Tag-out Plan

3088 Lockout-Tagout Training Program Course Outline

Project & Task Work Health and Safety Risk Management Procedure

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

Lock-out/Tag-out.

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

Lockout/Tagout Training Program

University of Nevada, Reno

section 5 machine guarding and lockout

LOCKOUT/TAGOUT PROGRAM. Table of Contents

ISSUE: LOCK OUT BLOCK OUT

LOCK-OUT / TAG-OUT SAFETY TRAINING

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

Release 1. BSBWHS508A Manage WHS hazards associated with plant

Information for a person conducting a business or undertaking

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

Lockout/Tagout Compliance Guide and Checklist

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lockout/Tagout (LOTO) Compliance Guide

Alcohol, Tobacco and Other Drugs Minimum Standard. April 2015

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

Energy Control Lockout/Tagout

HealthStream Regulatory Script

Hazard Identification, Risk Assessment and Control Management

L O C K O U T / TA G O U T A D M I N I S T R AT I V E G U I D E

Heading FACT SHEET. Overview.

Confined Space Management Procedure

Lockout Tagout Program. Table of Contents

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

WHS Contractor Management Procedure

Lockout/Tagout. Training: 29 CFR Lockout Tagout Standard States employer must provide training on lockout tagout.

Incident Response and Investigation Procedure

HS307 Hazard & Incident Reporting Procedure

WHS CONTRACTOR MANAGEMENT PROCEDURE

WHS Policies and Procedures Package

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

File Name: LO/TO Orig. Date: November 2005 Revision Date:November 2006 Reviewed Date: November Standard: OSHA: 29CFR

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

Event Management Guidelines. Month Event Management Guidelines (Month, 2011)

Policy Number: 054 Work Health and Safety July 2015

Fire Alarm and Protection Impairment Policy and Procedures

Hazard Identification, Risk Assessment and Control Procedure

Unit Title: Unit purpose and aim

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Accident/Incident Investigation & Reporting Procedure

Unit Title: Unit purpose and aim

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

CONTRACTORS AND SUBCONTRACTORS UNDER THE WORK HEALTH AND SAFETY ACT 2011

Maintaining Fire Protection Systems

INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT

ACCIDENT/INCIDENT REPORTING AND INVESTIGATION

POLICY: CONFINED SPACES

AFTRS Health and Safety Risk Management Policy

POLICY ON OCCUPATIONAL HEALTH AND SAFETY RISK MANAGEMENT

Electrical safety code of practice Managing electrical risks in the workplace

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

Safe Operating Procedure

MANAGING THE RISK OF PLANT GUIDELINES

Risk Engineering Guideline

Hazard Identification, Risk Assessment And Control Procedure

Business Unit/Area: N/A. Protocol No.: COR-3S3-PR

OCCUPATIONAL HEALTH AND SAFETY RISK ASSESSMENT PROGRAM FOR AGRICULTURE

Lockout / Tagout Awareness

PBX Series Quick Fit Connector Bimetallic Steam Traps

TRAINING RESOURCE MANUAL NATIONAL SPECIALISED ELECTRICAL WORK RECORD OF WORK EXPERIENCE AND TRAINING UEENEEP024A UEENEEP017A. EE-Oz Training Standards

SAFETY and HEALTH MANAGEMENT STANDARDS

MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

Circuit Electrical Testing

Oil and Coolant Circulating Heating System. Model - OCSM

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

Operating instructions

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:

UNIVERSITY OF TOLEDO

Procedure. Work Health and Safety General construction. Document number: PRO Description Process Owner Approved for issue. Rev no.

Work Health and Safety (WHS) Policy

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

WORKER REPRESENTATION AND PARTICIPATION GUIDE

GHD EPCM Standard operating procedure Working at height May 2013 v1

Preventing Overheated Boiler Incidents

Health and Safety Management Standards

Transcription:

Procedure Plant Isolation Lock out/tag out Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational Unit CONTENTS Executive Director, Commercial Services and Development Executive Director, Commercial Services and Development Commercial Services and Development (Infrastructure Planning and Compliance Unit) 1 Objective... 2 2 Scope... 2 3 Procedure... 2 3.1 Isolation and Tagging of Plant... 2 3.1.1 Take plant out of service (shut down)... 2 3.1.2 Identify all energy sources and other hazards... 2 3.1.3 Identify all isolation points... 2 3.1.4 Isolate all energy sources... 2 3.1.5 De-energize all stored energy... 3 3.1.6 Lock out and tag all isolation points/energy sources... 3 3.1.7 Test isolation to prove safe... 3 3.1.8 Complete the work... 4 3.1.9 Test/return plant to service... 4 3.2 Exemptions... 4 3.3 Applying and Removing Tags... 5 3.3.1 Out-of-service tags... 5 3.3.2 Danger tags... 6 3.4 Responsibilities... 6 4 Definitions and Acronyms... 7 5 Supporting Documentation... 9 6 Versioning... 9 1 Plant Isolation Lock out/tag out Procedure (November, 2014)

1 Objective The objective of this Procedure is to articulate the system by which plant in University of Tasmania (University) workplaces shall be isolated, locked out and tagged to provide protection from the uncontrolled release of energy sources and in so doing, to either eliminate, or if not reasonably practicable, minimise the risk of damage or harm. 2 Scope This Procedure applies to all isolation, lock out and tagging activities performed by workers and other persons at the University, including when undertaking maintenance, repair, installation, service, cleaning and inspection of plant. 3 Procedure 3.1 Isolation and Tagging of Plant The procedural steps required to isolate, lock out and tag plant so that work may be performed are outlined below. Isolations that involve fire protection equipment shall be performed in accordance with the University Fire Protection Systems Impairment Procedure. 3.1.1 Take plant out of service (shut down) Cease using and shut down the item of plant. Complete and attach an out-of-service tag (see paragraph 3.3). 3.1.2 Identify all energy sources and other hazards Conduct a risk assessment in accordance with the University Minimum Standard Work Health and Safety Project and Task Risk Management. The assessment must: identify all potential sources of energy associated with the item of plant; identify all other hazards and control measures required to perform the work safely, including any permit to work (PTW) procedures to be applied (e.g. hot work) and requisite training and competency; be approved by relevant Managers, along with any other required documentation (e.g. permits) prior to work commencing. 3.1.3 Identify all isolation points Determine the isolation points for each energy source identified. If available/used, record each point on an isolation checklist for the task (particularly for isolations that are repeated). 3.1.4 Isolate all energy sources Isolate all energy sources at the isolation points identified, in accordance with the task isolation checklist if available. With the exception of simple electrical equipment connected via a plug and socket, all electrical isolations must be carried out by a licensed electrical contractor. 2 Plant Isolation Lock out/tag out Procedure (November, 2014)

Wherever practicable, the isolation of plant is to include mechanical locks and whole current isolators. 3.1.5 De-energize all stored energy Stored energy in the plant must be discharged/de-energised by: inspecting plant to ensure all parts have stopped moving; isolating and proving dead all electrical power supply to the plant; lowering suspended equipment with stored potential energy to its rest position; blocking moveable parts that may be affected by gravity, pressure or other forces; draining or bleeding hydraulic and air lines to remove pressure; releasing or blocking spring energy; draining process piping systems and closing valves to prevent the flow of hazardous material; purging tanks and process lines and/or dissipating extreme cold or heat (and/or provide appropriate personal protective equipment). 3.1.6 Lock out and tag all isolation points/energy sources Wherever practicable, all potential energy sources must be tagged and locked out as follows: each worker intending to work on an item of plant shall complete and attach a Personal Danger Tag (see paragraph 3.3) and lock to each isolation point for all energy sources; and any plant designed to be operated from more than one location shall be fitted with lock outs that effectively isolate the power source. The authorised person who locks out the plant shall: retain the key to the safety lock(s) or ignition; ensure the relevant PTW Register is updated; and notify the relevant Officer of the isolation. 3.1.7 Test isolation to prove safe The worker(s) performing the task shall re-check all energy sources are isolated, deenergised and tagged effectively. Without exposing the tester or others to risk, test that plant is safe by: pushing start buttons (with guards in place where required); inspecting moveable parts to see they are at rest; 3 Plant Isolation Lock out/tag out Procedure (November, 2014)

testing electrical circuits to make sure power is off; checking tags and locks are in place; and performing any other test specific to task. Work shall only commence when tests confirm it is safe to do so. If the plant engages or moves, work must not commence and workers shall: turn the item of plant off at the main isolator where possible; remove personal danger tags and locks (if leaving the work area), but leave out-of-service tags in place; and inform the relevant Officer of the incident to determine appropriate action, which may include completion of a University Incident Report Form. 3.1.8 Complete the work Work must be completed in accordance with the task risk assessment and all relevant procedures and permits. 3.1.9 Test/return plant to service When testing or returning plant to service, the following steps must be observed: notify all personnel involved with the plant; ensure all personal danger tags have been removed; remove all locks; ensure all tools are out of the plant and guards are in place; ensure braces, pins, blocks, chains etc. are removed; and ensure all personnel are clear at start-up. If plant is to be re-energised temporarily for testing purposes, all energy sources must be isolated, locked and tagged out again in accordance with this procedure before work recommences. If work is complete and plant is safe to return to service and is to be re-energised, the out-of-service tag can be removed and the relevant PTW Register can be completed after the above steps have been performed. 3.2 Exemptions Lock out or danger tags do not need to be applied in the following circumstances: minor adjustments and other minor servicing activities that take place during normal operations where: o the plant is under the control of an authorised person; o the authorised person has a line of sight to all access points of the plant that would place a person at risk if the plant commenced operation; and o there is no risk of contact with electricity when undertaking the task; 4 Plant Isolation Lock out/tag out Procedure (November, 2014)

cord and plug-connected electrical plant if: o exposure to unexpected start-up is controlled by unplugging the plant from its energy source; and o the plug is under the exclusive control of the worker carrying out the servicing, maintenance or cleaning of the plant; situations where isolating the plant will also isolate essential services, provided that: o continuity of services is essential and shutdown of the system is impractical; o equipment is used that will provide proven effective protection for workers and other persons; o a Take5 risk assessment has been conducted; and o an approved safe work procedure (SWP) is being followed. In all circumstances outlined above, out-of-service tags must still be applied. 3.3 Applying and Removing Tags 3.3.1 Out-of-service tags Out-of-service tags shall be completed and affixed to isolation points of plant, or - where an isolation point is not available or practical - to a readily visible part of the plant, to identify that the plant has been taken out of service. Out-of-service tags are available from the Infrastructure Planning and Compliance (IPAC) Unit and/or Health and Safety Representatives (HSRs). All information on the tag must be completed in ink pencil is not acceptable. Attached tags must be clearly visible from the position from which the plant is started/operated to identify that it must not be used. Where possible, tags should obstruct the method of starting the plant. In the case of small items of plant, the plant should also be removed from service. The relevant Officer (or IPAC Supervisor if the plant is controlled or maintained by IPAC), shall be notified so that they can ensure that a job request and/or purchase order is raised for the repair, maintenance or replacement of the plant. Details of the tagging shall be recorded in the relevant PTW Register. Tagged-out plant is not to be operated unless by an authorised person for the purpose of maintenance, testing or repair. No maintenance or cleaning of plant shall be conducted while the plant is operating unless written authorisation has been given. Where such permission is given, the plant may only be operated by the person carrying out the work. When plant is safe to return to service, out-of-service tags shall only be removed by an authorised and competent person, who has confirmed that the plant is safe to return to service. 5 Plant Isolation Lock out/tag out Procedure (November, 2014)

If there is disagreement between a worker and an Officer regarding the application or removal of an out-of-service tag, the matter shall be referred to the area HSR. 3.3.2 Danger tags Danger tags are used in addition to out-of-service tags to provide personal protection to workers. Each worker working on or near plant that could place them at risk of injury if operated must complete and attach their own danger tag to the item of plant. Danger tags are available from the IPAC Unit. All information on the tag must be completed in ink pencil is not acceptable Danger Tags must be placed on the plant isolation control to make it clear to other workers that the plant is not to be started or operated. Danger Tags may only be removed by the person who applied the tag at the completion of a task or before leaving work at the end of a shift. The out-of-service must remain attached unless the plant is safe to return to service. Failure to remove a danger tag before leaving the place of work will result in that worker being called back at their own expense to remove the danger tag. If plant must be returned to service and a worker has become incapacitated or has left the job and cannot be located, an authorised person from the IPAC Unit can inspect the job, declare the situation safe, remove the worker s Danger Tag and complete the relevant PTW Register. The authorised person shall continue to try and contact with the worker to advise that the worker s personal danger tag has been removed. Failure to comply with danger tag removal protocols may lead to disciplinary action. 3.4 Responsibilities Officers are responsible for ensuring that: this Procedure is implemented effectively within their area of responsibility, including the provision of appropriate supervision and equipment for isolation and tagging; Organisational Unit-specific guidelines are developed where necessary and that these are consistent with this Procedure; authorised personnel with relevant qualifications and training are designated to carry out plant isolation; PTW Registers are updated and completed; Records relating to the maintenance, repair and servicing of plant under their control are retained in accordance with the provisions of the University Records Management Policy and the Work Health Safety Records Management Guidelines; and appropriate resources and processes are available and used to eliminate or minimise risks associated with plant at the University. The Infrastructure Planning and Compliance Unit is responsible for ensuring that records relating to the maintenance, repair and servicing of plant under its control are retained in accordance with the provisions of the University Records Management Policy and the Work Health Safety Records Management Guidelines. 6 Plant Isolation Lock out/tag out Procedure (November, 2014)

All Workers are responsible for ensuring that: this Procedure is implemented when undertaking work at the University, in accordance with any information, training or instruction they have received; plant identified as unsafe/faulty: o is not used; o has an out-of-service tag is attached to it; and o a Responsible Officer is notified; all energy sources are effectively isolated, tagged, de-energised and restrained prior to work commencing; and PTW permits and registers associated with the work are completed when required. 4 Definitions and Acronyms Term/Acronym Authorised Persons Contractor Danger Tag Employee Energy Sources Fire protection equipment Definition Authorised persons are IPAC personnel and workers who have been authorised by the relevant Officer to carry out repairs, maintenance or servicing work and who have undertaken suitable training to be able to apply this procedure. For the purposes of this procedure, a contractor is any worker engaged by UTAS to perform work for gain or reward other than an employee. Danger Tags indicate that the worker whose name appears on the tag is working on the item of plant, and that the item must not be operated as operation could result in an incident occurring (e.g. injury). Each worker that is working on any type of plant must complete and attach a personal Danger Tag to an appropriate type of isolation device. It is recognisable as a red and white tag with the wording Danger Do Not Operate. Tags shall only be removed by the person who placed and signed the tag. Where more than one person or a group is working on the same isolated energy source, multiple tags shall be used on a suitable multiple lockout device. For the purposes of this procedure, employee refers to any University staff member or to any student or visitor using plant. An energy source is a form of energy e.g. electrical, mechanical, chemical, hydraulic, radiation, thermal (heat, steam), gravitational, pneumatic, and kinetic energy systems, that has the potential for uncontrolled or catastrophic release, which can result in an incident occurring. The energy source must be rendered safe using isolation measures to avoid injury. Fire protection equipment includes: automatic sprinkler systems; special dump systems (foam, CO2 etc); fire pumps; fire doors; fire indicator panels (FIP s) including detectors and circuits; early warning information systems (EWIS); fire hydrants; hose reels; 7 Plant Isolation Lock out/tag out Procedure (November, 2014)

external fire plugs; water mains and valve arrangements; backflow prevention systems; and municipal council connection water meters and valve arrangements. Hierarchy of control The ways of controlling risk can be ranked from the highest level of protection and reliability to the lowest. This ranking, known as the hierarchy of control, is as follows: Eliminate the hazard; Level 1 Substitute the hazard with something safer; Isolate the hazard from people; Engineering controls to reduce the risks; Administrative actions to reduce the level of harm; Personal Protective Equipment. Level 2 Level 3 If it is not reasonably practicable to eliminate a hazard, you must minimise the risk by working through the other alternatives in the hierarchy. Incident Isolation Isolation measures Permit to Work (PTW) Register Lockouts Lock out/tag out Officer An incident includes injury, near miss and damage; i.e. An event which causes, or has the potential to cause, an injury to a person, and/or damage to plant. Isolation is the removal of the energy source from an item of plant to prevent the possibility of accidental or unplanned energisation of the whole, or a specific section of that plant, so that the plant does not move or start up. Isolation must also prevent the introduction of contaminants or conditions through equipment such as piping, ducts, vents, drains, conveyors, service pipes and fire protection equipment. Isolation of plant also ensures that entry to a restricted area is controlled while the specific task is being carried out. Isolation measures to isolate plant include locks, clasps, tags, closing and blanking devices, removal of mechanical linkages, blocks, slings, and removal from service. An appropriate measure that is high on the hierarchy of controls must be used where practicable to isolate the energy source(s). Registers are available to record PTW activities in each Organisational Unit, including the application of lockouts and tags. PTW Registers shall be readily accessible by all workers. For more information refer to the University Permit to Work (PTW) Registers Guidelines. Lockout is where a positive isolator is turned to the OFF position and secured in that position by removal of a key or having a physical block fitted such as a padlock and the key removed. This stops the plant being turned on accidentally or in an unplanned circumstance. The term used to identify the combined process of lock out of plant and application of an out-of-service tag. Any person at the University who makes, or participates in making, decisions that affect the whole, or a substantial part, of 8 Plant Isolation Lock out/tag out Procedure (November, 2014)

Organisational Unit Out-of-Service Out-of-Service Tag Person Conducting Business or Undertaking (PCBU) Plant Worker the University is an Officer. As such, members of UTAS Council, Boards, Committees, Senior Management Team, Deans of Faculties, Organisational Unit heads and Directors/Principals of Institutes are deemed to be Officers at the University. Faculty, School, Centre, University Institute, other University Entity, Division, Section or University Business Enterprise. Plant that is deemed to be unsafe to operate can be taken out-ofservice by the placement of an Out-of-Service Tag. Out-of-Service Tags are placed on plant to indicate it may be unsafe, as it is not operating correctly or is not ready to be operated, and use of that plant could cause an incident. It is recognisable as a yellow and black tag, with the wording Caution Out of Service. Out-of-Service plant must not be operated until all faults have been rectified and an authorised person has removed the tag. PCBUs are the principal duty holder, with primary duty of care for the operation of the University. As such, Members of UTAS Council, Board members, Deans of Faculties and Directors/Principals of Institutes are deemed to be PCBUs at the University. Plant includes any machinery, equipment, appliance, container, implement and tool, any component of any of those things, and anything fitted or connected to any of those things. Any person carrying out work in any capacity at the University, including work as an employee, contractor or sub-contractor, employee of a labour hire company, outworker, apprentice or trainee, work integrated learning or work experience student and volunteer. 5 Supporting Documentation AS/NZS 4024.1:2000 Safety of Machinery University Fire protection systems impairment permit system University of Tasmania Permit to Work Procedure University Minimum Standard Work Health and Safety Project and Task Risk Management University Records Management Policy and Procedure University Work Health Safety Record Management Guidelines Relevant Codes of Practice (e.g. Managing Risks of Plant in the Workplace) 6 Versioning Former Version(s) Current Version(s) Version 1 Isolation Procedure, approved September, 2000; and Out-of-Service Procedure, approved September 2000. Version 2 Isolation and Tagging Procedure (current document); approved by Responsible Officer, November, 2014 9 Plant Isolation Lock out/tag out Procedure (November, 2014)