SOLAR Power Plant pv Module (Renewable source of Energy)

Similar documents
Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

Analysis of Solar Energy Industry in India & Its Future Prospects

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

Success in Scaling-up Solar Energy in Rajasthan, India

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

Tamil Nadu WiNd ENErgy ProfilE

SOLAR ENERGY IN INDIA

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR

G.O.MS.No. 8 Dated Read the following:-

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Solar systems provide a range of flexible heating

Wind Power Programme in India

In Focus. India s Renewable Energy Certificate Market

Delhi Solar Energy Policy, 2015

Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation

Initiatives by TEDA and

Perspectives on Global Competitiveness in Solar Energy at the U.S Department of Energy

Solar Power in China. By Zhou Fengqing

DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014

Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources

TELANGANA SOLAR POWER POLICY 2015

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

welcome! Turkish Renewable Energy Market Rome 29 th April 2015 Levent Çelepçi

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential

Photovoltaic in Mexico Recent Developments and Future

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

AN OVERVIEW OF INDIA S ENERGY SECTOR

Overview of Long Island Electric Service Territory

Alternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility

Rooftop Solar PV Power : Potential,Growth and Issues related to

Electricity from PV systems how does it work?

Ministry of Power & Energy

Renewable Energy Research

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector

Solar Energy. Airports Going Green Aimee Fenlon

Electricity in Egypt

Guidelines for Solar Grid Power Projects

Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay.

New and Renewable Energy Policy in Republic of Korea

Western Australian Feed-In Tariff Discussion Paper

Comparison of Electricity Supply and Tariff Rates in South Asian Countries

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

all that you want to know About Rajasthan Solar Energy

Solar Power Plants FAQs

Enough Solar Energy falls on New York in ONE DAY to power the state for ONE YEAR

Financial Analysis of Solar Photovoltaic Power plant in India

How to Earn the LEED Green Power Credit

NESEMC Top Solar Policies

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

A Proposal for Solar Energy Power in the city of Boulder, Colorado

Existing Wind Power Policies and Incentives

The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE

FEED-IN TARIFF (FiT) IN MALAYSIA

THE SOLAR ENERGY INDUSTRY: CURRENT STATUS AND FUTURE CHALLENGES

Presentation Title ( Arial, Font size 28 )

Analysis of state-wise RPO Regulation across India

ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012

Clean Energy Jobs Plan

FREQUENTLY ASKED QUESTIONS

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Distributed Generation: Frequently Asked Questions

Strategy for Providing 24x7 Power Supply. Forum of Regulators

By: Crystal Warren IMPLEMENTATION OF SOLAR PANELS ON COMMERCIAL PROPERTIES AND THE COST-BASED INCENTIVES

To assist you with getting started with the SRECs program, find enclosed a copy of the following:

Solar Panels and the Smart Grid

SOLAR POWER. Information Book

Renewable Choice Energy

4th Basic Plan Targets of Renewable Energy Deployment

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

An Airport Sustainable Energy Strategy

SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY. Anton Garcia Diaz Economic Bureau of the Prime Minister

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

Transcription:

SOLAR Power Plant pv Module (Renewable source of Energy)

With its abundance of sunlight, India has tremendous potential to emerge as one of the leaders in solar power generation. According to the Government of India s policy for the solar sector Jawaharlal Nehru National Solar Mission (JNNSM) a target of 20 GW of solar installations by 2022 has been set.

Global Scenario Solar Energy demand globally has been growing at about 30% per annum over the past 15 years. In comparison, the hydrocarbon demand growth rate is 0 2% per annum. This high growth rate in solar energy is due to many reasons increasing cost of petroleum products and the parallel decreasing cost of producing power from solar, and a concern world over on the harmful effects of using fossil fuels

Solar Energy in India India is one of the few countries in the world that has a dedicated ministry for New and Renewable energy In India, the high GDP growth rate has created a huge demand for energy, but the supply is unable to match the demand. The total installed capacity of power as of January 2012 is 187 GW. The per capita total consumption is 778 kwh. The estimated shortage of power in India is about 20 GW.

Plant Commissioned in India Name of Plant DC Peak Power (MW) Notes Mithapur Solar Power Plant Mithapur, Gujarat (Tata Power) 25 Commissioned February 2012 WAA SOLAR POWER PLANT Surendranagar, Gujarat 10.22 Commissioned January 2012 Reliance Power Pokaran Solar PV Plant, Rajasthan 40 Commissioning in March 2012 Adani Bitta Solar Plant, Gujarat 40 Completed in January 2012 Mahindra Solar Plant, Jodhpur, Rajasthan 5 Completed in January 2012 Sivaganga Photovoltaic Plant 5 Completed December 2010 Kolar Photovoltaic Plant 3 Completed May 2010 Itnal Photovoltaic Plant, Belgaum 3 Completed April 2010 Azure Power Photovoltaic Plant 2 Completed 2009 Chesdin Power Biomass and Solar Photovoltaic Plants 4.1 Completes December 2011 Citra and Sepset Power Plants Solar Photovoltaic Plants 4 Commissioned October 2011 Jamuria Photovoltaic Plant 2 Completed 2009 NDPC Photovoltaic Plant 1 Completed 2010 Thyagaraj Stadium Plant Delhi 1 Completed April, 2010 Gandhinagar Solar Plant 1 Completed January 2011 Tata Mulshi, Maharashtra 3 Commissioned April 2011 Azure Power Sabarkantha, Gujarat (Khadoda village ) 10 Commissioned June 2011. Moser Baer Patan, Gujarat 30 Commissioned July 2011 B&G Solar Pvt Ltd Mayiladuthurai, Tamil Nadu 1 Commissioned June 2011 REHPL Sadeipali, (Bolangir) Orissa 1 Commissioned July 2011 Tata Patapur, Orissa 1 Commissioned August 2011 Tata Osmanabad, Maharastra 1 Commissioned 1st Aug 2011 Amruth Solar Power Plant Kadiri, Andhra Pradesh 1 Commissioned March 2012 Abengoa Gwal Pahari, Haryana 3 Commissioned September 2011 Chandraleela Power Energy Narnaul, Haryana 0.8 Commissioned December 2011 Green Infra Solar Energy Limited Rajkot, Gujarat 10 Commissioned November 2011 Total 182.1

Why In India India is in the sunny regions of the world with most parts of the country receiving 4 7 kwh (kilowatt hour) of solar radiation per square meter per day, 250 300 sunny days in a year. Even though Solar energy constitutes a miniscule part in India s installed power generation capacity (with grid connected solar PV generation at a mere 6 MW as of March 2010), in the medium and long run, it is expected that solar energy, especially solar PV will form a vital component of the country's energy mix.

Solar Resource Map of India

Different suppliers of Module Manufacturer Country Model Number Watts (p) Life in years/guarantee given Bosch Germany M 240 3 BB 240 10 years-90%, 25 years-80% Canadian solar Canada CS5A-170 170 25 years Co energy US Power Plus 215 P 215 12 years-92%, 25years-80% Del Solar Taiwan D6P_E 120 10 years-90%, 25 years-80% Evergreen solar US ES-A series 200 25 years First solar US FS Series 70 10 years-90%, Mitsubishi Japan TD/TE series 190 JA solar holdings China JAS 165 10 years-90%, 25 years-80% Q cells Germany SL 1 70 25 years PLG Solar India 10 years-90%, 25 years-80% Moser Baer India 10 years-90%, 25 years-80% Tata BP Solar India 10 years-90%, 25 years-80%

Incentives from Government

Jawaharlal Nehru National Solar Mission The Jawaharlal Nehru National Solar Mission (also known as the National Solar Mission) is a major initiative of the Government of India and State Governments to promote ecologically sustainable growth while addressing India s energy security challenges. It will also constitute a major contribution by India to the global effort to meet the challenges of climate change. Named for Jawaharlal Nehru, the Mission is one of the several initiatives that are part of National Action Plan on Climate Change. The program was officially inaugurated by Prime Minister of India, Manmohan Singh.

Scheme on financing of Off Grid and Decentralised Solar Applications Government of India, Ministry of New and Renewable Energy (MNRE) has formulated a scheme on financing of Off Grid and Decentralised Solar (Photovoltaic and Thermal) applications as part of the Jawaharlal Nehru National Solar Mission (JNNSM). Under the scheme, banks may extend subsidised loans to entrepreneurs at interest rates not exceeding five per cent where refinance of two per cent from Government of India is available.

Excise Duty Exemption on Transmission Equipments Exemption of Excise Duty on procurement of Transmission Equipments for initial setup of Solar Power Plant. The exemption would be available on transmission equipments wherever the contractual obligation for installing transmission lines/equipments up to the point of delivery is c0st on the solar power developer.

Subsidy in installation of Solar Power plant The Ministry of New and Renewable Energy (MNRE) provides 70 percent subsidy on the installation cost of a solar photovoltaic power plant in North East states and 30 percentage subsidy on other regions. The detailed outlay of the National Solar Mission highlights various targets set by the government to increase solar energy in the country's energy portfolio.

Major other incentives In the budget for 2010/11, the government has announced an allocation of US $ 220 million towards the Jawaharlal Nehru National Solar Mission. They encouraged private solar companies by reducing customs duty on solar panels by 5% and exempting excise duty on solar photovoltaic panels. The budget also proposed a coal tax of US$1 per metric ton on domestic and imported coal used for power generation. The government has initiated a Renewable Energy Certificate (REC) scheme, which is designed to drive investment in lowcarbon energy projects.

Opportunities and Challenges Land is a scarce resource in India and per capita land availability is low. Dedication of land area for exclusive installation of solar arrays might have to compete with other necessities that require land. The amount of land required for utility scale solar power plants currently approximately 1km 2 for every 20 60 megawatts (MW) generated could pose a strain on India's available land resource. The architecture more suitable for most of India would be a highly distributed set of individual rooftop power generation systems, all connected via a local grid. However, erecting such an infrastructure, which does not enjoy the economies of scale possible in mass, utility scale, solar panel deployment, needs the market price of solar technology deployment to substantially decline, so that it attracts the individual and average family size household consumer. That might be possible in the future, because PV is projected to continue its current cost reductions for the next decades and be able to compete with fossil fuel.

Solar Power Plant in Gujarat

Incentives from State Government Government of Gujarat declared comprehensive Solar Policy 2009, wherein Govt will purchase the power at the following minimum rates. for first 12 years for next 12 years from date of commissioning Solar PV Rs. 12/ kwh Rs. 3/ kwh Solar Thermal Rs. 9/ kwh Rs. 3/ kwh

Transmission charges & transmission losses At 66kV : Transmission charges and transmission losses applicable to normal Open Access Consumer. Below 66 kv : Transmission charges, applicable to normal open access consumer and transmission and wheeling losses @ 10% of the energy fed to the grid, for Solar power Plant of capacity more than 5MW. For Solar power Plants of capacity less than 5 MW, Transmission charges, applicable to normal open access consumer and transmission and wheeling losses @ 7% of the energy fed to the grid.

Policy related to Land Acquisition for Solar Plant At 66kV : Transmission charges and transmission losses applicable to normal Open Access Consumer. Below 66 kv : Transmission charges, applicable to normal open access consumer and transmission and wheeling losses @ 10% of the energy fed to the grid, for Solar power Plant of capacity more than 5MW. For Solar power Plants of capacity less than 5 MW, Transmission charges, applicable to normal open access consumer and transmission and wheeling losses @ 7% of the energy fed to the grid.

Govt. s Initiative The Government of Gujarat is promoting Solar Power Parks in the Sate. Rolled Out Special Policy in 2009. Already few Plants are operational in the State. The development of solar parks will streamline the project development timeline by letting government agencies undertake land acquisition and necessary permits, and provide dedicated common infrastructure for setting up solar power generation plants largely in the private sector.. The State Government is taking initiative in providing the common infrastructure/ facilities like site preparation and leveling, power evacuation, availability of water, access roads, security and services. In parallel with the central government's initiative.

Contd. The Gujarat Electricity Regulatory Commission has announced feed in tariff to mainstream solar power generation which will be applied for solar power generation plants in the solar park. Gujarat Power Corporation Limited is the responsible agency for developing the solar park of 500 megawatts and will lease the lands to the project developers to generate solar power. Gujarat Energy Transmission Corporation Limited will develop the transmission evacuation from the identified interconnection points with the solar developer. This project is being supported, in part, by the Asian Development Bank

Exclusive mandate for Land in Gujarat Land area Location Expected Price : About 1200 acre (485 hec.) : 60 km from Ahmedabad (Capital of Gujarat) 20 km from Sanand (Plant of Tata Nano Car). : $ 12,000/ per acre Primary Use Secondary Use : Solar Power Plant : Storage/ Warehousing

Location : INDIA

Location : Gujarat

Location : Bagodra

Location : Bagodra to proposed site

Location : Proposed site

Expected Production 1200 acre @ 10 MW /100 acre X 0.80 = 96 MW Assuming efficiency 80%

Cost of the Project ($ m) Land Cost : 1.4 Cost of Approvals/Coversion/Devlopment 0.28 (20% of land cost) PV Power Panels @ 4m 480.00 Thus total initial investment for 120 Mw : 48168 Say 500.00 Less Subsidy 30% 150.00 Net Investment 350.00

Expected revenue Expected Revenue from the Selling of Electricity @ Rs. 12/ per kwh for first 12 years: = 2,102,400,000/ or USD $ 42 mn/ year Assuming the plant will for 5 hours a day with efficiency of 80%

Return of Investment Payback period of 8 years includes land also With that other benefits like Carbon Credits and other subsidies, moreover appreciation in the land value.

Secondary benefits Can be used as Storage purpose if constructed as Roof top Solar power plant, to store the items which is not effected by UV rays and other harmful rays.