HEATING SYSTEM FOR CERAMIC TILE FACTORY IN VIETNAM

Similar documents
Committed to make a better world

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

OROT RABIN POWER STATION UNITS x 350 MW

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

Practical Examples of Heat Regenerative System at Steelmaking Works

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units.

Waste to Energy. Anders Damgaard. Thanks to Jiri Hyks and Thomas H Christensen DTU for some slides

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

Calculate Available Heat for Natural Gas Fuel For Industrial Heating Equipment and Boilers

Midland Combustion Electric Line Heaters with Integral Panels

RECON WATER HEATER INSTALLATION FORM

Waste to Energy in Düsseldorf. for a clean city.

Webpage: Volume 3, Issue IV, April 2015 ISSN

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns

HEAVY DUTY STORAGE GAS

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Improving Energy Efficiency through Biomass Drying

INTEC Engineering GmbH Heating Solutions for the Marine Industry

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration

steam centre of excellence Steam Boiler System Optimization

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Originators of the Flexible Water Tube design

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

Cooking at the Speed of light!

Presentation Outline. Background

OilonChooser Operating Instructions

Heating with wood chips and pellets

Beware of Exaggerated Claims and Uncertified Manufacturers Ratings Regarding Commercial Boiler Efficiency

PROFESSIONAL CEMENT PLANT OPTIMIZATION, MODERNIZATION AND ENERGY CONSERVATION

Tips from the Help Desk

CABINET. A Clean Burn Heat Exchanger provides approximately 200% more surface area for capturing combustion heat. You get more heat from less oil.

Rule EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS

Greenhouse gas emissions from direct combustion of various fuels (e.g. grain dryer)

1.3 Properties of Coal

heat treatment equipment & accessories

Bioenergy. A sustainable energy source.

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

Boiler & Pressure Vessel Inspection discrepancies and failures

Overview of Waste Heat Recovery for Power and Heat

Sea Water Heat Pump Project

BEST PRACTICES ADOPTED IN JINDAL STEEL & POWER LTD., RAIGARH TO ACHIEVE ENERGY EFFICIENCY. Presented By : Kumar Rohit Sudhanshu Rometra

A GUIDE TO SELECTING YOUR INDUSTRIAL OVEN

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

Stora Enso Fors Ltd Sweden

Boiler efficiency measurement. Department of Energy Engineering

Chapter 3.4: HVAC & Refrigeration System

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Microwave absorbing tiles:

Natural Gas Energy Efficiency Opportunities for Commercial & Industrial Customers. Michael Pace Lead Engineer C & I Efficiency Programs

Free Examples of plant layout drawing

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Optimising Glass Melting Processes with Energy & Mass Balance Calculations

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Modern Sand Reclamation Technologies for Economy, Environment Friendliness and Energy Efficiency

Building Energy Systems. - HVAC: Heating, Distribution -

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Online Infrared Flue Gas Analyzer Gasboard 3000

Case Studies: Infrared Heating in Industrial Applications

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Interested in conducting your own webinar?

Waste Incineration Plants

Figure 22: Typical Individual Venting. Figure 21: Single Water Heater Venting

REGULATORS 175/153 Series

Effect of Self-Heat Circulation on VOCs Decomposition in Regenerative Thermal Oxidizer

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

Small Scale Coal Power Plant in Indonesia

Description of Thermal Oxidizers

Case History: Ethanol Facility Retrofit with a Lower Emissions, Improved Fuel Efficiency Thermal Oxidizer and Dryer Burners

Installation and Service Instructions. Neutralization System Part no Grünbeck part no

PHOENIX ENERGY of NEVADA, LLC (PENV) (PENV)

Rainwater Harvesting

Condensing Boiler Efficiency

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC

F ox W hi t e Paper. Reduce Energy Costs and Enhance Emissions Monitoring Systems

Blast Furnace Gas-Fired Boiler for Eregli Iron & Steel Works (Erdemir), Turkey

UDSA - UDSBD unit heater

Less Exhaust Gas Less Pollution More Dollar Savings

ASX7-4-IOM-7 J

SIOUX HYBRID WATER HEATER

BOILER OPERATORS HANDBOOK

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

Maximizing Boiler Plant Efficiency. Presenter: Dan Watkins, LEED BD+C Sales Engineer Bornquist, Inc.

Chapter. Flares and Stacks. Flares (FLR) Stacks (STK) G2 ICARUS Corporation, 1998.

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

SULFUR RECOVERY UNIT. Thermal Oxidizer

Last update: January 2009 Doc.: 08A05203_e

Energy Efficiency in Steam Systems

Energy is the basic necessity for the economic

OIL FURNACES CLASSIC PREMIUM CLASS UPFLOW OIL FURNACES. ROBD- SERIES Heating Capacities 56,000 to 151,200 BTU/HR [16.41 to 44.

Heat Exchangers in Boilers

What is Cement? History Overview of the Cement Manufacturing Process Brief Overview of Kiln Operations Why Burn Wastes?

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

Recovery Boiler Research Needs An Industry Perspective

Heat recovery. Ian Matthews Sales & Marketing Director Gasco

Centauri. Condensing Fire Tube Water Boiler 399 to 1000 MBH

Gas-Fired, Residential Storage Type Water Heaters

Transcription:

HEATING SYSTEM FOR CERAMIC TILE FACTORY IN VIETNAM USING FURNACE OIL Devon Guile Jean-Marc Guindon Andreas Hart Emerson Hawkins Alex Higgs Jono Horne

OUTLINE Background Process Flow Engineering Plant layout Economics Conclusion Roller Hearth Kiln. (February 2014). Retrieved from http://www.ngk.co.jp/english/products/ceramic/heating/ 2

INTRO Vietnam has a very successful tiling industry In 2013 a total of 199 million m 2 of tile was manufactured That s a 27% share of the global market output Runs 24 hours per day Regenerative heating Fuel Oil Proper design of tiles factories maximized the profit/output This factory is capable of outputting 25,700 tiles per hour 3

BACKGROUND Process followed for manufacture Raw materials are crushed Wet milled into a paste Mixed, formed and dried into 12 by 12 by 1/2 blocks Glazed to add color and protective coating Fired in a continuous kiln to save time Ceramic material properties. (2014, February). Retrieved from http://www.engineeringtoolbox.com/ce ramics-properties-d_1227.html 4

PROCESS FLOW 5

ENGINEERING ANALYSIS The following factory properties were assumed during the design stage: The factory will operate 24 hours per day, 365 days per year. The material will be formed into 12 x 12 x 1/2 floor tiles. The average temperature of the kiln will be 2500 F [3]. The total firing time will be 60 minutes. The factory will produce 2000 tons of tiles per day [3]. To fire 1 kg of ceramic tiles, 1000 kcal of energy is required [3]. Typical efficiencies of ceramic tile kilns are approximately 50% [3]. 6

KILN DESIGN Based on the previous assumptions, the kiln was designed yielding the following results: 8.4 GJ/day energy requirement. This energy will be supplied by burning furnace oil number 4. Furnace oil number 4 is often used in industrial boilers; with a heating value of 34.4 MJ/l [9]. The total fuel flow required to fire the tiles is then calculated as 2.82 l/s. Due to the 50% efficiency, the total fuel flow rate required is increased to 5.64 l/s. 7

KILN DETAILS To determine the dimensions of the kiln, the following assumptions were used: The density of ceramic tile is 2900 kg/m 3 [5]. The horizontal and vertical distance between the tiles in the kiln is ½. The kiln details are then given as: The number of tiles manufactured is 25,700/hr. The overall size of the kiln will be 10.4 wide, 2 tall and 104 long. Tiles arranged 10 horizontally and 24 vertically. Require using racks to transport the tiles from one end of the kiln to the other. Ceramic rollers will be driven by an electric motor at 1.73 ft/min. 8

REGENERATIVE AIR HEATER Used to capture the waste heat in the exhaust from the kiln. Heat exchanger that uses the flue gas from the kiln to preheat metal plates. These metal plates then transfer the heat to incoming kiln air. Require less fuel to achieve an average kiln temperature of 2500 F. 9 Preheated combustion air. (2007, November). Retrieved from http://www1.eere.energy.gov/manufacturing/tech_assistance/pdfs/et_pr eheated.pdf

AIR HEATER DESIGN Several assumptions were made to perform the air heater design: All heat transfer takes place between the flue gas and the entering air. The mass flow rate of the inlet air is the same as the mass flow rate of the flue gas. c p of flue gas = 0.96 kj/kg [2] and c p of air = 1.05 kj/kg [1]. Flue gas entrance temperature is 2500 F and outlet temperature is 1500 F. Inlet air temperature to the heat exchanger is 86 F. Outlet air temperature of the heat exchanger can be calculated as 1000 F. This level of heat transfer is possible with most modern regenerative air heaters. Estimated 38% fuel savings can be achieved [10]. Total fuel rate required is decreased to 3.5 l/s from 5.64 l/s. 10

BURNERS Our design will utilize 40 burners; 20 on each side of the kiln, spaced 5 feet apart. The fuel flow rate for each burner is calculated as 0.0875 l/s. This flow rate is attainable for a typical industrial burner [4]. 11

FINAL KILN DESIGN Parameter Material processed Energy requirement Tiles manufactured Fuel flow rate Value 2000 tons/day 1000 kcal/kg 25700 tiles/hr 3.5 l/s Kiln dimensions 10.4 x 2 x 104 Number of burners 40 Conveyor speed 1.73 ft/min 12

PLANT LAYOUT 13

ECONOMIC ANALYSIS INITIAL COST Item Qty. Units Kiln [17] 178,000.00 $ Burners 40 units Retail Price 160.00 $/unit Air-Air Heat Exchanger [11] 50,000.00 $ Property [18] 1800 m 2 Land rate in Vietnam 5.37 $/m 2 Infrastructure [18] 220,000.00 $ Contingency 10 % Total Capital Expense 488,472.60 $ All figures are in USD Equipment: Kiln, burners, heat exchanger Install & commission Property Infrastructure: Facilities, utilities 14

ECONOMIC ANALYSIS REVENUE & EXPENSES Operations Cost = 4 x Fuel Cost Max revenue based on individual tile sales PERFORMANCE PARAMETER: Net Present Value 8%, 10 years NPV of +452.7 million USD Item Qty. Units Fuel 3.5 litre/s Market Price [7,8] 1.03 $/US gallon Total 30,022,272.00 $/yr Raw Clay 2000 tons/day Market Price [15] 40.00 $/ton Total 29,200,000.00 $/yr Operations 4*Fuel Cost Estimated Total 120,089,088.00 $/yr Total Expenses 149,289,088.00 $/yr Item Qty. Units Retail price 0.929 $/ft 2 Tiles manufactured 25700 units/hr Total Revenue 209,147,628.00 $/yr

CONCLUSION Ceramic tile factory located in Vietnam 2000 tonnes of tiles per day 1000 kcal per kilogram of tile High Efficiency Kiln 40 Burners Inlet Air Reheater (38% fuel savings) Valued at $450 Million US Annual Revenue $209 Million US Construction is recommended http://myatlantaflooring.com/wp-content/uploads/2011/03/atlanta-ceramic-tile- Flooring-1.jpg 16

REFERENCES 1. Air properties. (2014, February). Retrieved from http://www.engineeringtoolbox.com/air-properties-d_156.html 2. Assessment of boilers and thermic fluid heaters. (2006, September). Retrieved from http://www.energyefficiencyasia.org/energyequipment/assessment_boiler_indirectmethod.html 3. Basu, Pabir, Dr. "Kiln Design." Telephone interview. Feb. 2014. 4. Bussman, W., Venizelos, D., & Hayes, R. (2003). Fluid flow. Retrieved from ftp://ftp.demec.ufmg.br/ema867j/livros%20selecionados/queimadoresind/1386_c03.pdf 5. Ceramic material properties. (2014, February). Retrieved from http://www.engineeringtoolbox.com/ceramics-propertiesd_1227.html 6. "Fuel Cost." Fuel Cost. Vietnam Online, 2011. Web. 10 Feb. 2014. <http://www.vietnamonline.com/az/fuel-cost.html>. 7. Fuel Cost." In Vietnam. Energypedia, 15 Apr. 2013. Web. 11 Feb. 2014. <http://www.vietnamonline.com/az/fuel-cost.html>. 8. "Basu, Pabir, Dr. "Kiln Design." Telephone interview. Feb. 2014. 9. Fuel oil and combustion values. (2014, February). Retrieved from http://www.engineeringtoolbox.com/fuel-oil-combustionvalues-d_509.html 10. Preheated combustion air. (2007, November). Retrieved from http://www1.eere.energy.gov/manufacturing/tech_assistance/pdfs/et_preheated.pdf 17

QUESTIONS? 18