Approved by. STANDARD OPERATING PROCEDURE No 20 SAMPLE SHIPPING PROCEDURES. Centennial Colorado R Squared Inc 9034 E Easter Place Suite 201

Similar documents
Sample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG. Revision Number Description Date

UC Davis Guide to Shipping Dry Ice REVISED 06/10/2015 JDC

Pointers on Shipping: Clinical Samples, Biological Substance Category B(UN 3373) and Environmental Test Samples

GTEx Work Instruction for Whole Brain, Brain Stem, and Hair Collection Receipt and Shipping (Green Kit)

Spee Dee Delivery Service, Inc Clearwater Road, St Cloud, MN 56301

Sample Custody. SSFL SOP 10 Revision: 1 Date: November 2012

The Truth About Asbestos In Your Home

SYNTHETIC ORGANIC CONTAMINANTS (SOC) COMPLIANCE SAMPLING COLLECTION GUIDE

UNIVERSITY OF RICHMOND REGULATED MEDICAL WASTE MANAGEMENT GUIDELINES

Policies. Prep Room Policies

Packaging Perishable Shipments

How to Package and Ship. Cremated Remains

Shipping Hazardous Materials

Guidelines for the Safe Transport of Infectious Substances and Diagnostic Specimens

Packaging Perishable Shipments

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE

CHAPTER 5 SHIPPING PROCEDURES

Packaging & Shipping Laboratory Specimens Guide Volume XI

DHL EXPRESS PACKING GUIDE. Protect your shipment with good and quality packaging

Blood Collection and Processing SOP

4 QUALITY ASSURANCE 4.1 INTRODUCTION

Basement Window Installation Guide Hopper and Sliding

Spill Kits and Incidental Spill Response

Content Sheet 5-1: Overview of Sample Management

UNIVERSAL WASTE MANAGEMENT TRAINING

2.3. The management in each HCF shall be responsible for ensuring good waste management practices in their premises.

UCLA Henry Samueli School of Engineering and Applied Science STANDARD OPERATING PROCEDURE MEDICAL WASTE (BIOHAZARD WASTE) MANAGEMENT

BIO MEDICAL WASTE MANAGEMENT

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Waste Management

How to Properly Remove Cement Asbestos Board Siding

What to Recycle with NYC Dept. of Sanitation

ST. CLOUD TECHNICAL AND COMMUNITY COLLEGE HAZARDOUS WASTE PROCEDURE

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure

Managing Regulated Medical Waste in New Mexico

US EPA - Region III BROWNFIELDS. Quality Assurance Project Plan. Template

Asbestos Inspection Project Procedure

SPILLS & SPILL KITS. Spills -General Guidelines:

Appendix H Managing Biohazardous Waste SOP

ASBESTOS MANAGEMENT PROGRAM

April Chemical Waste Guide

ITEM XX M - TREATMENT AND DISPOSAL OF ASBESTOS AND LEAD-BASED COATING WASTE

Rutgers Environmental Health and Safety

DANGER CONTAINS ASBESTOS FIBERS AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD

Sash Replacement Guide

BECHTEL JACOBS COMPANY ORR WASTE CERTIFICATION PROGRAM DOCUMENT CONTROL SYSTEM

(A) All asbestos-containing waste material shall be deposited as soon as is practical by the waste generator at:

RADIATION CONTROL TECHNIQUE #2 INSTRUCTIONS FOR PREPARATION OF RADIOACTIVE WASTE FOR DISPOSAL

Convertible Top Hydraulic Cylinder Removal Manual for W124 E-Class Convertibles Models 300CE (1993) and E320 ( )

VialSafe. DHL VialSafe. UN3373 Packaging Solutions

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

Sentinel Laboratory Guidelines Procedure Adopted: 5/3/2011 Nebraska Public Health Laboratory Version: December 21, 2015

Utah Division of Solid and Hazardous Waste Solid Waste Management Program

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

HAZARDOUS WASTE MANAGEMENT PROGRAM. For OTTERBEIN UNIVERSITY. Prepared by: 140 North Otterbein Avenue Westerville, Ohio 43081

FACT SHEET : Using Autoclaves Safely

Transport and Mailing Systems

Particularly Hazardous Substances (PHS) Standard Operating Procedure (SOP)

Asbestos Removal Procedures for Homeowners

CRIME SCENE PROCEDURES III.

Central Supply Lists 2015/2016. Kindergarten Mrs. McRae, Miss Steptoe, New Kindergarten Teacher

WASTE COLLECTION SERVICES

ATTACHMENT 1-9 CHWSF CONTAINER MANAGEMENT

Food Safety and Quality Management System

Etching using chemicals

ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN

- PACKAGING INSTRUCTIONS - - COLLECTION INSTRUCTIONS AND REPAIR TRACKING -

BRC Food Safety and Quality Management System. New Issue 7

Appendix H IBC Managing Biohazardous Waste SOP

Veterinary Clinics and Hospitals

Medical or Biological Waste: Storage, Treatment, Disposal and Transportation Plan

Solids, Liquids, and Gases

Packing for Transportation

Frequently Asked Questions about Hazardous Waste Lamps (e.g., fluorescent or other lights containing mercury)

Generally no more than 6 lines of data should be on a single label.

(800) Cryo-Cell.com

STANDARD OPERATING PROCEDURES SPILL RESPONSE AND CLEAN-UP OUTSIDE BIOSAFETY CABINET

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

HEALTH AND SAFETY IN THE FOOD INDUSTRY DETECTING HARMFUL MICROORGANISMS HEALTH AND SAFETY PRECAUTIONS (EXAMPLES FROM CONQUEST FOODS)

Class or Individual Characteristics. Class. Individual

Transportation of Dangerous Goods. Transportation of Dangerous Goods Training for Queen s University Shippers and Receivers.

North Carolina State University Emergency Facilities Closure Checklist- Part I

Berea College Chemical waste/product Management Guide. October 2014

Coating and Extraction of Honeycomb Denuders

The Lamp Recycling Outreach Project

Pharmaceutical Waste Management Program St. Joseph Mercy Oakland. Pharmacy/Patient Care

Training on Standard Operating Procedures for Health Care Waste Management Swaziland 12 May, 2011

Each has the following responsibilities under this SOP:

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

PREPARING REGULATED MEDICAL WASTE FOR SHIPMENT

School of Chemistry and Chemical Biology Hazardous Waste Management Plan

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

The Texas A&M University System Environmental, Health & Safety Special Thanks to Koch Industries, Wichita, KS

Revised EHS Biosafety. 1 Select appropriate containers/bags for autoclaving.

Proper Segregation and Disposal of Low-Level Radioactive Waste (LLRW) at Wayne State University

Acronis Backup & Recovery Online. Initial Seeding Step-by-Step Guide

Residential. San Leandro. Recycling Guide

Transcription:

T STANDARD OPERATING PROCEDURE No 20 SAMPLE SHIPPING PROCEDURES J R Squared Inc 9034 E Easter Place Suite 201 Centennial Colorado 80112 Approved by Date

TABLE OF CONTENTS 10 PURPOSE AND SCOPE 201 20 RESPONSIBILITIES AND QUALIFICATIONS201 30 DATA QUALITY OBJECTIVES 201 40 RELATED STANDARD OPERATING PROCEDURES 201 50 EQUIPMENT LIST 201 60 COLLECTION OF SAMPLES 202 70 PROCEDURES 202 80 QUALITY ASSURANCE QUALITY CONTROL 204 90 DOCUMENTATION 204 10 REFERENCES 204 805 08 i R Squared Inc

10 PURPOSE AND SCOPE The following SOP describes the procedures to be followed when samples are shipped off site 20 RESPONSIBILITIES AND QUALIFICATIONS The principal investigator or their designated representative is responsible for the implementation to the SOP The individuals must be cognizant ofapplicable DOT USPS UPS and Federal Express requirements regarding the shipment of samples and hazardous materials 30 DATA QUALITY OBJECTIVES Compliance with the SOP is mandatory to ensure samples are conveyed to the laboratory within established holding periods Non compliance may require the samples to be discarded and another sample obtained 40 RELATED SfANDARD OPERATING PROCEDURES SOP No30 SOP No90 SOP No 220 SOP No 30 SOP No 330 Drill Core Test Pit Excavation Logging and Sampling Groundwater Sampling Soil Sampling Soil Sampling with Radionuclides 50 EQUIPMENT LIST Sturdy plastic or metal ice cooler Chain of Custody forms Custody seals Mailing labels Strapping clear packing and duct tape Ziploc plastic bags Knife or scissors Tape and dispenser Extra labels custody seals Permanent marker Surgical gloves Large plastic bag garbage can size Arrow labels or This End Up labels 805 08 Page I of6 R Squared Inc

Minimum eight pounds ofice Wet ice packs frozen Bubble wrap or other packing material Federal Express form with account number Vermiculite or commercially available cat litter 60 COLLECTION OF SAMPLES Sample collection and all shipment activities will be under the direction ofthe Principal Investigator PI 70 PROCEDURES For shipping purposes samples are segregated into two classes environmental samples and restricted articles ie hazardous materials Environmental samples can also be categorized based on expected or historical analyte levels ie low or high An environmental sample is one that is not defined as a hazardous material by the Department of Transportation DOT 49 CFR Part 171 8 The DOT defines a hazardous material as a substance which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health safety and property when transported in commerce and which has been so designated Any material of a suspected hazardous nature previously characterized as hazardous or known to be hazardous is considered a restricted article In general the two major concerns in shipping samples are protecting the samples from incidental breakage during shipment and complying with applicable requirements for restricted article shipments DOT and courier Protecting the samples from incidental breakage can be achieved by following common sense All samples should be packed in a manner that will not allow them to freely move about in the cooler or shipping container Glass surfaces should not be allowed to contact each other When possible repack the samples in the same materials that they were originally received in from the laboratory Each container should be cushioned with plastic bubble wrap styrofoam or other nonreactive cushioning material Shipping hazardous materials should conform to the packaging marking labeling and shipping instructions identified in 49 CFR Parts 172 173 Environmental samples shall be packed for shipment using the following procedures I Select a sturdy cooler in good condition Secure and tape the drain plug with fiber tape Line the cooler with a large heavy duty plastic bag 2 Place24inches ofbubble wrap or other packing material in the bottom ofthe cooler 3 The sample packer should wear eye protection and protective gloves when handling the samples during the packing process 4 After ensuring that sample container lids are secure place the bottles in separate and appropriately sized Ziploc polyethylene bags Seal the bags with tape 805 08 Page 2 of6 R Squared Inc

5 Wrap duplicate volatile organic VOA vials in one piece ofbubble wrap or other packing material as a VOA sandwich 6 Place the bottles in the cooler with sufficient space to allow for the addition ofmore bubble wrap or other packing material between the bottles Large or heavy sample containers should be placed on the bottom ofthe cooler with lighter samplesie VOAs placed on top to eliminate breakage 7 Put wet ice ie ice packs or ice that has been placed in sealed heavy duty polyethylene bags on top ofor between the samples Pack enough ice in the cooler to chill the samples during transit Ifthe cooler is shipped on a Friday or Saturday for Monday delivery double the amount of ice placed in the cooler Fill all remaining space with bubble wrap or other packing material Securely fasten the top of the garbage bag lining the cooler with tape 8 Place chain of bag and affix to the cooler custody form and if applicable CLP traffic reports into Ziploc plastic s inside lid then close the cooler Securely fasten the top of the cooler shut with fiber tape Place two signed and dated chain of custody seals on the top and sides ofthe cooler so that the cooler cannot be opened without breaking the seals 9 Once cooler is sealed shake test cooler to make sure that there are no loose sample containers in the cooler Ifloose samples are detected open the cooler and repack the samples 10 Using clear tape affix a mailing label and return address to the top ofthe cooler 11 Mark the cooler with This End Up and arrow labels that indicate the proper upward position ofthe cooler 12 Ship samples via priority overnight express to the contracted analytical laboratory for next morning delivery If applicable check for Saturday delivery 13 Declare value ofsamples on the shipping form for insurance purposes Note this declared value should reflect the cost to recollect the samples 14 Record the tracking numbers from the Federal Express forms in the field notebook Also retain the customer copy ofthe Federal Express airbill Hazardous materials should be packed according to the above procedures with the following additions 1 Place samples in individual Ziploc plastic bags and secure with a plastic tie 2 Place samples in paint cans in a manner which would prevent bottle breakageie place glass against glass do not 3 Place vermiculite or other absorbent packing material in the can paint around the samples The amount of packing material used should be sufficient to absorb the entire contents ofthe sample ifthe container is broken during shipment 4 Secure a lid to the paint can with can clips and labels the outside ofthe can with sample numbers and quantity Mark the paint can with This End Up and arrow labels that indicate the proper upward position of the paint can 805 08 Page 3 of6 R Squared Inc

5 Package the paint cans in DOT boxes or coolers with appropriate DOT shipping labels and markings on two adjacent sides ofthe box or cooler 6 Ship the restricted articles via overnight courier following the courier s documentation requirements A special airbill must be completed for each shipment Retain a copy ofthe airbill for records and tracking purposes if necessary 80 QUALITY ASSURANCE QUALITY CONTROL During the project QA QC field book checks will be conducted by the designated project representatives Any corrective action must be conducted in writing by the owner ofthe Note book and initialed by the QA QC representative 90 DOCUMENTATION All sampling shipping documents manifests and notebooks must be maintained by the designated Principal Investigator PI 10 REFERENCES EPA March 2001 Guidance for Preparing Standard Operating Procedures SOPS EPA QAG6 EPA 240 B02 004 Office of Environmental Information Washington DC EPA March 2001 EPA Requirements for Quality Management Plans EPA AR2 EPA 240 13 02 002 Office of Environmental Information Washington DC EPA Nov ember 2002 Guidance on Environmental Verification and Data Validation EPA QAG8EPA 240 R02 004Office ofenvironmental Information Washington DC EPA December 2002 Guidance for Quality Assurance Project Plans EPA AQG5 EPA 240 R2009 OfficeofEnvironmental Information Washington DC 805 08 Page 4 of6 R Squared Inc