Waterproofing Details Design Under Constrained Conditions Samuel Vesely, B.Sc.

Similar documents
constructive solutions Fosroc total waterproofing protection of below-ground structures

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Waterproofing below-ground with Proofex Engage. constructive solutions

SikaProof A Technology

Waterproofing construction Joints

WATERPROOFING OF WET ROOMS

Concrete Waterproofing Systems. Integral Protection.

WATERPROOFING SikaProof -A TECHNOLOGY

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Remedial Waterproofing of Basement

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

Membrane for tunnels and underground construction

WATERPROOFING SikaFuko INJECTION HOSE SYSTEMS UNIQUE WATERPROOFING SOLUTIONS FOR CONSTRUCTION JOINTS

R E S I D E N T I A L H O U S I N G

WATERPROOFING SIKAPLAN MEMBRANE SYSTEMS FOR BASEMENTS TECHNOLOGY & CONCEPTS

Basement Moisture Problems

WATERPROOFING BASEMENTS

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction

The AQUAFIN Approach to Concrete Repair

THORO. Waterproofing Systems

SIKABIT W-15 WET-BONDED WATERPROOFING MEMBRANE

Chapter 2 Basis of design and materials

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

Concrete Waterproofing Systems

Flexible Waterproofing of Basement Structures with Sikaplan Membranes

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO

What Causes Foundation Leaking?

CHAPTER 8- REDUCING THE MOISTURE

State of Connecticut Department of Public Health RADON PROGRAM

INVESTIGATING AND REMEDIATING LEAKS IN BELOW GRADE STRUCTURES AND UNDER PLAZAS

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

School Construction Authority Architecture & Engineering

BUTE Department of Construction Management and Technology

Complete Waterproofing Protection from Rooftop to Basement. Crack Injection, Joint Waterproofing, Waterproofing Membranes

Construction. Sika -1 Waterproofing System. Waterproofing Above and Below Ground for both New and Refurbishment Works

SECTION EARTH MOVING

The Ultimate Guide To Protecting Your House From Water In The Basement

World Tunnel Congress Underground Facilities for Better Environment and Safety - India

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

BELOW GROUND TANKING

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

protect your greatest asset... your home

Waterproofing below-ground with Proofex Engage

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

about your house Before You Start Renovating Your Basement Moisture Problems Figure 1 Moisture problems to solve

Water Damage & Repair

Soils, Foundations & Moisture Control

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

8.7 Schluter -KERDI-LINE

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Technical Data Sheet Art. No Kiesol. applications. Shelf-life. rate depending on application. Characteristic data of the product

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

Guide to working on Public Sewers

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

A guide to preventing structural damage

WATERPROOFING PRODUCTS

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

Vulcan Basement Waterproofing DIY Guide

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Milan M5 metro extension the construction of Lotto station

How to Install GoBoard:

Helitech Waterproofing & foundation repair. Heal your home with. Helitech. HELITECH Waterproofing & Foundation Repair helitechonline.

Extra. Technical. November 2014 Issue 16 NHBC STANDARDS GUIDANCE AND GOOD PRACTICE. In this issue:

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Fosroc Solutions for Waterproofing. constructive solutions

Schluter -KERDI-LINE Elegant, low-profile linear floor drain

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

USER GUIDE Easier, Safer, Betta! WATERPROOFING

Ron Miedema Cement Contractor 1865 Pine Ridge ~ Jenison, MI 49428

Division 9. SignaFlor Pad and Pour Flooring System

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

INSTALLATION THE SIMPLIFIED VERSION

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

Sources A recent survey of leaking basements showed water comes from a variety of sources, but walls are the usual culprit: Occurrence of moisture

Wecryl Waterproofing System under surfacing supplied by others

bout your HOUSE before you start Renovating Your Basement Moisture Problems

Renovating Your Basement

DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS

In accordance with the Department of Labor and Industry s statute , Subd. 11,

Section 2100-Trenching and Tunneling

Waterproofing of exterior walls at 7 Anderson Place, Queenstown

Certification: Building Plans Examiner. Exam ID: B3

bout your house before you start Renovating Your Basement Moisture Problems

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Accessible planning and construction

SECTION SUPPORT OF EXCAVATION

European Technical Assessment ETA-15/0028 of 23/02/2015

FORENSIC INVESTIGATION QUESTIONNAIRE

(4020-NY) ARCHITECTURAL BUILDING INSPECTION ASSESSMENT AND REPORT

Safe & Sound Bridge Terminology

A Guide to Structural Waterproofing

Transcription:

Waterproofing Details Design Under Constrained Conditions Samuel Vesely, B.Sc. Key Words: Waterproofing details, constrained conditions, expansion joints Abstract The research and development (R&D) effort to develop high quality waterproofing materials is an ongoing, worldwide, process. Recent development of high-quality membranes and spray-applied waterproofing materials, as well as a variety of complementary accessories, has opened a range of new capabilities in the design of waterproofing systems. Various types of hydrophilic swelling waterstops, sophisticated injectable hoses and a wide range of injectable resins, anchoring strips and terminating devices are but a few examples of such accessories. These may now provide an answer to just about any requirement that may be presented. Nevertheless, occasionally a constrained situation may arise. A constrained situation arises when an owner, architect, structural engineer, soil engineer or other co-designer is not aware of waterproofing problems that may be created by his requirements and/or design. This type of situation has no text-book solution, and conventional systems will, in some cases, provide no answer. In this presentation, examples of constrained conditions will be presented and the technical approach adopted in practice, in some cases, will be discussed. In other cases, architectural changes were needed to avoid future problems. Author Biography Samuel Vesely has an engineering degree from the University of British Columbia, Canada, 1973 and has been involved in various aspects of the waterproofing profession since 1979. At present, he is the manager of a firm of consulting engineers and specifiers specializing in the design of waterproofing systems to complex structures in Israel and a number of European and Latin American countries. Mr. Vesely is a member of the Israeli Organization of Consulting Engineers (IOCE) and of several committees at the Israeli Standards Institute. He made a presentation at the VII International Roofing and Waterproofing Congress, Madrid, 1992. Constrained Meaning? Constraining situations in the design of waterproofing systems may arise under different sets of conditions. The following demonstrate some selected constrained conditions : 1

1. Proximity of a new building to an existing building problem of access and/or safety. In some cases, available working space may be limited and/or unsafe to perform waterproofing work in a professional, controllable manner. Figure LCT-101 clearly demonstrates there is usually no problem to waterproof the building envelope on grade (A). Matters become more difficult as the building is lowered below ground (B). It gets more complicated to waterproof parts of the building that are to be submerged in ground water. The situation gets even more complicated when a below-ground building is to be built next to an existing building (C1 and C2). However, when a new building extends farther below an existing one (D1 and D2) a serious waterproofing problem may be created. To waterproof area (W) an applicator must position himself underneath the existing building. The possibility of differential settlement of the new building relative to the existing one may complicate the matter even farther. 2. Construction Schedule - limited time. A series of pedestrian tunnels are to be constructed under railroad tracks. It has been decided the main part of the tunnel will be prefabricated on site. In due course, the tracks will be dismantled for a short period of time (a few hours), and a trench will be excavated. As soon as the 100-metric ton tunnel will be hoisted and positioned in place, everything will be returned to its original state. The question is, how does one waterproof under the prefabricated tunnel provided the precondition that through-out the entire process train traffic may be interrupted for no longer than 24 hours is met? See figure LCT-102 3. Constrained Conditions imposed by design or functional requirements 3.1 A large shopping center was enlarged. The new extension included a basement submerged in ground water. See figure LCT-103. At an advanced stage of construction, the construction manager was faced with a dilemma: Option 1 - Keep de-watering the site until the waterproofing of the joint between the 2 parts of the complex will be completed. This would result in a long and costly de-watering operation. Option 2 Stop the de-watering at a relatively early stage and save money, which in turn means dealing with the waterproofing of the joint area under wet conditions, which is a high-risk condition. In fact, it was decided to take the risk. The waterproofing problem was dealt with as described in figure LCT-104. The waterproofer used bentonite membranes for waterproofing the surface. The joints were treated by various types of waterstop strips, and an injection hose was positioned in between the waterstops. To seal the joint, 2 component polyurethane resin was injected into the hose. The selected resin, after solidification, will swell when submerged in water. The under water space, about 4000 square meters (m 2 ), is now dry and occupied by an Office Depot store. 3.2 Openings are to be made in an existing swimming pool being renovated. The openings are shown in figures LCT-105, LCT-106 and LCT-107. As a 2

part of the renovation, new stairs will be sunk into the wall, new pipes will penetrate through the walls, and a new drainage sump will be constructed. As mechanical and other rooms are positioned under the pool, water leaks will have extremely serious consequences. In this case, a combination of parallel waterstop strips and injection hose placed in between the waterstop strips and injected with selected polyurethane resins did the job. In another case, an old swimming pool was extended. Expansion joints were designed along the interface between the old part and the new part of the pool. Because of possible differential settlement, the waterproofing specifications of the submerged expansion joint called for the application of Sodium Bentonite granules in the joint as well as for the injection of a 2 component polyurethane resin. Results were good. 3.3 The outside fasad of a high-rise building is designed to be made of prefabricated panels. Special mechanical fixtures are to be used to attach the panels to the structure. Openings were designed in the structure so that the fixtures may be positioned through the structure. Only at a very late stage, someone noticed that a long water reservoir was positioned along the outer circumference of the roof. For the same purpose, openings were also designed in the walls of the water reservoir. In this case, an uncompromising demand - not to deal with waterproofing solutions but rather change the architectural design - was eventually accepted. 3.4 The Israeli National Geophysical Institute has sites throughout the country. The sites are instrumented to monitor earthquakes. The instruments are positioned on a concrete table cast directly on the subgrade rock. The below - ground structure is built around this concrete table. An expansion joint separates the concrete table and the building. See figure LCT-109. SBS modified bituminous membranes were used to waterproof the underground envelope of the structure. The problem was how to terminate the waterproofing membrane along the expansion joint around the concrete table. A special terminating and anchoring accessory, was used for that purpose. This anchoring accessory is a strip similar to a flat-sided PVC waterstop, but it is made of a special blend of modified polymeric material that is compatible with and torchable to the waterproofing membranes. A preformed polymeric adhesive strip, Ram-Nek, was used as a secondary waterproofing of the joint between the anchoring accessory and membrane. Because the instruments are sensitive to moisture, as a precaution a few injection hoses were positioned around the table. Two component, flexible polyurethane was injected into the expansion joint to seal any possible leaks through the joint. See figure LCT-109 (B). 3

3.5 A part of the basement floor of a large commercial building will be lowered to increase the height of the basement by 1 meter. In winter months, this basement may be submerged in ground water. To lower the basement floor, a diaphragm wall of piles was cast down through the existing floor. Consequently, the waterproofing system under the floor was seriously damaged. See figure LCT-110. There was no problem to waterproof the new, lower part of the structure. However, it was practically impossible to repair the damaged waterproofing system, thus reservations were clearly stated in all relevant design and legal documents. 3.6 At the High-Tech City in Haifa, Israel 300-500 meters from the coast of the Mediterranean Sea, all the buildings were designed with two underground parking levels. This was necessary to avoid ground water problems because of the rock formation and difficulties in de-watering the site. A shortage of parking spaces required that the new building be constructed with three underground parking levels. This challenge was accepted by Mr. Yossi Shiran, the structural engineer, and myself. Once the excavation was completed, a network of drainage channels, about 60 centimeters deep was excavated in the subgrad rock. The size and location of the drainage channels were selected so they were as far away as possible from concentrated structural loads and to ensure no interference with load transfer to the ground. The drainage channels were covered with prefabricated concrete elements and lean concrete was cast on the entire floor area. See figure LCT-111. All the water that continued to flowed on the lean concrete was directed into the drainage channels and from there to the sumps and was pumped out of the site. The end result was a very wet, lean concrete substrate but no ponding water. The first layer of 5 millimeters thick polymer modified bituminous membrane was applied. The membranes were loose laid and torched to each other at the seams only. A second layer of polymer modified bituminous membrane was fully torched to the first layer. A protection course of 5 centimeters thick cementitious concrete was cast upon the waterproofing system. Finally, the floor slab was cast. Now, the basement floor is dry and a second building is under construction. 3.7 In a new hotel, soon after opening, it was discovered that water from the showers seeps under the gypsum walls into the rooms. The hotel, at a high rate of occupancy, had to solve the problem with no delay. See figure LCT- 112. To remove the tiles and sand-bed and renew the waterproofing 4

system in an operating hotel was out of the question. Alternative ways to stop the leaks were presented and discussed. Finally, it was decided to adopt a modified technique of soil stabilization using hydro-activated polyurethane resins pressure-injected into the sandbed beneath the tiles. Repair work commenced at a rate of 10-16 rooms a day. At the first round of application, the problem was solved in 84.5 percent of the rooms. In the second round, the rate of success was increased to 96.5 percent. A rate of 100 percent success was reached by the third round of application. In any situation with unforeseen waterproofing problems, the specifier will have no alternative but to resort to a different, unorthodox approach. He must consider a new alternative or a combination of innovative alternatives to ensure the functionality of the structure. Following are three alternatives: Alternative 1: Alternative 2: Alternative 3: To approach co-designers and explain the problems and convince them and/or the owner to change the design. This will create a new set of conditions to accommodate a proper waterproofing design. The experienced and daring waterproofing specifier may come up with an original, novel solution to a given problem. In some cases the only solution may be a religious one, i.e., pray for its success. Conclusions The main conclusions that may be drawn from this presentation include: 1. A waterproofing consultant should be involved in the early stages of the design for any building where waterproofing problems are to be anticipated/expected. 2. Every effort should be made to avoid constrained conditions. 3. With some experience, imagination, determination and daring, we may come up with solutions even to unprecedented waterproofing problems. 4. In a situation of constrained conditions, it is the responsibility of the waterproofing specefier to stand firm on his professional beliefs based on education and experience. An unfortunate compromise may result in a flooded building. 5. In some cases, even an experienced consultant may find no proper solution to a given waterproofing problem. 5

A B C-2 NEW C-1 EXISTING D-1 EXISTING D-2 NEW W LCT - 101 VARIOUS CASES OF WATERPROOFING THE ENVELOPE OF A BUILDING

PREFABRICATED TUNNEL TEMPORERY PROTECTION ON WATERPROOFING TO BE EXCAVATED AT A LATER STAGE WATERPROOFING LEAN CONCRETE COMPACTED SUBGRADE DIAPHRAGM WALL (PILES) LCT - 102 A PREFABRICATED TUNNEL PLACED UNDER RAILROAD TRACKS

M2 LCT-104 WATER LEVEL ESCALATOR WALL OF SLURRY (DIAPHRAGM) WALL EXISTING BUILDING OLD BUILDING NEW BUILDING LCT - 103 THE INTERFACE BETWEEN THE EXISTING AND THE NEW BELOW-GROUND BUILDINGS

WATERPROOFING (BENTONITE) INJECTION HOSE PREFORMED POLYMERIC ADHESIVE WATERSTOP STRIP LEAN CONCRETE HYDRO-ACTIVATED BENTONITE WATERSTOP STRIP SLURRY WALL CONCRETE WALL SEE LCT-103 LCT - 104 WATERPROOFING SYSTEMS USED AT A NEW BUILDING

LCT-106/B LCT-106/A LCT-107 LCT - 105 SWIMMING POOL RENOVATION

CERAMIC TILES BACKER ROD WATERSTOP STRIP SEALANT "STOPAQ" A NEW PIPE PENETRATING THROUGH OPENNINGS IN SWIMMING POOL WALL 8 CM MIN. INJECTION HOSE NEW WALL HYDRO-ACTIVATED WATERSTOP STRIP PREFORMED POLYMERIC ADHESIVE WATERSTOP STRIP EXISTING WALL B WATERPROOFING JOINT BETWEEN EXISTING WALL AND A NEW ONE LCT - 106 NEW ADDITIONS TO EXISTING SWIMMING POOL

INJECTION HOSE CRACK BRIDGING DESIGNATED STRIP BETWEEN EPOXY OR SIMILAR BONDING LAYERS HYDRO-ACTIVATED WATERSTOP STRIP EXISTING FLOOR A B LCT - 107 NEW ADDITIONS TO EXISTING SWIMMING POOL

SEALANT SODIUM BENTONITE GRANULES BACKER ROD 10 cm INJECTION HOSE LCT - 108 EXPANSION JOINT SUBMERGED IN WATER

TABLE TERMINATION OF WATERPROOFING MEMBRANES SEE DETAIL B A 3-D HDPE FOR PROTECTION LEAN CONCRETE WATERPROOFING BY POLYMER MODIFIED BITUMINOUS MEMBRANES ROCK INJECTION HOSE FLOOR LEAN CONCRETE B PREFORMED POLYMERIC ADHESIVE STRIP TERASTOP TERMINATING ACCESSORY ROCK SBS MODIFIED BITUMINOUS MEMBRANE LCT - 109 WATERPROOFING AROUND SEISMIC "TABLE"

A A OUTERWALL SMOOTHING WALL WATERPROOFING SYSTEM INNER WALL PILES EXISTING FLOOR? NEW FLOOR PILES CROSS SECTION AA LCT - 110 NEW PILES DRIVEN THROUGH EXSITING WATERPROOFED BASEMENT FLOOR

PREFABRICATED CONCRETE COVER FLOOR SLAB LEAN CONCRETE (WET) WATERPROOFING SYSTEM DRAINAGE CHANNEL WATER CEMENTIOUS PROTECTION LAYER ROCK LEAN CONCRETE = MUD SLAB LCT - 111 CROSS SECTION THROUGH DRAINAGE CHANNEL UNDER FLOOR SLAB

DRY WALL (GYPSUM) ADHEASIVE MORTAR AND TILES WET ROOM H O (PROBLEM) 2 POLYURETHANE INJECTION (REPAIR) WALL-TO-WALL CARPET H O 2 H O 2 SAND BED LIQUID-APPLIED WATERPROOFING SYSTEM LCT - 112 REPAIR OF LEAKS FROM HOTEL SHOWERS

WATER RESERVOIR MECHANICAL ELEMENT TO FIX THE PREFABRICATED FACAD ELEMENT TO THE STRUCTURE PREFABRICATED FACAD ELEMENT LCT - 113 A FASAD OF PREFABRICATED ELEMENTS FIXED TO THE STRUCTURE THROUGH OPENNINGS IN THE STRUCTURE