COLOMBO, SRI LANKA. Case Study (Port Expansion) Project Summary:

Similar documents
ASIAN DEVELOPMENT BANK

PPP Models. Ownership of capital assets Responsibility for investment Assumption of risks, and Duration of contract.

MEDIA RELEASE SIKA WITH STRONG GROWTH IN EMERGING MARKETS

Ship Finance International Limited (NYSE: SFL) - Earnings Release. Reports second quarter results and quarterly dividend of $0.

BLOEMFONTEIN, SOUTH AFRICA. Case Study (Healthcare) Project Summary:

PORT REFORM TOOLKIT WORLD BANK

MLD: Domestic Maritime Transport Project

Impact of Regulations and Risk Management in Financial Markets in Europe

Management s Discussion and Analysis

PRESENTS. Top 5 Financing Options for Auto Repair Shop Owners

CONCEPT AND BACKGROUND TO PUBLIC PRIVATE PARTNERSHIP (PPP) / PRIVATE FINANCE INITIATIVE (PFI) UK EXPERIENCE

Total Tax Contribution of the UK banking sector

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING

PPIAF Assistance in Afghanistan

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

A PLAN FOR A DEBT-FREE ALBERTA

SECTOR ASSESSMENT (SUMMARY): PUBLIC MANAGEMENT INVESTMENT CLIMATE

The Economics of Public-Private Partnerships

Citizen & Stakeholder Frequently Asked Questions 10/7/2014

Cashflow Management. What is cashflow

-1- GATEWAY TERMINALS INDIA PRIVATE LIMITED Scale Of Rates GTI or Terminal means GATEWAY TERMINAL INDIA PVT. LTD.

MARITIME CRIME AND THE EFFECTS ON GROWTH AND DEVELOPMENT IN THE AFRICAN REGION SEMINAR REPORT

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

Virginia s Public- Private Partnership Approach. Barbara W. Reese, Summer/Fall 2006

ARKANSAS FINANCING OPTIONS FOR ECONOMIC DEVELOPMENT

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

Ex-Ante Evaluation (for Japanese ODA Loan)

Technical Assistance Report. Project Number: December Technical Assistance Republic of the Philippines: Debt and Risk Management Project

PPI 1 in IDA Countries, 2009 to 2014

ECONOMIC ANALYSIS (Republic of the Marshall Islands: Public Sector Program)

APPENDIX 1 THE UK NEED FOR DEEPSEA CONTAINER HANDLING

PORT OF SAN FRANCISCO STRATEGIC PLAN. To increase the volume of cargo shipping. To efficiently manage and improve all Port property.

Refer to the Exhibit B: 2014 Port of Ponce Employee Roster PDF document posted on the RFP webpage.

Agenda. Historical Tecon Santos Mesquita CONVICON Tecon Imbituba Financial Highlights Bagres Port. of Santos Expansion Corporate Governance

GrandVision reports Revenue growth of 13.8% and EPS growth of 31.7%

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012

Infrastructure Development Funding and Financing

Bondholders Report. Six months ended 30 September 2010

To Our Shareholders A Message from the CEO

Infrastructure and Project Financing Asia Pacific Scenario. Ajay Sagar

SUPPLEMENTARY GREEN BOOK GUIDANCE

Fiscal Impact Analysis of the Annexation Proposed by the Town of Beaumont. Leduc County FINAL REPORT

FINANCIAL MANAGEMENT AND PERFORMANCE ASSESSMENT

Working Capital Management and Firms Performance: An Analysis of Sri Lankan Manufacturing Companies

Global Infrastructure: Trend Monitor

SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT. 1. Public Resource Management Sector Issues and Opportunities

ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal

Financing of Smart Cities. Kumar V Pratap Economic Adviser Ministry of Urban Development Government of India

E2-2: Identifying Financing, Investing and Operating Transactions?

Case 1: Container Port

REPUBLIC OF KENYA COUNTY GOVERNMENT OF LAIKIPIA MEDIUM TERM DEBT MANAGEMENT STRATEGY 2013/ /18

Qualitative information regarding first-quarter settlement of accounts

Container Shipping Industry: Facing Another Difficult Year

DP WORLD ANNOUNCES INTENTION TO BACK POTENTIAL INFRASTRUCTURE DEVELOPMENT IN INDIA AND SEEKS OPPORTUNITIES WORTH OVER $1 BILLION

CANON REPORTS RESULTS FOR FISCAL 1999

PRESS RELEASE Paris, 20 February 2014

Check against delivery. Hans Dieter Pötsch Speech at the Annual Media Conference and Investor Conference on March 13, 2014.

Outcome 4. Efficient management of the Commonwealth overseas owned estate EFFECTIVENESS QUALITY AND QUANTITY EFFECTIVENESS QUALITY AND QUANTITY

Business Higher Level (400 marks)

Car Wash Business Plan Soapy Rides Car Wash

Chapter 14 Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases

BENTELER GROUP SALES DOWN 28%

Impact of Larger Vessel Size on Port Infrastructure Costs

arrangements typified by joint working between the public and private sectors covering all types of collaboration across the private-public sector

Chapter 9 Exporting Services

Peter Davis, Marcus Jefferies and Peter Ward Faculty of engineering and built environment School of architecture and built environment October 2015

Surface Transport in India

DISCLOSEABLE TRANSACTION FORMATION OF A JOINT VENTURE

CHIYODA CORPORATION Financial Results for Fiscal 2004 Third Quarter Ended December 31, 2004

Thailand s Logistics

Transaction Advice Corporate Finance

The Sumitomo Warehouse Co., Ltd.

B. INFORMATION ON ACT HOLDINGS, COSCO PACIFIC AND CHINA SHIPPING

Delivery. Upgrading Information Infrastructure Parcels Inquiry System Settlement Service, Such as Payment on Delivery

Business Example Car Wash Business Plan Soapy Rides Car Wash

Why infrastructure is so important

HALF-YEAR FINANCIAL REPORT FOR THE PERIOD JANUARY JUNE 2016

BUSINESS ENTITIES AND ECONOMIC DEVELOPMENT

On-Site Examination Policy for Fiscal Examination Policy for Fiscal 2016" briefly reviews on-site examinations carried out in

FY2011 Third Quarter Consolidated Financial Results (Prepared in accordance with U.S. GAAP) (Period ended December 31, 2011) (Unaudited)

TO OUR SHAREHOLDERS A MESSAGE FROM THE CEO. shareholders equity ratio and ROE both rose to over 10%.

Residential Solar Guide:

TIGroup Shareholder Update: Fiscal 2008 Major Goals Met or Exceeded. Revenue Run Rate Reaches $40M. Positive 2009 Outlook

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert

Frequently Asked Questions Q3 2006

QUARTERLY REPORT For the six months ended September 30, _ indd /12/21 11:54:11

Tata Communications Gains Next-Generation Flexibility with Rapid Upgrade from Cramer 6 to Amdocs OSS 8 in India

Consolidated Earnings Report for the Second Quarter of Fiscal 2011 [Japanese GAAP]

Modernization of the National Payment System

Procurement Outsourcing Services¹

APRIL Economic Impact of AIM

Lao PDR Public-Private Partnership Policy

QSC AG. Company Presentation. Results Q Cologne, May 12, 2014

VOLEX INTERIM RESULTS TO OCTOBER Christoph Eisenhardt, CEO Nick Parker, CFO November 2014

Legislative Council Panel on Financial Affairs. Proposal to Attract Enterprises to Establish Corporate Treasury Centres in Hong Kong

Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation

Port of the Americas Rafael Cordero Santiago

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISES. 1. Sector Performance, Problems, and Opportunities

PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

Transcription:

COLOMBO, SRI LANKA Case Study (Port Expansion) Project Summary: The Democratic Socialist Republic of Sri Lanka is located in the Indian Ocean only 31 kilometers off the southern coast of India and is home to approximately twenty million people. The island is strategically situated in the Indian Ocean, along the main East-West shipping route and is therefore in a central location for all of South Asia. Because of its location, Sri Lanka was poised to be a strong competitor in the global shipping sector, with three deep water ports: Colombo, Trincomalee, and Galle. Colombo, the capital of Sri Lanka, is the site of a large deep water port. Located on the southeast side of the island, the Colombo Port facilities include two terminals, Jaya Container Terminal (JCT) and Queen Elizabeth Quay (QEQ). From 1987 to 1997, throughput of container traffic for the terminals at Colombo Port increased from less than 500,000 twenty foot equivalent units (TEUs) to over 1.5 million TEUs. By the mid-1990s, however, this growth was beginning to slow due to inefficiencies and delays caused by outdated systems and equipment. Projections showed traffic volume leveling off in 2003 or 2004 when the maximum capacity for JCT, the larger and more active of the terminals, would be reached. In addition, estimates at the time indicated that around 40% of west-to-east traffic was being diverted from Colombo Port to more competitive ports outside of Sri Lanka. Regional traffic would continue to grow; forecasts predicted an estimated 7.3% annual growth in traffic to India until 2018 and an overall increase in regional container traffic because of the increasing trade volume. But Colombo Port was slowly losing it competitive edge to newer, more modern port facilities, and required capital investment to maintain or increase its market share. The Sri Lankan government s desire to remain a true competitor in the shipping sector prompted the creation of a Public-Private Partnership in 1999. The South Asia Gateway Terminals (Private) Limited (SAGT partnership) was created by the Sri Lanka Port Authority and several private companies to improve, expand, operate, and manage the QEQ terminal through a 30-year Build- Operate-Transfer (BOT) concession. Construction for the expansion of QEQ was completed in August of 2003. Throughput for QEQ increased by 350 percent from 2000 to 2004, leading to a 30 percent increase for Colombo Port Nov-12 1

as a whole. Economic efficiency for the port as a whole has improved because of management techniques utilized by the SAGT partnership at QEQ and in turn transferred from the SAGT partnership to JCT. Project Objectives: The Sri Lankan national government granted the SAGT partnership a thirty-year concession to develop and manage the country s first modern container terminal. There were several objectives for the project. The first objective was to expand the Queen Elizabeth Quay (QEQ) terminal from the original capacity of 250,000 TEUs per year to a capacity of 1.1 million TEUs. The expansion in the volume of trade handled by Sri Lanka would increase, generating revenue for the port, and broader economic benefits as well. A second objective of the project was to improve port efficiency. Sri Lanka s location gave it a competitive advantage in the port industry, but with a limited container capacity and expanded shipping world-wide, the competitive advantage would have disappeared. Efficiency needed to be improved in gross gantry moves (the number of containers handled) per hour. Berth efficiency, which measures the average waiting time for container vessels, needed to be improved from the 1997 average of 6.9 hours. A third objective of the project (contingent upon success) was to demonstrate to the international community and the private sector that public-private infrastructure projects could have positive outcomes in Sri Lanka. After the Asian financial crisis, and in response to internal political troubles in Sri Lanka, private firms were hesitant to invest in projects there. A strong, efficient project with the SAGT partnership would show the effectiveness of private sector involvement and the benefits that are possible, and encourage further investment in Sri Lanka. Nov-12 2

Project Description: 1. Partners The PPP of SAGT is comprised of eight partners: the public agency known as the Sri Lanka Port Authority (SLPA), a Sri Lankan investment group, two port management companies, three lending institutions, and a shipping company. The shareholdings of the SAGT partnership are allocated so that 41.25 percent of holdings are owned by Sri Lankan shareholders and only 26.25 percent are owned by foreign port management companies. Of the 41.25 percent Sri Lankan owned shares, 15 percent are owned by SLPA and the other 26.25 percent are owned by the Sri Lankan private investment group. The three lending institutes are the Asian Development Bank, the International Finance Corporation, and the Commonwealth Development Corporation, each of whom owns 7.5 percent of the shares. The final 10 percent is owned by a foreign shipping company. 2. Implementation - Legislative The Sri Lankan economy was liberalized in the 1970s to promote economic growth. This has included partnerships and private sector involvement in many aspects of the economy. Since that time, Sri Lanka has seen marked increases in economic growth and direct foreign investment. Infrastructure development and renovation have featured prominently in these partnerships because the government believes infrastructure is the basic building block of any economy. Without solid infrastructure, only limited economic growth can be realized. On January 31, 1978, the Greater Colombo Economic Commission Law, No. 4 was enacted by the National State Assembly. The law established the Greater Colombo Economic Commission, giving the commission the powers deemed necessary for the development and resurgence of the economy. The law has been amended five times and has renamed the Economic Commission the Board of Investment. An objective of the board is to foster, generate, and strengthen the economy and to promote foreign investment within the nation. Since 1995, the Sri Lankan government has actively sought private sector participation in the development of port infrastructure through partnerships in the form of either Build-Own-Operate (BOO) or BOT transactions. With knowledge of the limited capacity of their ports and rapid growth in the shipping industry, the expansion of a port was deemed necessary to maintain a competitive advantage. Colombo Port was selected for the expansion project because Colombo is the national capital and it provided an ideal location. Initially, the private sector was invited to Nov-12 3

bid for the development of an outer harbor for the port, which required the construction of an expensive new breakwater structure because the port did not have any land for expansion. Although several developers showed interest, no bids were offered. This eventually led to alternative approaches being considered. Realizing how vital infrastructure is to their economy, in 1996 the Board of Investment established the Bureau of Infrastructure Investment (BII) to promote and facilitate private sector investment in infrastructure. The BII oversees infrastructure in the power, ports, information technology, highways, housing, water, and solid waste sectors. A major milestone was reached in 1999 with the formation of the PPP SAGT to expand and operate the QEQ at Colombo Port. The project allowed for the expansion within the existing port footprint and did not require the costly upfront investment that would have been required to build a new breakwater structure. The project was the first transportation PPP project undertaken in Sri Lanka. In 2006, reflecting the continuing role of PPPs in Sri Lanka, the Cabinet Subcommittee on Investment Promotion established a Public-Private Partnership Unit within the Board of Investment. The PPP unit facilitates projects and has generated procurement guidelines. 3. Financial Agreement The total cost of the project for the expansion and operation of the QEQ was estimated at US$240 million, but came in under budget at US$227.4 million. The project was financed based on a debt/equity ratio of 60:40. Originally, there were US$144 million in loans, provided through the International Finance Corporation (part of the World Bank Group), the Asian Development Bank, and the Commonwealth Development Corporation, at $35 million in loans and $7.3 million in equity for each of the institutions. The Private Sector Infrastructure Development Company Ltd., which is supported by the World Bank Group, provided $39 million in long-term loans. The loans are held and paid by the SAGT partnership. Due to a reduction in project costs, the Asian Development Bank (ADB) actually lent only $25 million in loans and $3.6 million in equity, making the debt portion of the costs only US$135 million. The 40 percent equity ($92.4 million) to finance the project was provided through the eight partners in the SAGT partnership. Ownership of shares ranged from 3.91 percent to 27.27 percent. SLPA owns 15.58 percent of the shares in the SAGT partnership. Of the eight partners, three controlled 15 percent or more of the shares. As mentioned above, the three lending Nov-12 4

institutions also provided equity and the IFC and the CDC gained 7.5 percent of the shares in the SAGT partnership; the ADB gained 3.91 percent of the shares. Investments in the SAGT partnership ranged from US $3.6 million to $25.2 million. Of the $92.4 million in equity, the public sector provided $32.4 million and the private sector provided $60 million. 4. Contract Provisions SAGT (Pvt) Ltd. was granted a thirty-year concession in the form of a Build-Operate-Transfer contract with SLPA in September of 1999. This contract was the first BOT and the first PPP within the transportation sector of Sri Lanka. It called for the extension of the quay, the repair and upgrading existing facilities, and purchasing new equipment. Three new container berths and one new passenger berth were to be built. Under the BOT contract, the SAGT partnership pays the Port Authority lease payments for the terminal. The Port Authority also earns income from shares in the company. With increased traffic to QEQ, and Colombo Port in general, SLPA benefits from fees charged directly to vessels using the port (i.e., tug service fees, piloting fees, and dockage fees). All partners earn income from the dividends they receive for their holdings in the company. The contract required the SAGT partnership to offer employment to all 500 workers at QEQ. If those workers chose not to join the SAGT partnership, the Port Authority was required to employ them. There was a fear that retrenchment would take place right after the QEQ switched hands, so this provision was included in the contract to protect workers. The SAGT partnership created jobs to offset the workers who chose to remain with SLPA. The contract also required the SAGT partnership to maintain the facilities through outsourcing to local companies. Drivers, janitorial staff, and security personnel were not employees of the SAGT partnership, but of local companies. 5. Implementation Metrics The SAGT partnership expanded and modernized the QEQ, both physically and in efficiency. The PPP undertook to increase the container capacity to 1.1 million TEUs per year. To accomplish this, the main terminal area needed to be expanded from 7.5 to about 20 hectares of container yard (1 hectare is equal is 10,000 square meters). The total linear berth (area in the harbor used to moor vessels) was 940 meters in length after the completion of the project. This was accomplished by increasing the width of the quay by 100 meters into the harbor basin over a 940 meter long stretch. Nov-12 5

Construction was completed in three phases to ensure the continued operations of the port during this time. The first stage was completed and operational in February 2002, the second stage in July 2002, and the third stage in August 2003. For each stage, additional meters of quay length were added 340, 310, and 290, respectively along with three post-panamax cranes, for a total of nine new cranes. With the expansion of quay length, throughput was expected to increase by an average of 50 percent a year until 2005, when the design capacity of 1.1 million TEUs per year would be reached. Actual throughput grew steadily from 200,186 TEUs in 2000 to 899,720 TEUs in 2004, an increase of 350 percent. The goal of 1.1 million TEUs was not reached in 2005 because of a two-month delay in the handover of QEQ from SLPA to the SAGT partnership and in the delivery of equipment. Due to these delays, QEQ s throughput increased by an average 45 percent annually, slightly below the 50 percent goal. In the first ten months of 2006, throughputs grew by 39 percent over the same period in the previous year. The SAGT partnership improved Colombo Port, as well as QEQ, efficiency. Management strategies and technology were transferred from the private sector port management companies and used by the SAGT partnership. The company raised its service standards, which have become a benchmark for ports throughout the country; today the Port of Colombo is rated as one of the top 35 ports in the world. Management and staff have been trained to improve their knowledge and skills, with the possibility for advancement within the company. All employees, with the exception of two senior positions, are staffed with Sri Lankan nationals. The company has 500 employees, which is the same as the quay had before the PPP; however, the volume of TEUs passing through QEQ has increased 350 percent. Employee efficiency has improved drastically because of the expansion of QEQ capacity, equipment modernization, better training, and work process improvements. By the end of the fiscal year ending March 2004 (four and a half years into the project), QEQ was generating enough cash to cover capital expenditures. The operating cash flow for the project has been very strong. The Asian Development Bank evaluated the project and found that the Financial Internal Rate of Return was at least 2.5 percent greater than the Weighted Average Cost of Capital over the lifetime of the project. This earned the project a rating of excellent. Nov-12 6

Commentary: 1. Overcoming Impediments As previously discussed, one of the provisions of the contract required the SAGT partnership to offer employment to all the SLPA workers previously employed at QEQ. Only a portion of QEQ workers accepted employment with SAGT, with the rest continuing their employment with the Port Authority. The SAGT partnership overcame this temporary shortage of workers by hiring qualified personnel from across Sri Lanka. The partnership ended up creating a number of jobs because employee levels for QEQ remained constant through the changeover in ownership. Through effective training, and infrastructure and technology investment, these workers were more productive than the original staff, processing three a half times more TEUs per worker. Economic growth for QEQ, and for Sri Lankan ports in general, slowed in 2001 because the insurance industry placed a war risk surcharge on all vessels going into and out of Sri Lanka. The surcharge was levied by insurers after the Joint War Committee and the War Risk Rating Committee of the London Insurance Market determined that all of Sri Lanka should be brought under held cover. Previously only northern Sri Lanka was under held cover, which relates to war. The surcharges resulted from security concerns following an attack by the Liberation Tigers of Tamil Eelam, a Tamil separatist movement, on the International Airport near Colombo in July 2001. During this time many vessels used ports in neighboring nations; however, when the surcharge was removed in March 2002, traffic returned to Sri Lankan ports. This demonstrates the importance of political stability and security in securing international trade and continuing growth and development. 2. Success/Failure Overall, the SAGT partnership has dramatically improved the efficiency of QEQ. Container traffic has increased from 200,186 TEUs in 2000 to 899,720 TEUs in 2004, a 350 percent increase, with no net increase in QEQ staffing.. Traffic will continue to rise, as QEQ is not yet operating at full capacity. Gross gantry moves per hour rose from 12 in 1998 to 30 in 2003. Berth efficiency has increased from an average of 6.9 hours of wait time for vessels in 1997 to 0.9 hours in 2003. Productivity at the port overall has increased because SLPA has adopted many of the same management techniques as the SAGT partnership. Roughly 500 jobs were created directly by the SAGT partnership and many others were created as a result of contracts for maintenance at Nov-12 7

the expanded QEQ. Jobs in surrounding sectors have been created because of increased spending by the SAGT partnership employees. With a greater number of vessels using Colombo Port, demand for ancillary services in and around the port increased. According to an Asian Development Bank study, the economic internal rate of return, which measures the quantifiable net economic benefits to all of society, was over 15 percent for the life of the project, earning the project s contribution to economic development a rating of excellent. The third objective of the partnership was to demonstrate the positive impacts PPPs and private sector investment could have in Sri Lanka. In 2006, one of the partners in the SAGT partnership increased its holdings from 26.25 to 33.75 percent of the SAGT partnership s shares, demonstrating its confidence in the SAGT partnership. Further faith in PPPs in Sri Lanka has been shown with the proposed South Harbor project at Colombo Port. The project will involve the building a new terminal with three berths and a new breakwater. Estimated costs are around $500 million. The criteria for submitting an Expression of Interest (EOI) to the government included having handled around 2 million TEUs, including at least 600,000 TEUs as transshipment in two terminals in the previous two years. Five companies or partnerships, including the SAGT partnership, submitted EOIs. This signifies their belief in the success of further projects at Colombo Port. Nov-12 8