MEETING SUMMARY. Additional Pond Sampling Revised Project Schedule Possible Fish Ladder Fish Tissue Sampling

Similar documents
Fairlington Community Center

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Muddy River Restoration Project Project Description

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Maintaining water sensitive urban design elements

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

Home Drainage & Causes of Basement Flooding. Water

CASFM Stormwater Quality Field Trip June 23rd, 2011

Basic Elements of Reading Plans

Homeowner s Guide to Drainage

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network

Local Road Assessment and Improvement Drainage Manual

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

2012 Program Report. Agricultural Group Drainage Program

4.3 Cisterns and Rain Barrels

Stormwater/Wetland Pond Construction Inspection Checklist

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

A Developer s Guide: Watershed-Wise Development

City of Des Moines Stormwater Structural Control Maintenance Guidelines

Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Toronto s Wet Weather Flow Master Plan

Operations and Maintenance

How to Build a Rain Garden at Your Home

Green Stormwater Infrastructure in the Sustainable Site. Outline: 2/19/2014. The Stormwater Problem: Impacts of turning spongy forests into cities

Kansas City s Overflow Control Program

VILLAS OF TRADITIONS AT GREY OAKS

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Operation & Maintenance Document Templates

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

STORMWATER MANAGEMENT CHECKLIST

CITY UTILITIES DESIGN STANDARDS MANUAL

A DESIGN AND ADOPTION GUIDE

Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation

Property Care White Papers. Site Drainage: Monitor and Maintain

RainScapes. Runoff/Erosion: RainScapes for Schools Environmental Report Card. Excess runoff will affect these indicators of Bay health:

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

SUSTAINABLE URBAN DRAINAGE SYSTEMS

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

Downspout Disconnection Program FAQs

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels.

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

The City of STORM DRAINAGE SYSTEM Section 12 Grande Prairie Page 1 of 41 SECTION 12 STORM DRAINAGE SYSTEM

Permeable Interlocking Concrete Pavements

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Private storm drain inlet retrofitting requirements - Purpose. Sec Private storm drain inlet retrofitting requirements - Definitions.

City of Camas. Storm Sewer Systems. Operation & Maintenance Manual. Public & Private Systems

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Description Quantity Cost Total Cost

Scheduling Maintenance for Infiltration Basins and Trenches

CHAPTER 5. Storm Sewer

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Information For Residents In The High-Risk Flood Zone

City of Shelbyville Site Inspection Checklist

Living on the Fox River

Mosquito Control Guidelines

2014 Low Impact Development Project Performance Monitoring Report

Architectural Processing and Inspections for Home Mortgage Insurance

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

SECTION INLETS INLET LOCATIONS

Phosphorus. Phosphorus Lake Whatcom Cooperative Management.

Recommendations for future developments

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

Green Streets, Places, and Spaces

Total Suspended Solids: The Hows & Whys of Controlling Runoff Pollution

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Underground Injection Control Storm Water Information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Funding the Long-Term Operation and Maintenance of Stormwater Best Management Practices

LOW IMPACT DEVELOPMENT TOOLKIT. prepared for the city of mesa, arizona

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

Green Innovation Grant Program

The International Stormwater BMP Database Part 1: Summary of Database

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Burnsville Stormwater Retrofit Study

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Outlet stabilization structure

Briefing note: Sustainable Stormwater Management prepared by the NTUA

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

Richard M. Daley Mayor

Gettysburg Adams Chamber of Commerce Storm Water Management

Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction

Lansdowne Stormwater UPDATE

Soakage Trenches. A better way to manage stormwater. Thinking Globally and Acting Locally

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

The Clean Water Project What Is The Stormwater Impact?

Transcription:

MEETING SUMMARY PROJECT: Roger Williams Park DATE: July 15, 2011 TIME: 9:30 AM 2:00 PM LOCATION: Roger Williams Park PRESENT: Tom Ardito (NBEP), Margherita Pryor (EPA), Bob McMahon (PPD), Brian Kuchar (HW), Hannah Carlson (HW), Charles Strobel (EPA), Scott Ribas (RIDEM), Lesley Lambert (NBEP), Holly Ewald (UPP) A meeting was held at the Roger Williams Park at 9:30 AM on Tuesday July 12th to perform a site walk to identify stormwater problem spots and retrofit opportunities. Prior to walking the site the following topics related to the Roger Williams Park Ponds Water Quality Management Project were discussed: Additional Pond Sampling Revised Project Schedule Possible Fish Ladder Fish Tissue Sampling The following is a brief meeting summary that highlights the major items discussed, agreed upon action items, and a numbered list of the sites identified during the site walk. Summary: Additional Pond Sampling Additional water sampling was discussed with Charlie Strobel the following samples will be taken: o Phosphorus samples o Sediment core sampling Charlie suggests taking additional samples at outfalls and middle of the ponds for comparison. Charlie discussed connection between Deep Spring and Cunliff o Pipe put in 50 s-60 s Bob stated that dredging occurred on Roosevelt, Willow and Polo ponds and dredged materials went to the overflow parking area for the zoo. Bob provided plan to show the dredging depths and location of dredged material. H:\Projects\2011\11058 Providence-Roger William Park

Project Schedule Brian distributed a revised project schedule that outlined the future meetings and goals for a completion date by the end of 2012 Fish Ladder Tom mentioned the Final Master Plan should include mention of a fish passage at outlet at Elm Lake as a potential future project. Fish Tissue Sampling: Discussed identifying parts of the fish that various ethnic groups eat to target parts that should be ground and sampled. Action Items: HW is to provide water sampling locations to Charles Strobel identifying additional sampling location based upon storm water outfall. o Deadline: 2 Weeks HW to scan dredging plans and post to FTP Site HW to continue research outlet pipe from Mashapaug to Roosevelt with RIDOT Loon to coordinate additional sampling with EPA (Charlie Strobel) o Provide sampling containers Bob to provide additional plans for parking lots, sewer and any soils information Following the meeting, a site walk was conducted between 10 AM and 2 PM by Tom Ardito and Bob McMahon to identify possible retrofit locations. The items numbered below correspond to the attached site plan depicting the numbered site locations. Site Identification (see attached Site Plan): 1. Boathouse water s edge Plant buffer Short plants to maintain visibility Potential education 2. Catch Basins/Depression on road by Carousel Bioretention Catch Basin across from Carousel could capture runoff from Carousel Areaintercept pipe before it enters Willow Lake All CBs could use hoods oil/grease separators 3. Carousel Roof Intercept downspouts to planters Japanese garden (potential in-water BMP) 4. Erosion on hill with gravel path 5. Raingarden by stream in Japanese Garden 6. Roosevelt Lake across from Monument Remove one of the two roads across from the monument Erosion on far side of road Bioretention/buffer plantings by pond Maintain specific areas for access to the water s edge

Joel Booden (Park Landscape Architect), contact for info on view sheds Include other water fowl controls such as fencing within the planting Pond is shallow 7. Outlet at Roosevelt Lake Remove/fill in the dead end in southwestern area of pond where debris collects 48 outlet pipe Use Route 10 off ramp open space as area for sediment forebay/treatment DOT could take over construction/maintenance in this area This site is off-the-table within the timeframe of this grant This area could provide a wet vegetated treatment system (WVTS) 8. Path Landscaped Triangle Island Potential outreach project Raingarden 9. Path/Hillside Erosion Erosion control Soil amendments 10. Shoreline Planting New seed mix with mowing regiment Low maintenance 11. Erosion on Stairs/Path 12. Erosion under ornamental bridge Terraced swale 13. Seal House Outreach/Education Holly mentioned using geese fencing as a potential art/education component. 14. Catch Basins on north side of Roosevelt Lake Potential bioretention 15. Lawn Hill Down to Polo Lake Intercept road CB pipes into bioretention area, outlet to Polo Elevations suitable for a diversion structure to a bioretention area 16. Hillside Erosion 17. Geese Feeding Area by Polo Lake Road flumes into bioretention areas No CB runoff from road flows overland Remove benches Maintain specific access points to water Geese control measures 18. Spillway to Polo Diversion to treatment along pond edge Space is a concern in this location 19. Erosion on side of Polo Lake Geese control 20. Side of Willow lake by Bridge Planting area 21. Overflowing drainage manhole by Willow Lake Blockage

22. Path Intersection by Willow Lake Bioretention 23. Road Curbing Remove 24. Wide Road Pavement Reduction 25. Temple of Music shoreline Shoreline at monument is wall that could be kept and rebuilt Not many geese by wall Shoreline further down- buffer planting 26. Boat Ramp 27. Fish Passage at Elm Lake Stream bank restoration Fish ladder 28. Road Intersection of Beachmont, Edgewood and FC Greene Memorial Blvd. 2 Outfalls from road CBs to pond Pavement reduction Bioretention off road to the east Bioretention on pond side of Blvd Flume in from road or redirect pipes WVTS 29. Existing Concrete Swale Potentially a big watershed WVTS CBs need maintenance Terraced swale 30. Steep hill off Blvd. and Man-made canal at Pleasure Lake CBs outlet to stream and pond Man-made canal has standing water with duckweed Intercept pipes to bioretention area 31. Outlet by zoo parking back entrance 2 large CBs from road drain to outlet Filled with sediment Thick vegetation 32. Existing wet depression by end of zoo overflow parking Standing water Eroded swale along road to wetland Inlet/outlet to other side of parking lot The above meeting summary constitutes the general understanding by Horsley Witten Group, Inc. of the meeting content. Please advise this office of any errors or omissions.