Metal Garden Shed. OWNER S MANUAL / Instructions for Assembly. Size 6 x 4 Ver: 1.0. Customer Service Hotline (800)

Similar documents
Owner's Manual & Assembly Instructions

Cedar Cottage Doghouse Plans

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

RZ Guardrail System Installation Manual

Models A spe n, Econoline C o l o n i al. and Savoy. Installation Instructions. Contractors Wardrobe

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions

Installation Instructions HighRock 4x4 TM

Customer Service or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Best Barns USA Assembly Book

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

ECM-D70T / ECM-D70T1.5

March 14, Installation of Bay, Bow and Garden Windows

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

Expanding a 40-Type Cabinet

Seismic Installation for Attic Storage System

Installation Instructions

ESTATE WAGON MODEL 300 OWNER MANUAL

Owner's Manual & Assembly Instructions

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Information Technology Solutions

Protecting Your Home From Hurricane Wind Damage

Beautifully Traditional

Installation Instructions

Consult your local authorities for any permits required to construct shed.

INSTRUCTIONS: LocknCharge Laptop Carts

Installation Instructions

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU # ).

TYPICAL PATIO COVERS 111

Speed-Mat Rectangle Cutter

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

Hollow or Cinder Block Wall Mount Job Aid

FLAT ROOF BOX SPAN CARPORTS

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

PANELIZED HOME INSTALLATION GUIDELINE

2.9 WINDOW & DOOR BUCKS

Protecting Your Home from Wind Damage

STANDARD OPEN PATIO COVER

How to secure your property after a disaster

TracRac G2. Overhead Rack Installation Instructions. TracRac Inc. 994 Jefferson St. FallRiver MA IN-42000_B

PATHWAY Classic Series with Handrails Portable Wheelchair Ramp INSTRUCTIONS FOR USE 6428 REV A

Garden Oasis BAY WINDOW GAZEBO SEARS ITEM # Warning:

Anthro Tablet Charging Cabinets

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Basement Window Installation Guide Hopper and Sliding

Calvert USA, Inc. Attic Stairs

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

Standard Sleep Pod Side Entry Assembly Instructions

DIY CABINET REFACING INSTALLATION GUIDE

MGB Chrome Bumper Conversion

AMERICAN GOTHIC PLAYHOUSE

RadianceRail Installation Guide

Installation Instructions

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

ALUMINUM UNIVERSAL VAN / CAP RACK INSTRUCTIONS ROOF MOUNT APPLICATION P/N ULRHDGV-1 / ULRHDGC-1

SUPER SHED. Indoor shelter for your outdoor tools.

Premier & Deluxe 3-Season Room Sliding Glass Door

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

HORIZONTAL INSTALLATION

SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER MODEL #7200

Installation Instructions For Slider Casement Air Conditioners

Item #: BTOL Assembly Instructions

Table of Contents. Safety... 3 Specifications... 4 Assembly Maintenance Warranty Parts Lists... 30

WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS

Ceiling Mounted Folding Attic Ladders Installation Instructions

INSTALLATION INSTRUCTIONS

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

AZEK Rail Install Guide


Earthquake Shake Table Original Design by Casey Hagbo Geophysics Major, Class of 2001

OWNER S MANUAL Table Tennis Table Patent Pending

Assembly Instructions ShadeTree Canopy Systems. A wood support constructed with a ShadeTree Bracket System. Garden Getaway

Horizontal Mini Blinds Installation Guide

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Retractable Screen. Replacement Screen Instructions

Panel Track Installation Guide

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

INSTRUCTION BOOK FOR. Single Monitor Video Conference Cart

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

All-Season Sunroom Sliding Glass Door Installation Instructions

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

SIDE CURTAIN COVERING KITS for MG TC, TD & TF

WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Assembly and Usage Instructions

Wall installation for Samsung Galaxy

Assembly Instructions

Brick Veneer Construction

Instruction Manual 19/9/01. Flat Roof Carport

Residential Deck Safety, Construction, and Repair

Fabric Replacement Top Installation Instructions

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL

Awning Instructions. Standard Manual 1.5m to 4.5m

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

OAK WORKBENCH WITH 2 DRAWERS

Residential Roofing Guide

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

Transcription:

A L L P U R P O S E M E T A L S T O R A G E S H E D S Metal Garden Shed OWNER S MANUAL / Instructions for Assembly Size 6 x 4 Ver: 1.0 Customer Service Hotline (800) 483-4674 www.uspolymersinc.com Requires two people and takes 2-3 hours for Installation. Tall Walk in Shed Quick & Easy Assembly Ridge Reinforced Walls Wide Double Doors Available in Various Sizes Call us for any missing or damaged parts. Do not return to the store.

Parts List : Check all parts prior to installation. CODE DESCRIPTION QTY BLC BASE BAR BACK LEFT 1 BRC BASE BAR BACK RIGHT 1 BASE BAR SIDE LEFT & RIGHT 2 BASE BAR FRONT LEFT & RIGHT 2 ECC ENTRANCE TAPER CHANNEL 1 DCLC DOOR COLUMN PROFILE LEFT 1 DCRC DOOR COLUMN PROFILE RIGHT 1 ABLC TOP ANGLE BACK LEFT 1 ABRC TOP ANGLE BACK RIGHT 1 ASC TOP ANGLE SIDE LEFT & RIGHT 2 SCC SLIDING CHANNEL COVER 1 SSB SLIDING CHANNEL SUPPORT 1 SLC SLIDING CHANNEL LEFT 1 SRC SLIDING CHANNEL RIGHT 1 RSC ROOF SUPPORT LEFT & RIGHT 2 RF1C ROOF FLASHING (FRONT RIGHT / BACK LEFT) 2 RF2C ROOF FLASHING (FRONT LEFT / BACK RIGHT) 2 RFSA ROOF FLASHING SIDE LEFT & RIGHT 2 RFCC ROOF FLASHING CENTER 1 TSLC DOOR PANEL STRIP TOP LEFT 1 TSRC DOOR PANEL STRIP TOP RIGHT 1 BDSC DOOR PANEL STRIP BOTTOM LEFT/RIGHT 2 DOOR PANEL STRIP SIDE LEFT & RIGHT 2 DOOR PANEL STRIP CROSS 4 WCFC WALL PANEL CORNER FRONT LEFT & RIGHT 2 WALL PANEL CORNER BACK LEFT & RIGHT 2 WSC WALL PANEL SIDE 3 WFLC WALL PANEL FRONT LEFT 1 WFRC WALL PANEL FRONT RIGHT 1 GPLC GABLE PANEL FRONT LEFT/BACK RIGHT 2 GPRC GABLE PANEL FRONT RIGHT/BACK LEFT 2 GPS GABLE PANEL SUPPORT 2 RP1C ROOF PANEL FRONT LEFT / BACK RIGHT 2 RP2C ROOF PANEL FRONT RIGHT/BACK LEFT 2 DPLC DOOR PANEL LEFT 1 DPRC DOOR PANEL RIGHT 1 ACCESSORIES CODE DESCRIPTION QTY BS BOTTOM SLIDER 4 DH DOOR HANDLE 2 FC FLASHING END CAP 2 TC TOP CORNER 4 TS TOP SLIDER 4 VC VENTILATION COVER 4 PW PLASTIC WASHER 134 PC PLASTIC SCREW COVER 86 WST WEATHER STRIPPING TAPE 2.00 mtr DIA. 4.2 x 10mm. (5/32 x 3/8 ) SHEET METAL SCREW 156 S2 DIA. 4.2 x 16mm. (5/32 x 5/8 ) SHEET METAL SCREW 22 M4 x 16mm. (5/32 x 5/8 ) MACHINE SCREW W/ NUT 54 BOTTOM SLIDER (BS) TOP CORNERS (TC) PLASTIC WASHER (PW) ACCESSORIES DOOR HANDLE (DH) TOP SLIDER (TS) PLASTIC SCREW COVER (PC) PROFILES BASE BAR TOP ANGLE BACK (BLC, BRC, ) (ABLC, ABRC) BASE BAR ENTRANCE TAPER () CHANNEL (ECC) DOOR COLUMN PROFILE DOOR COLUMN PROFILE LEFT (DCLC) RIGHT (DCRC) SLIDING CHANNEL COVER TOP ANGLE SIDE (SCC) (ASC) SLIDING CHANNEL SLIDING CHANNEL (SLC, SRC) SUPPORT (SSB) ROOF SUPPORT DOOR PANEL STRIP SIDE (RSC) AND CROSS (, ) SHEET METAL SCREW (),(S2) MACHINE SCREW WITH NUT () ROOF FLASHING (RF1C, RF2C) ROOF FLASHING CENTER (RFCC) Tools You Will Need FLASHING END CAP (FC) VENTILATION COVER (VC) DOOR PANEL STRIP TOP AND BOTTOM (TSLC, TSRC, BDSC) Hand Gloves Cordless Drill - Philips Head Screw driver - Philips Head Carpenters Square Eye Protector 8 Step Ladder Adjustable pliers Level - 3ft. Tape Measure WEATHER STIPPING TAPE (WST) GABLE PANEL SUPPORT (GPS)

Exploded View RFCC RF1C RFSA RP2C RP1C RF2C RP2C RF1C RP1C RF2C RFSA GPRC RSC GPLC GPLC GPS GPRC WCFC ASC SLC ABLC ABRC WSC WSC WSC SSB SRC ASC BLC WFLC ECC BRC SCC DCLC WFRC WCFC DPLC DCRC DPRC

Duramax Storage Shed Limited Fifteen Year Warranty U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase. This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto. This warranty only covers failures due to defects in material or workmanship which occurs during normal use and does not extend to color change arising due to normal weathering or to damage resulting from misuse or neglect, commercial use, failure to follow assembly instructions and the owner s manual (including proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control. Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in a dated sales slip and clear photograph of the part to: U.S. Polymers, Inc. 6915 Slauson Avenue Commerce, CA 90040 We reserve the right to discontinue or change components. If a component has been discontinued or is not available, U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible. Limits and Exclusions There are no express warranties except as listed above. The warrantor shall not be liable for incidental or consequential damages resulting from the use of this product, or arising out of any breach of this warranty. All express warranties are limited to the warranty period set forth above. Some states do not allow the exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal rights and you may also have other rights which vary from state to state or country to country.

47 (1193.80mm) A. Foundation & Base Frame : It is important that these instructions are followed step by step. DuraMax must be installed on a level wooden platform or a level concrete foundation. Wooden Platform (Not Included) The following are a list of lumber and sizes you will need. Pressure Treated - Wood Studs: 3ea 2 x 4 x 71 (50mm x 88.9mm x 1803.4mm) 2ea 2 x 4 x 47 (50mm x 88.9mm x 1193.8mm) Exterior Grade (CDX) - 3/4 (19mm) plywood 1ea 3/4 x 4 x 78 (19mm x 1193.8mm x 1981.2mm) Wooden platform is extra and is not included. Don t install under windy conditions. L-Brackets: 4ea Parts needed: (1) Base bar back left (BLC) (1) Base bar back right (BRC) (2) Base bar side left & right () (2) Base bar front left & right () (1) Entrance taper channel (ECC) (18) Sheet metal screws () (12) Sheet metal screws (S2) Lay 50mm x 88.9mm Flat 1. Use pressure treated wood studs 2 x 4 (50mm x 88.9mm) to create a platform frame that has an outside dimension of 47 x 78 (1193.80mm x 1981.20mm). 47 (1193.80mm) L- BRACKET L- BRACKET 18 1/4 (463.55mm) 18 1/4 (463.55mm) L- BRACKET L- BRACKET 71 (1803.40mm) 78 (1981.20mm) 2. Using exterior grade CDX 3/4 (19mm) plywood, cut the sheets to form solid foundation as shown. Foundation must be square and level. 78 (1981.20mm) 1

3. Assemble base bar back left (BLC) and base bar back right (BRC) with four () screws. See fig. 1 & 2. Take care of sharp edges. BLC BLC BRC BRC 4. Place the base bar assembly on top of the foundation. Use (S2) screws to fix the assembly to foundation. S2 Left BLC Back BRC Front Right 5. Insert the base bar side () into (BLC) & (BRC) secure with two () screws on both sides. See blowup. Step 1 BLC BLC BRC Step 2 BRC 2

6. Using a carpenter square, line up the corners. Secure the base () to the foundation with (S2) screws. See blowup. S2 7. Place the base bar () on top of () on both sides. Secure with () screw to () on both corners. See fig. 1 & 2. 8. Using the carpenter square, line up the corners. Secure the base () to the foundation with (S2) screws. S2 3

9. Place the entrance taper channel (ECC) on top of the (). Secure with (S2) screws to the foundation. See fig. 1 & 2. S2 ECC ECC 10. Measure in all direction as shown in figure. Make the base bar assembly in a perfect square. (970mm) BLC (1836mm) Concrete foundation 10a. (Concrete foundation) Using a carpenter s square, line up corners. Align Base bars, mark the concrete at the holes in the base and drill concrete with 1/4 (dia. 6mm) concrete bit to accept anchor bolts to a 1 3/4 (44mm) depth. Replace base and secure with 1/4 x 1 3/8 (M6 x 35mm) anchor bolts (not provided). ECC (1836mm) (970mm) BRC B. Walls & Columns All panels are clearly marked and care should be taken to use the correct one. 4 Parts Needed: (1) Wall panel front right (WFRC) (1) Wall panel front left (WFLC) (2) Wall panel corner front left & right (WCFC) (2) Wall panel corner back left & right () (3) Wall panel side (WSC) (1) Sliding channel right (SRC) (1) Sliding channel left (SLC) (2) Top angle side Left & Right (ASC) (1) Sliding channel support (SSB) (1) Sliding channel cover (SCC) (4) Top slider (TS) (1) Door column profile left (DCLC) (1) Door column profile right (DCRC) (1) Top angle back left (ABLC) (1) Top angle back right (ABRC) (54) Plastic washer (PW) (66) Sheet metal screw () (8) Machine screw ()

1. Place the wall panel (WFRC) on the base bar (). Front right side of the shed line up the holes with base bar. Secure with () screws with washers from outside. WFRC WFRC Front 2. Place the wall panel corner front (WCFC) on the base bar (). Line up the holes with base bar and use () screws with washers to Secure. Make sure the overlapping position is as shown in fig.1 1 WCFC WFRC WFRC 2 WCFC 3. Use () bolt and nut with washers to join together the wall panels. WFRC WCFC 5

4. Place the sliding channel right (SRC) on top of the wall panel (WFRC) from inside. See the position in fig.1. Line up the holes with wall panel. Use () screws with washers to fix. See fig.2 SRC SRC SRC WCFC WCFC WFRC WCFC 5. Insert the 2 pieces of (TS) Top slider into the sliding channel. See blowup. Make sure the position of the projection on (TS) towards inside. SRC TS TS SRC WFRC Front 6. Place the wall panel (WFLC) on the base bar (). Front left side of the shed. Line up to holes with base bar. Secure with () screws with washers from outside. WFLC WFLC Front 6

7. Place the wall panel corner front (WCFC) on the base bar (). Line up the holes with base bar and use () screws with washers to secure. 1 Make sure the overlapping position is as shown in fig.1 WCFC WFLC WCFC 2 WFLC 8. Use () bolt and nut with washer to join together the wall panels. WCFC WFLC 9. Place the sliding channel left (SLC) on top of the wall panel (WFLC) from inside. See the position in fig1. Line up the holes with wall panel use () screws with washers to fix. See fig. 2 SLC SLC WFLC WFLC WFLC 7

10. Insert the 2 pieces of (TS) Top slider into the sliding channel. See blowup. Make sure the position of the projection on top slider towards inside. SLC TS TS SLC Front 11. Place the sliding channel support (SSB) on the sliding channel (SLC) & (SRC). See fig.1. Align the holes with sliding channels and secure with () screws. See fig. 2 & 3. SRC SLC SRC SRC SSB SLC SSB SLC SSB 12. Place the wall panel corner back () on the base bar () and overlap to wall panel (WCFC). Line up the wholes with base bar and use () screws with washers to secure. Use () bolt and nut with washer to join together in the middle of the wall panel. WCFC WCFC Back 8

13. Place the wall panel (WSC) on the base bar (BLC). Line up the holes with base bar. Secure with () screws with washers. Use () bolt and nut with washer to join together in the middle of the wall panel. See fig.1. Make sure the overlapping position is as shown in fig.2. WSC BLC WSC 14. Place the top angle back left (ABLC) on top of the wall panel (WSC) from inside. See the position in fig.1. Line up holes with wall panel. Use () screws with washers to fix. See fig. 2 ABLC ABLC ABLC WSC 15. Place the top angle side (ASC) on top of the wall panels () & (WCFC) and top angle (ABLC). Line up the holes and secure with () screws with washers. See fig.1 & 2. Top angle (ASC) must sit on top angle (ABLC). ABLC ASC WCFC ABLC ASC ABLC ASC 9

16. Place the wall panel corner back () on the base bar (). Line up the holes with base bar and use () screws with washers to secure. Use () bolt and nut with washer to join together in the middle of the wall panel. Back 17. Place the wall panel (WSC) on the base bar (BRC). Line up the holes with base bar and use () screws with washers to secure. Use () bolt and nut with washer to join together in the middle of the wall panel. See fig. 2. Make sure the overlapping position of panels is as shown in fig. 1. WSC BRC BLC WSC 18. Place the top angle back right (ABRC) on top of the wall panel (WSC) from inside. See the position in fig.1. Line up the holes with wall panel use () screws with washers to secure. See fig. 2 ABRC ABRC ABRC WSC WSC 10

19. Join top angle back left & right (ABLC) & (ABRC) together with () screws. See blowup. ABRC ABLC 20. Place the top angle side (ASC) on top of the wall panels (WCFC) & () from inside. Line up the holes with panels and secure with () screws with washers. Top angle (ASC) must sit on top angle (ABRC) ASC ASC ABRC ASC ABRC WCFC 21. Place the wall panel (WSC) on the base bar and secure with () screws with washers to base bar & top angle. Use () bolt and nut with washer to join together in middle of the wall panel. See fig. 2. Make sure the overlapping position. See fig.1. WSC WSC Back 11

22. Place the left door column (DCLC) on top of the base bar () and insert into the wall panel. See Blowup. DCLC DCLC DCLC 23. Secure the door column with () screws. Repeat the same for the right door column (DCRC). DCLC DCLC 24. Place the sliding channel cover (SCC) on top of the sliding channel support (SSB). Secure with two () screws. See blowup. SCC SCC 12

C. Roof All parts are clearly marked and care should be taken to use the correct one. Remove the Polyethylene Film before assembling. Parts Needed: (2) Gable panel front left / back right (GPLC) (2) Gable panel front right / back left (GPRC) (2) Gable panel support (GPS) (2) Roof support left / right (RSC) (2) Roof panel front left / back right (RP1C) (2) Roof Panel front right / back left (RP2C) (2) Roof flashing front right / back left (RF1C) (2) Roof flashing front left / back right (RF2C) 1. Place the Gable panel (GPRC) on top of the sliding channel (SRC). See fig.1. Push the Gable panel inside the top angle side (ASC). See fig.2. Align the holes with sliding channel and secure with () screws from inside. (2) Roof flashing side left / right (RFSA) (1) Roof flashing center (RFCC) (2) Flashing end cap (FC) (2m) Weather stripping tape (WST) (4) Ventilation cover (VC) (4) Top corners (TC) (98) Plastic washers (PW) (98) Sheet metal screw () (4) Sheet metal screw (S2) (40) Machine screw with nut () GPRC GPRC SRC SRC GPRC SRC ASC ASC GPRC ASC 13 Fig.3

2. Place the Gable Panel (GPLC) on top of the sliding channel (SLC). Insert the Gable panel inside thetop angle side (ASC). Align the holes with sliding channel and secure with () screws from inside. GPLC SLC 3. Assemble the Gable Panel (GPLC) & (GPRC) together with Gable Panel support (GPS), () bolt and nut. & (). See fig. GPLC GPRC GPLC GPRC GPLC GPRC GPS GPS 4. Place the Gable panel (GPLC) & (GPRC) on top of the Top angle (ABRC) & (ABLC). Insert the Gable Panel into the Top angle side (ASC). Align the holes with Top angle and secure with () screws. GPRC GPLC ABRC GPLC ABRC GPLC ASC ASC GPLC ASC 14 Fig.3

5. Assemble two roof structure (RSC) together with () bolt and nut. Make sure the taper side on (RSC) must be the same. RSC RSC Taper side RSC RSC 6. Insert the one end of the roof structure assembly to the Gable panel. The Gable panel should go in between the roof structure assembly. Secure with () bolt and nut. Continue the same for the other end. See fig.1 & 2 Make sure the taper side on (RSC) must be up. RSC Taper side RSC GPRC RSC GPLC 7. Place the roof panel (RP2C) on top of the Gable panel (GPRC). Line up the holes with Gable panel and secure with () bolt and nut with washers. RP2C GPRC RP2C GPRC 15

8. Line up the holes with Roof structure and Top angle side and secure with () screws with washers. RP2C 9. Place the Roof panel (RP1C) on the Roof structure and Gable panel. Secure with () screws with washers to Roof structure. Use () bolt and nut with washers for Gable panel. Make sure the overlapping position for Roof panel is as shown in blowup. RP1C RP2C RP1C RP2C 10. Place the Roof panel (RP2C) on top of Gable panel and Roof structure. Use () bolt and nut with washers for Gable panel and use () screws with washers to secure with Roof structure and Top angle side. RP2C 16

11. Place the Roof panel (RP1C) and secure with () bolt and nut with washers to Gable panel and use () screws with washers to the Roof structure. Make sure the overlapping position for Roof panel is as shown in blowup. RP1C RP2C RP1C RP2C 12. Put provided weather stripping tape between roof panels (left & right) before fixing all roof flashing. RP2C RP1C 13. Assemble the Roof flashing (RF1C) & (RF2C) with Roof panel as shown in fig. Use () screws with washers to secure. RF1C RF2C RF2C RF1C 17

14. Assemble the roof flashing (RFSA) with Roof panel. Secure with () screws with washers. RFSA RFSA 15. Place the roof flashing center (RFCC) on top of Roof panels. Line up the holes and secure with () screws with washers. RFCC RF2C RFCC RF1C 16. Slide the flashing end cap to the front & back top of the roof and secure with () screws with washers. See fig. 1 & 2 RFCC FC 18

17. Place the Top corner (TC) on the Roof flashing joints and secure with (S2) screws with washers. S2 TC 18. Insert the ventilation cover (VC) into the Front Gable panel and secure with () screws. VC Front 19. Insert the ventilation cover (VC) into the back Gable panel and secure with () screws. VC Back 19

20

D. Door Parts Needed: (1) Door panel left (DPLC) (1) Door panel right (DPRC) (4) Door panel strip cross () (2) Door panel strips side left and right () (1) Door panel strip top left (TSLC) (1) Door panel strip top right (TSRC) (2) Door panel strip bottom left/right (BDSC) (2) Door handle (DH) (4) Bottom Slider (BS) (22) Plastic washer (PW) (10) Sheet metal screw () (26) Machine screw () TSLC TSRC DPLC BDSC DPRC Left Door BDSC Right Door 21

Right Door Assembly 1. Assemble the door panel strip side () to the door panel right (DPRC) from inside. Use () bolt and nut with washers. Remove the Polyethylene Film before assembling. DPRC 2. Assemble the door panel strip cross () with door panel from inside. The strip one edge should go inside the () and other edge inside the door panel. Use () bolt and nut with washers. DPRC 22

3. Secure the door panel strip cross () to the door panel strip side () with () screws. See blow up details. 3 4. Assemble the door panel strip (TSRC) with door panel. Make sure the door panel top edge to be inserted into the (TSRC). See fig.1. Secure the (TSRC) to the () with () screws. See fig. 2. Secure the other end through the door panel to the () with () screws. See fig. 3. 2 TSRC TSRC DPRC DPRC TSRC TSRC DPRC Fig.3 5 BDSC 23 4

4a. Assemble the door panel strip (BDSC) with door panel. Make sure the bottom edge of the door panel to be inserted into the (BDSC). Secure with () screws to the () and (DPRC) to the other side. See fig. 5. Use () bolt and nut with washer with door panel. See fig. 4. BDSC Fig.4 DPRC BDSC Fig.5 5. Assemble the bottom slider (BS) to the door panel bottom side at both edge with () bolt and nut with washer. DPRC BS 24

6. Fix the door handle (DH) with door panel from front side with () bolt and nut. DPRC DH Left Door Assembly 7. Assemble the door panel strip side () to the door panel left (DPLC) from inside. Use () bolt and nut with washers. Remove the Polyethylene Film before assembling. DPLC 25

8. Assemble the door panel strip cross () with door panel from inside. The strip one edge should go inside the () and other edge inside the door panel. Use () bolt and nut with washers. DPLC 9. Secure the door panel strip cross () to the door panel strip side () with () screws. See blow up details. 26

10. Assemble the door panel strip (TSLC) with door pane. Make sure the door panel top edge to be inserted into the (TSLC). See fig.1. Secure the (TSLC) to the () with () screws. See fig. 2. Secure the other end through the door panel to the () with () screws. See fig. 3. 3 TSLC 2 TSLC DPLC TSLC DPLC TSLC DPLC 4 BDSC Fig.3 5 10a. Assemble the door panel strip (BDSC) with door panel. Make sure the bottom edge of the door panel to be inserted into the (BDSC). Secure with () screws to the (DPLC) and () to the other side. See fig. 4. Use () bolt and nut with washer with door panel. See fig. 5. DPLC BDSC Fig.4 BDSC 27 Fig.5

11. Assemble the bottom slider (BS) to the door panel bottom side at both edge with () bolt and nut with washers. DPLC DPLC BS 12. Fix the door handle (DH) with door panel from front side with () bolt and nut. DPLC DH 28

13. Slide the door panel assembly into the base bar front () & (ECC). Make sure the bottom slider (BS) should slide inside the base bar front and entrance taper channel. See fig.1. Fix the door panel top to the top slider (TS) with () screws. See fig. 2 & 3. TS BS TS TS BS ECC Fig.3 13a. To get proper alignment of the door realign the holes with door panel. See fig. SC Fig.4 Fig.5 TS IMPORTANT 14. Fix the plastic screw cover (PC) to the screws and bolts edge from inside to prevent injury. PC PC 29