TRENCH SHORING NZ ltd KVL ASSEMBLY & OPERATING INSTRUCTIONS

Similar documents
EXCAVATOR SAFETY TRAINING

SAFE USE OF LIFTING EQUIPMENT

RATCHET RELEASE SHACKLE

Excavation & Trenching Procedure

Lightweight, Heavy Duty

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

Contents. 1. Foreword Common accidents in lifting operations Legislative requirements and code of practice of lifting operations 2

Slings, Rigging and Lifting Equipment

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

POLE MOUNT SYSTEM EX-3 INSTALLATION

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate

HORIZONTAL INSTALLATION

1000-LB. TRAILER JACK OWNER S MANUAL

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

LiftAlloy Chain Slings

SCAFFOLDING RUNWAY SYSTEM

Hydraulic Excavators

Greenhouse Assembly Instructions

X-Tension TM Guardrail End Terminal

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

SIG 556 Match Sear/Hammer Installation

Mini Pallet Jack OWNER S MANUAL

COMPACT ELITE MAT CUTTER

STANDARD PRACTICE INSTRUCTION

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Transportation and Lifting of Liquefied Gas Dewars

POLE MOUNT SYSTEM-3 INSTALLATION

Pole Lathe and Shave Horse Design

EC DECLARATION OF CONFORMITY FOR MACHINES

UNIT 7 Crane safety. Engineering CASE STUDY. Cambridge English for. Professional English. Part 1. Part 2

Elevating Your House. Introduction CHAPTER 5

Owner s Manual Read and keep this manual. Patents World Wide

Owner s Manual Gantry Cranes

User Manual. Studio Rail. Size Version

Written By: Sam Lionheart

SD. Flat roof. Rack Mounting. Installation instructions (2010/11) AU

CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT

Thomson Engineering Design Ltd Cable Handling Equipment

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

10 TON HYDRAULIC PRESS

Excavation Safe Working Practices

Front axle components, overview

ReadyKart Mobile Processing Station Instructions for Use

Service Guide. Gateway M275

Cat Fusion Coupler System Wheel Loaders 938, 950, 962, 966, 972 H and K-series

Belt Conveyor System

ANSWER KEY. Work and Machines

Ceiling Mounted Folding Attic Ladders Installation Instructions

SITE SPECIFIC FALL PROTECTION PLAN

General Safety. Always do a risk assessment.

POTENTIAL HEALTH & SAFETY HAZARDS

MANUAL HANDLING IN OFFICES

Awning Instructions. Standard Manual 1.5m to 4.5m

EMPLOYEE FALL PROTECTION

ECM-D70T / ECM-D70T1.5

TRACTOR QUICK HITCH CATEGORY I

Installation Instructions For Slider Casement Air Conditioners

2. Crane standing on firm, horizontal ground.

Working at Heights and Fall Protection

Product Data Sheets. Belt Conveyor System

Roll-Up Door Maintenance Guide

Rack installation instructions

Tips for Eliminating and Controlling MSD Hazards

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

Product # Overall Length Claw Blade Width Head Width Weight in (457 mm) 1-1/2 in (38 mm) 6-1/2 in (165 mm) 4.51 lbs (2.

Universal Gauge Measuring System USERS MANUAL

Written By: Walter Galan

Best Practices for Excavation. Best Practices for. Excavation

Vehicle Recovery and Towing

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Trenching and Excavation Safety

- 2 - IMPORTANT SAFETY REMINDERS

Contractor s Safe Working Agreement

Written By: Walter Galan

758 Heavy-duty Ratchet Guy Wire Cutter

How To Ensure Safety Of Lifting Equipment

User Manual. Instructions for installing the Sure Stitch on the Next Generation Quilting Frame. Parts Included:

KNITTING MACHINE Quick Tips for Knitting Success

Overhead Power Line Safety for Contractors

Slings Effect of Angle of Lift on a Sling Rated Capacity

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

Huwilift DUO, Huwilift DUO Forte Seite 4 3. Huwilift MAXI. Huwilift MAXI UP. Huwilift Senso, Huwilift E-Senso Page 4 17

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

DITCH WITCH MT12 MICROTRENCHER. ditchwitch.com

Auto-belay Cable Replacement Process

Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing

Assembly and Usage Instructions

Operation of Fork Lift Trucks Procedure

DESCRIPTION OF WORK:

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

SAFETY BULLETIN. Human interaction with backhoes and excavators

BUILDINGA 1/10 SCALE FLATBED TRAILER

PLM series Permanent load lifting magnets

Waste Collection Systems

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Aerial/Scissor Lift Program. Environmental Health & Safety Office

Welcome to the Retail Module.

Transcription:

TRENCH SHORING NZ ltd KVL ASSEMBLY & OPERATING INSTRUCTIONS The KVL system is a lightweight steel shoring unit that is ideal for laying urban services and smaller diameter pipe laying. The base unit weighs in at 805kgs assembled which makes it ideal for lighter machines and limited access sites where heavy gear is not an option. KVL bases can go to 2m deep and 1m top boxes are available providing the loadings don t exceed the SWL. Widths are from 530mm 1890mm internal. These units are quick to assemble with lightweight components and are not designed for the dig and push method, The method is dig and place which is dig the hole and drop it into place. www.shorenz.co.nz Excavation and Safety Specialists

Safety Lifting, handling, pulling, dragging Component weights are not stamped on our gear as the weights can vary, these weights are on the packing list provided with your order. Handling should be carried out as close to the ground as possible. Only lift from the lifting points, never lift or drag by the struts they will bend and will need to be replaced and the cost recovered. Lifting chains must be chosen to suit the weight being handled and must be certified. To prevent the accidental detachment of the load use only load hooks with safety catches. The load must be slung in such a way that the shoring is kept in a horizontal position and swinging is kept to a minimum. Use a tag line to control the movement of gear. Do not stand within the pivoting range of the excavator or crane or beneath suspended loads. A load operator must stand to the front of the excavator and be in eye contact with the machine operator. Checklist: Am I trained for the task? Am I wearing the correct PPE (Personal Protective Equipment) for this task? Do I require assistance from a licensed machinery operator- eg cranes? Do I have the correct tools for the task? What are the safety devices being used on site eg chains etc? Is the work area cleared of debris, tools etc? Measures to reduce hazards The safety of persons on site is paramount and should be enhanced with the aid of appropriate signs, cones, warning tapes and safety staff trained and deployed for the purpose of preventing accidents. The risk of instability as a consequence of wind loads when setting up or using shoring must be considered. Shoring must be secured against accidental impacts and set up in an area of sufficient size and on firm ground. Care must be taken to look out for and avoid contact with overhead cables when handling, installing and removing shoring. Where the ground is sloping or uneven, the shoring should be set up, if possible, at right angles to the slope. Damages on site The contractor must notify TSNZ of any damage ASAP; TSNZ will assess the damage and advise whether it is safe to continue using the item. Repairs must be carried out by TSNZ or carried out by another party only when in authorised in writing by TSNZ. Loadings Ensure that the loadings don t exceed the Limit State Design load for the system, which for the KVL 3m long x 2m deep base box is 27.2kNm² and the 3m x 1m deep top box Long Box is 32kNm² Strut sizes available TYPE A 530-630mm TYPE B 620 820mm TYPE C 800 1170mm TYPE D 1160-1890mm 1

Step 1, Lay the first panel on flat even ground with the channel facing up. Step 2, Put 4 x KVL struts into the panel as shown Step 3, Put 20mm pins into the holes either side of the struts and secure with clips provided. 2

Step 4, Lift up the 2 nd panel and place it so it sits just above the struts. Wind the struts so that they go up into the panel, this is easier than trying to drop the panel onto all 4 struts. Step 5, Put 20mm pins into the two holes either side of the strut and secure with clip provided. Wind the struts to the measurement required for the job, the bottom strut should be roughly 30mm wider than the top. 3

Step 6, Using certified chains, attached to the lifting points never by the struts. Roll the unit onto its bottom edges ready for install. Whenever lifting or moving always use the lifting points. Never lift off the struts they will bend and need to be replaced The Install method is a dig and drop shield, do not try to push these in KVL manhole base unit KVL Mini pile frame 4