Installation and Startup Instructions

Similar documents
Float and Thermostatic Traps Series H, C and X

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTM3-SF-1. Split System Cooling 4TTM3018-4TTM3060

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX

Oil and Coolant Circulating Heating System. Model - OCSM

AE R6 December Digital Capacity Control for Copeland Scroll Refrigeration Compressors AE R6

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

TECHNICAL SUPPORT MANUAL 3 Phase Air Conditioner Component R2A3**GHR

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

REFRIGERATED TYPE COMPRESSED AIR DRYERS INSTRUCTION MANUAL. For Sales & Service please contact:

Your safety and the safety of others are very important.

CARING FOR YOUR WATER HEATER

Refrigeration System Installation & Operation Manual

ice 3 FLUID TO FLUID HEAT PUMP

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

PANCAKE CAPACITOR GENERATOR Installation, Operation and Maintenance Manual

Installation Instructions

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

NITROUS TRANSFER PUMP INSTRUCTIONS

12V Portable Diaphragm Compressor Operating and Maintenance Instructions

A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

OASIS-PLUS 120V READ ALL INSTRUCTIONS BEFORE OPERATING READ ALL INSTRUCTIONS BEFORE OPERATING OZONE IS A POWERFUL OXIDIZER AND MUST BE USED WITH CARE

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

PBX Series Quick Fit Connector Bimetallic Steam Traps

DESIGN STANDARDS SECTION

COMPRESSOR REPLACEMENT PROCEDURE

IMPORTANT SAFETY NOTICE

D I G I T A L C L A M

Toroidal Conductivity Sensor

MODEL T200-F18 MODEL T125-F18 Finish Nailers

Service manual. Website: CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

Installation Instructions for Alarm Module Kit A043F059

MAC-120HE-01 Air-Cooled Chiller

A/C refrigerant system, overview

, User s Manual

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE

SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor

Skills Canada National Competition Instructions and Competition Details 38 Refrigeration and Air Conditioning / Post - Secondary May 27-30,

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

POLICY BULLETIN Tecumseh Compressor Company Compressor Group

SERVICE PARTS INSTRUCTIONS

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Why and How we Use Capacity Control

Technical Information

PC1131 Electric Air Compressor

HENRY TECHNOLOGIES - OIL LEVEL REGULATORS (CONVENTIONAL)

Cooling system components, servicing

PowerFlex 700S and 700H Frame 12 DC Bus Connector Kit

OWNER S MANUAL FORCE 10 MARINE COMPANY HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) FAX: (604)

Instructions For SF 6 Refill Kit

Refrigerant Changeover Guidelines HCFC R-22 to HFC R-404A/R-507. Leading the Industry with Environmentally Responsible Refrigerant Solutions

Section 7 Adjustment, Repair and Replacement

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

AIR CONDITIONER INSTALLATION MANUAL

15GAL STEEL OIL DRAIN WITH 110V PUMP

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

MDT5N25 & MTD5N40 SERVICE PARTS

Technical data. Danfoss DHP-A

VOYAGER 570G. 744A Sprayer Control

XL PREMIUM OIL COOLER KIT

SMD Rework Station TABLE OF CONTENTS

Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español

PC1130 Electric Air Compressor

Cooling system components, removing and installing

Not required for most applications Not required for most applications High pressure ( provided) High pressure ( provided)

Threaded Inline Air Heaters

INSTALLATION INSTRUCTIONS

INSTALLATION & OPERATING INSTRUCTIONS

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

USER MANUAL. 10 GPM Small Single Line Cryogenic Coupling

Unique DV-ST UltraPure - Manuel: for valve sizes DN8 to DN80 (¼ to 3 )

PREPIPED LIQUID FUEL MANIFOLDS PLPM

Technical Information

ECOCIAT. Domestic hot water heat recovery unit

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

COMPRESSOR REPLACEMENT PROCEDURE

Condensing unit type EPSILON-ECHOS LE Technical information manual

TECHNICAL INSTRUCTIONS REPAIR KITS Hydroguard Series 420 Thermostatic Valve All Models (1 9)


10ACC WARNING WARNING. Service Literature 10ACC SERIES UNITS

Volkswagen B3 Passat General-Engine 4 CYL. 19 Engine - Cooling System (Page GR-19)

OPERATOR S MANUAL 18 VOLT, 1 HOUR CHARGER

Air Vantage 500 Kubota

Packaged Terminal Air Conditioner Wall Sleeve Installation

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

V47 Series Temperature Actuated Modulating Water Valves

ACCUMULATOR INSTALLATION

INSTALLATION AND MAINTENANCE INSTRUCTIONS 4AC16LT SERIES. Split System Air Conditioner. Save these instructions for future reference WARNING

3620 W 11th Streetб Houston, TX Telephone: sales@kellogg-american.com Website:

SDX Submersible Depth Transmitter User Manual

SBC90. Abrasive Blast Cabinet Assembly & Operating Instructions

Wilo SP Series Submersible Sump Pumps ECS. ECS ECS ECS Installation and operating instructions

RAY-MAX Integrated Solar Power Strip

MODEL G300 BRAKE BLEEDER


Transcription:

Installation and Startup Instructions ORBIT 8 Series R410A Scroll Compressors Content Page 1 General 1 2 Safety Instructions 1 3 Installation Procedures 2 4 Accessory Items 6 5 Compressor Installation / Preparation 7 6 Checks before Starting 7 7 Operational Checks 8 1 General This document provides installation and startup instructions for BITZER s ORBIT 8 Series R410A Scroll compressors. A more complete description of the compressors and application requirements can be found in the 8 Series Compressor Application Manual, which is available on BITZER s website (www.bitzerus.com). 2 Safety Instructions! WARNING ELECTRICAL SHOCK HAZARD Failure to follow these safety warnings could result in serious injury or death. All installation and servicing activity should be performed only by trained personnel. Wear safety goggles. Shut off all power to this equipment during installation and service. Lock and tag all disconnect locations until work is completed.! CAUTION Compressors contain oil and refrigerant under pressure. Release pressure from both high and low side of compressor before installation or servicing.! CAUTION Tube brazing and compressor operation can produce hot surfaces. To avoid burns, allow surfaces to cool down before continuing installation or servicing. Do not remove oil drain plug as the entire oil charge could be lost. Do not reuse drained oil that has been exposed to the atmosphere. 1. The compressor should be inspected for shipping damage and a claim fled with the shipping company if the compressor arrives damaged. 2. Check the compressor nameplate to insure you have the correct model and voltage for the application. Also, insure that the maximum pressure/temperature ratings listed on the nameplate are not exceeded during installation or operation of the compressor. 3. Before attempting to install the compressor, be sure to review this document in its entirety as well as all related BITZER application literature. You should familiarize yourself with the compressor application requirements before continuing with the installation. The literature is available through BITZER s website (www.bitzerus.com). 4. Insure that all work on compressor and refrigeration systems shall be carried out only by refrigeration personnel which have been properly trained and instructed. Applicable safety procedures and practices should be followed. 5. The compressor is under pressure with a holding charge of approximately 7 psi (0.5 bar) above atmospheric pressure. Do not open any connections before relieving the pressure as discussed in the holding charge section below. Incorrect handling may cause injury. 6. Safety glasses should be worn while working on compressor. 7. Do not apply any power supply to the compressor unless all suction and discharge valves (i.e. service valves) are installed and opened. 8. Do not operate or provide any electrical power to the compressor unless the terminal box cover is in place and secured. Measurement of amps and volts during running conditions must be taken at other points in the power supply. 9. Do not remove terminal box cover until all electrical sources have been disconnected. 1

10. Follow recommended safety precautions listed on terminal box cover label before attempting any service work on the compressor. 11. During operation surface temperatures can exceed 275 F (135 C). Severe burns are possible. 3 Installation Procedures Transporting Compressor should be transported either bolted down to a wooden pallet or lifted using the lifting lugs that are welded to the compressor as shown in Figure 1. The PVE oil used in this compressor is very hydroscopic (i.e. will absorb moisture), similar to POE oil. The compressor should be installed quickly with limited exposure to the atmosphere to avoid moisture contamination. Holding Charge The compressor is shipped under pressure with a holding charge of dry air or nitrgen approximately 7 psi (0.5 bar) above atmospheric pressure. Do not remove any compressor bolts or fittings until the factory supplied holding charge has been relieved. Exhaust the holding charge through the high (HP) pressure connections, see Figure 2, by removing the Schrader valve cap and depressing the internal Schrader valve. Exhausting the holding charge via the LP pressure connections can allow pressure to remain in the high side of the compressor. Rotalock / Braze Connections The compressor may have either braze or rotalock connections. Remove the factory supplied suction and discharge connection caps and/or plugs. When installing rotalock connections, torque: Suction Rotalock 180-190 Nm (133-140 FT LB) Discharge Rotalock 150-160 Nm (111-118 FT LB) When brazing pipe to the rotalock valve, disassemble the valve or wrap in a wet cloth to prevent heat damage. Remove the teflon gasket when brazing to the rotalock fittings. The system piping must be carefully designed to ensure that under all circumstances, oil is returned to the compressor, and as little as possible remains in the evaporator. Consult BITZER Application Manual for further details. Refrigerant Piping Brazing should be accompanied with a nitrogen purge to prevent scale and oxidation build-up. Tubing should be clean and free of burrs, cuttings, or other material that may enter the compressor. Mounting Figure 1 Transporting Compressor For most applications the compressor is isolated from the unit with rubber grommets. For single compressor applications the grommets are placed between the compressor and the unit. For tandem and trio applications, the compressors are hard mounted to base rails with rubber grommets placed between the rails and the unit base. The available grommet packages are listed in the accessory item summary on page 6. The Compressor Application Manual should be referenced for detailed mounting instructions. Refrigerant / Oil The GSD8 Series compressors are only approved for R410A medium and high temperature applications. See ORBIT 8 Series Application Manual for the allowable operating envelope and detailed application requirements. Most compressors are shipped with a factory oil charge. The only oil approved for the 8 Series compressors is the PVE oil noted below. If an alternate oil is shipped with the compressor, the oil type will be denoted by an oil label added adjacent to the compressor sight glass. If the compressor is shipped without oil, a No Oil Added wire tag will be added to the oil charge fitting. See application manual for a list of all approved refrigerant oils. 2

GSD8 ALL Brazed GSD8 295-485 Rotalock GSD8 182-235 Rotalock Figure 2 Compressor Connection Points and Access Fittings Oil Charge Refrigerant Oil: Polyvinylether Oil (PVE) Oil Volume: 179 oz. (5.3L) BITZER Oil Type: BVC32 Do not charge compressor with oil through the suction/ discharge access fittings as it may result in damage to the compressor. The oil level should generally remain at 1 /4 to 3 /4 up the sightglass. During multi (tandem/trio) operation it is possible for the oil level to move outside this range. See the application manual for further details on acceptable oil levels. Check the oil level after the compressor has run for a few hours as it may be necessary to top off the oil after startup. The compressor should be isolated from the system before adding or removing oil. Use only the oil access port (3) to add and remove oil from the compressor, see Figure 2. Access Points Thread 1. High pressure connection (HP)* 1/8-27 NPTF, with Plug 1a. High pressure connection (HP)* 1/8-27 NPTF, with Schrader Valve 2. Low pressure connection (LP) 1/8-27 NPTF, with Schrader Valve 3. Oil fill port 1/8-27 NPTF, with Schrader Valve Connection Points Rotalock Thread Connection Brazed Connection SL Suction gas line 2-1 /4" 12 UNF, Rotalock only 1-5 /8" ODF DL Discharge gas line 1-3 /4" 12 UNF, Rotalock only 1-3 /8" ODF SG Sight Glass 1-3 /4" 12 UNF, Rotalock only * Used for discharge gas sensor (optional, see page 7). Sensor can be installed in any of the (HP) fittings. 3

Electrical Wiring The motor protection for the 8 Series compressors and electrical terminal plate wiring are discussed below. The standard compressor shipment will include the SE-B3 protection module (SE-B2 and SE-E1 are optional). Consult the compressor wiring diagram on the underside of the terminal box cover along with the diagrams below for correct compressor wiring. Running the compressor in reverse (reverse rotation) will cause compressor damage. Insure compressor is wired for correct rotation. Compressor must be phased for correct rotation. See Startup Procedures at end of this document for reverse rotation test. Motor Protection Figure 3 below shows the wiring of the electronic motor protection module. The orange wires on the SE-B3 are connected between the M1 & M2 terminals on the compressor terminal plate. Terminals 1 and 2 on the optional SE-E1 must be connected to M1 and M2. The incoming power from the controller is wired in series with the compressor safeties and connected to the module at terminal 11. Terminal 14 is wired to the compressor contactor. Terminal 12 (optional) is wired to the alarm output. If the motor overheats, the resistance of the internal sensors will spike (generally over 2.5k Ohms) causing the module to lock out requiring a manual reset. To reset the module, the power supply must be interrupted for at least 5 seconds. The SE-E1 module is an optional upgrade in compressor protection. It provides motor thermal overload protection exactly the same as the SE-B3 module, but adds the following additional protection features: Reverse Rotation Protection checks the rotation direction during the first 5 seconds after a compressor start. Phase Loss Protection checks for phase loss during first 5 seconds of operation. Locks out for 6 minutes if phase loss is detected. A manual reset is required (interrupt power for at least 5 seconds) if three phase failures are detected within 18 minutes or 10 phase failures during 24 hours. Figure 3 Electrical Wiring Schematic 4

Testing Module after Installation To test the control module after compressor installation, the service technician should conduct the following tests: All testing should be conducted with main compressor power and control power supply to liquid solenoid(s) locked-out. Remove one of the leads from either M1 or M2 on the compressor terminal plate. Provide power to the module (control power only) and confirm that the control voltage appears between terminal 12 and N on the device (i.e. device has tripped). NO voltage should appear between terminal 14 and N. Terminal Plate Wiring Figure 4 shows a schematic of the terminal plate. Ring terminals should be added to the incoming power wires and affixed to the L1, L2 & L3 terminal plate power connections using the screws shipped with the compressor. Recommended Ring Terminal: 1/4"/M6 stud size, insulated ring terminal Ring Terminal Connection Torque: M6 screw, Torque: 4.5-5.1 NM (40-45 in-lbs) Ground Lug M8 Hex Nut, Torque: 4.5-5.1 NM (40-45 in-lbs) SE-BX Protection Module Figure 4 Terminal Plate Wiring 5

4 Accessory Items Mounting Kits In order to reduce sound/vibration transmittal to the surrounding structure, it is recommended that all compressors be mounted using rubber isolation mounts. Different isolation mounts are required for single and multi compressor installations as summarized in Table 1. Table 1: BITZER Rubber Isolation Mounting Kits Description BITZER Part Number Single Compressor Application 37002001 Multi-Compressor (i.e. tandem / trio) 37002101 Note: Mounting kits contain 4 of each: rubber grommets, washers, spacers. The mounting bolt (not included) requirements will depend on the application. The sleeve is sized for 3/8" (9.5 mm) diameter fastener Rotalock Service Valves and Connection Adapters These parts are only applicable to compressors that ship with rotalock connections. A variety of valves and connectors are available for the compressor as summarized in Table 2 below. Table 2: BITZER Rotalock Kits Rotalock Standard Service Valves Application Thread Connection Connection Size Part Number Discharge Port* 1 3 /4" 12 UNF 1-3 /8" rotalock valve 361321-11 Suction Port 2 1 /4" 12 UNF 1-5 /8" rotalock valve 361321-12 Rotalock Standard Braze Adapter Fittings Application Thread Connection Connection Size Part Number Discharge Port* 1 3 /4" 12 UNF 1-3 /8" rotalock braze adapter 366000-07 Suction Port 2 1 /4" 12 UNF 1-5 /8" rotalock braze adapter 366000-22 * Can also be used for Sight Glass connection. Oil Heater A bellyband heater is an optional accessory item, see application manual for application recommendations and requirements. Table 3: 8 Series Bellyband Heaters Description Wattage (W) Voltage (V/1Ph) BITZER Part Number Band heater, metal strap 140 120 343255-01 Band heater, metal strap 140 240 343255-02 6

Discharge Gas Sensor A discharge gas sensor is an optional accessory item, see application manual for application recommendations and requirements. The sensor provides over-temperature protection for the compressor when wired in series with the motor PTCs (see electrical drawings in Figure 3). The protection module will lock the compressor out if the discharge temperature exceeds 285 F (140 C). Table 4: Discharge Gas Sensor Description BITZER Kit Part Number 140 C Discharge Gas sensor (PTC) 347023-06 The sensor kit includes everything required to mount and wire the sensor into the PTC control circuit (Figure 3). The sensor has a 1/8" NPTM threaded connection designed to be screwed into the discharge access fitting (1a) as shown in Figure 5. ALL Brazed & GSD8 295-485 Rotalock GSD8 182-235 Rotalock Oil heater installed here (optional) Figure 5 Discharge Gas Sensor 5 Compressor Installation / Preparation Be sure to follow installation instructions covered in this document, including: compressor mounting, piping connections, oil charging and electrical wiring instructions. 6 Checks before Starting Insure all wiring connections to the compressor terminal plate and related components (i.e. circuit breaker, contactor) are tight. Insure oil level is 1 /4 3 /4 up the sight glass. Test installation, wiring and operation of all compressor safeties. The safeties must lock the compressor out when they trip. Insure low and high pressure switches (LPS / HPS) are set appropriately for the application. Is the motor protection module installed, wired and functioning properly (test per instructions on page 5)? Are the shut-off / isolation valves open? Reverse Rotation Check Before starting the compressor and letting it run, correct rotation must be checked. Operation of the compressor in the wrong direction for more than a few minutes can lead to a compressor failure. In order to monitor for reverse rotation a pressure gauge should be added to the discharge port and monitored while the compressor is bump-started. The discharge pressure must rise when the compressor starts. If reverse rotation is found, two of the motor leads should be reversed to achieve proper rotation. 7

7 Operational Checks An initial check should be made of the following parameters after the compressor starts. A second set of readings should be taken once the operation has stabilized (typically 20 30 minutes after startup). These readings should be recorded for future reference. Operating Parameter Acceptable Level Notes Oil Level** 1/4-3 /4 Sight Glass Extended range approved for tandem/trio applications. Low (suction) Pressure 35 psig (2.4 bar) Low pressure switch must be set no lower than 35 psig (2.4 bar). High (discharge) Pressure 610 psig (42 bar) High pressure switch must be set no higher than 625 psig (43 bar). Max Differential Pressure (Discharge Suction) Max Discharge Temperature Max Return Gas Temperature 609 psig (42 bar) Internal Relief Valve may open at differential pressures (high to low) that exceed 609 psi (42 bar). 250 F (120 C) Temperature on discharge pipe, measured within 4" of the service valve adapter fittings, must be less than 250 F (120 C). 65 F (18 C)* Temperature on suction pipe, measured within 4" of the service valve must be less than 65 F (18 C). Min Superheat 10 F (5 K) Suction superheat at the compressor inlet should generally be maintained at or above 10 F (5 K). Lower superheat settings may be applicable for certain applications.** Amp Draw** See performance data Measured amp draw should be compared to amp draw from BITZER Software or performance data. Unbalance 2%. Voltage** +/- 10% of Nominal Voltage unbalance should be 10%. Compressor Cycling** 6 starts per hour Compressor cycling rate should be less than 6 starts per hour with a minimum run-time of 3 minutes. * Or as limited by the operating envelope. ** See application manual for further details. During the running-in period scroll compressors show an increase in performance. In case of performance tests a running-in period must be considered. See BITZER Software for details. Bitzer US, Inc. 4031 Chamblee Road, Oakwood, GA 30566, U.S.A. Tel +1 770 503-9226 Fax +1 770 503-9440 www.bitzerus.com sales@bitzerus.com Subject to change 11.09