( Shanta Gold or the Company ) New Luika Gold Mine, Elizabeth Hill Reserve and Resource Update

Similar documents
ALCYONE REPORTS JORC SILVER RESOURCES

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

For personal use only

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Savannah North Scoping Study Looking into the future 3 February 2016

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

Update on Heap Leach potential of the Murchison gold project

London STOCK EXCHANGE

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

For personal use only

THE SOUTH AFRICAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND MINERAL RESERVES (THE SAMREC CODE) 2007 EDITION

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

How To Mine And Treat Ore From Castle Hill Stage 1

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Cannon Big Pit Given the Green Light

Exploration. Exploration methods

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

Positioned for Production: Exploring for Growth

SEPCO III Completes Successful Site and Country Visit to Tanzania

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Sorby Hills Silver Lead Project

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

Resources Rising Stars

FOCUS MINERALS LIMITED

INVESTOR PRESENTATION JULY 2013

Richland Resources Limited ("Richland" or "the Company") (AIM: RLD) Resource Upgrade

Interim Financial Report for the half-year ended 31 December 2011

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

COMPANY PRESENTATION. Cape Town 2016

Press Release 30 th October 2015

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Cummins Range Rare Earths Project

Exploration and Development Activity

2015/01/04. New SAMREC Representative. Ken Lomberg. Group. Pr.Sci.Nat. Senior Principal Consultant. with Coffey. 30 years experience in South Africa

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development 8 February 2016 Alecto Minerals plc ( Alecto or the Company )

Barkly Phosphate Project Tenement Granted

Detour Gold Provides New Life of Mine Plan for Detour Lake

For personal use only

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

Quarterly Activities Report

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

The final quarter of 2015 recorded 7,924 ounces of gold production, giving a year-end total of 32,629 ounces.

For personal use only

Mako Project, Eastern Senegal Completion of Scoping Study

For personal use only

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Pathway to Production

Armadale Capital Plc Armadale or the Company Robust Project Demonstrated by Mpokoto Feasibility Study HIGHLIGHTS

KYLYLAHTI RESOURCE INCREASED

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

Merlin Diamonds Limited

For personal use only

For personal use only

North Atlantic and Rio Tinto Joint Venture Potash Project in Saskatchewan, Canada. Resource Summary

Press Release 29 th January 2016

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

BAUXITE RESOURCES LIMITED

Chapter 5. Rules and Policies

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

For personal use only

NOVEMBER January 2013

Challenges of Investing in Junior Mining Companies and. Sotkamo Silver

Executive Summary. It is considered unlikely that, in Mineral Reserve estimation, one individual will have the requisite skills or experience to

Shaw River Manganese Ltd January 2012 Update. Vincent Algar - Managing Director

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

For personal use only. MRV Metals Launch February 2016

September 2015 Quarterly Activities Report

Investing in an Underground Coal Mine in Indonesia

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Five targets advanced to drill-ready stage ahead of drilling anticipated to commence during the September 2013 Quarter.

Report for the Quarter Ended 30 September 2015

Corporate Presentation October 2015

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

Transcription:

25 January 2016 Shanta Gold Limited ( Shanta Gold or the Company ) New Luika Gold Mine, Elizabeth Hill Reserve and Resource Update Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to provide an update from its ongoing resource development programme within and surrounding its flagship asset, the New Luika Gold Mine ( NLGM or the Mine ) located in the Lupa Goldfield in southwest Tanzania. The Elizabeth Hill Prospect ( Elizabeth Hill or the Prospect ) is located approximately 3 kilometres east of the Mine s 600,000 tonnes per annum central processing facility. The Prospect is one of the satellite deposits which comprise the focus of Shanta s resource development programme within and surrounding the NLGM licence. Elizabeth Hill Reserve Highlights: Elizabeth Hill Reserve increased from 70,000 tonnes @ 2.3 g/t for 5,000 oz already included in Base Case Mine Plan (or the Plan ) to 667,000 tonnes @ 1.33 g/t for 28,000 oz; 17 per cent. increase in the total surface mineable ounces contained in the Base Case Mine Plan (133,000 oz to 156,000 oz); and Tonnage exceeds the 362,000 tonnes unutilised mill capacity referenced in the first five years of the Plan, and also provides an additional six months plant feed on a 100 per cent. basis. Elizabeth Hill Resource Highlights: Improved definition of near surface resources including a northern splay, previously classed as an Inferred Resource; Indicated Resources 1 of 1.06 million tonnes ( Mt ) at 1.8 grams per tonne ( g/t ) for 61,000 ounces ( oz ) which: o Represents an increase of over 100 per cent. since the September 2014 resource statement 2 (61,000 oz up from 29,000 oz); o Comprise over 52 per cent. of the Total Resources (previously 33 per cent.); and Total Resources have increased 32 per cent. to 116,000 oz (previously 88,000 oz). 1 2016 Indicated resources based on a 1g/t cut off and gold price $1,200/oz 2 2014 Indicated resources based on a 1g/t cut off and gold price $1,300/oz Toby Bradbury, Chief Executive Officer, commented: Shanta has continued to upgrade and extend the NLGM resource base since the resource and reserves updates provided in July and September, 2015. The results from the Elizabeth Hill Prospect upgrade studies to date demonstrate the uncapped potential value still to be realised from the NLGM licence, through a systematic uplift of our understanding of

resources that had not previously been fully explored. These resources offer significant realisable value in that they sit within the existing mining licence with a proven and highly efficient process plant. This resource and reserve update delivers incremental value to the Base Case Mine Plan, filling the vacant plant capacity and extending mine life. The considerable uplift in Indicated Resources since 2014 also demonstrates the greater optionality NLGM offers during future operation. Additional resources that still sit outside the Mine Plan, including 90,000oz of Inferred Resource at Bauhinia Creek, provide potential to further extend mine life. All resources at NLGM remain open at depth. We anticipate continual updates to resources, adding them into the Mine Plan over the course of 2016. Enquiries: Shanta Gold Limited Toby Bradbury (CEO) +255 22 2925148-50 Eric Zurrin (CFO) +255 22 2925148-50 Nominated Adviser and Broker Peel Hunt LLP Matthew Armitt / Ross Allister + 44 (0)20 7418 8900 Financial Public Relations Tavistock Emily Fenton / Nuala Gallagher +44 (0)20 7920 3150 About Shanta Gold Shanta Gold is an East Africa-focused gold producer, developer and explorer. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties in the country. Shanta s flagship New Luika Gold Mine commenced production in 2012 and produced 81,873 ounces in 2015. The Company is admitted to trading on London s AIM and has approximately 469 million shares in issue. For further information please visit: www.shantagold.com.

Elizabeth Hill Resource Update Table 1: Elizabeth Hill In situ Resource 2015 - Fresh Rock Density: 2.75 grams per cm³ depleted to LiDAR topographical surface.. Main Body Northern Splay Total Indicated Indicated Indicated Cut Off Tonnes Grade Ounces Cut Off Tonnes Grade Ounces Cut Off Tonnes Grade Ounces g/t Mt g/t Koz g/t Mt g/t Koz g/t Mt g/t Koz 0.0 4.66 0.7 104 0.0 0.19 1.5 9 0.0 4.85 0.7 113 0.5 2.38 1.1 85 0.5 0.14 2.0 9 0.5 2.52 1.2 94 1.0 0.95 1.7 52 1.0 0.11 2.4 8 1.0 1.06 1.8 61 1.5 0.49 2.2 34 1.5 0.08 2.8 7 1.5 0.56 2.3 41 2.0 0.26 2.6 22 2.0 0.06 3.1 6 2.0 0.31 2.7 27 Inferred Inferred Inferred Cut Off Tonnes Grade Ounces Cut Off Tonnes Grade Ounces Cut Off Tonnes Grade Ounces g/t Mt g/t Koz g/t Mt g/t Koz g/t Mt g/t Koz 0.0 4.33 0.6 88 0.0 1.29 1.1 46 0.0 5.61 0.7 135 0.5 2.84 0.8 73 0.5 1.24 1.1 46 0.5 4.09 0.9 118 1.0 0.47 1.4 21 1.0 0.78 1.4 35 1.0 1.25 1.4 56 1.5 0.13 1.8 7 1.5 0.16 2.2 11 1.5 0.28 2.0 19 2.0 0.03 2.2 2 2.0 0.08 2.7 7 2.0 0.10 2.6 8 Total Total Total Cut Off Tonnes Grade Ounces Cut Off Tonnes Grade Ounces Cut Off Tonnes Grade Ounces g/t Mt g/t Koz g/t Mt g/t Koz g/t Mt g/t Koz 0.0 8.99 0.7 192 0.0 1.48 1.2 55 0.0 10.47 0.7 248

0.5 5.22 0.9 158 0.5 1.38 1.2 54 0.5 6.61 1.0 212 1.0 1.43 1.6 73 1.0 0.89 1.5 43 1.0 2.31 1.6 116 1.5 0.61 2.1 42 1.5 0.23 2.4 18 1.5 0.85 2.2 60 2.0 0.28 2.6 23 2.0 0.13 2.9 12 2.0 0.42 2.7 36 Competent Person Statement The technical information contained within this announcement has been reviewed and approved by Mr. David Briggs Pri.Sci.Nat. NHD Economic Geology, a Member of the South African Council for Natural Scientific Professionals (SACNASP Membership Number 400225/09), a 'Recognized Professional Organization' (RPO) included in a list that is posted on the ASX website from time to time. Mr. Briggs is a consultant to Shanta and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009. Elizabeth Hill Reserve Update The JORC (2012 Edition) compliant study supporting the Ore Reserve statement was completed by Philip van Vuuren, Shanta Gold s Consultant Mining Engineer. The JORC (2012 Edition) compliant January 2016 Mineral Resources estimate, summarised above, formed the basis of this Ore Reserve estimate. Ore Reserves were estimated with Micromine 2015, utilising the Lerchs-Grossman optimisation algorithm, using the current mining operation s cost structure and pit slopes defined in the geotechnical report by Middindi. Only Ore Reserves contained within the Measured and Indicated Resource category envelope have been used to determine these Reserves resulting in two economic pits. It is intended that the Ore Reserves from Elizabeth Hill will be utilised to augment the production from the other pits ensuring the beneficiation plant is run at full capacity. The current beneficiation plant capacity is 600,000 tons per annum. The updated Ore Reserve estimate is summarised below: In-situ Tonnes (Mt) January 2016 Ore Reserves for New Luika Gold Mine In-situ ROM Recoverable Grade Grade Reserve Ounces Tonnes Ounces (g/t) (g/t) (koz) (koz) (Mt) (koz) Elizabeth Hill 0.645 1.46 30 0.667 1.33 28 26 Total Probable Ore Reserves for Elizabeth Hill 0.645 1.46 30 0.667 1.33 28 26 The following key technical parameters were used in the determination of the Ore Reserve: Parameter Units Value

Gold Price US$ per ounce 1,200 Overall Pit Wall Slope Degrees 42 Mining Dilution Added % 10 Mining Recovery % 94 Plant Recovery % 91 Royalty Payment % 5 Note: 1) Projected poor hanging wall conditions resulted in this lower than normal average pit slope Based on the above parameters, the economic cut-off grade is 0.94g/t and the average cash cost inclusive of royalties is USD 1,094 per ounce. The reported Ore Reserves have been compiled by Mr. Philip van Vuuren BSc (Min) Eng, BComm (UNISA) is a member of the SAIMM (member number 20424) and ECSA (member number 865248) and is an Independent Consulting Mining Engineer. He has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking, to qualify as a Competent Person as defined in the Australasian Code for Reporting of Mineral Resources and Ore Reserves of December 2012 ( JORC Code ) as prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Geoscientists and the Minerals Council of Australia. Mr. van Vuuren gives Shanta Gold Limited consent to use this reserve estimate in reports. Glossary of Terms g/t Mineral Resource Indicated Mineral Resource Inferred Resource Mineral Grams per metric tonne. The unit of measurement of metal content or grade, equivalent to parts per million. A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth s crust in such form, grade (or quality), and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade (or quality), continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories. An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade (or quality), densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes, and is sufficient to assume geological and grade (or quality) continuity between points of observation where data and samples are gathered. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Ore Reserve. An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade (or quality) are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade (or quality) continuity. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations

In-Situ JORC Code Koz Mt Ore Reserve Probable Reserve Recoverable Ounces ROM Ore such as outcrops, trenches, pits, workings and drill holes. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to an Ore Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. In its natural position or place. The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code or the Code ) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves. The Joint Ore Reserves Committee ( JORC ) was established in 1971 and published several reports containing recommendations on the classification and Public Reporting of Ore Reserves prior to the release of the first edition of the JORC Code in 1989. Revised and updated editions of the Code were issued in 1992, 1996, 1999, and 2004. The 2012 edition supersedes all previous editions. One thousand Troy ounces. All references to ounces are Troy ounces with the conversion factor being 31.1034768 metric grams per Troy ounce One million metric tonnes An Ore Reserve is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. A Probable Ore Reserve is the economically mineable part of an Indicated, and in some circumstances, a Measured Mineral Resource. The confidence in the Modifying Factors applying to a Probable Ore Reserve is lower than that applying to a Proved Ore Reserve. That portion of the metal contained within the ore that can be recovered through metallurgical processing Mined ore that can be processed by the recovery plant Appendix 1 Summary of Resource Estimation Parameters The Mineral Resource estimate for the Elizabeth Hill was completed by Mr. David Briggs in November 2015. Totals have been rounded to reflect uncertainty in accordance with JORC guidelines for mineral resource estimation from actual derived results and some rounding errors may occur when multiplying summary table figures Block modelling and resource estimation has been completed using CAE Studio with wireframe models of mineralised domains created within Micromine Data supporting the resource estimate has been audited by an external consultant who concluded that sufficient QAQC and data validation has been undertaken to support a resource estimate of this nature The primary data was used to define the extents of the mineralised envelope while 1m down-hole composites were used for statistical analysis, variography and resource estimation High value outliers were capped where deemed appropriate

Resource estimation was completed using Ordinary Kriging for all domains with nugget and sills based on statistical analysis and variography of the identified mineralised domains. Search ellipses were orientated to reflect the geometry of the mineralised structures. A global bulk density was used based on a weighted average of ore intersections which was modified near surface to reflect unquantified artisanal workings The model was validated visually, by comparison to previous estimates, comparison of model and composite statistics and by swath plots for each prospect Resource classification was based on geological confidence and on quality of estimate determined by factors such as proximity to informing data, sample spacing, number of informing data, number of informing holes Indicated Resources are predominantly interpolated between known data whilst Inferred Resources can be extrapolated beyond known data Reported ounces represent estimated gold content contained in the tonnes of material in situ net of any mining. Mining recovery, dilution and plant recovery factors have not been applied in the contained ounces calculation