SUBCONTRACTOR SAFETY REQUIREMENTS Pre-Mobilization/Pre-Construction Meeting Safety Checklist

Similar documents
Safety Resources from

Contractor Safety Program Office of Environmental Health and Safety University of Toronto

Temporary Electrician Helper Steps into Unguarded Elevator Shaft and Dies

CITY OF AUSTIN ROCIP PROJECT SAFETY MANUAL

OSHA Compliance Checklist ASC

Policy ALCOHOL AND DRUG BRI-HS-PI-00002

PDCA SAFETY ACHIEVEMENT AWARD PROGRAM OFFICIAL ENTRY FORM

Site Specific Safety Plan

APPENDIX C EHS CONTRACTOR QUALIFICATION QUESTIONNAIRE

tips How smallchangescan saveyou big, &

IMPROVEMENTS PROGRAM

UNION PACIFIC RAILROAD COMPANY. Contractor Minimum Safety Requirements

Independent Contractor Policy

Rev. No. Initial Issue Safety Procedure Page No. i SHP 3.12 JOB BRIEFING Date: 06/04/03

Sample Hazard Communications Program for Spray Polyurethane Foam Applications

Management Leadership and Organizational Commitment

Safety and Environmental Information for External Companies

WEEKLY SAFETY MEETING All Euramax Subsidiaries MATERIAL SAFETY DATA SHEETS (MSDS) Safety Meeting Contents. Meeting Notice.

Contractor Environment, Health and Safety Management Plan

Model Safety Program

Office of Research Facilities Development and Operations Contractor Safety Policy

Temporary Worker Safety Checklist

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

SR CONSTRUCTION 3579 Red Rock Street Las Vegas, Nevada 89103

Drug and Alcohol Policy

INTRODUCTION TO OSHA PRESENTATION

Health and safety policy

Business & Legal Reports (BLR) Training. Workplace Safety Online Courses. Accident Investigations. Aerial Lift Safety

EMPLOYMENT APPLICATION Are you 18 years or older? Yes No

Copyright 2012, General Dynamics Information Technology. All Rights Reserved.

City of Belmont Contractor Induction Program

SAFETY MANUAL LANGSTON UNIVERSITY OFFICE OF HUMAN RESOURCES

Safety and Environmental Information for External Companies

Mobile Equipment Service. Scope of Work

(Company Name) CORPORATE SAFETY AND HEALTH PROGRAM

ISHMS Post Test Answer Key

Site Induction Presentation

Gulf of Mexico Safe Work Practices

O Brien House Community Service Worker s Packet

Shawmut Design and Construction

Contractor Name: Foremen/Superintendent on-site: phone: 24 Hr Phone# Project Address: Floor(s)

General Compliance and Best Practices. HR Audit Worksheet

SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

Safety and Environmental Information for External Companies Koehler Oberkirch

Division of Public Health Administrative Manual

Division of Administration and Finance Planning + Design + Construction PO Box Cincinnati, Ohio

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

Contractor Safety Management

Classification: SAFETY PROGRAM. Accountabilities

Odyssey Charter School, Inc. Uniform Policy

Project Health, Safety, and Environment Plan. Interior Heart and Surgical Center Project Number:

Safe Driver. Information Sheet

Skanska Sweden s General Conduct and Safety Rules. Content

Workplace Injury & Illness Prevention Program

APPLICATION FOR EMPLOYMENT

APPENDIX A AURA SAFETY AND HEALTH QUESTIONNAIRE FOR BIDDERS

Health and Safety at Work Policy

DRUG AND ALCOHOL POLICY AND PROGRAM

2. Permit to Establish or Alter a Memorial or Place of Interment

Pinner Construction Company, Inc. SUBCONTRACTOR PREQUALIFICATION QUESTIONNAIRE

810. Health and Safety Policy

CHAGUARAMAS TERMINALS LTD.

Annex 2 to the Memorandum of Understanding of the One Safety Project. Handbook for the subscription of contractors to the One Safety Project

ENVIRONMENT, HEALTH & SAFETY

How To Prevent An Accident From Happening

Guidelines for Aerial Teacher Training Programs

PHENIX OF IDAHO, INC. SUBCONTRACTOR QUALITY ASSURANCE PLAN

A Case Study: Best Practices to Ensure Safety on a Construction Project

SUB-CONTRACTOR/VENDOR PRE-QUALIFICATION QUESTIONNAIRE

GHD EPCM Standard operating procedure Working at height May 2013 v1

New and Living Way Bible Church Transportation Policies and Procedures

INDEPENDENT SCHOOL DISTRICT 199 Inver Grove Heights Community Schools th Street East Inver Grove Heights, Minnesota HEALTH AND SAFETY

Construction Safety Policy

Workers Compensation Incident / Accident Investigation Narrative Home Health Care

Policy Statement Regarding an Alcohol and Drug-Free Workplace

Construction Safety Manual

The Contractor EHS Management Process

Excavation & Trenching Procedure

Accident, Injury & Illness Program Training

Substance Abuse Prevention Program

Revision: 5. Category: Contract Management CONTENTS

Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2.

SUPPLY CHAIN PREQUALIFICATION PACKAGE

SCHOOL DISTRICTS ONLINE COURSE CATALOG. TargetSolutions

Injury Prevention for the Construction Industry

Safety Programs and Policies

TOTAL SAFETY PERFORMANCE COURSE CONTENTS

ARTICLE IV: Transportation

PCMH DRESS CODE: MINIMUM STANDARDS OF PROFESSIONAL DRESS AND APPEARANCE

COLLEGE STUDENT SUMMER PROGRAM APPLICATION Age: Date of Birth:

Operation of Fork Lift Trucks Procedure

Health & Safety Policy For Locations Hosting Film Production Companies

KENTUCKY FINANCE AND ADMINISTRATION CABINET. Guide for Drivers of the Commonw ealt h s Vehicles

MEMORANDUM. Employees. Human Resources AGENCY DRUG-FREE WORKPLACE POLICY

Eskom Life Saving Rules Implementation of the Eskom Life Saving Rules

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

CONTRACTOR SAFETY QUALIFICATION PACKET

1.0 HSE Management: Policy and Plan

Transcription:

Project Name: Date of Meeting: Name of Subcontractor: Meeting Location: Scope of Work: ATTENDANCE NAME COMPANY ** All of the following items must be reviewed and accepted by Bayley s Project Management Team before the subcontractor is allowed to start work. At a minimum, the subcontractor s representatives at this meeting must include their Project Manager, designated on-site Safety Coordinator and Supervisor/Foreman.

ITEMS OF DISCUSSION 1. Has Subcontractor submitted a Site-Specific Safety Manual/Plan? Does it include: a. Job Hazard Analysis(s) for each/every phase of work for this project? Name of person who will be meeting to review JHA s w/ Bayley? b. A Site-Specific Fall Protection Plan? c. Procedures for their employees to report all injuries, unsafe conditions and property damage? d. A Drug Free Workplace Policy, which states it, is against policy for their employees to use illegal substances and/or alcohol. The use of alcohol, illegal drugs, and/or other unauthorized substances on Bayley Construction project property is strictly prohibited. e. Housekeeping procedures and policies? f. The name of their on-site designated Safety Coordinator? g. The name of their on-site Competent Person? h. The name of the person who will conduct weekly safety audits? i. The name of their on-site First-aid/CPR trained personnel? j. Emergency Response Plans/Procedures for medical, natural, fires/explosions situations? k. Training cards for fork/aerial lifts, scaffold users, and others required by OSHA? l. A written Hazard Communication Program? m. Are the Material Safety Data Sheets (MSDS s) project specific?

2. Will Subcontractor conduct their own weekly tool box safety meetings? If, then all personnel must attend and sign in at Bayley Construction s weekly safety meetings. These meetings are held on: Day Location Time If YES, then Subcontractor s On-site Safety Coordinator must attend and sign-in at Bayley s weekly meetings. ALL information at Bayley s meeting must be communicated to Subcontractor s employees. Subcontractors meeting will be held: Day Location Time Subcontractor s meeting minutes must be submitted to Bayley within three days. 3. Has subcontractor been issued Bayley s Project Orientation and Procedures Manual? Project hardhat stickers?

4. All Sub-tier contractors must comply with all applicable provisions of OSHA and Bayley Safety Policies. How will Subcontractor communicate safety program requirements to their subcontractor(s) and submit their site-specific safety plan(s) to Bayley? 5. How will subcontractor effectively enforce all project safety regulations/policies? 6. Medical Information: First aid is available at: Non-Serious medical care is available at: Emergency Treatment is located at:

7. All Project personnel will abide by OSHA standards for work attire and boots. In addition: a. BAYLEY REQUIRES 100% HARD HAT AND 100% EYE PROTECTION AT ALL TIMES! b. Tennis Shoes and Radios are not allowed at any time. c. Hard hats and seat belts must be worn while operating all mechanized equipment. d. How will Subcontractor communicate these policies to their employees? 8. List follow-up items from this meeting that will be required prior to mobilization. cc: Subcontractor Attendees Construction Manager Project Manager Jobfile